HomeMy WebLinkAbout04-77 RESOLUTION•
RESOLUTION NO. 21-7/
•
A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO
EXECUTE A CONTRACT WITH KING AND CARRAO CONSTRUCTION FOR THE
REHABILITATION OF A STRUCTURE AT 924 NORTH FRISCO.
BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
That the Mayor and City Clerk be, and they hereby are,
authorized and directed to execute a contract with King and
Carrao Construction for the rehabilitation of a structure
located at 924 North Frisco at a contract price of $4,102.00.
A copy of said contract, marked Exhibit "A", is attached hereto
and made a part hereof.
PASSED AND APPROVED THIS Gd DAY OF
ATTEST',•
CITY CLERK
A
APPROVED:
?1,--i4 -A--.1.II A
C
MAYOR
a 1977.
MICROFILMED
DATE OCT 2 0 1919
REEL ti l`
•
CONTRACT
THIS AGREEMENT.is made this if day o
between the City of Fayetteville, hereafter known as "OWNE
of rl>
, hereafter known
Cam 4-77
//� 19!c�
and L.6f.1/44 c 6'
as "CONTRACTOR".
For payments and agreements mentioned,,. the CONTRACTOR agrees with the D�OWNER _...-
to commence and complete repairs and remodeling of structure at 1Z4 N . t-v-r7co
City of Fayetteville, Arkansas, hereafter known as the "PROJECT," for the total
sum of 410 212" : . . The CONTRACTOR agrees to furnish all
- materials, supplies, machinery, equipment,'tools, superintendence labor, ..insurance,.... ...-..
and other items necessary to complete said PROJECT in accordance.with."Specificat.ions."....,.,...
and "Description of Work."
' The CONTRACTOR agrees to commence work under this CONTRACT within FIVE (5) -
consecutive calendar days of "Notice to Proceed" from OWNER and to fully complete
the PROJECT within 00 consecutive calendar days. CONTRACTOR
agrees to pay, as liquidateddamages, the sum of TWENTY-FIVE DOLLARS ($25.00) per
each consecutive calendar day after contract date of completion.
.EMM .191
The OWNER agrees to pay CONTRACTOR in current funds for performance -of the
CONTRACT subject to additions and deductions, and to make payments in accordance
with "Specifications."
In the event the CONTRACTOR abandons the work, or fails, neglects or refuses
to continue work after TEN (10) days written notice, given to the CONTRACTOR by, -the...
OWNER, then the OWNER shall have the option (1) to declare this CONTRACT at an
end, in which event, the OWNER shall not be liable to the CONTRACTOR for any work
or (2) to require the surety bond to be surrendered and carry out CONTRACT of
CONTRACTOR. The CONTRACTOR shall be paid for that portion of work completed only
after PROJECT is completed.
•
•
•
CONTRACTOR•agrees to hold CITY harmless from any and all claims and demands
arising out of or connected with the performance of-CONTRACTOR's obligations
hereunder, or as the result of anything claimed to be doneo' omitted to be done
by CONTRACTOR.
This CONTRACT shall be binding upon the heirs, representatives, successors
or assigns of the parties hereto, including the surety.
IN WITNESS WHEREOF, the OWNER and CONTRACTOR have hereto set their:hands and
seals, respectively.
/Qi 6ai.L
WITNESSES
+.17'
1, 1
ATTEST:
12-41_1.1
•
•
CITY OF FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
By: ; v� J✓� -� .�
•
•
DESCRIPTION OF WORK
.F OSS IE . JOHNSON
92,1 North Frisco
Fayetteville, Arkansas
72701
NO. 3026
Remove the entire back portion of the house. Construct two new bedrooms and bath,
as indicated in drawings. It will be necessary to cut into the bank that lies
to the east of the house, in order to make room for the additional building depth
(approx. 4 ft.). The existing trees to the east of the bank must remain, so pay
close attention to the drawing indicating basic dimension this area. The new
room may cover not only the addition, but the existing front portion of the
house as well. Since the ceiling levels of the old and new spaces vary dramatically,
it is necessary to remove the roof and ceiling joist of the front portion. The
new roof and ceiling to be constructed as indicated in Section A, rectifies the
difference in ceiling height. Removal of the existing root: over the front portion
creates a problem in terms of weather exposure. So, the new roof must be con-
structed as the old roof is removed (see drawings). In the event of rain or snow,
the roof can be temporarily covered and the interior of the old portion protected.
See drawings for specific materials, locations and sizes of doors and windows,
overall dimensions, framing sizes, plumbing requirement locations, and typical
details, etc.
BID ITEMIZATION
a. Demolition of existing back half.
b. Foundation, including excavation.
c. Framing walls, floor, windows, doors, exterior surfaces
and plywood for floor..
17(
Roof (including removal of roof and ceiling over front half)
shingles, deck, all structure, ceiling joists, enclosure
of ends, vents, etc,
e. Owner provide5a11 material and work to complete job, including interior surfaces,
electrical, plumbing and insulation.
Address
TOTAL: