HomeMy WebLinkAboutOrdinance 5342 ORDINANCE NO. 5342 AN ORDINANCE AMENDING ORDINANCE NO. 5311 TO ACCURATELY REFLECT THE TOTAL CONTRACT AMOUNT WITH NEC, INC. AND H2 ENGINEERING, INC. OF $29,322.13 FOR SEWER IMPROVEMENTS AT VETERANS MEMORIAL PARK, AND TO REDUCE THE PROJECT CONTINGENCY BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby amends Ordinance No. 5311 to accurately reflect the total contract amounts with NEC, Inc. and H2 Engineering, Inc. of$29,322.13 for sewer improvements at Veterans Memorial Park. Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby amends Ordinance No. 5311 by replacing Exhibit"A"of the Ordinance with the attached Exhibit"A." Section 3. That the City Council of the City of Fayetteville, Arkansas hereby amends the project contingency approved in Ordinance No. 5311 to $4,397.87. PASSED and APPROVED this 3rd day of August, 2010. APPROVED: ATTEST: By: By: L O ELD J AN, Mayor SONDRA E. SMITH, City Clerk/Treasurer °°etetaa�rtvo�, FAYETTEVILLE® m e,,A GTOt�1 d,aaaaaeaa►a®�� 2425 S. 5th PIace Rogers,AR 72758 To: City Of Fayetteville Contact: Address: 113 W.Mountain Street Phone: Fayetteville,AR 72701 Fax: Project Name: Park Centre Sewer Extension Bid Number: Project Location: Park Centre,Fayetteville,AR Bid Date: Line# Item# Item Description Estimated Quantity Unit Unit Price Total Price 000 Site Prep&Clean-up 1.00 LS $1,775.00 $1,775.00 001 8"PVC Sewer Main Including Base Backfill As 560.00 LF $24.90 $13,944.00 Needed 002 Manhole 4'11) 5.00 EACH $1,800.00 $9,000.00 003 Maintenance Bond For 2 Years At 25% 1.00 LS $600.00 $600.00 Total Bid Price: $25,319.00 ACCEPTED: CONFIRMED: The above prices,specifications and conditions are satisfactory and N.E.C.,Inc. are hereby accepted. Buyer: 1.io& e/d _or'c zgn Signature: _ — Authorized Signature: / Date of Acceptance: 0 Estimator: 6/16/2010 10:43:49 AM � ��BIt -,, Page 1 of 1 City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 8/j/2010 City Council Meeting Date Agenda Items Only Alison Jumper (itis Park Planning Parks and Recreation Submitted By Division Department Action Required: Staff recommends the approving an amendment to Ordinance 5311 for the construction approximately 597 feet of 8"sewer line estimated at$33,720, including a 15% project contingency, from the Veterans Memorial Park restroom to a sewer lift station located in the adjacent development. $ 30,720.00 $ 35,295.00 Lake Fayetteville Improvements Cost of this request Category/Project Budget Program Category/Project Name 2250.9255.5315.00 $ 4,003.13 Parks Development Funds Used to Date Program/Project Category Name 02043..1002 $ 31,291.87 Parks Development/PLDO(NE) Project Number Remaining Balance Fund Name Budgeted Item ® Budget Adjustment Attached Previous Ordinance or Resolution# Depart Di ctor Date Original Contract Date: Original Contract Number: orney Date -P.,A 0. 7 - .bb Finan nd Internal Services Director Date Received in City 07-1 5-1 0 P05 :35 R CVD Clerk's Office Chief of StZDate • Received in E iEREO Mayor's Office 7 01-Y ZSC /��D/-& M or D e Comments: Revised January 15,2009 1 THE CITY OF FAYETTEVILLE,ARKANSAS DEPARTMENT CORRESPONDENCE ARKANSAS s CITY COUNCIL AGENDA MEMO To: Mayor Lioneld Jordan and City Council Thru: Don Marr, Chief of Staff Connie Edmonston,Director of Parks and Recreation; From: Alison Jumper, Park Planning Superintendent Date: July 12, 2010 Subject: Amendment to Ordinance 5311 PROPOSAL: City Council approved Ordinance 5311 on April 6, 2010 approving a bid waiver for the construction and engineering of approximately 597 linear feet of 8"sanitary sewer line from the Veterans Memorial Park restrooms to a new lift station. Since that time, costs for construction have decreased,making an ordinance amendment necessary. Construction costs have been provided to the City by NEC, Inc. and H2 Engineering for these improvements as follows: Sewer Line construction $ 25,319.00 Design $ 4003.13 Total $ 29,322.13 RECOMMENDATION: Staff recommends the approving an amendment to Ordinance 5311 for the construction approximately 597 feet of 8" sewer line estimated at$33,720,including a 15%project contingency, from the Veterans Memorial Park restroom to a sewer lift station located in the adjacent development. BUDGET IMPACT: Total construction costs including a 15%project contingency is $33,720 and will be funded from Park Land Dedication Funds, Northeast Quadrant. Payment in the amount of$3,000 has been made to H2 Engineering for design,making the total remaining cost$30,720. Attachments: Bid from NEC,Inc. egwsi on o.: Date: city",Of FayetteY>tlte. Purchase Order(PQj Request 7/15/2010 (Nara Purchase Orde�� cYKU Number: hxpeCted Delivery a e: AR purchases under$25t)0 shag be usetl.on a P Cartl unless roedrea/or=?,Q$9,se rice re/ated (Call x258 with question ) �Aff!?O t2.': uest stia//be-'scannecf�to therP,urchasln �"e'marl�-'P-brcfia`sYn', ifa stfevi!!'e':ar,us.... '.. .. ..�:- Vendor VendorName: mail NEC,Inc. Yes:_ No: Address: Fob Point: Taxable Quotes Attached 2425 S.5th Place Yes:_ No:_ Yes:_x_ No: City: State: Zip Code: Ship to code: Divison Head Approval• Rogers AR 72758 Requester: Requester's Employee#: Extension: Alison Jumper 2369 469 Item Description Quantity Unit of Issue Unit Cost Extended Cost Account Numbers Project/Subproject# Inventory# Fixed Asset# 1 2 Construction of sewer line 1 L.S. 25,319.00 $25,319.00 2250.9255.5315.00 02043.1002 per attached quote 3 $0.00 4 $0.00 5 $0.00 6 $0.00 7 $0.00 8 $0.00 9 $0.00 10 $0.00 Shipping/Handling Lot $0.00 'Special Instructions: Subtotal: $25,319.00 Tax: Total: $25,319.00 Approvals: Mayor: Department Director: Purchasing Manager: Finance&Internal Services Director: Budget Manager: IT Manager: Dispatch Manager: Utilities Manager: Other: Revised 1/2!2008 ORDINANCE NO. AN ORDINANCE AMENDING ORDINANCE NO. _5311 TO ACCURATELY REFLECT THE TOTAL CONTRACT AMOUNT WITH NEC, INC. AND H2 ENGINEERING, INC. OF $29,322.13 FOR SEWER IMPROVEMENTS AT VETERANS MEMORIAL PARK, AND TO REDUCE THE PROJECT CONTINGENCY BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby amends Ordinance No. 5311 to accurately reflect the total contract amounts with NEC, Inc. and H2 Engineering, Inc. of$29,322.13 for sewer improvements at Veterans Memorial Park. Section 2. That the City Council of the City of Fayetteville, Arkansas,hereby amends Ordinance No. 5311 by replacing Exhibit"A"of the Ordinance with the attached Exhibit"A." Section 3. That the City Council of the City of Fayetteville, Arkansas hereby amends the project contingency approved in Ordinance No. 5311 to $4,397.87. PASSED and APPROVED this 3ra day of August, 2010. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer ORDINANCE NO.5311 AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVING CONTRACTS WITH NEC,INC. AND H2 ENGINEERING,INC.IN THE TOTAL AMOUNT OF$30,690.63 FOR SEWER IMPROVEMENTS AT VETERANS MEMORIAL PARK,APPROVING A PROJECT CONTINGENCY OF $4,404.00, AND APPROVING A BUDGET ADJUSTMENT WHEREAS,the restrooms at Veterans Memorial Park at Lake Fayetteville currently utilize a septic system which requires occasional maintenance and raises concern regarding the age of the system and its proximity to Lake Fayetteville,and; WHEREAS, NEC, Inc. is constructing Park Centre, a mixed-use development south of Veterans Memorial Park,and is required to construct a sewer lift station to provide sewer service to the site which will be located approximately fifty(50)feet from the park's south boundary,and; WHEREAS, H2 Engineering, Inc. has knowledge of the capacities and elevations of the sewer lift station that is critical to the design of the sewer connection to the restrooms at Veterans Memorial Park,and is working as the engineering firm on the Park Centre project with NEC,Inc., and; WHEREAS,the City would benefit from utilizing the Park Centre developer and engineers to design and construct a sewer line from the lift station to the restroorns at Veterans Memorial Park; NOW,THEREFORE,BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,ARKANSAS: Section 1. That the City Council of the City of Fayetteville,Arkansas hereby determines that an exceptional situation exists in which formal competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves contracts with NEC,Inc.and H2 Engineering,Inc.in the total amount of$30,690.63 for construction of sewer improvements at Veterans Memorial Park. Copies ofthe contracts,marked as Exhibits"A" and"B,"are attached hereto and made a part hereof. Page 2 Ordinance No.5311 Section 2. That the City Council of the City of Fayetteville,Arkansas,hereby approves a project contingency of$4,404.00 and a budget adjustment of$35,295.00,a copy of which is marked as Exhibit"C"attached hereto and made a part hereof. PASSED and APPROVED this 6�"day of April,2010. APPROVED ATTEST: By. By: L LD JORW,Mayor SON SAUTH,City Clerk/Treasurer �«ti�nnrr►r�,� Y•0'p!0. % _�. ns �1 ILLE o ;FAYETfEV • %9s,s,•:QKA NS.SP i 2425 S: 5th Place Rogers,AR. 72758 To: City Of Fayetteville Contact: Address: 113 W.Mountain Street Phone: Fayetteville,AR 72701 Fax: Project Name: Park Centre Sewer Extension Bid Number: Project Location: Park Centre,Fayetteville,AR Bid Date: Line# Item# Item Description Estimated Quantity Unit Unit Price Total Price 000 Additional Tree Clearing 1.00 LS $535.00 $535.00 001 8"PVC Sewer Main Including Base Backfill As 597.00 LF $27.50 $16,417.50 Needed 002 Manhole W ID 5.00 EACH $1,825.00 $9,125.00 003 Maintenance Bond For 2 Years At 25% 1.00 LS $610.00 $610.00 Total Bid Price: $26,687.50 Notes: ACCEPTED: CONFIRMED: The above prices,specifications and conditions are satisfactory and N.E.C.,Inc. are hereby accepted. Buyer: Signature: . Authorized Signature: Date of Acceptance: Estimator: 3/17/2010 8:55:40 AM Page 1 of 1 e . il,Nlri�NBL°EtlNti, IN+C. cH:2* PROPOSAL FOR ENGINEERING SERVICES For THE CITY OF FAYETTEVILLE VETERANS PARK SEWER EXTENSION MARCH 22,2010 SCOPE OF SERVICES: Task 1—Sewer Extension Construction Plans—H2 Engineering,Inc.,as part of this proposal,will produce a set of construction plans and reports which meet or exceed the requirements,standards,and specifications of the City of Fayetteville. This set of construction plans will include a sanitary sewer main extension from the existing restroom facilities on the south side of Veterans Park to the proposed Park Centre Lift Station This task includes permits(excluding the associated fees)and a letter of approval from the City of Fayetteville Engineering Department and the Arkansas Department of Health. Easement dedication is not part of this proposal, Easement dedication shallbe the responsibility of the City of Fayetteville, Task 1 shall be considered complete upon construction plan approval from the City of Fayetteville Engineering Department and the Arkansas Department of Health. Task 2—Construction Inspection and As-Built Plans—H2 Engineering,Inc.will coordinate and attend all site work pre-construction conferences as required by the City of Fayetteville. We will provide inspection specifically for utility improvements,as required by the City of Fayetteville. Construction staking is NOT within the scope of this contract. The addition of construction staking shallbe performed on an HOURLYBASIS as reflected in Paragraph 9 under"Additional Services." We will coordinate and attend the site work Final Inspection by the City of Fayetteville. We will generate a final inspection punch list(based on City of Fayetteville comments)and supervise completion,by the respective contractor,of each punch list item.We will produce as-built plans upon completion of the project's site work as required by the City of Fayetteville. Task 2 shall be considered complete when the as-built plans have been accepted by the City of Fayetteville. FEES AND BILLING• The above tasks(1-2)will be performed for an amount equal to 15%of the construction cost of the project. This project's construction cost is currently estimated at approximately$27,000. Based on this estimated construction cost,the estimated 15%engineering fee would be$4,050. This is an estimate only and is subject to change based on the actual construction contract with the Contractor. ADDITIONAL HOURLY WORK WILL BE PERFORMED ON AN HOURLY RATE AS REFLECTED IN PARAGRAPH 9 UNDER"ADDITIONAL SERVICES." Billing of this fee will be submitted on a monthly basis as a percent complete of the associated activities. All invoices are due upon receipt. For bills which are not paid within 30 days,an additional 5%of the billed amount will be accrued for each delinquent 30day period thereafter. H2 Engineering,Inc.reserves the right to discontinue work on this project if invoices are not paid within 45 days. The following represents the task breakdown of engineering compensation for this project: Total Estimated Engineering Fee(Tasks 1—2)=$4,050 • Task 1—75%of Engineering Fee • Task 2—25%of Engineering Fee City of Fayetteville,Arkansas Budget Adjustment Form Budget Year Department: Operations Date Requested Adjustment Number 2010 Division: Parks&Recreation Program: Parks Development Capital 3/1$/2010 Project or Item Added/Increased: Project or Item Deleted/Reduced: To increase funding to construct approximately 597 feet Reduce Park Land Dedication funds to allow for of 8"sewer line from the Veteran's Memorial Park construction of sewer at Veteran's Memorial Park. restroom to a sewer lift station located in the Park Centre development. Justification of this Increase: Justification of this Decrease: Additional funding has become available in this Park This adjustment is administrative: Land Dedication Quadrant since our last CIP Plan was submitted. There is adequate funds in these accounts to fund this line item. EXHIBIT C Increase Budget Account Name Account Number Amount Project Number Contract Services 2250 9255 5315 00 35,295 02043 1002 Decrease Budget Account Name Account Number Amount Project Number Greenspace Fees-NE 2250 0925 4419 01 35,295 02043 1002 J� 1 W V.090403 3/18/2010 Division Head Date Budget&Research Use Only Type: A B C D E Bud et Director Alate/� 3/18/2010 Requested By epartment Director Date LU a ,' .o 3-Z3 d?,plp General Ledger Date Finance Director Date 3^;Lq—/Z> Posted to General Ledger h'4Loflfff Date Initial Date V q` Posted to Project Accounting or D e Initial Date City of Fayetteville Staff Review Form City Council Agenda Items and Contracts,.Leases or Agreements 4/6/2010 City Council Meeting Date Agenda Items Only Alison Jumper.er,. �,�,. Park Planning Parks and Recreation � bmitt W Bell' y � Division � Department Action Reulred: taff recommends the approval of a bid waiver for NEC, Inc.and H2 Engineering to construct approximately 597 . eet of 8'sewer line estimated at$30,691 from the Veteran's Memorial Park restroom to a sewer lift station located 'n the Park Centre development and including a 15%project contingency in the amount of$4,404 for a total cost of $35,295. $ 35,295.00 $. 48,006.00 . Lake Fayetteville Improvements mw- Cost of this request Category/Project Budget Program Category/Project Name 2250.9255.5315.00. $ - Parks Develo ment Funds Used to Date Program/Project Category Name 02043.100?. $ 48,006.00 Parks.Develo ment/PLDO(NE) . ipi,l Rig ilri�wl wr...RYIf 1 f iW .ui�.w. Project Number Remaining Balance Fund Name Budgeted Item Budget Adjustment Attached x: Previous Ordinance or Resolution# artmen Director Date Original Contract Date: �j / ✓ 0 Original Contract Number: rtlome Date ` � �*� ENiEREp . Finance arid Intemai`Services Director Date Received in clerk's Office : ffice 3-Iq•to ((�,�, W. Chief of a Date ERE Received in Mayor's Office Comments: Revised January 15,2009