Loading...
HomeMy WebLinkAbout54-75 RESOLUTIONRESOLUTION NO. 67.1-176- A RESOLUTION AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE A STIPULATION WITH THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WITHDRAWING A REQUEST FOR AN ADJUDICATORY HEARING ON THE PROPOSED EPA DISCHARGE PERMIT FOR THE FAYETTEVILLE POLLUTION CONTROL PLANT. BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF FAYETTEVILLE, ARKANSAS: That the Mayor and City Clerk be, and they hereby are, authorized and directed to execute a stipulation with the United States Environmental Protection Agency withdrawing a request for an adjudicatory hearing on the proposed EPA discharge permit for the Fayetteville Pollution Control Plant. A copy of said stipulation, marked Exhibit "A", is attached hereto and made a part hereof. PASSED AND APPROVED THIS /67u$ DAY OF 1975. 7 71t4A ATTEST: em tal-2-414F-&-tub -.CITY CLERK _-% aaid- APPROVED: ency,i4 4-Ove.aciat MAYOR • EVAihrl- "An UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION VI DALLAS, TEXAS IN THE MATTER OF: _ NATIONAL:POLLUTANT.DISCHARGE ELIMINATION SYSTEM PERMIT FOR: - CITY OF FAYETTEVILLE, ARKANSAS PERMITTEE No. AR 0020010 No, STIPULATIONFORREGIONAL ADMINISTRATOR'S APPROVAL STIPULATION THE PERMITTEE HEREINABOVE NAMED AND THE REGIONAL ADMINISTRATOR OF THE ENVIRONMENTAL PROTECTION AGENCY, REGION VI, STIPULATE AND AGREE AS FOLLOWS: 18 PUBLIC NOTICE OF THE GRANTING OF PERMITTEE'S REQUEST FOR AN ADJUDICATORY HEARING TO RECONSIDER THE PERMIT PROPOSED TO BE ISSUED TO PERMITTEE WAS PUBLISHED ON SEPTEMBER 21, 1974. • II. THERE ARE NO PARTIES TO THIS PROCEEDING OTHER THAN THE PARTIES ENTERING THIS STIPULATION, 1118 THE PARTIES HERETO HAVE RECONCILED THE ISSUES INVOLVED IN THIS MATTER IN THE MANNER SET FORTH HEREAFTER, 4HERE THE TERM "AS, PROPOSED" IS USED, IT MEANS AS PROPOSED IN THE NPDES PERMIT REFERRED TO IN THE PUBLIC NOTICE OF ISSUANCE DATED APRIL 20, 1974, GENERAL CONDITIONS 1.B. THE LIABILITY PROVISION SHALL REMAIN AS PROPOSED, 3. CAUSE FOR MODIFICATION AND PERIODIC REVIEW OF TERMS SHALL REMAIN AS PROPOSED. 10, PLANS AND IMPLEMENTATION SCHEDULES FOR POWER FAILURE CONTINGENCIES SHALL BE SUBMITTED WITHIN 180 DAYS OF EFFECTIVE 1 DATE OF PERMIT. . 11. BYPASS PROHIBITION REMAINS AS PROPOSED, 16, THE LANGUAGE ESTABLISHING A WAIVER OF DEFENSE TO LIABILITY FOR NON-COMPLIANCE HAS BEEN DELETED. • SPECIAL CONDITIONS INTERIM EFFLUENT LIMITATIONS HAVE BEEN RAISED TO ALLOW LEVELS SHOWN IN ATTACHMENT "A': ON 11,5 MGD FLOW FOR A PERIOD OF 180 DAYS, THE 7 -DAY AVERAGE LIMITATION HAS BEEN RETAINED, 1.B1 FINAL EFFLUENT LIMITATIONS, LASTING UNTIL MAY 1, 1977; HAVE BEEN RAISED ON 11.5 MGD FLOW TO THOSE SHOWN IN • • • ATTACHMENT "B," 7 -DAY AVERAGE RETAINED, PERMITTEE SHALL PREPARE A PLAN, PRIOR TO THE MAY 1, 1977 EXPIRATION DATE OF THIS PERMIT, FOR ATTAINING EFFLUENT LIMITS NECESSARY TO MAINTAIN WATER QUALITY STANDARDS AND REPORT, EVERY SIX MONTHS FROM EFFECTIVE DATE OF THE PERMIT, PROGRESS TOWARD ATTAINING THESE LIMITS AT THE EARLIEST POSSIBLE DATE. 1.D. THE PH RANGE OF 6,0 TO 9.0 SHALL BE RETAINED. • LE, PROHIBITION OF FLOATING SOLIDS SHALL BE RETAINED. 1.F. (2) AND (3) SCHEDULE FOR INVENTORY AND REPORTING INDUSTRIAL CONTRIBUTORS WILL BE EXTENDED TO 115 DAYS AND 120 DAYS RESPECTIVELY, 2,13, ALLOWABLE INDUSTRIAL INPUT REPORT SHALL BE SUBMITTED • WITHIN 120 DAYS AS PROPOSED, 2.D. REPORTING SCHEDULES OF 90 DAYS AND 300 DAYS CHANGED TO 120 AND 300 DAYS RESPECTIVELY. 3.(A)(2) MONITORING FREQUENCY SHALL REMAIN ONE PER WEEKDAY • AS PROPOSED, :3,(c)(2) FIRST DISCHARGE MONITORING REPORT SHALL BE SUBMITTED WITHIN 75 DAYS AS PROPOSED. 4.c. CONDITION DELETED AS REDUNDANT, 5.A.(2) . REPORTING TIME CHANGED TO 120 DAYS, 5.A.(3)(C) CONSTRUCTION SCHEDULE DELETED. IV, THE ENVIRONMENTAL PROTECTION AGENCY HAS MADE CHANGES IN THE PROPOSED PERMIT IN ACCORDANCE WITH THE ABOVE AND AGREES TO ISSUE THE PERMIT AS CHANGED, SUBJECT TO THE CERTIFICATION OF SUCH PERMIT BY THE ARKANSAS DEPARTMENT OF POLLUTION CONTROL AND ECOLOGY, OR WAIVER THEREOF, WITHIN 30 DAYS OF THE DATE OF THE SIGNATURE HEREON OF THE REGIONAL ADMINISTRATOR, REGION VI. • •V, PERMITTEE HAS AGREED TO ACCEPT THE PERMIT AS CHANGED AND TO WITHDRAW ITS REQUEST FOR AN ADJUDICATORY HEARING, UPON APPROVAL OF THIS STIPULATION BY THE REGIONAL ADMINISTRATOR, REGION VI. VI, THIS STIPULATION SHALL BE BINDING UPON THE PARTIES HERETO UPON THE_DATE,OF THE SIGNATURE OF THE REGIONAL ADMINISTRATOR, P.EGION VI, ENVIRONMENTAL PROTECTION AGENCY, DATE: 7/21/75 ATTEST: 0(101/4-thealtU2-43-euttALk) CITY CLERK DATE: CITY OF FAYETEVILLE PERMITTEE By: -1/7a--1--iee 12 MAYOR U. S. ENVIRONMENTAL PROTECTION AGENCY REGION VI BY: REGIONAL ADMINISTRATOR UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION VI DALLAS, TEXAS IN THE MATTER OF: NATIONAL POLLUTANT -DISCHARGE ELIMINATION SYSTEM PERMIT FOR: -CITY OF FAYETTEVILLE, ARKANSAS PERMITTEE No, AR 0020010 No, STIPULATION - FOR REGIONAL . ADMINISTRATOR'S APPROVAL• • STIPULATION THE PERMITTEE HEREINABOVE NAMED AND THE REGIONAL ADMINISTRATOR OF THE ENVIRONMENTAL PROTECTION 8,GENCY, REGION VI, STIPULATE AND AGREE AS FOLLOWS: I. PUBLIC NOTICE OF THE GRANTING OF PERMITTEE'S REQUEST FOR AN ADJUDICATORY HEARING TO RECONSIDER THE PERMIT PROPOSED TO BE ISSUED TO PERMITTEE WAS PUBLISHED ON SEPTEMBER 21, 1974. 11. THERE ARE NO PARTIES TO THIS PROCEEDING OTHER THAN THE _PARTIES_ENTERING THIS STIPULATION, III, THE PARTIES HERETO HAVE RECONCILED THE ISSUESHIMVOLVED IN THIS MATTER IN THE MANNER SET FORTHHEREAFTER. WHERE THE TERM "AS PROPOSED" IS USED, IT MEANS AS PROPOSED IN THE NPDESPERMIT REFERRED . _ . TO IN THE PUBLIC NOTICE OF ISSUANCE DATED APRIL 20,J974, GENERAL CONDITIONS 1,B1 THE LIABILITY PROVISION SHALL--REMAIA:AS PROPOSED.' 3, CAUSE FOR MODIFICATION AND PERIODIC.REVIEW OF TERMS SHALL REMAIN AS PROPOSED, 10, PLANS AND IMPLEME TATION SCHEDULES. FORy0WERiFAILUR:Et CONTINGENCIES SHALL BE SUBMITTED WITHIN 180 DAYS:-.OPEFFECTIVE DATE OF PERMIT, 11, BYPASS PROHIBITION REMAINS AS PROPOSED, 16, THE LANGUAGE ESTABLISHING A WAIVER OF DEFENSE TO LIABILI1Y FOR NON-COMPLIANCE HAS BEEN DELETED'. • 2 SP-CIAL CONDITIONS 1,A, INTERIM EFFLUENT LIMITATIONS HAVE BEEN RAISED TO ALLOW LEVELS SHOWN IN ATTACHMENT ON 11,5 MGD FLOW FOR A PERIOD OF 180 DAYS. THE 7 -DAY AVERAGE LIMITATION HAS BEEN RETAINED, 1,B. FINAL EFFLUENT LIMITATIONS, LASTING UNTIL MAY 1, 1977, HAVE BEEN RAISED ON 11.5 MGD FLOW TO THOSE SHOWN IN ATTACHMENT "B. 7 -DAY AVERAGE RETAINED, PERMITTEE SHALL PREPARE A PLAN, PRIOR TO -THE VAY 1, 1977 . EXPIRATION DATE OF THIS PERMIT, FOR ATTAINING EFFLUENT LIMITS NECESSARY TO MAINTAIN WATER QUALITY STANDARDS AND REPORT, EVERY SIX MONTHS FROM EFFECTIVE -DATE OF THE PERMIT, PROGRESS TOWARD ATTAINING THESE LIMITS AT THE EARLIEST POSSIBLE DATE. 1.D. THE PH RANGE OF 6.0 TO 9,0 SHALL BE RETAINED. 11E. PROHIBITION OF FLOATING SOLIDS SHALL BE RETAINED 1 1.F, (2) AND (3) SCHEDULE FOR INVENTORY AND REPORTING INDUSTRIAL CONTRIBUTORS WILL BE EXTENDED TO 115DAYSAND 120 DAYS RESPECTIVELY. 21B, ALLOWABLE INDUSTRIAL INPUT REPORT SHALL BE SUBMITTED WITHIN 120 DAYS AS PROPOSED, 21D, REPORTING SCHEDULES OF 90 DAYS AND 300 DAYS CHANGED TO 120 AND 300 DAYS RESPECTIVELY, 3,(A)(2) MONITORING FREQUENCY SHALL REMAIN ONE PER WEEKDAY AS PROPOSED! .31(C)(2) FIRST JISCHARGE MONITORING REPORT SHALL BE SUEr_TTED WITHIN 75 DAYS AS PROPOSED. 4.C1 CONDITION 'DELETED AS REDUNDANT. 5,A,(2) I4EPORTING TIME CHANGED TO 120 DAYS, 5,A.(3)(C) CONSTRUCTION SCHEDULE DELETED, IV, 4 RON El. AL PROTECTI4N, Arrynw THE PROPOSED AIN CCODNCE ITN THBOVE ANDNARA ISSUE- THE PERMIT AS CHANGED -SUBJECT TO r"-It."127c CERIICATF PERMIT BY THE ARKANSAS - DEPARTMENT OF POLLUTION CONTRO: TO 1:: S'JCFI ECG! OGY) OR 1:iAIVER THEREOF, 'iUT IN 30 DAYS OF THE DATE OF THE • SIGNATURE HEREON OF THE EGIONAL ADM.NISTRATOR) 4 - 3 V, PERMITTEE HAS AGREED TO ACCEPT THE PERMIT AS CHANGED AND. TO WITHDRAW ITS REQUEST FOR AN ADJUDICATORY HEARING .UPON APPROVAL OF THIS STIPULATION BY THE REGIONAL ADMINISTRATOR, REGION VI, • VI, THIS STIPULATION SHALL BE BINDING UPON THE PARTIES HERETO UPON THE DATE OF THE SIGNATURE OF THE REGIONAL ADMINISTRATOR, flEGION VI, ENVIRONMENTAL PROTECTION AGENCY, DATE: 7/21/75 ATTEST: , • kailis-01-CLAtc,Listi CIT( CLERK CITY OF FAYETEVILLE PERMITTEE MAYOR U. SI ENVIROMENTAL PROTECTIn? AGE CY REGION VI.