HomeMy WebLinkAbout08-78 RESOLUTION• RESOLUTION NO.3 %K • • A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT FOR SERVICES WITH McCLELLAND CONSULTING ENGINEERS, INC. FOR THE CONSTRUCTION OF A WATER TRANSMISSION LINE TO SERVE THE CITY OF WEST FORK, ARKANSAS. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk are hereby authorized to execute an agreement for engineering services with McClelland Consulting Engineers, Inc. for the construction of a water transmission line to serve the City of West Fork, Arkansas. A copy of said contract, marked Exhibit "A", is attached hereto and make a part hereof. PASSED AND APPROVED THIS 1 DAY OF FEBRUARY, 1978. ' 11." jos' . # / 71 3� j ,n .sc,ITY CLERK APPROVED: MAYOR MICROFILMED, DATE QCr „ u in REEL 1 �` 77'159 EXHIBITReS 6--/C3 AGREEMENT FOR ENGINEERING SERVICES THIS AGREEMENT, made this ✓J day of.:4u,/,tit�, 19/P , by and between the City of Fayetteville, Arkansas, hereinafter referred to as the OWNER, and McCLELLAND CONSULTING ENGINEERS, INC., Fayetteville, Arkansas, hereinafter referred to as the ENGINEER: The OWNER desires to construct a water transmission line from Greenland, Arkansas to the north limit of the service area of West Fork, Arkansas in Washington County, State of Arkansas, and the ENGINEER agrees to perform the professional engineering services required for same. WITNESSETH: That for and in consideration of the mutual covenants and agreements between the parties hereto, it is hereby agreed: SECTION A - ENGINEERING SERVICES That the ENGINEER shall .furnish basic engineering services as follows: 1. The ENGINEER will conduct preliminary investigations required to determine project feasibility. 2. The ENGINEER will prepare preliminary plans and cost estimate. 3. The ENGINEER will prepare an engineering report. 4. The ENGINEER will furnish copies of the preliminary engineering report, cost estimates, and layout maps to the OWNER, as requested. 5. The ENGINEER will attend conferences with the OWNER and other interested parties. 6. After the preliminary engineering report has been reviewed and the OWNER directs the ENGINEER to proceed, the ENGINEER will perform the necessary design surveys, accomplish the detailed design of the project, prepare detailed plans, specifications and contract documents, and make a full cost estimate based on the final design for the entire system. However, design surveys, as used in this Section A-6, are understood to be limited to those required to perform the design and to prepare the detailed plans and specifi- cations. MICROFILMT 3 WS DATE»� REEL�� 4 • • 7. Prior to the advertisement for bids, the ENGINEER will provide not to exceed 10 copies of detailed plans, specifications, and contract documents for use of the OWNER, and the appropriate Federal, State, and local agencies from whom approval of the project must be obtained. The cost of not to exceed 10 copies of such plans, specifications, and contract documents shall be included in the basic compensation paid to the ENGINEER. 8. The ENGINEER will furnish additional copies of plans, specifications and contract documents as required by prospective bidders, material suppliers, and other interested parties, but may charge for the actual cost of such copies. Upon award of each contract, the ENGINEER will furnish to the OWNER eight sets of plans, specifications, and contract documents for execution, the cost of these being included in the basic compensation paid to the ENGINEER. Original documents, survey notes, tracings, and the like, except those furnished to the ENGINEER by the OWNER, are and shall remain the property of the ENGINEER. 9. The plans prepared by the ENGINEER under the provisions of Section A-6 above shall be in sufficient detail to permit the actual location of the proposed improvements on the ground. The ENGINEER shall prepare, and furnish to the OWNER without any additional compensation, three copies of a map showing the needed construction easements and permanent easements, and the land to be acquired. Property surveys, property plats, legal descriptions, and negotia- tions for land rights shall be accomplished by the OWNER unless the OWNER requests the ENGINEER TO perform these services. In the event the ENGINEER is requested to perform such services, the ENGINEER shall be additionally compensated as set out in Sections C and D hereof. 10. The ENGINEER will attend the bid opening and tabulate the bid proposals, make an analysis of the bids, and make recommendations for awarding contracts for construction. 11. The ENGINEER will check and approve any necessary shop and working drawings furnished by contractors. 12. The ENGINEER will interpret the intent of the plans and specifications to protect the OWNER against defects and deficiencies in construction on°the part of the contractors. The ENGINEER will not, however, guarantee the performance by any contractor. 13. The ENGINEER will provide horizontal and vertical control for all structures and lines in the form of bench marks or reference points to be used by the contractor in staking the construction. 14. The ENGINEER will provide general engineering observation of the work of the contractors as construction progresses. 15. The ENGINEER will review and approve estimates for progress and final payments. 16. The ENGINEER will make final observation of all construction and a written certification to the OWNER. 17. The ENGINEER will provide the OWNER with two sets of "As -Built" prints at no additional cost to the OWNER. • • • 18. The ENGINEER further agrees to obtain and maintain at the ENGINEER'S expense, such insurance as will protect him and the OWNER from claims under the Workman's Compensation Act and from all claims for bodily injury, death, or property damage which may arise from the negligent performance by the ENGINEER or by the ENGINEER'S employees of the ENGINEER'S functions and services required under this Agreement. 19. The ENGINEER will provide detailed resident observation of the work of the Contractors as the construction progresses. resses. The ENGINEER does not guarantee the performance of the Contractor(s) by the ENGINEER'S performance of such work. The ENGINEER'S undertaking hereunder shall not relieve any contractor of his obligation to perform the work in conformity with the plans and specifi- cations and in a workmanlike manner, shall not make the ENGINEER an insurer of contractor's performance; and shall not impose upon the ENGINEER any obligation to see to it that the work is performed in a safe manner. SECTION B - COMPENSATION FOR ENGINEERING SERVICES That the OWNER shall compensate the ENGINEER for engineering services based upon the following.schedule: PLANNING: A sum equal to Ten thousand two hundred dollars ($10,200.00) for the services described in Section A, paragraphs 1 to 10 inclusive. This amount shall be due and payable upon completion, presentation to, and acceptance by the OWNER of the detailed plans and specifications. GENERAL OBSERVATION: A sum equal to One thousand thirty dollars (1,030.00) for the services described in Section A, paragraphs 11 to 17 inclusive. This amount shall be payable in monthly installments based upon the monthly estimates prepared to pay the construction contractor(s). RESIDENT OBSERVATION: A sum equal to Three thousand nine hundred forty dollars ($3,940.00) for the services described in Section A, paragraph 19. This amount shall also be payable in monthly installments based upon the monthly estimates prepared to pay the construction contractor(s). OVERTIME ENGINEERING• The construction contract(s) will contain a completion time expressed in calendar days. Should the construction require additional time and result in a requirement for additional services, payment for these services shall be made in accordance with the schedules given in Sections D. SECTION C - ADDITIONAL ENGINEERING SERVICES In addition to the foregoing services, the following services may be required upon written authorization of the OWNER. 1. Property surveys, descriptions of needed land and easement rights and maps, plans, or estimates related thereto; assistance in negotiating for land and easement rights. 2. Necessary data and filing maps for water rights, water adjudication, and litigation. • • 3. Redesigns ordered by the OWNER during the Planning or Preliminary Engineering phases, or after final plans have been accepted by the OWNER. 4. Appearances before courts or boards on matters of litigationrelated to the project. Payment for the services specified in this Section C shall be in accordance with the schedule set out in Section D hereof. The ENGINEER will render to OWNER for such services an itemized bill, separate from any other billing, at the end of each month for compensation for services performed hereunder during such month, the same to be due and payable by OWNER to the ENGINEER on or before the 10th day of the following month. SECTION D - SCHEDULE OF RATES AND CHARGES FOR ADDITIONAL ENGINEERING SERVICES PERSONNEL: Survey Three-man party $•33.00/hour Two-man party $ 23.00/hour Construction Inspection Resident Engineer Resident Inspector $::25.00/hour $ 18.00/hour Engineering and General Supervision Principal or Officer of Firm $ 35.00/hour Project Engineer $ 30.00/hour Field or Design Engineer $ 25.00/hour Land Surveyor or Engineering Aide $ 18.00/hour Draftsman $ 12.00/hour Office Personnel Secretarial/Clerical $ 10.00/hour Reimbursable Expenses 1. Travel from office at $0.20 per mile, or at actual travel cost, plus time at above rates for both ways. 2. Actual cost of subsistence and lodging. 3. Actual cost of long-distance telephone calls, telegrams, express charges and postage other than ordinary first-class. 4. Actual cost of materials required for the job and used in surveying, drafting, and allied activities, including printing and reproduction costs. 5. Actual cost of special tests and services of special consultants, as referred to in Section C of this agreement. This AGREEMENT shall inure to the benefits of and be binding upon the legal representative and successors of the parties respectively and shall become effective upon execution. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this AGREEMENT in duplicate on the date heretofore started. `,i -ti., o:SA.L, i r� �c _O C )--- •-) -(l.��-z-�2/-i c..t.6L4J ?[TpegName" Oarlanp Title City Clerk 4 4 +(SEAL) 41 ^�iOn ATTE ST • OWNER: CITY OF FAYETTEVILLE,•ARKANSAS to By Type Name Ernest E. Lancaster Title Mayor ENGINEER: McCLELLAND CON ULTING ENGINEERS, INC. .CP.41./uC71i a, (ni lei ti) Type Name Maurice A. McClelland e Name J. E. McClelland Title Secretary -Treasurer Title President