HomeMy WebLinkAboutOrdinance 5311 ORDINANCE NO. 5311 AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVING CONTRACTS WITH NEC,INC. AND H2 ENGINEERING, INC. IN THE TOTAL AMOUNT OF $30,690.63 FOR SEWER IMPROVEMENTS AT VETERANS MEMORIAL PARK,APPROVING A PROJECT CONTINGENCY OF $4,404.00, AND APPROVING A BUDGET ADJUSTMENT WHEREAS,the restrooms at Veterans Memorial Park at Lake Fayetteville currently utilize a septic system which requires occasional maintenance and raises concern regarding the age of the system and its proximity to Lake Fayetteville, and; WHEREAS, NEC, Inc. is constructing Park Centre, a mixed-use development south of Veterans Memorial Park,and is required to construct a sewer lift station to provide sewer service to the site which will be located approximately fifty(50)feet from the park's south boundary, and; WHEREAS, H2 Engineering, Inc. has knowledge of the capacities and elevations of the sewer lift station that is critical to the design of the sewer connection to the restrooms at Veterans Memorial Park,and is working as the engineering firm on the Park Centre project with NEC,Inc., and; WHEREAS,the City would benefit from utilizing the Park Centre developer and engineers to design and construct a sewer line from the lift station to the restrooms at Veterans Memorial Park; NOW,THEREFORE,BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,ARKANSAS: Section 1. That the City Council of the City of Fayetteville,Arkansas hereby determines that an exceptional situation exists in which formal competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves contracts with NEC,Inc.and H2 Engineering,Inc.in the total amount of$30,690.63 for construction of sewer improvements at Veterans Memorial Park. Copies of the contracts,marked as Exhibits"A" and`B," are attached hereto and made a part hereof. Page 2 Ordinance No. 5311 Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby approves a project contingency of$4,404.00 and a budget adjustment of$35,295.00,a copy of which is marked as Exhibit"C" attached hereto and made a part hereof. PASSED and APPROVED this 6th day of April, 2010. APPROVED ATTEST: By: � By: L N t LD JO ,Mayor SO E. SMITH, City Clerk/Treasurer 'h�� G�'CY OF.•.p�'.,P c ;FAYETMOLLE; .tea %9s 9RKANSPOJ= 'i";y,NG,'o,N1�1,��. 2425 S. Sth Place Rogers,AR 72758 To: City Of Fayetteville - Contact: Address: 113 W.Mountain Street Phone: Fayetteville,AR 72701 Fax: Project Name: Park Centre Sewer Extension Bid Number: Project Location: Park Centre,Fayetteville,AR Bid Date: Line# Item# Item Description Estimated Quantity Unit Unit Price TOWI Price 000 Additional Tree Clearing 1.00 LS $535.00 $535.00 001 8"PVC Sewer Main Including Base Backfill As 597.00 LF $27.50 $16,417.50 Needed 002 Manhole 4'ID 5.00 EACH $1,825.00 $9,125.00 003 Maintenance Bond For 2 Years At 25% 1.00 LS $610.00 $610.00 Total Bid Price: $26,687.50 Notes: ACCEPTED: CONFIRMED: The above prices,specifications and conditions are satisfactory and N.E.C.,Inc. are hereby accepted. Buyer: Signature: . Authorized Signature: Date of Acceptance: Estimator: 3/17/2010 8:55:40 AM r Page 1 of 1 tE> IBiT r u anN- ElIgIN��WN�, INC. PROPOSAL FOR ENGINEERING SERVICES For THE CITY OF FAYETTEVILLE VETERANS PARK SEWER EXTENSION MARCH 22,2010 SCOPE OF SERVICES: Task 1—Sewer Extension Construction Plans—H2 Engineering,Inc.,as part of this proposal,will produce a set of construction plans and reports which meet or exceed the requirements,standards,and specifications of the City of Fayetteville. This set of construction plans will include a sanitary sewer main extension from the existing restroom facilities on the south side of Veterans Park to the proposed Park Centre Lift Station This task includes permits(excluding the associated fees)and a letter of approval from the City of Fayetteville Engineering Department and the Arkansas Department of Health. Easement - dedication is not part of this proposaL Easement dedication shall be the responsibility of the City of Fayetteville. Task I shall be considered complete upon construction plan approval from the City of Fayetteville Engineering Department and the Arkansas Department of Health. Task 2—Construction Inspection and As-Built Plans—H2 Engineering,Inc.will coordinate and attend all site work pre-construction conferences as required by the City of Fayetteville. We will provide inspection specifically for utility improvements,as required by the City of Fayetteville. Construction staking is NOT within the scope of this contract. The addition of construction staking shall be performed on an HOURLYBASIS as reflected in Paragraph 9 under"Additional Services." We will coordinate and attend the site work Final Inspection by the City of Fayetteville. We will generate a final inspection punch list(based on City of Fayetteville comments)and supervise completion,by the respective contractor,of each punch list item.We will produce as-built plans upon completion of the project's site work as required by the City of Fayetteville. Task 2 shall be considered complete when the as-built plans have been accepted by the City of Fayetteville. FEES AND BILLING: The above tasks(1-2)will be performed for an amount equal to 15%of the construction cost of the project. This project's construction cost is currently estimated at approximately$27,000. Based on this estimated construction cost,the estimated 15%engineering fee would be$4,050. This is an estimate only and is subject to change based on the actual construction contract with the Contractor. ADDITIONAL HOURLY WORK WILL BE PERFORMED ON AN HOURLY RATE AS REFLECTED IN PARAGRAPH 9 UNDER"ADDITIONAL SERVICES." Billing of this fee will be submitted on a monthly basis as a percent complete of the associated activities. All invoices are due upon receipt. For bills which are not paid within 30 days,an additional 5%of the billed amount will be accrued for each delinquent 30day period thereafter. H2 Engineering,Inc.reserves the right to discontinue work on this project if invoices are not paid within 45 days. The following represents the task breakdown of engineering compensation for this project: Total Estimated Engineering Fee(Tasks 1—2)=$4,050 • Task 1—75%of Engineering Fee • Task 2—25%of Engineering Fee EXHI$IT "= City of Fayetteville,Arkansas Budget Adjustment Form Budget Year Department: Operations Date Requested Adjustment Number 2010 Division: Parks& Recreation Program: Parks Development Capital 3/18/2010 Project or Item Added/Increased: Project or Item Deleted/Reduced: To increase funding to construct approximately 597 feet Reduce Park Land Dedication funds to allow for of 8" sewer line from the Veteran's Memorial Park construction of sewer at Veteran's Memorial Park. restroom to a sewer lift station located in the Park Centre development. Justification of this Increase: Justification of this Decrease: Additional funding has become available in this Park This adjustment is administrative: Land Dedication Quadrant since our last CIP Plan was submitted. There is adequate funds in these accounts to fund this line item. EXHIBIT it C Increase Budget Account Name Account Number Amount Project Number Contract Services 2250 9255 5315 00 35,295 02043 1002 Decrease Budget Account Name Account Number Amount Project Number Greenspace Fees- NE 2250 0925 4419 01 35,295 02043 1002 3/18/2010 V.090403 Division Head Date Budget&Research Use Only Type: A B C D E Bud et �Direct Date f2 3/18/2010 Requested By epartment Director Date 1.P-J A ^ 3- 4-!p-2olb General Ledger Date Finan Director Date ;Lq/U Posted to General Ledger trRiA of Wsff Date Initial Date ✓d oV Posted to Project Accounting or D e Initial Date City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 4/6/2010 City Council Meeting Date Agenda Items Only Alison Jumper Park Planning Parks and Recreation Subm tte Ely Division Department Action Re uired: Staff recommends the approval of a bid waiver for NEC, InC.and H2 Engineering to construct approximately 597 feet of 8'sewer line estimated at$30,691 from the Veteran's Memorial Park restroom to a sewer lift station located in the Park Centre development and including a 15% project contingency in the amount of$4,404 for a total cost of $35,295. $ 35,295.00 $ 48,006.00 Lake Fayetteville Improvements Cost of this request Category/Project Budget Program Category/Project Name 2250.9255.5315.00 $ Parks Development Funds Used to Date Program/Project Category Name 02043.1002 $ 48,006.00 Parks Development/PLDO(NE) Project Number Remaining Balance Fund Name Budgeted Item Budget Adjustment Attached 4 l Previous Ordinance or Resolution# ^ art an Directorr Date Original Contract Date: Original Contract Number: 41omey Date k 3- '23-V() 's- at Q _:._.«... ENTERED Finance and Internal Services Director Date Received in City Clerk's office Chief ofDate ERE Received in r� ' Mayor's Office .$! /D orto r omments: ..,.._ Revised January 15,2009 Tave ��T� �� THECITYOFFAYETT ENTCORARKANSAS v DEPARTMENT CORRESPONDENCE ARKANSAS CITY COUNCIL AGENDA MEMO To: Mayor Lioneld Jordan and City Council Thru: Don Marr, Chief of Staff Connie Edmonston, Director of Parks and Recreation From: Alison Jumper, Park Planning Superintendent (� Date: March 17, 2010 Subject: Proposed Bid Waiver for construction of sanitary sewer connection for Veteran's Park at Lake Fayetteville PROPOSAL: NEC,Inc. is constructing Park Centre, a mixed use development south of Veteran's Memorial Park at Lake Fayetteville,north of Zion Road. As a part of this development,the developer is required to construct a sewer lift station to provide sewer service to the site. The restrooms at Veteran's Memorial Park currently utilize a septic system. The septic system has not been problematic; however, it does require occasional maintenance and raises some concern regarding the age of the system and its proximity the lake. Connecting to a public sanitary sewer system would eliminate future septic maintenance as well as concerns of aging and potential lake contamination. The required sewer lift station in the Park Centre development is located approximately 50 feet from the park's south boundary. The City would benefit from utilizing the development's engineering firm and contractors to design and construct the sewer line from the lift station to the restroom while they are on site. The developer's engineering firm, H2 Engineering has knowledge of the capacities and elevations of the sewer lift station that is critical to the design of the sewer connection to the restroom. Utilizing NEC, hic. to construct the sewer line while they are on site would reduce costs for mobilizing equipment,bidding and advertising. Construction costs have been provided to the City by NEC, hic. and H2 Engineering for these improvements as follows: Sewer Line construction $ 26,687.50 Design $ 4003.13 Total $,30,690.63 THE CITY OF FAYETTEVILLE,ARKANSAS RECOMMENDATION• Staff recommends the approval of a bid waiver for NEC, Inc. and H2 Engineering to construct approximately 597 feet of 8"sewer line estimated at $30,691 from the Veteran's Memorial Park restroom to a sewer lift station located in the Park Centre development and including a 15%project contingency in the amount of$4,404 for a total cost of$35,295. BUDGET IAS PACT: The final costs to the City will be based upon actual costs as documented by NEC subject to review by the City and may, or may not exceed the submitted estimate. However, the City's cost will not exceed the estimate without additional authorization. Attachments: Estimate from NEC,Inc. Estimate from H2 Engineering Budget Adjustment Project Accounting Request Purchase Requests MAUJ f"--d euksew+ -1-o N 64 s ORDINANCE NO. AN ORDINANCE WANING THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVING CONTRACTS WITH NEC,INC. AND H2 ENGINEERING, INC. IN THE TOTAL AMOUNT OF $30,690.63 FOR SEWER IMPROVEMENTS AT VETERANS MEMORIAL PARK, APPROVING A PROJECT CONTINGENCY OF $4,404.00,AND APPROVING A BUDGET ADJUSTMENT WHEREAS,the restrooms at Veterans Memorial Park at Lake Fayetteville currently utilize a septic system which requires occasional maintenance and raises concern regarding the age of the system and its proximity to Lake Fayetteville,and; WHEREAS,NEC, Inc. is constructing Park Centre, a mixed-use development south of Veterans Memorial Park,and is required to construct a sewer lift station to provide sewer service to the site which will be located approximately fifty(50)feet from the park's south boundary, and; WHEREAS,H2 Engineering,hic. has knowledge of the capacities and elevations of the sewer lift station that is critical to the design of the sewer connection to the restrooms at Veterans Memorial Park,and is working as the engineering firm on the Park Centre project with NEC,hic., and; WHEREAS,the City would benefit from utilizing the Park Centre developer and engineers to design and construct a sewer line from the lift station to the restrooms at Veterans Memorial Park; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby determines that an exceptional situation exists in which formal competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves contracts with NEC,hic.and H2 Engineering, Inc. in the total amount of$30,690.63 for construction of sewer improvements at Veterans Memorial Park. Copies of the contracts,marked as Exhibits"A"and"B,"are attached hereto and made apart hereof. Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby approves a project contingency of$4,404.00 and a budget adjustment of$35,295.00,a copy of which is marked as Exhibit"C" attached hereto and made a part hereof. PASSED and APPROVED this 6s'day of April,2010. APPROVED: ATTEST: By: By: LIONELD JORDAN,Mayor SONDRA E. SAMH, City Clerk/Treasurer RESOLUTION NO. A LUTION APPROVING CONTRACT TH NEC, INC. AND ENGINEERING, INC. IN THE TAL AMOUNT OF $30,690.63 FOR SEWER IMPROVEM TS AT VETERANS MEMORIAL PARK, APPROVING A P OJECT CONTINGENCY OF $4,404.00, D APPROVING A B GET ADJUSTMENT BE IT RESOLV BY THE C COUNCIL OF THE CITY OF FAYETTEVILLE,ARKAN S: Section 1. That the Ci Co cil of the City of Fayetteville, Arkansas, hereby approves contracts with C, Inc. and H2 Engineering, Inc. in the total amount of $30,690.63 for co ction of sewer improvements at Veterans Memorial Park. Copies of t e co acts, marked Exhibits "A" and "B," are attached hereto and made a art hereo Section 2. That e City Council the City of Fayetteville, Arkansas, hereby approves a pr ect contingency of $ 404.00 and a budget adjustment of $35,295.00, a copy of hich is marked as Exhi 't "C" attached hereto and made a part hereof. PASSE and APPROVED this 6th day of Apr 2010. APPROVE ATTEST: By: By: ONELD JORDAN,Mayor SONDRA E.SMITH,Ci Clerk/Treasurer ADDITIONAL SERVICES: The following items are assumed to be additional services,reimbursable services,or work to be performed by others and are in addition to costs quoted herein above for all work: 1. Any services beyond the scope of what is outlined in this proposal. 2. Expense of reproduction of drawings and specifications other than for inter-office use. 3. Special renderings,presentations,or visual graphics not included in this estimate. 4. Work related to appeals from decisions rendered by agencies on permits or site issues that affect our work are assumed to be additional services. 5. Fees for permit and permit applications and legal fees and expenses involved with review of applications and decisions rendered by agencies. 6. Cost of geotechnical investigations are assumed to be work performed by others and are to be reimbursable expenses or paid directly by owner. 7. Costs of other consultants which may be required for work not specified in this proposal,which includes testing of utilities and roadway mats,traffic studies,extensive hydrological)food studies,wetlands determinations,landscape design,tree assessments,and architectural renderings. 8. Costs of identifying,procuring,and filing off-site utility easements as may be required by the City. We will perform this service at the hourly rate indicated in paragraph 9. 9. Costs related to making revisions in drawings or other documents when such revisions are inconsistent with approvals or instructions previously given by the owner,including revisions made necessary by adjustments in the owner's project budget,or due to changes required as a result of the owner's failure to make decisions in a timely manner. These costs will be billed on the following hourly rate: a. Project Engineer-$125 per hour b. Drafting/Engineering Technician-$85 per hour c. Stakeout Crew-$100 per hour d. Surveyor-$100 per hour CHANGES IN SERVICES: The Client reserves the right to request changes in the services. If the requested changes by the Client require additional engineering services,then in that event the Engineer shall be compensated for the services requested. Upon mutual acceptance of desired and necessary changes,and of an equitable adjustment of engineering costs,a Supplemental Engineering Services Agreement shall be executed and shall be approved by the Client prior to the performance of any changed service. H2 Engineering,Inc. Client Kipp Hearne, P.E. President Alison Jumper-Parks SS @ Park Centre From: "Jeremy Thompson" <jthompson@h2ei.net> To: "Alison Jumper" <ajumper@ci.fayetteville.ar.us> Date: 3/17/2010 11:16 AM Subject: Parks SS @ Park Centre Attachments: Park Centre Sewer Extension Rev-l.pdf Alison, Here is the estimate from the contractor. Looks like our new route added tree removal and an additional manhole. Our engineering fee will just be 15% of the final contract price. Based on this estimate from NEC of$26,687.50, our engineering fee would be $4,003.13 for a total estimate of$30,690.63. The contractor will give an actual number if we are given the notice to proceed and produce an actual construction plan. I'm a little busy today so I didn't have time to put this into a formal proposal—I can do that later if you need me to. Hopefully these numbers will help you get started, though. Thanks, Jeremy Thompson, PE, LEED AP Vice President H2 Engineering, Inc. (479) 582-4234 Requisition o.: Date: City Of Fayetteville - Purchase Order (PO) Request 3/19/2010 (Not a Purchase order) KO Number: apecteci univery Date: All purchases under $2500 shall be used on a P-Card unless medical or 1099 service related. (Call x255 with questions) All PO Request shall be scanned to the Purchasing e-mail., Purchasin Lfayetteville.ar.us Ven or : vendor Name: Mail 16130 H2 Engineering Yes:_ No: — Address: Fob Point: Taxable Quotes Attached 2758 Millennium Dr. Yes:_ No:_ Yes: x_ No:_ City: State: Zip Code: Ship to code: Divison Heqtl A roval: . Fayetteville AR 72703 Requester: Requester's Employee #: Extensi Alison Jumper 2369 469 Item Description Quantity Unit of Issue Unit Cost Extended Cost Account Numbers Proect/Sub ro'ect # Inventory # Fixed Asset # 1 2 Engineering for sewer line 1 L.S. 4,003.13 $4,003.13 2250.9266.6315.00 02043.1002 per attached quote 3 $0.00 4 $0.00 5 $0.00 6 $0.00 7 $0.00 8 $0.00 9 $0.00 10 $0.00 Shipping/Handling Lot $0.00 �pecial Instructions: Subtotal: $4,003.13 Tax: Total: $4,003.13 Approvals: Mayor: Department Director wa,24d Purchasing Manager: Finance & Internal Services Director: Budget Manager: IT Manager: Dispatch Manager: Utilities Manager: Other: Revised 102008 City Of Fayetteville - Purchase Order (PO) Request Requisition o.: a e: 3119/2010 (Net a Purchase Order) 11.0 Number: Lxpected Denvery a e: All purchases under $2500 shall be used on a P-Card unless medical or 1099 service related. (Call x256 with questions) All PO Request shall be scanned to the Purchasing e-mail., Purchasin ci.fa etteville.ar us vendor*: vendor Name: Mail NEC, Inc. Yes:_ No: Ad Tess: Fob Point: - Taxable Quotes Attache 2425 S. Sth Place Yes:_ No:_ Yes: x No: City: State: Zip Code: Ship to code: D' n He A royal: Rogers AR 72758 Requester: Requester's Employee #: Ext Alison Jumper 2369 469 Item Description Quantity Unit of Issue Unit Cost Extended Cost Account Numbers Pro ecUSub ro ect # Inventory # Fixed Asset # 1 2 Construction of sewer line per attached quote 1 L.S. 26,687.50 $26,687.50 2250.9255.5315.00 02043.1002 3 $0.00 4 $0.00 5 $0.00 6 $0.00 7 $0.00 8 $0.00 9 $0.00 10 $0.00 Shipping/Handling Lot $0.00 Special ns ru ions: Subtotal: $26,687.50 Tax: Total: $26,687.50 Approvals: Mayor: Department Director:y�� �� Purchasing Manager: Finance 8 Internal Services Director: Budget Manager: IT Manager: Dispatch Manager: Utilities Manager: Other: Revised 1/2/2008 ORDINANCE NO.5342 AN ORDINANCE AMENDING ORDINANCE NO. 5311 TO ACCURATELY REFLECT THE TOTAL CONTRACT AMOUNT WITH NEC, INC. AND H2 ENGINEERING, INC. OF $29,322.13 FOR SEWER IMPROVEMENTS AT VETERANS MEMORIAL PARK, AND TO REDUCE THE PROJECT CONTINGENCY BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby amends Ordinance No. 5311 to accurately reflect the total contract amounts with NEC, Inc. and H2 Engineering, Inc. of $29,322.13 for sewer improvements at Veterans Memorial Park. Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby amends Ordinance No. 5311 by replacing Exhibit "A" of the Ordinance with the attached Exhibit "A." Section 3. That the City Council of the City of Fayetteville, Arkansas hereby amends the project contingency approved in Ordinance No. 5311 to $4,397.87. PASSED and APPROVED this 3`d day of August, 2010. APPROVED: ATTEST: By: .�./� �— By: &dje42 CE &fla L O ELD J AN, Mayor SONDRA E. SMITH, City Clerk/Treasurer .FAYETTEVILLE: 2425 S. 5th Place Rogers, AR 72758 To: City Of Fayetteville Contact: Address: 113 W. Mountain Street Phone: Fayetteville, AR 72701 Fax: Project Name: Park Centre Sewer Extension Bid Number: Project location: Park Centre, Fayetteville, AR Bid Date: line # Item # Item Description Estimated Quantity Unit Unit Price Total Price 000 Site Prep @ dean -up 1.00 LS $1,775.00 $1,775.00 001 8" PVC Sewer Main Including Base Badfill As 560.00 LF $24.90 $13,944.00 Needed 002 Manhole 4' ID 5.00 EACH $1,800.00 $9,000.00 003 Maintenance Bond For 2 Years At 25% 1.00 LS $600.00 $600.00 ACCEPTED: The above prices, specifications and conditions are satisfactory and are hereby accepted. Total Bid Price: 525.319.00 CONFIRMED: N.E.C., Inc. Authorized signature: Estimator. 6/16/2010 10:43:49 AM ' ` ��,-, {��BI'�' Page 1 of 1 City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 8/3/2010 City Council Meeting Date Agenda Items Only Alison Jumper L Park Planning Parks and Recreation Submitted By Division Department racuon aff recommends the approving an amendment to Ordinance 5311 for the construction approximately 597 sewer line estimated at $33,720, including a 15% project contingency, from the Veterans Memorial Park stroom to a sewer lift station located in the adjacent development. $ 30,720.00 Cost of this request 2250.9255.5315.00 $ 35,295.00 Category / Project Budget 4,003.13 Funds Used to Date Lake Fayetteville Improvements Program Category / Project Name Parks Development Program / Project Category Name 02043.1002 $ 31,291.87 Parks Development/PLDO (NE) Project Number Remaining Balance Fund Name Budgeted Item r --- I Budget Adjustment Attached Previous Ordinance or Resolution # Date Original Contract Date: Original Contract Number: Date Finan nd Internal Services Director Date Date ENTERED Received in / Mayor's Office % (/ D e ReceivedinCity 09-15-10P05:35 RCVD Clerk's Office Revised January 15, 2009 THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE CITY COUNCIL AGENDA MEMO To: Mayor Lioneld Jordan and City Council Thru: Don Marr, Chief of Staff Connie Edmonton, Director of Parks and Recreation. From: Alison Jumper, Park Planning Superintendent 11) Date: July 12, 2010 Subject: Amendment to Ordinance 5311 PROPOSAL: City Council approved Ordinance 5311 on April 6, 2010 approving a bid waiver for the construction and engineering of approximately 597 linear feet of 8" sanitary sewer line from the Veterans Memorial Park restrooms to a new lift station. Since that time, costs for construction have decreased, making an ordinance amendment necessary. Construction costs have been provided to the City by NEC, Inc. and H2 Engineering for these improvements as follows: Sewer Line construction $ 25,319.00 Design $ 4003.13 Total $ 29,322.13 RECOMMENDATION: Staff recommends the approving an amendment to Ordinance 5311 for the construction approximately 597 feet of 8" sewer line estimated at $33,720, including a 15% project contingency, from the Veterans Memorial Park restroom to a sewer lift station located in the adjacent development. BUDGETIMPACT: Total construction costs including a 15% project contingency is $33,720 and will be funded from Park Land Dedication Funds, Northeast Quadrant. Payment in the amount of $3,000 has been made to H2 Engineering for design, making the total remaining cost $30,720. Attachments: Bid from NEC, Inc. City Of FayetteyPpe PurcF aseRequest Requisition on NO.: : Date: nsl2o+o ....., s A(#Purchases untlec $ZSOO shafl.be usedoa a'P'Cae�Pgfess medrCa` 1�R8�S�s�afed--(dal#x25S�ivgu�ftoos� um er. xpe a ervery ae: ,, _ -r1ff PEd>_.'rYesLshaU hesgeArfedlo fheyPurchasfn ��err#aUl� Ih"reliasXn ":fe"tfewlPeals.', r.:¢ .a endor vendor or ame: mail NEC, Inc. Yes:_ No: AdTress POO Folnt I axaGle Quotes Attached 2425 S. 5th Place Yes:_ No:_ Yes:_x_ No: City: State: Zip Code: Ship to code: Divison Head Approval, r Rogers AR 72758 Requester: Requester's Employee #: Extension: Alison Jumper 2369 469 Item Description Quantityro Unit of Issue Unit Cost Extended Cost Account Numbers PectlSub ro'ect# Inventory # Fixed Asset # + 2 Construction of sewer line + L.S. 25,319.00 $25,319.00 2250.9255.5315.00 02043.1002 per attached quote 3 $0.00 4 $0.00 5 $0.00 6 $0.00 7 $0.00 6 $0.00 9 $0.00 10 $o.00 ShippinglHandling Lot $0.00 Special ns ons: Subtotal: $25,319.00 Tax: Total: $25,319.00 Approvals: Mayor: Department Director: Purchasing Manager: ` Finance & Internal Services Director Budget Manager: IT Manager: Dispatch Manager: Utilities Manager: Other: Revised 10008 ORDINANCE NO. AN ORDINANCE AMENDING ORDINANCE NO. 5311 TO ACCURATELY REFLECT THE TOTAL CONTRACT AMOUNT WITH NEC, INC. AND H2 ENGINEERING, INC. OF $29,322.13 FOR SEWER IMPROVEMENTS AT VETERANS MEMORIAL PARK, AND TO REDUCE THE PROJECT CONTINGENCY BE IT ORDAINED. BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby amends Ordinance No. 5311 to accurately reflect the total contract amounts with NEC, Inc. and H2 Engineering, Inc. of $29,322.13 for sewer improvements at Veterans Memorial Park. Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby amends Ordinance No. 5311 by replacing Exhibit "A" of the Ordinance with the attached Exhibit "A." Section 3. That the City Council of the City of Fayetteville, Arkansas hereby amends the project contingency approved in Ordinance No. 5311 to $4,397.87. PASSED and APPROVED this 3rd day of August, 2010. APPROVED: ATTEST: By: . By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer ORDINANCE NO.5311 AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVING CONTRACTS WITH NEC, INC. AND 112 ENGINEERING, INC. IN THE TOTAL AMOUNT OF $30,690.63 FOR SEWER IMPROVEMENTS AT VETERANS MEMORIAL PARK, APPROVING A PROJECT CONTINGENCY OF $4,404.00, AND APPROVING A BUDGET ADJUSTMENT WHEREAS, the restrooms at Veterans Memorial Park at Lake Fayetteville currently utilize a septic system which requires occasional maintenance and raises concern regarding the age of the system and its proximity to Lake Fayetteville, and; WHEREAS, NEC, Inc. is constructing Park Centre, a mixed -use development south of Veterans Memorial Park, and is required to construct a sewer lift station to provide sewer service to the site which will be located approximately fifty (50) feet from the park's south boundary, and; WHEREAS, H2 Engineering, hic. has knowledge of the capacities and elevations of the sewer lift station that is critical to the design of the sewer connection to the restrooms at Veterans Memorial Park, and is working as the engineering firm on the Park Centre project with NEC, Inc., and; WHEREAS, the City would benefit from utilizing the Park Centre developer and engineers to design and construct a sewer line from the lift station to the restrooms at Veterans Memorial Park; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council ofthe City of Fayetteville, Arkansas hereby determines that an exceptional situation exists in which formal competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves contracts with NEC, Inc. and H2 Engineering, Inc. in the total amount of$30,690.63 for construction of sewer improvements at Veterans Memorial Park. Copies of the contracts, marked as Exhibits "A" and "B," are attached hereto and made a part hereof. Page 2 Ordinance No. 5311 Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby approves a project contingency of $4,404.00 and a budget adjustment of $35,295.00, a copy of which is marked as Exhibit "C" attached hereto and made a part hereof. PASSED and APPROVED this 60' day of April, 2010. APPROVED ATTEST: S. 5th Place s, AR 71758 To: CRY Of Fayetteville Contact: Address: 113 W. Mountain Street Phone: Fayetteville, AR 72701 Fax: Project Name: Park Centre Sewer Extension Bid Number: Project Location: Park Centre, Fayetteville, AR Bid Date: Line # Item # Item Description Estimated Quantity Unit Unit Price Total price 000 Additional Tree Clearing 1.00 LS $535.00 $535.00 001 8" PVC Sewer Main Including Base Backfill As 597.00 LF $27.50 $16,417.50 Needed 002 Manhole 4' ID 5.00 EACH $1,825.00 $9,125.00 003 Maintenance Bond For 2 Years At 25% 1.00 LS $610.00 $610.00 Notes: ACCEPTED: CONFIRMED: The above prices, specifications and conditions are satisfactory and N.E.C., Inc. are hereby accepted. Buyer: Signature: . Date of Acceptance: 3/17/2010 8:55:4D AM Authorized Signature: EsUmatur: Total Bid Price: $26,687.50 Page 1 of 1 cH — ENOI!NERMNfi, lime. PROPOSAL FOR ENGINEERING SERVICES For THE CITY OF FAYETTEVILLE VETERANS PART{ SEWER EXTENSION MARCH 22, 2010 COPE OF SERVICES: Task 1 fewer Extension Construction Plans — H2 Engineering, Inc., as part of this proposal, will produce a set of construction plans and reports which meet or exceed the requirements, standards, and specifications of the City of Fayetteville. Ibis set of construction plans will include a sanitary sewer main extension from the existing restroom facilities on the south side of Veterans Park to the proposed Park Centre Lift Station This task includes permits (excluding the associated fees) and a letter of approval from the City of Fayetteville Engineering Department and the Arkansas Department of Health. Easement dedication is not part of this proposal. Easement dedication shall be the responsibility of the City of Fayetteville. Task I shall be considered complete upon construction plan approval from the City of Fayetteville Engineering Department and the Arkansas Department of Health. Task 2 — Construction Inspection and As -Built Plans — H2 Engineering, Inc. will coordinate and attend all site work pre -construction conferences as required by the City of Fayetteville. We will provide inspection specifically for utility improvements, as required by the City of Fayetteville. Construction staking is NOT within the scope of this contract 77ie addition of construction staking shall be performed on an HOURLYBASIS as reflected in Paragraph 9 under "Additional Services." We will coordinate and attend the site work Final Inspection by the City of Fayetteville. We will generate a final inspection pinch list (based on City of Fayetteville comments) and supervise completion, by the respective contractor, of each punch list item We will produce as -built plans upon completion of the project's site work as required by the City of Fayetteville. Task 2 shall be considered complete when the as -built plans have been accepted by the City of Fayetteville. FEES AND BELLING - The above tasks (1-2) will be performed for an amount equal to 15% of the construction cost of the project. This project's construction cost is currently estimated at approximately $27,000. Based on this estimated construction cost, the estimated 15% engineering fee would be $4,050. This is an estimate only and is subject to change based on the actual construction contract with the Contractor. ADDITIONAL HOURLY WORK WILL BE PERFORMED ON AN HOURLY RATE AS REFLECTED IN PARAGRAPH 9 UNDER "ADDITIONAL SERVICES." Billing of this fee will be submitted on a monthly basis as a percent complete of the associated activities. All invoices are due upon receipt. For bills which are not paid within 30 days, an additional 5% of the billed amount will be accrued for each delinquent 30day period thereafter. H2 Engineering, Inc. reserves the right to discontinue work on this project if invoices are not paid within 45 days. The following represents the task breakdown of engineering compensation for this project: Total Estimated Engineering Fee (Tasks 1— 2) = $4,050 • Task 1— 75% of Engineering Fee • Task 2 — 25% of Engineering Fee City of Fayetteville, Arkansas Budget Adjustment Form Budget Year Department: Operations Date Requested 2010 Division: Parks & Recreation 3/16/2010 Program: Parks Development Capital Project or Item Added/Increased: To increase funding to construct approximately 597 feet of 8" sewer line from the Veteran's Memorial Park restroom to a sewer lift station located in the Park Centre development Adjustment Number Project or Item Deleted/Reduced: Reduce Park Land Dedication funds to allow for construction of sewer at Veteran's Memorial Park. Justification of this Increase: Justification of this Decrease: Additional funding has become available in this Park This adjustment is administrative: Land Dedication Quadrant since our last CIP Plan was submitted. There is adequate funds in these accounts to fund this line Item. EXHIBIT C Increase Budget Account Name Account Number Contract Services 2250 9255 5315 Decrease Budget Account Name Account Number Greenspace Fees - NE 2250 0925 4419 3/18/2010 Date �� 3/18/2010 Date 3-23 `2010 Date gg Date J__yL Amount Project Number 00 35,295 02043 1002 Amount Project Number 01 35,295 02043 1002 Budget & Research Use Only Type: A B C D Requested By General Ledger Date Posted to General Ledger Posted to Project Accounting V.090403 E Initial Date Initial � Date City of Fayetteville Staff Review Form City Council Agenda Items and Contracts,. Leases or Agreements 4/6/2010 City Council 1=ng Date Agenda items Only Alison Jum tte Park Plannin�^.eY1 Parks and Recreation Subm By Division Department at of 8" sewer line estimated at $30,691 from the Veteran's Memorial Park restroom to a sewer lift station located the Park Centre development and including a 15% project contingency in the amount of $4,404 for a total cost of 3529$..00 Cost of this request t2250.9255.5315.00 $ 48,006.00 . Category / Project Budget Funds Used to Date Lake Fayetteville Improvements Program Category / Project Name Parks Development Program / Project Category Name 02043.1002 $ 48,006.00 Parks .Develo m!nVKDO (NE) Project Number Remaining Balance Fund Name Budgeted Item Budget Adjustment Attached z ZI Date 3-22-la Data Date and Internal'Se�ces Director' Dam Previous Ordinance or Resolution # Original Contract Date. .rrrw�� Original Contract Number., Received in city ENTERED Clark'sOffice 3"iq-10 K64 t..r+..rrrer.rrt. Mrrwr -O Date Received in xx Mayor's Office DAW Revised January 15, 2009 THE CITY OF FAYErMILLE, ARKANSAS DUARTMENrCORRESPONOENCE CITY COUNCIL AGENDA MEMO To: Mayor Lioneld Jordan and City Council Thru: Don Marr, Chief of Staff Connie Edmonton, Director of Parks and Recreation From: Alison Jumper, Park Planning Superintendent Date: March 17, 2010 Subject: Proposed Bid Waiver for construction of sanitary sewer connection for Veteran's Park at Lake Fayetteville PRQPQSAU: NEC, Inc. is constructing Park Centre, a mixed use development south of Veteran's Memorial Park at Lake Fayetteville, north of Zion Road. As a part of this development, the developer is required to construct a sewer lift station to provide sewer service to the site. The restrooms at Veteran's Memorial Park currently utilize a septic system. The septic system has not been problematic; however, it does require occasional maintenance and raises some concern regarding the age of the system and its proximity the lake. Connecting to a public sanitary sewer system would eliminate future septic maintenance as well as concerns of aging and potential lake contamination. The required sewer lift station in the Park Centre development is located approximately 50 feet from the park's south boundary. The City would benefit from utilizing the development's engineering firm and contractors to design and construct the sewer line from the lift station to the restroom while they are on site. The developer's engineering firm, H2 Engineering has knowledge of the capacities and elevation of the sewer lift station that is critical to the design of the sewer connection to the restroom. Utilizing NEC, Inc. to construct the sewer line while they are on site would reduce costs for mobilizing equipment, bidding and advertising. Construction costs have been provided to the City by NEC, Inc. and H2 Engineering for these improvements as follows: Sewer Line construction $ 26,687.50 Design 400 .13 Total 0 69W THE CITY OF FAYETTEVILLC ARKANSAS Staff recommends the approval of a bid waiver for NEC, Inc. and H2 Engineering to construct approximately 597 feet of 8" sewer line estimated at $30,691 from the Veteran's Memorial Park restroom to a sewer lift station located in the Park Centre development and including a 15% project contingency in the amount of $4,404 for a total cost of $35,295. BUDGET IMPACT: The final costs to the City will be based upon actual costs as documented by NEC subject to review by the City and may, or may not exceed the submitted estimate. However, the City's cost will not exceed the estimate without additional authorization. Attachments: Estimate from NEC, Inc. Estimate from H2 Engineering Budget Adjustment Project Accounting Request Purchase Requests ORDINANCE NO. AN ORDINANCE WANING THE REQUIREMENTS OF FORMAL COMPETITNE BIDDING AND APPROVING CONTRACTS WITH NEC, INC. AND H2 ENGINEERING, INC. IN THE TOTAL AMOUNT OF $30,690.63 FOR SEWER IMPROVEMENTS AT VETERANS MEMORIAL PARK, APPROVING A PROJECT CONTINGENCY OF $4,404.00, AND APPROVING A BUDGET ADJUSTMENT WHEREAS, the restrooms at Veterans Memorial Park at Lake Fayetteville currently utilize a septic system which requires occasional maintenance and raises concern regarding the age of the system and its proximity to Lake Fayetteville, and; WHEREAS, NEC, Eric. is constructing Park Centre, a mixed -use development south of Veterans Memorial Park, and is required to construct a sewer lift station to provide sewer service to the site which will be located approximately fifty (50) feet from the park's south boundary, and; WHEREAS, H2 Engineering, Inc. has knowledge of the capacities and elevations of the sewer lift station that is critical to the design of the sewer connection to the restrooms at Veterans Memorial Park, and is working as the engineering firm on the Park Centre project with NEC, Inc., and; WHEREAS, the Citywould benefit from utilizing the Park Centre developer and engineers to design and construct a sewer line from the lift station to the restrooms at Veterans Memorial Park; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby determines that an exceptional situation exists in which formal competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves contracts with NEC, Inc. and H2 Engineering, Inc. in the total amount of $30,690.63 for construction of sewer improvements at Veterans Memorial Park. Copies ofthe contracts, marked as Exhibits "A" and `%," are attached hereto and made apart hereof. Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby approves a project contingency of $4,404.00 and a budget adjustment of $35,295.00, a copy of which is marked as Exhibit "C" attached hereto and made a part hereof. PASSED and APPROVED this Ob day of April, 2010. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer RESOLUTION NO. A LUTION APPROVING CONTRA NEC, INC. AND ENGINEERING, INC. IN THE AL AMOUNT OF $30,690.63 FOR SEWER IMPRO AT VETERANS MEMORIA ARK, APPROVINGFGO JECT CONTINGENCY OF $4,404.00, APPROVING AT ADJUSTMENT BE IT RESOL BY THEOUNCIL OF THE CITY OF FAYETTEVILLE, ARKAN . Section 1. That the Ci Co it of the City of Fayetteville, Arkansas, hereby approves contracts wiC, Inc. and HZ Engineering, Inc. in the total amount of $30,690.63 for Ath nofsewer improvements at Veterans Memorial Park. Copies ofcts, marked Exhibits "A" and "B;' are attached hereto and made a Section 2. That e City Council the City of Fayetteville, Arkansas, hereby approves a pr ect contingency of $ .00 and a budget adjustment of $35,295.00, a copy o hich is marked as Exhi attached hereto and made a part hereof. By: PASSE11and APPROVED this 6th day of Apr'l� 2010. JORDAN, Mayor ATTEST: SONDRA E. SX=,.Cit Clerk/Treasurer ADDITIONAL SERVICES: The following items are assumed to be additional services, reimbursable services, or work to be performed by others and are in addition to costs quoted herein above for all work: 1. Any services beyond the scope of what is outlined in this proposal. 2. Expense of reproduction of drawings and specifications other than for inter -office use. 3. Special renderings, presentations, or visual graphics not included in this estimate. 4. Work related to appeals from decisions rendered by agencies on permits or site issues that affect our work are assumed to be additional services. 5. Fees for permit and permit applications and legal fees and expenses involved with review of applications and decisions rendered by agencies. 6. Cost of geotechnical investigations are assumed to be work performed by others and are to be reimbursable expenses or paid directly by owner. 7. Costs of other consahants which may be required for work not specified in this proposal, which includes testing of utilities and roadway mats, tra,J, a studies, extensive hydrologicalllood studies, wetlands determinations, landscape design, tree assessments, and architectural renderings. 8. Costs of identifying, procuring, and filing off -site utility easements as may be required by the City. We will perform this service at the hourly rate indicated in paragraph 9. 9. Costs related to making revisions in drawings or other documents when such revisions are inconsistent with approvals or instructions previously given by the owner, including revisions made necessary by adjustments in the owner's project budget, or due to changes required as a result of the owner's failure to make decisions in a timely manner. These costs will be billed on the following hourly rate: a. Project Engineer - $125 per hour b. Drafting/ Engineering Technician - $85 per hour c. Stakeout Crow - $100 per hour d. Surveyor - $100 per hour CHANGES IN SERVICES: The Client reserves the right to request changes in the services. If the requested changes by the Client require additional engineering services, then in that event the Engineer shall be compensated for the services requested. Upon mutual acceptance of desired and necessary changes, and of an equitable adjustment of engineering costs, a Supplemental Engineering Services Agreement shall be executed and shall be approved by the Client prior to the performance of any changed service. H2 Engineering, Inc. Client Kipp Hearne, P.E. President Alison Jumper - Parks SS @ Park Centre From: "Jeremy Thompson" <jthompson@h2ei.net> To: "Alison Jumper"<ajurnper@ci.fayetteville.ar.us> Date: 3/17/201011:16 AM Subject: Parks SS @ Park Centre Attachments: Park Centre Sewer Extension_Rev-l.pdf Alison, Here is the estimate from the contractor. Looks like our new route added tree removal and an additional manhole. Our engineering fee will just be 15% of the final contract price. Based on this estimate from NEC of $26,687.50, our engineering fee would be $4,003.13 for a total estimate of $30,690.63, The contractor will give an actual number if we are given the notice to proceed and produce an actual construction plan. I'm a little busy today so I didn't have time to put this into a formal proposal — I can do that later W you need me to. Hopefully these numbers will help you get started, though. Thanks, Jeremy Thompson, PE, LEED AP Vice President H2 Engineering, Inc. (479)582-4234 equrs ion o.: e: City Of Fayetteville - Purchase Order (PO) Request 311912010 (Not a Purchase Order) KU Number a ervery a All purchases under$2500 shall be used on a P-Card unless medical' or 1099 service related. (Call x= with questions) AO PO R uestshallbe scanned to the Purchas/n e-mail. Pun9mal 6hyeftev/l/e.ar us Ven or#: - e or anhe:Mail 16130 H2 Engineering Yes:_ No:_ ress: - ob Point, Taxable Quotes Attached 2758 Millennium Or. Yes:_ No: Yes: x_ No:_ City: State: Zip Code: Ship to code: Divison He hovel: Fayetteville AR 72703 Requester. Requester's Employee#: Extensi Altson Jumper 2369 469 Its Description Quantity Unit of lesue Un0 Coal Extended Cost Account Numbers Pro ect8ub ro'ect # Inventory # Fixed Asset # 1 2 Engineering for sewer line 1 LS. 4,003.13 $4,003.13 2250.9256.6315.00 02043.1002 per attached quote 3 woo 4 $0.00 5 $0.00 6 $0.00 7 $0.00 8 $U.00 9 $0.00 10 $0.00 ShlppinglHandling Lot $0.00 peas n ons: Subtotal: $4,003.113 Tax: Total: $4,003.13 Approvals: �••�� Mayor. Department DireaorA�C a ,, �LO� Purchasing Manager. Finance & Internal Services Director. Budget Manager. IT Manager. Dispatch Manager: Utilities Manager. Other. City Of Fayetteville - Purchase Order (PO) Request quiai .on o.: 3110/2010 (Not a Andiese order) NUMDer: txpecieo Ueavery a e: All purchases finder $2500 shall be used on a P-Card unless medical or 1099 service roleted. (Call x256 with questions) AlIPORequestaballb0 scanned to the liurohasln a-maiL•Purchas7n '.f vi0earus en of : en or ame: MOO, NEC, Inc. Yes:_ No: Ad ress: Fob Point I aXable notes Its 2425 S. 5th Place Yes:_ No:_ Yes: No: City: State: Zip Code: Ship to code: D ' n Fle roval: Rogers AR 72758 Requester. Requesters Employee #: Alison Jumper 2369 469 Item Description Quantity Unh of Issue Unit Cost Extended Cost Account Numbers Pro' etAki ro' cl # Inventory # Fixed Asset # t 2 Construction of sewer line per attached quote 1 L.B. 26,687.50 $26,687.50 2250.9255.5315.00 02043.1002 3 $0.00 4 $0.00 5 $0.00 6 $0.00 7 $0.00 6 $0.00 9 $0.00 10 $0.00 ShippingMandling Lot $0.00 Special Inswcuons; Subtotal: $26,687.50 Tax: Total: $26,687.50 Approvals: Mayor. Department Director. �+ Purchasing Manager. Finance & Internal Services Director. Budget Manager. IT Manager: Dispatch Manager: UtigOes Manager: Other; Revised =7008