Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
08-79 RESOLUTION
• • RESOLUTION NO. -en A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A CONTRACT WITH HECKATHORN CONSTRUCTION COMPANY FOR AN ADDITION TO THE FAYETTEVILLE YOUTH CENTER. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized and directed to execute a contract with Heckathorn Construction Company for an addition to the Fayetteville Youth Center. A copy of said contract marked Exhibit "A" is attached hereto and made a part hereof. / %� PASSED AND APPROVED this d day of al , 1979. APPROVED: ATTEST: Gr fafi viztcaerfii MAYOR micROfll1k•t, yq�9 DAtE� REEL • T THE AMERICAN INSTITUTE OF ARCHITECTS Stan AIA Document ATOT and Form f Agreement Between Owner an Contract r where the basis of payment is a STIPULATED SUM 1977 EDITION THIS DOCUMENT HAS IMPORTANT LEGAL CONSrQUENCES; CONSULTATION WITH AN ATTORNEY I5 ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION Use only with the 1976 Edition of AIA Document A201, General Conditions of the Contract for Construction. This document has been approved and endorsed by The Associated General Contractors of America. AGREEMENT made as of the FOURTEENTH (14) day of FEBRUARY Hundred and SEVENTY-NINE (1979) BETWEEN the Owner: and the Contractor: The Project: The Architect: CITY OF FAYETTEVILLE POST OFFICE DRAWER F FAYETTEVILLE, ARKANSAS 72701 in the year of Nineteen HECKATHORN CONSTRUCTION COMPANY, INC. 2401 NORTH GREGG FAYETTEVILLE, ARKANSAS 72701 AN ADDITION TO FAYETTEVILLE BOYS CLUB AND YOUTH CENTER 915 CALIFORNIA DRIVE FAYETTEVILLE, ARKANSAS 72701 A JOINT VENTURE FLETCHER, MILLER, DEAN AND ASSOCIATES, INC. LITTLE ROCK, ARKANSAS McCLELLAND CONSULTING ENGINEERS, INC., FAYETTEVILLE, AR The Owner and the Contractor agree as set forth below. Copyright 1915, 1919, 1925, 1937, 1951, 19511, 1961, 1961, 1167, 197.1, 0 1977 by Ihr American Institute of Architects, 1735 New York AYenrle, N.W., Washington, D. C. 20006. KrpIMIIIC inn of the material herein or substantial quotation of its provisions without Permission of Ihr AIA violates the copyright lags of the United Stats amt will be subject In legal prosecution. AIA DOCUMENT A101 • OWNER -CONTRACTOR AGREEMENT • EI.EVENTI. EDITION • JU1NE 1977 • AIA® 01977 • THE A,\IERICAN INSTITUTE OF ARCHITECTS, 1:15 NEW YORK AVE., N.W., WASHINGTON, D. C. 20006 A101-1977 1 • ARTICLE 1 THE CONTRACT DOCUMENTS 7 The Contract Documents consist of this Agreement, the Conditions of the Contract (General, Supplementary and other Conditions), the Drawings, the Specifications, all Addenda issued prior to and all Modifications issued after exe- cution of Ibis Agreement. These form the Cuntracl, and all are as fully a part of the Contract as if attached lo this Agreement or repeated herein. An enumeration of the Contract Documents appears in Article 7. ARTICLE 2 THE WORK The Contractor shall perform all the Work required by the Contract Documents for Construction of a ttlere insert the caption descriptive of the Work as used on other Contract Documenls.l gymnasium, upper level dressing rooms, lower level weight room, and connecting lobby with concessions, for the Fayetteville Boys Club and Youth Center. The new addition will consist of open web steel joist with concrete block and brick wall construction. The spaces include one gymnasium, a weight room at the gym level, two dressing rooms, a concession area and storage areas. ARTICLE 3 TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION The Work to be performed under this Contract shall he commenced on date specified in written "Notice to Proceed" and, subject to authorized adjustments, Substantial Completion shall be achieved not later than 300 consecutive days thereafter. (Llai hoot; :cop'mural Pr, -mons lot liquidated damages relating 10 failure 10 c mplNr 011 li1111•.1 AIA DOCUMENT A101 • OWNER -CONTRACTOR AGREEMENT • ELEVENTH EDITION • JUNE 1977 • AIA' ©1977 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D. C. 20006 A101-1977 2 ARTICLE 4 CONTRACT SUM The Owner shall pay the Contractor in current funds for the performance of the Work, subject to additions and deductions by Change Order as provided in the Contract Documents, the Contract Surn of Five Hundred Sixty -Four Thousand Six Hundred Twenty -Two and No/100 - - -Dollars ($564,622.00) The Contract Sum is determined as follows: (Stale here the base bid or other lung: ..um amuum. accepted alternates, and unit prices, as applicable.) Base Bid $669,600.00 Deductive Alternate #1 $ 85,100.00 Deduct negotiated changes as follows: (1) Provide latex paint in lieu of epoxy above 8 ft. height in gymnasium area. (2) Delete fire alarm system and detectors. (3) Delete storm drainage piping at west side of building. (4) Delete scoreboard in gymnasium. Rough in conduit. (5) Delete removal of existing chain link fence and basketball goals. (6) Delete cavity fill between block and brick masonry wall construction. (7) Change gymnasium HVAC to six unit heaters and two ventilators as negotiated. Leave two fresh air intakes with motorized dampers. (8) High pressure gas to be regulated toCl 5 pressure at units or exterior walls. ARTNegotiated Deduct. $ 19,878.00 PROGRESS PAYMENTS Contract Amt. $564,622.00 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as pro- vided in the Contract Documents for the period ending the Last - day of the month as follows: Not later than TEN (10) days following the end of the period covered by the Application for Payment Ninety percent ( 90 "/n) of the portion of the Contract Sum properly allocable to labor, materials and equipment incorporated in the Work and Ninety percent (90 %) of the portion of the Contract Sum properly allocable to materials and equipment suitably stored at the site or at some other location agreed upon in writing, for the period covered by the Application for Payment, less the aggregate of previous payments made by the Owner; and upon Substantial Completion of the entire Work, a suns sufficient to increase the total payments to Ninety-five percent ( 95 ^b,) of the Contract Sum, Tess such amounts'as the Architect shall determine for all incomplete Work and unsettled claims as provided in the Contract Documents. (11 not covered elsewhere in the Contract Documents, herr insert any provision Tor limiting or reducing the amount retained alter the Work reaches a certain stage of completion.) When fifty percent (50%) of the project has been completed, the retainage may be reduced to five percent (5%). Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at the rate entered below, or in the absence thereof, at the legal rate prevailing at the place of the Project. IDere imrrl any rate of interest agreed upon.) l/suq'laws and requirement' under the federal Truth in tonding Act, similar slit' .tnd Inca! 1nnm:rner credit laws and other regulations al the Owner's and Contractor's principal places of hu,lnrss. the location of the ;bofrct and chew/tete may affect der validity of this Provision. Specific !'gal advice should be obtained with respect :0 deletion. modification. or other requirements such ,n uviIb•n dnc.10,11(s or nvivrn.) AIA DOCUMENT 4101 • OWNER -CONTRACTOR AGREE.MIIN I • O.EVI:NTII EDITION • JUNE 1977 • AIAO 01977 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D. C. 20006 A101-1977 3 • ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be paid by the Owner to the Contractor when the Work has been completed, the Contract fully performed, and a final Certificate for Payment has been issued by the Architect. ARTICLE 7 MISCELLANEOUS PROVISIONS 7.1 Terms used in this Agreement which are defined in the Conditions of the Contract shall have the meanings designated in those Conditions. 7.2 The Contract Documents, which constitute the entire agreement between the Owner and the Contractor, are listed in Article 1 and, except for Modifications issued after execution of this Agreement, are enumerated as follows: (List below the Agreement, the Condition or the Contract (General, Supplementary, and other Conditions), the Drawings, the Specifications, and any Addenda and accepted alternates, shmving page or sheet numbers in all cases and dates where applicable.l ITEM 1: ITEM 2: ITEM 3: ITEM 4: ITEM 5: ITEM 6:. ITEM 7: ITEM 8: A.I.A. Document A101 (This document) dated: February 14, 1979, standard form of agreement between Owner and Contractor (stipulated sum) A.I.A. Document A201, General Conditions of contract for construction, 1976 edition. Supplementary General Conditions, Specifications, 10 pages. Supplementary Mechanical and Electrical General Conditions, Specifications, 12 pages. Drawings, dated September 20, 1978. Cover Sheet Al thru A9 Spl Sl thru S6 MEP1 M1 & M2 Architectural Site Plan Structural Utility Site Plan .Mechanical El thru E4 Electrical P1 & P2 Plumbing Specifications, dated September 20, 1978, titled: An Addition to Fayetteville Boys Club and Youth Center. Addendum No. 1, dated September 28, 1978. Addnedum No. 2, dated November 6, 1978. ARTICLE 8 PAYMENT OF PREVAILING WAGE RATES Not less than the prevailing hourly rate of wages as found by the Arkansas Department of Labor or determined by the Court on appeal shall be paid to all workmen performing work under the oontract. There may be withheld from the Contractor so much of the accrued payments, as may be considered necessary by the Owner to pay to laborers and mechanics employed by the Contractor. or any subcontractor, if any, of the work, the difference between the rates of wages required by the contract to be paid to laborers and mechanics on the work and the rates of wages received by such laborers and mechanics and not refunded to the Contractor, subcontractor -or their agents. This Agreement entered into as of the day and year first written above. OWNER CITY OF FAYETTEVILLE POST OFFICE DRAWER F CONTRACTOR HECKATHORN CONSTRUCTION CO .INC.r . • 2401 NORTH GREGG : nab 1, • FAYETTEVILLE 32701 5"1701 S , ARKANSAS 0 LE, ARKANSAS Cl v- ❑_ // \• Vn2-svC7:e t•CgY J :fre • 6Y •'-y. ('TTV CLERK.: tAIA•,DOCUAtENT, AIQ- C AGREEMENT ELEVENTH EDITION • )UNE 1977 f ©1977 r."'THE AMERICAN INSTITUTE OF ARCHITECTS, 173S NEW YORK AVE., N.W., WASHINGTON, D. e- •-• •' '?1•MAYOR'"r C a. 2'. Rattick. ER -CONTRA 'TOR ART FAY TTE�JVIIILL �� 1, Cr;•1171.1 ;CV. CC` ee • AIA C. 20006 A101-1977 4 • SEPTEMBER 28 , 1978 ADDENDUM NO. 1 AN ADDITION TO FAYETTEVILLE BOYS CLUB AND YOUTH CENTER FAYETTEVILLE, ARKANSAS A Joint Venture FLETCHER, MILLER, DEAN AND ASSOCIATES, INC. LITTLE ROCK, ARKANSAS McCLELLAND CONSULTING ENGINEERS, INC. FAYETTEVILLE, ARKANSAS TO ALL BIDDERS: The following changes, clarifications and amplifications of plans and specifications shall be goverened by the same General Conditions, Supple- mentary General Conditions, and Supplementary Mechanical and Electrical General Conditions as the original contract documents. Where changes are required by this addendum, they shall nulify any conflicting specifications as may be affected: ARCHITECTURAL ITEM N0. 1 Refer to the "Bid for Stipulated Sum Agreement" change the sentence: "It is also agreed that his bid may not be withdrawn for a period of thirty (30) days from the opening of the Bids", to read: "It is also agreed that this Bid may not be withdrawnfor a period of sixty (60) days from the opening of the Bids." ITEM NO. 2 Refer to the Supplementary General Conditions, and insert the following page to complete Section No. 5, Seperate Contracts:, and Section No. 6, Bond and • Insurance: c. The Contractor shall not endanger any work by cutting, digging or otherwise and shall not cut or alter the work of any other contractor save with the consent of the Architect. d. Each section of the specifications describes the cutting, patching digging, required for the work under that section as may be required for the proper accomodation of work of other trades. This does not relieve the general contractor from responsibility described above. Execute work with competent workmen who are skilled in trade required. e. The Contractor shall also do demolition and cutting and parching of existing work required to accommodate new work unless otherwise specified. 6. BOND AND INSURANCE: a. Performance and Payment Bond...The Owner will require the Contractor to furnish bond of 100% of the amount of the contract price, covering faithful perforamnce of the contract and the payment of all obligations arising thereunder in such a form as the Owner may prescribe and with such securities as he may approve. The bond guaranteeing the performance of this contract shall be given in compliance with the laws of the State of Arkansas. The Contractor shall furnish a bond with an approved surety company authorized to do business in the State of Arkansas. Incorporated in the bonds must be the following:"This bond is given in compliance with Act 351 of the Acts of 1953 of the State of Arkansas", and the provisions of said Act are incorporated herein. The bond shall be written in favor of the Owner. After approval by the Architect, the Contractor shall file the bonds with the Circuit Clerk and Recorder of the county in which the work to be performed is located. Contractor shall obtain from the circuit clerk certificates as evidence that the bonds have been approved and filed with the clerk and said certificates shall be filed with the Architect. The premium for the required bond shall be paid by the Contractor. The obtaining by the Contractor of the bond shall be a condition precedent to the effectuation of the contract between Owner and Contractor. The Contractor shall include in his contract sum, all roualties and costs arising from the use of patented materials or methods and the Contractor shall pay all such costs. Insurance...(Minimum limits.required). The Contractor shall not commence work under this contract or allow any subcontractor to commence work until he has obtained all the insurance required under" ITEM NO. 3 Refer to the Supplementary General Conditions, Section No. 6b., Item No. 5, "Owner's Protective Liability Insurance", and change the name of the Additional insured from "A Joint Venture" to "Fletcher, Miller, Dean and Associates, Inc., Little Rock, Arkansas, and McClelland Consulting Engineers, Inc., Fayetteville, Arkansas." ITEM N0. 4 Division 10, Specialties 333, 9" x (" matte Black permanent faces. Section 1040, Identifying, B. Materials: Change "Series to read: "Series 337, 6" x 6" matte black". Provide MECHANICAL PLUMBING 1. Section 15005.1 (Service Connections): Change the word "quthorities" to "authorities"." 2. Section 15007.2 (Hot and Cold Water Piping): Change the word "facticated" to "fabricated.-" 3. Section•15026.1 (Sterilization): Change the word "chloring" to "chlorine." 4.. Section 15029.2 (Testing and Adjusting): Change the word "per.od" to "period." HEATING, VENTILATING AND AIR CONDITIONING 1. Section 15517 (Fire and Smoke Dampers): Delete section 15517 in its entirety. 2. Section 15526 (Gas, Feed -water and Drain Connections): Delete Section 15526.2 in its entirety. 3. Section 15529.1.4 (Ductwork): Change the word "sucured" to "secured." . 4. Section 15551.1.3 (Duct Furnace): Delete existing line in its entirety and replace with: "Controls: Manufacturer shall supply a modulating valvewith the duct furnace (see Section. 15551.9.5)." 5. Section 15551.1.4 (Duct Furnace): Change the word "un-ercoating" to "undercoating." 6. Section 15551.2.5 (AC Unit 1): Change the word "combiantion" to "combination." 7. Section 15551.2.11 (AC Unit 1): Change the word "Bombustion" to "Combustion." B. Section 15551.2.20 (AC Unit 1): Delete the word "sahll." 9. Section 15551.6.3 (Roof Mounted Relief Vent): Change the word "mechinical" to "mechanical." 10. Section 15551.9.2 (Heating and Ventilating Unit Automatic Temperature Controls): Delete the existing paragraph in its entirety and replace with: "All mounting, conduit, wire , and terminal connectors for all voltage less than 120 V. shall be the responsibility of the mechanical contractor and shallbe installed by the control subcontractor." 11. Section 15551.9.3 (Heating and Ventilating Unit Automatic Temperature Controls): Delete "for installation by the electrical contractor. 12. Section 15551.10.1 (Heating and Ventilating UnitsFilters): Change the word "Fan -Type" to "Farr Type." 13. Section 15551.10.4 (Heating and Ventilating Units Filters): 'Change the word "fan" to "Farr." 14. Section 15551.5.4 (Roof Mounted Exhaust Fans): 'Add the following to. the existing sentence: "and backdraft dampers." PLUMBING y 1. Section 15032 (Expansion Tank): Provide and install an ASME Design and Constructed Expansion Tank as shown on drawings. The tank shall have pre - charged air chamber with heavy duty diaphram and shallhave a minimum acceptance volume of 2.5 GA1. and a minimum total volume of 4.7 Gal. Expansion tank shall be Amtrol Model AST -12 or equivalent. Please acknowledge receipt of Addendum No. 1 by signing the copy of this notice and returning it to, McClelland Consulting Engineers, P.O. Box 151, Fayetteville, Arkansas 72701 November 6, 1978 ADDENDUM NUMBER 2 MnV• 7 :.978 - AN ADDITION TO THE FAYETTEVILLE BOYS CLUB AND YOUTH CENTER FAYETTEVILLE, ARKANSAS A JOINT VENTURE FLETCHER, MILLER, DEAN AND ASSOCIATES, INC. LITTLE ROCK, ARKANSAS McCLELLAND CONSULTING ENGINEERS, INC. FAYETTEVILLE, ARKANSAS • TO ALL BIDDERS: The following changes, clarifications and amplifications of plans and specifications shall be governed by the same General Conditions, Supplementary General Conditions, and Supplementary Mechanical and Electrical General Conditions as the original contract documents. Where changes are required by this addendum they shall nulify any con- flicting specifications as may be affected. ARCHITECTURAL ITEM NO. 1 Division 8: Doors, Windows and Glass, Section 0885, B2 Exterior glass: to read "Wireglass: '" clear wire glass in vision panels to existing gym and vision panels to existing gym and vision panels to handball courts". Glass at the west wall of lobby shall be 'a" clear temp. glass with the deletion of the handball courts. ITEM NO. 2 Division 8: Doors, Windows, and Glass Section 0885, B.3 Tempered glass: delete sentence, "use clear tempered wire glass as indicated on schedule". ITEM N0. 3 Division 8; Doors, Windows, and Glass Section 0885, B.4 Glass interior: To read "Float Glass: ;" clear float glass in exterior windows in new gymnasium. ITEM N0. 4 Division 8; Doors, Windows and Glass Section 0895, B. Materials 1: change 13/4" x 41/2" to read 1 3/4" x 41/2". P • • ITEM NO. 5 Division 9. Finishes, Section 0959, Resilient Wood Floor System, refer to C-1, to read, Concrete subfloor below grade shall have membrane vaporproofing consisting of a permantly bolded multi -ply coreboard with polyvinylchloride sheet suspended between two layers off pure blown high - melt -point asphalt, which is then sandwiched between layers of saturated kraft or felt and glass mat. Membrane to have a constant rate of water - vapor transmission not greater than 0.000 grains/per square foot per hour, certified as measured in accordance with ASTM test method E-96, both before and afer alternate cycles of wetting and drying. Membrane shall be installed under slab in the handball courts, all joints shall be made with material supplied for the purpose by the membrane manufacturer. Membrane material shall. be Premoulded Membrane Vapor Seal with Plasmatic Core as manufactured by W. R. Meadows, Inc., Elgin, Illinois. ITEM NO. 6 Division 9; Finishes, Section 0959, Resilient Wood Floor System, D4 wood flooring: to read "shall be 33/32" x 2-1/4" second and better, T & G and EM, northern hard maple flooring. Flooring isto be securely nailed to each permacusion sleeper. Flooring to be laid parallel to the long dimension of the room. . ITEM NO. 7 Division 11; Equipment, Section 1142, Food Service Equipment, 63. Rangehood shall be 18ga. Stainless steel in lieu of 18ga. Galv. Steel. ITEM NO. 8 Division 11; Equipment, Section 1150, gymnasium equipment, 62 -Basketball Backboards: shall be rectangular wood No. 401 provided with No. 25 H goal and net as manufactured by Aalco Manufacturing Company. ITEM NO. 9 Refer to architectural sheet A-9, window schedule 1,4,5. Glass to be ;" wireglass. Door schedule "A" to read: "1 3/4" styleas specified, alum. storefront with Duranondic Bronze finish and with 1" clear temp. glass". ITEM NO. 10 Louvers above Gymnasium Clerestory (refer to: Section 1, Sheet S-4) to be : "Ruskin" type ELF -375 extruded aluminum louvers with baked enamel finish of color to be selected by architect. flax static pressure drop to be .15" water gauge and 0 water penetration. Provide standard mullion design, bird screen and optional extended sill. sizes shall be as shown on plans. • • ITEM NO. 11 Refer to plumbing sheet P-1; add; Provide 3" from coke machine, American Standard Party Line No. 7050.016, 12" x 15" white cast iron sink with faucet No. 4146.015 Heritage Combination Kitchen Faucet -Bottom Mount -Less Spray - Aquaseal Valves - Renewable Seats - Cast Brass Lever Handles 8" Centers- Hydromold Swing Spout - Aerator - Inlets 1/2" male thread with coupling nuts - Chrome finish. Run z" insulated Ilot waterand cold water lines under slab and stub up under counter. Provide 3' sanitary sewer and tie into sewer shown on drawings. Please acknowledge receipt of addendum No. 2 by signing the copy of this notice and returning it to; McClelland Consulting Engineers, P. 0. Box 151, Fayetteville, Arkansas 72701 rte/ (Ns/au 7; /viol/slim/2e co,Ureo,c., 556-77o,V 077o ) ,84%,C .a/41i V52/L oa ri o./. ,GOCAT/O,v at" /,cvs/,/2-4770,c1 AS • sP€c/Tit o '0i el cc- • r I • • HP / Q tn 4,1 UJ Atal- 1 • • ‘,I 4 PP • ,.. ... 7 .1 171: _� it .. °; 3 I • • CHANGE ORDER AIA DOCUMENT G701 J e OWNER ARCHITECT CONTRACTOR FIELD OTHER • • PROJECT: (name, address) TO (Contractor) L_ An Addition to Fayetteville Boys Club and Youth Center 915 California Drive Fayetteville, Arkansas 72701 Heckathorn Construction Co. 2401 North Gregg Fayetteville, AR 72701 CHANGE ORDER NUMBER: 1 ARCHITECT'S PROJECT NO: 78-A-15 CONTRACT FOR: J CONTRACT DATE: You are directed to make the following changes in this Contract: 1. A. B. Feb. 14, 1979 Window No. 3 at control desk to be le wireglass with hollow metal frame. Four (4) sets of double doors marked "C'I from gymnasium to upper and lower corridors to be "A'I label flush panel door with rated frame. ADD $ 331.00 2. Revise contract sum to reflect the current Arkansas Prevailing Wage Determination Number 78-102, dated February 22, 1979, which is attached as part of this change order. DEDUCT TOTAL DEDUCTION $8,000.00 $7,669.00 The original Contract Sum was Net change by previous Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be (iii&I4N#>) (decreased)6614i#014 by this Change Order . The new Contract Sum including this Change Order will be The Contract Time will be (#414114.1) (dfdtir wuecr (unchanged) by The Date of Completion as of the date of this Change Order therefore is A Joint Venture Fletcher, Miller, Dean, L.R. Heckathorn Const. Co. ARCHITECT McClelland Consult. Address Engineers Fayetteville, AR CC)2v467tC rth Gregg Address Fayetteevillle, AR 72701 HY °'/• Asce-4/ 7, /77, DAlE /97 4/1 /9 $ 564,622.00 $ NONE $ 564,622.00 $ 7,669.00 $ 556,953.00 ( ) Days. City of Fayetteville T.Nia Drawer F Add rens - Fayetteville, AR 72701 DATI: ^ ` 6 - 7y AIA noCLMINI (:7111 • 1 IIAN(.1 111:D11). • AI9211 19/111111111 IPI • AIA''' • ! 19/11 • 1111. AMI'.RICAN INSI111)11 1)1 AR( 11111( IS, 171: NI W Y /1K AVI., NW, WASIIINI; InN, I).(. _'ullelp NI. I'ACI.