HomeMy WebLinkAbout2009-03-02 - Agendas - Final Parks&Recreation Staff _ Parks&Recreation Advisory Board
r_
Connie Edmonston,Director � �� k+p �,;F� ?' Wade Colwell,Chairman
Byron Humphry,Maintenance Superintendents Darby Benson
''. : A, of _
Chase Gipson,Recreation Superintendent ,y� �z _ Valerie Biendara
Alison Jumper,Park Planner ' 'F. Steve Hatfield
Carole Jones,Park Planner -• _ - Phil Jones
Melanie Thomas,Senior Secretary Craig Mauritson
Jim Meinecke
FAYETTEVILLE Steve Meldrum
ff Mk Bill Waite,Jr.
Parks and Recreation Advisory Board Meeting
March 2, 2009 at 5:30 p.m.
City Administration Building Room 326
113 West Mountain Street
Fayetteville, AR
AGENDA:
1. Arkansas Recreation & Parks Association 2008 Awards: Mayor Jordan
Arkansas Volunteer Group of the Year: Master Gardeners
Arkansas Volunteer Individual of the Year: Wade Colwell
2. Approval of January 5, 2009 PRAB Meeting Minutes
PRAB Motion:
3. Botanical Garden Monthly Report and 2008 Annual Report: Bill Dollar, BGSO
Board President
4. Community Gardens Presentation: Lisa Netherland, Park Horticulturist
5. Lake Fayetteville Trail Update: Matt Mihalevich, Trails Coordinator
6. Dog Park Presentation: Alison Jumper, Park Planner
7. 2008 Parks and Recreation Annual Report: Connie Edmonston, Parks & Rec. Dir.
According to Article Il, Chapter 33.018 (B) in the Fayetteville Code of Ordinances, Parks
and Recreation Advisory Board is to prepare an annual report to City Council. This
report is included in the attachments. Once approved by PRAB, this document will be
forwarded to the City Council.
PRAB Staff Recommendation: To approve the 2008 Annual Report
PRAB Motion:
8. Regional Park Update: Connie Edmonston, Parks & Recreation Director
9. Bryce Davis Park Public Meeting Report: Alison Jumper, Park Planner
10. Park Cleanup Report: Byron Humphry, Parks Maintenance Superintendent
Volunteer Pictures from February 21, 2009
11. Other Business
12. Adjournment
Attachments:
January 5, 2009, PRAB Meeting Minutes
Botanical Garden 2008 Annual Report
Community Garden Coalition (CGQ Information
2008 PRAB Annual Report
Park Land Dedication Ordinance Fund Monthly Report
CIP Report
HMR Monthly Report
Upcoming Events
• Bryce Davis Park Expansion Public Meeting on Thursday, February 26 at 5:30 pm, Ozarks
Electric Community Room
• Arctic Classic Softball Tournament on Saturday& Sunday, February 28 and March 1 at Gary
Hampton and Lake Fayetteville Softball Complexes
• Soccer practice starts on Saturday, February 28 at Lewis and Asbell Soccer Complexes
• Community Gardens Public Meeting: Thursday, March 5 from 5:30 pm—7:15 pm, Public
Library Walker Room
• Rodney Ryan Park Opening on March 26 at 5:30 pm. The park is located by Stonebridge Golf
Course south of Highway 16 East at 1862 South River Meadows Drive.
March 2,2009 PRAB Agenda Page 2 of 2
FAYETTEVILLE
PARKS AND RECREATION BOARD
Minutes for January 5, 2009
Opening:
The regular meeting of the Parks and Recreation Advisory Board was
called to
order by Chairman Wade Colwell at 5:31 p.m. on January 5, 2009 in room
111
of the City Administration Building located at 113 West Mountain Street
in Fayetteville, Arkansas.
Present:
Parks and Recreation Advisory Board members Colwell, Biendara, Waite,
Hatfield, Meinecke, Meldrum,
P. Jones, and Mauritson were present. Benson was absent. Parks and
Recreation Staff members Edmonston,
Humphry, Gipson, C. Jones, Thomas, and the audience were present.
Introduction of new PRAB Member Jim
Meinecke: Connie Edmonston, Parks & Recreation
Director
1. Election of PRAB Officers for 2009: Wade Colwell,
Chairman
Chairperson: Mauritson motioned for Colwell to remain
Chairperson. Hatfield seconded it.
Vice Chairperson: Waite motioned for Hatfield to become Vice
Chairperson. Hatfield seconded it.
PRAB Motion: Both motions passed 7-0-0 by voice vote.
2. Approval of December 1, 2008 PRAB Meeting Minutes
PRAB Motion: Mauritson motioned to accept the December
minutes as written, and Biendara
seconded it. Motion passed 7-0-0 by voice vote.
3. Botanical Garden Monthly Report: Walt Filers, Board of
Directors
Eilers discussed the report. Phase I is complete. The Reading
Railroad, an outdoor reading area, is
under construction. It is a $20,000 gift from the Kiwanis Club. The
Plans and Property Committee
is working with a consulting company to develop a master plan for
the remaining ninety acres of the leasehold.
There are many activities on the 2009 Garden Calendar, including
nationally known speaker, Earth Day
activities, and the spring plant sale.
Edmonston said she appreciates Eilers coming to the meeting
every month to give an update.
Mauritson commented that they are doing a great job. He also
mentioned that Cindi Cope, who has
planted around 26,000 tulip bulbs for various projects in
Fayetteville, should be called "Johnny Tulipbulb".
4. PRAB 2009 Orientation Date: Connie Edmonston, Parks &
Recreation
Director
Please bring your calendar so we can select a date for the annual
PRAB Orientation. We need to allow
a time frame of approximately 2 hours prior to our February 2nd
PRAB monthly meeting.
A two hour lunch meeting was discussed. Edmonston suggested
having it at the library, or Parks and
Recreation, or the Botanical Garden.
Meldrum says Wednesdays are bad for him.
It was decided to have the orientation on January 20, 2009 from 11:30
to 1:30 at the Botanical Gardens.
5. Regional Park Update
Edmonston said there was no meeting for the Regional Park in
December.
Jumper commented that the consultants are getting Phase I ready to
submit to the Planning Division.
Mauritson asked if the City was doing a survey.
Jumper said yes, but it wasn't ready.
6. Other Business
Troy Lawrence from Troop 142 presented a project for a trail at
Lake Sequoyah. He and his fellow workers
would start at the single land bridge, cross the road, and end near
the picnic table. They would clear cut the
trail in a time frame of two to three weeks. He said he needs help
with the crosswalk for walkers and bikers.
He has already talked to Jeff Coles, who was supportive about the
issue.
Edmonston said she thought that part of Lake Sequoyah is in the
county.
Colwell said it was in the City limits.
Jumper said she would verify that.
Lawrence said he also needs help with Mr. Spencer's pond,
because it's very froggy. There is a crevice
close to the pond that could be hazardous. He would like to put in a
pipe and fill it in. The crevice is about ten feet deep.
Mauritson suggested using phone poles.
Humphry suggested installing a bridge.
Colwell said that where it's feasible, fences need to be removed.
Fences also need to be on the property line.
Lawrence said that he wants to start the project the last week in
January.
Colwell told him to be sure and keep track of his hours.
PRAB Motion: Mauritson motioned to accept the Lake Sequoyah
trail proposal. Meldrum seconded it.
Motion passed 7-0-0 by voice vote.
Wade will be leading a full moon hike on Rookery Trail.
Biendara said Rookery Trail has a geocache now.
Meinecke asked if there was a rookery there.
Colwell said yes, and would point it out on the hike.
ADDENDUM TO AGENDA:
Naming of Unnamed Tributary to Mud Creek
C. Jones said the name Niokaska Creek is an Osage Tribal term
that means "Little Ones (or children)
of the Middle Waters".
Colwell says due to "political pressure" from the fourth graders of
Root Elementary, he will bow to it.
Edmonston said that it's not a done deal. It still has to pass the City
Council's approval.
7. Adjournment
The meeting was adjourned at 6:20 p.m.
Minutes taken by Melanie Thomas
BOTANICAL
GARDEN
OF
QZARKS
2008 Annual Report
Parks and Recreation Advisory Board
March 2, 2009
LOOKING FORWARD - 2009 PRIORITIES
Objectives:
• Fund, recruit and employ an Executive Director responsible for operating the
Garden and serving as the CEO and chief fundraiser.
• Approve and track the 2009 strategic plan.
• Move the Garden to financial sustainability by 2011.
• Update the Fayetteville lease and get Council approval by May 31.
• Conclude a land swap with the Environmental Center.
• Conclude details and construction of the Lake Fayetteville Trail through and
adjacent to the Garden fee space.
1. GOVERNANCE ACTION MATRIX
EXECUTIVE DIRECTOR
Action item Responsible Target
Submit funding grant. Dollar, Bass, March 23
Shirley, Eilers
Write Executive Director transition plan, budget and Mulhollan, April 14
calendar. Dollar
Start Executive Director announcement and interview Dollar, Shirley July 21
protocol. and Bass
Oversee Executive Director hiring, contract and move. Ex.Comm. Dec. 15
Board
1
2. BGSO STRATEGIC PLAN
Action item Responsible Target
Seek Chair edits to Strategic Plan. Dollar March 5
Review and final edit of Strategic Plan. Eilers, Dollar March 10
Complete the Operations components. Scott Starr March 12
BGSO Board adopts the Strategic Plan. Board March 17
Board meeting review and assessment. EC and Board Bimonthly
3. BGO SUSTAINABILITY PLAN
Action item Responsible Target
Develop 2010 budget with ED salary and line item. McKnight Feb. 27
Write a fundraising and grant plan for$85,000 in 2009. Eilers, Dollar, March 10
McKnight
Seek weekday commercial rental of Totemeier Center. Staff, Board Monthly
Board focus on fundraisers, fundraising and grants. Board Monthly
4. FAYETTEVILLE LEASE UPDATE
Action item Responsible Target
Develop annual report to Parks and Council. Dollar, Eilers March 2
and Mulhollan
List and define lease details and changes. Dollar, Eilers March 10
and Mulhollan
Meet with Edmonston, Colwell on lease. Dollar, Eilers March 26
and Mulhollan
Land swap details and map/description. Troutman and April 17
Plans and Prop.
Lease revisions to Council. Dollar, Eilers May 19
5. LAKE FAYETTEVILLE TRAIL
Action item Responsible Target
Plan land swap map/description and letter agreement. Troutman and April 17
List lease implications. Plans and Prop.
Complete the Mesa Master Plan with sequence/priority Plans/Prop May 19
plan and projected construction budget.
Identify design and feature details of the parking lot, Plans/Prop June 15
trailhead access and Lake Fayetteville Trail in the BGO
fee area.
Discussion details with Parks and Trails on project. Plans/Prop July 10
BGO board action on trail. Dollar July 21
2
LOOKING BACKWARD - 2008 IN REVIEW
The Botanical Gardens' initial year of operation was a challenging and growing
experience. We had to discover and invent many things. Our successes include:
• Construction of all infrastructure, gardens and features in Garden Phase 1A is
complete. This includes the Ball Greenhouse and features and gardens. The
nine completed Gardens and Totemeier Center represent a leasehold
improvement value of over$2.18 million.
• More than 30,000 people visited the Garden, including visitors from at thirty-
seven states and five countries.
• More than 4000 students from five area school districts participated in the Earth
Day and Butterfly Day events.
• The staff and Plans/Properties Committee developed an operations manual,
wrote policies on rental, catering, photography, liquor and guest etiquette.
• 165 volunteers donated 8,474 hours to support the Garden. This service is
valued at $319,000.
• The Reading Railroad, a $20,000 gift of the Kiwanis, is under construction
adjacent to the Children's Garden. This outdoor reading area should be
available in spring 2009.
• The Garden hosted a summer musical series, two gala fundraisers, Shakespeare
production, ballet recital, Christmas Farmers' Market, educational series, cocktail
series and 28 weddings.
• 2008 membership hit a record level of 1245 households. Nearly 1800 individuals,
families, and businesses donated to the Garden in 2008.
• BGSO has recently launched three initiatives to achieve financial sustainability:
Giving Circles campaign for annual or monthly giving, Chamber leader
membership campaign for business members and an end-of-the year appeal.
• The Board completed a revamp and update of the 1994 corporate filings and our
1993 bylaws. All governance documents are now current.
• The www.bgozarks.org website and monthly electronic newsletter are well
received and popular. Over 2000 readers each month check out BGO and its
digital newsletter.
3
Fayetteville Community Garden Coalition (FCGC)
Initiated weekly meetings January 10, 2009
Objectives/Concepts:
• Develop network of garden "communities" that learn and grow as one.
• Sustainable/Organic: emphasize the use of renewable resources and the
conservation of soil and water to enhance environmental quality for future
generations.
• Each garden community will develop their garden and garden activities.
Each community will continually define its own goals, (personal use,
donation of surplus food, plant-a-row, education, fundraising,
entrepreneurship, etc) design, and structure.
• Education: Improved nutrition through all phases of home food production
and processing, other local sources of food including farmers market and
CSAs.
Goals:
Short-term
a. Create CGs policy committee to define and implement CG objectives.
Currently have 6-member committee
b. Focus:
• Public meetings to involve community (all sectors)
• Land acquisition, water must be available (for e.g. pilot project plus 1
garden/quadrant and/or area where most interest is)
• Develop coalition of partners (ONF, UofA, Wash. Co. Ext., DHS, School
District, AATRA, NCAT, City, etc.) Define potential role of partners, seek
involvement
• Facilitate development of individual gardens based on participating
garden members needs
• Identify garden leaders and develop volunteer base for each garden
c. Community Food Assessment
d. Utilize City web site
e. Zoning requirements (schools, parks, churches, neighborhoods, private and
other lands)
f. Appoint program coordinator
Medium-term
a. Utilize existing Ordinances (green space and/or others) to set aside preserve
land for CGs
b. Include CGs in general and comprehensive city plans
c. Develop avenues to support community food banks/food kitchens/address
childhood obesity
d. Develop economic opportunities for youth and low-income citizens
e. Add gardens as community needs and input necessitate
(continued)
Long-term
a. Partner to develop community facilities for food processing
b. Monitor/improve existing programs
Assessment:
1. Assess the current state of community gardens in
Fayetteville (public meetings will facilitate this)
• Locate current active sites and people
• Where interest level is in the community
• Determine needs to support a network of gardens
2. Initial goals
• Develop unified CGs wherever there is interest and community
• Identify neighborhood/community members that will actively
lead and participate in all phases of development and management for
their gardens.
3. Roles of our CGs committee/city government/other partners:
• Facilitate CGs from the people up, creating excitement in the community
• Support many community building possibilities of CGs
• Facilitate development of CGs with resources that the gardening members
need. Facilitation should be to help the community build their gardens and
the programs that evolve around CGs
Populations served:
• Low income residents
• Youth (obesity and other at risk populations)
• Social Service agencies
• Volunteers/residents grow to donate to hunger-relief agencies.
• ADA plots/other features
• Home school students
• Traditional students
Funding/Supplies Sources:
• Grants
• Fundraising
• Municipal participation
• Business and residential donations (monetary and in-kind)
Priorities Winter/Spring 2009:
1. Conduct public meetings to learn who most is interested and where they are
located
2. Secure land site(s) with water (gardens can be planned and constructed very
inexpensively, need land and water)
3. Access to City's Web site
(continued)
4. Yvonne Richardson Center Children's Garden
2
• Apply for $2,300 Fiskars for gardening tools and equipment
• Garden start Spring 2009
• Teach youth how to garden and prepare foods
Robert Wood Johnson Foundation
Healthy Kids, Healthy Communities Grant:
Healthy Kids, Healthy Communities is a national program of the Robert Wood
Johnson Foundation (RWJF) whose primary goal is to implement healthy eating
and active living initiatives that can support healthier communities for children
and families across the United States. The program places special emphasis on
reaching children who are at highest risk for obesity on the basis of
race/ethnicity, income and/or geographic location. This initiative will advance
RWJF's efforts to reverse the childhood obesity epidemic by 2015.
Through this call for proposals (CFP), RWJF will award approximately 60 grants
to help local community partnerships across the United States increase
opportunities for physical activity and improve access to affordable healthy foods
for children and families. Special consideration will be given to communities in 15
states where the incidence of or risk for childhood obesity is the greatest.
Approximately half of the grants under this CFP will be awarded to communities
in these states.
Brief proposal submitted on February 2, 2009 for $320,000
Long proposal due May 14, 2009
Late September finalist notified
Funding announced December 15, 2009.
3
PARK LAND DEDICATION ORDINANCE FUND REPORT
PRAB Meeting of March 2009
REPORT BY:TRACIE A.MARTIN
2126/200915:59
NORTHWEST PARK DISTRICT
Approved Original Amount
BALANCE YEAR TO BE SPENT Banked Land Remaining: PRAB Date Approved Project
$ 85,891.01 2009 1.5 Hoskine/Scull Creek Trail $ 1,244.11 Multiple $ 155,705.00 Salem Meadows(8/1/05,6/5106&11/6/06)
$ 277,849.14 2010 $ - 7/10/2006 $ 60,000.00 Davis Park Playground replacement match
$ 118,424.79 2011 $ 325,000.00 8/6/2007 $ 325,000.00 Davis Park Expansion
$ 1,262.60 2012 $ 0.00 4/7/2008 $ 35,000.00 Gary Hampton Pavilion
$ 39,578.00 N/A $ 39,578.00 Red Oak Park/Gordon Long Funds
$ 70,000.00 1212/2008 $ 70,000.00 Davis Expansion
$483,427.54 Total 2009-2012 $435,822.11 Total Approved Expenditures
$47,605.43 Total Un arcumbered 2008-2011
NORTHEAST PARK DISTRICT
Approved Original Amount
BALANCE YR TO BE SPENT Banked Land Remaining: PRAB Date Approved Project
$ - 2009 $ - 5!1/2007 $ 67,500.00 David Lashley Park
$ 26,824.48 2010 $ 52,172.79 8/6/2007 $ 67,000.00 Gulley Park Pavilion
$ 71,506.35 2011 $ - 4!1/2008 $ 35,720.00 East Mud Creek Tral Bridge
$ 257.50 2012 $ 16,827.50 12/2/2008 $ 17,000.00 Gulley Park Pavilion/Restroom Site
$98,588.33 Total 2009-2012 $69,000.29 Total Approved Expenditures
$29,588.04 Total Unencumbered 2008-2011
SOUTHWEST PARK DISTRICT
Approved Original Amount
BALANCE YEAR TO BE SPENT Banked Land Remaining: PRAB Date Approved Project
$ 118,241.63 2009 74 Sowder/Scull Creek Trail $ - 6/5/2006 $ 69,000.00 Wilson Park Trail and Walk Bridge
$ 45,178.63 2010 $ 1,546.00 Multiple $ 200,000.00 Harmony Pointe Park(10/2/06&1/8/07)
$ 268,577.23 2011 $ 87,195.93 8/6/2007 $ 217,000.00 Wilson Trail Lights
$ 1,131.24 2012 $ 109.85 8/6/2007 $ 30,000.00 Wilson Pool Rock Wall
$ 47,580.93 6/2/2008 $ 70,000.00 Finger Park Pavilion
$ 31,000.00 6/2/2008 $ 31,000.00 Mountain Ranch Trail
$ 245,000.00 12/2/2008 $ 245,000.00 Wilson Park Trail Renovations and Lights
$433,128.73 Total 2009-2012 $412,432.71 Total Approved Expenditures
$20,696.02 Total Unencumbered 2008-2011
SOUTHEAST PARK DISTRICT
Approved Original Amount
BALANCE YEAR TO BE SPENT Banked Land Remaining: PRAB Date Approved Project
$ - 2009 $ - 01/08/07 $ 40,400.00 Walker Basketball/Tennis Lighting
$ 129,542.05 2010 $ 300.00 7/9/2007 $ 300.00 Mt.Sequoyah Woods Trail Signage and posts
$ 56,185.59 2011 $ - 08/06/07 $ 100,000.00 Rodney Ryan Park
$ 2,411.38 2012 $ 50,000.00 1212/2008 $ 50,000.00 White River Baseball Field
$ 75,000.00 1212/2008 $ 75,000.00 Mount Sequoyah Pavilion Access
$188,139.02 Total 2009-2012 $125,300.00 Total Approved Expenditures
$62,839.02 Total Unencumbered 2008-2011
Number of Acres approved b PRAB
Listed by Subdivision Acres Data to PRAB Quadrant Engineer/Developer
YTD approved 0
Money in Lieu approved bPRAB Amount Date to PRAB Quadrant Engineer/Developer
Listed by Subdivision
Final fees to be determined at Planning Commission Approval.
TD approved
GIP STATUS-Quarterly Update
Project Name Description Current Status Projected Start&Completion Dates
Skate Park The construction of a new skate park facility located at Walker Staff has purchased infrared light and will install the camera at Infrared lighting will be completed in the Fist Quarter 2009.Sidewalk
Park.Installation of camera and connective sidewalk. Walker Park during the first quarter of 2009.Connecting sidewalks connection will begin in First Quarter 2009.
to the Skate Park will be constrcuted in house in the second
quarter of 2009.
Lights of the Ozarks Lights of the Ozarks is a display of more than 400,000 lights on the The installation began in October and ended with[the lighting Lighting Design-September
downtown square that runs from Mid-November until New Years. ceremony which was held on November 22.Removal of the 2008 Lighting Installation-October
display begins the first week of January 2009. The Wal-Mart Lighting Ceremony-November
Foundation awarded a$10,000 Grant for the 2008 Lights of the Lighting Removal-January
Ozarks program. The A&P Commission awarded$18,061.
Community Park Development Purchase and develop a multi-purpose Community Park according Staff continues to meet with South Pass developers.SouthPass Project will begin as soon as the 200 acre park land is donated to the City.
to the Parks and Recreation Master Plan.Cummings property was PZD,Annexation and Rezoning was approved by the Planning
selected for the community park site by PRAB and Park Staff. On Commission in September and approved by City Council in
September 7 2004,a resolution approving the mayor to enter into November.ADEQ hired a consultant to study the landfill and is
a contract with SouthPass Development was approved.This making final recomendations for remediation.The City Surveyor is
included the donation of 200 acres and 1 million dollars for the surveying the park boundary.ADEQ has provided over$200,000 to
development of the park. date to complete the landfill study.ADEQ continues to monitor the
site as well as working on a plan.
Terraced Consultants,Inc.completed a work plan that described
all necessary studies needed to determine the impact of the 33-
acre landfill located within the property. Estimated cost of the
complete study is$50,000. Staff is working with ADEQ for
potential funding of land fill remediation.
Park Beautifcations Additional fowerbeds were requested at several of the Parks and Flower arrangement plantings at Happy Hollow are complete for Ongoing. Entry feature for David Lashley Park is complete.Salem Park entry
Recreation Master Plan public meetings. Additional improvements 2008.Several trees did not survive the late planting and will be sign is under construction.Happy Hollow plantings are complete with the
are Happy Hollow planting and various entry features. replanted in the Spring of 2009. exception of a few replacement trees to be planted First Quarter 2009.
Neighborhood Park Development Funds are used to develop new neighborhood parks.St.Joseph The Davis Park Expansion design will begin in the second quarter St.Joseph Park 10 trees were ordered and planted in April 2006.Project
Park(PD),Salem Park(PLD),Walker Park Lighting(PD)Harmony of 2009. Construction of the Finger Park pavilion began in October completion date is pending on neighborhood fund raising.Salem Park is
Pointe Park(PLD),David Lashley Park(PD,PLD,ST),Rodney with completion scheduled for January 2009. Rodney Ryan Park is complete with the exception of entry signs which is expected to be completed
Ryan(PLD),Davis Park Expansion(PLD),Gary Hampton Pavilion complete.A request for reimbursement from Arkansas Parks and in the First Quarter 2009. Harmony Pointe Park is complete.Walker Park trail
(PLD and Donation),Mountain Ranch Trail(PLD),and Finger Park Tourism is in progress.The grand opening of the park will be in connection to Block Street is anticipated to begin design in Fourth Quarter.
Pavilion(PLD). March 2009. Rodney Ryan is under construction with completion in Fourth Quarter.Gary
Hampton Pavilion is complete.Davis Park design to begin Second Quarter
2009.Construction of David Lashley Park is complete.Trees were planted at
Harmony Pointe Park in January 2008.Construction of Finger Park pavilion
began in October 2008 with completion scheduled for January 2009.
Other Park&Safety Improvements Improvements to Wilson Park east bridge and renovations to the Wilson Park bridge construction begin during the quarter with Wilson Park bridge construction began in the Fourth Quarter and is scheduled
Parks and Recreation Office.Gary Hampton Softball Complex completion scheduled for early 2009. The office renovations to be completed in 2009. Office renovations started Fourth Quarter 2007 and
scoreboard replacement.Improvements to White River Baseball began during the fourth quarter of 2007 and will be completed in expected completion First Quarter 2009.Gary Hampton Softball Complex
Field. the first quarter of 2009.White River renovations began in the third scoreboard replacements began in January and was completed during the
quarter and will be completed in the third quarter of 2009. First Quarter of 2008. White River project began Third Quarter 2008 and will
be completed Third Quarter 2009.Final improvements to Gary Hampton
include replacement of concession equipment which was purchased Forth
Quarter 2008.
Gordon Long/Red Oak Improvements Trail and drainage improvements are needed at Red Oak and Staff is working with Dave Evans as a consultant from Game and Red Oak construction date tentatively scheduled to begin in Second Quarter
Gordon Long Parks. Water runoff from adjoining subdivisions Fish Commission on the restoration of the stream in Red Oak 2009,
discharges into the lower valley of Red Oak Park has created an Park.Park Staff is currently reviewing the design.
erosion problem for the park trail,tree root erosion,and various
park amenities.Gordon Long Park has two low water bridges that
need to be renovated.This project will improve the safety and
usability of the bridges over Scull Creek.The trail at Gordon Long
also needs improvements.
GIP STATUS-Quarterly Update
Project Name Description Current Status Projected Start&Completion Dates
Playground&Picnic Improvements Replacement of old equipment at playgrounds and picnic areas. Construction is complete and reimbursement has been received. Bid awarded in December 2007 to RJR Enterprises for Sweetbriar and Davis
Funds are to be used for a partial 50/50 matching Arkansas Parks The remaining funds are for Gulley Park surface.Quotes for playgrounds.Began construction in January 2008,completion Second
and Tourism Outdoor Recreation Grant. Grant funding in the removing and replacing existing playground surface at Gulley Park Quarter 2008.Reimbursement from Arkansas Parks and Tourism was
amount of$100,000 was awarded through the Arkansas Parks and are being requested. received in Third Quarter.Gulley Park safety surfacing is scheduled for First
Tourism Outdoor Recreation Grant Program for playground Quarter 2009.
replacement,toddler playground equipment,and basketball courts
for Sweetbdar and Davis Parks.
Lake Improvements An ADA accessible restroom will be installed to the Lake Evaluation of Lake Sequoyah Boat Docks began in March 2005. Fishing pier construction began December 2007,completion is expected
Fayetteville Boat dock recreation area.The Lake Sequoyah boat PRAB Committee and Staff evaluated the boatdocks in September Forth Quarter 2008. Funding for replacement of the Lake Fayetteville
docks are being evaluated for replacement/renovation.$12,000 2008. The Committee and Staff recommended that V'dock be Environmental Study Center Boat Dock/Study Area is a joint project with the U
was approved to replace the bleacher cover at Field#3,resod closed and no new boat slips will be rented due to the condition of of A Landscape Architecture Department,CEI Engineering,Fayetteville Public
ballfield access,concession building renovations,and restripe the the boatdock.This recommendation was approved by PRAB on Schools,Springdale Public Schools,and the City of Fayetteville.The City of
parking lot at Lake Fayetteville Softball Complex. October 6. Plans are being made to renovate the storage area Fayetteville and the schools are each providing$4,500 to fund the project.
and softball fields at the Lake Fayetteville Softball Complex. The The U of A Class designed and assisted the City of Fayetteville,Springdale
Lake Fayetteville Environmental Study Pier will be complete when and Fayetteville Public Schools and Kevin Bennoch with building the dock and
the plaque recognizing the partnership is installed. CEI stamped the design and oversaw the project.Lake Sequoyah Boatdock D
is closed.Lake Fayetteville storage area and softball fields will be completed
in Spring 2009.
Forestry,Safety,&ADA Compliance Funds are used for the Celebration of Trees give-away,a tree The Celebration of Trees will be moved in 2009 to Fall rather than Celebration of Trees will be moved in 2009 to Fall rather than Spring as voted
inventory,the Community Tree Planting Initiative program,and Spring as voted during the third quarter of 2008 by the Tree and during Third Quarter 2008 by the Tree and Landscape Committee.Mt.
grants. Funds will also to be used for unforeseeable emergencies Landscape Committee. The base work for the Mt.Sequoyah ADA Sequoyah ADA access is scheduled to begin after the pavilion is completed
occurring due to inclement weather,vandalism,replacement,or access is complete.Paving is scheduled to be completed in the by the FNHA.The base work for the Mt.Sequoyah ADA access is complete.
renovation of park amenities to meet ADA Safety standards. first quarter of 2009. Paving is scheduled to be complete in First Quarter 2009.
Mount Sequoyah Land Purchase The City of Fayetteville purchased 68 acres on Mt.Sequoyah in The final payment has been made. Completion in 2008.
2003 for$700,000 with 3%interest until paid. The payment plan
extends five years to 2008. This park is Mt.Sequoyah Woods
located at 100 N.Summit Avenue.
Lake Fayetteville Trails Projects include developing trail maps,mile markers,signs and Signs have been designed and ordered and installation will occur Brochures completed March 30.Signs have been designed and ordered.Sign
kiosks, in the first quarter of 2009. Trail maps are being designed. Map installation will occur in the First Quarter 2009.Trail maps will be installed in
cases have been constructed in house and will be installed when the First Quarter 2009.
the maps are complete.
Gulley Park Improvements Funds will be used to add a parking area and a pavilion in Gulley A grant was received through the Arkansas Urban Forestry Gulley Parking and Bioswale project was completed in April 2008.
Park. Commission for the parking and bioswale project which is Construction of Gulley Park pavilion began in October 2008 with completion in
complete.Brochures have been printed and a sign panel was January 2009.
installed to complete the grant obligation. Construction began for
the Gulley Park Pavilion in October and is scheduled to completed
in the first quarter of 2009.
Brooks-Hummel Land Purchase The City purchased 13.75 acres located north of the Lake Lucille A payment was made for 2008 and will be paid annually through Payments shall be made as follows:
Spillway in 2007 for a principal amount of$495.000 with an interest 2012.The trail was marked for blazing during the quarter and is 2008$78,000
rate of 6%annually for five years on the unpaid balance.The City scheduled to be blazed during the first quarter of 2009. 2009$78,000
agreed to see 1.89 acres to the United Presbyterian Church for 2010$78,000
$68,000.The City also agreed to sell a conservation easement for 2011$78,000
this property to the Fayetteville Natural Heritage Association for 2012$73,000
$179,500.This property has been names the Brooks-Hummel City Council moved funding from the Sales Tax Fund to Parks Development
Nature Preserve by Resolution 108-07. for 2008 payment.
Tree Escrow Funds from this project can be used in a variety of ways such as A public lands hazard tree assessment and mitigation is in This project is ongoing.
planting trees,maintaining trees with either a seasonal FTE or process.Staff is reviewing an option of contracting out some tree
contract labor,or to identify planting spaces using a tree inventory. plantings for 2009.
Funds for this project are deposited through the development
processes defined in Chapter 167 of the UDC and must be used
within seven years or be refunded. This money should first be
spent within the development and second within one mile and/or
within the appropriate quadrant.
Wilson Park Improvements Wilson Park is one of our City's oldest and most popular parks. Design of the trail renovation began during the quarter. Wilson Park Trial Renovation construction will start in 200p with completion
The trail,built in the early 1990's,is now eroding and needs to be Construction is expected to begin in the third quarter of 2009. late 2009/early 2010.Wilson Pool Rock Wall construction was completed in
repaired. The trail also needs to be lighted for safety reasons and Construction of the new pool wall is complete. The survey and October 2008.
to help deter vandalism.The seven by forty foot rock wall by the electrical engineering design are complete,
swimming pool exit displays a beautiful flowerbed,but is
deteriorating and needs repair. The condition of the wall is a
safety concern.
FAYETTEVILLE PARKS & RECREATION HMR COMPARISON
2006-2009
$250,000
M V
M M ( O W
N f N
O N FNM Nuj� mmw 7 eDMm �-W ��M oco
$200,000 N MfA
O,pV� M a N V� V N r NM I�OV r fA n V
M��w I O r�r ^nVi I�m- �� n n p
��o»w iao� i»cous f9� cCoc�o�
v �
r»
$150,000 ❑ 2006
■ 2007
❑ 2008
$100,000 ❑ 2009
$50,000
$-
U Q Z J w w w w
Q Q 0� a m m m m
Q W O W W
Z Of
Q uw Q 0- o o w
LL w z o
U)
City of Fayetteville
FAYETTEVILLE
Parks & Recreation
2008 Annual Report
TABLE OF CONTENTS
Parks and Recreation Advisory Board Members 1
Summary of Accomplishments 2-10
Parks and Recreation Advisory Board Guests 11-12
Parks and Recreation Advisory Board Motions 13
City Council Agenda Approvals 14
Parks & Recreation Division Employees 15-16
Park Land Summary 17-18
Park Classification and Service Levels 19
Park Acres, Quadrant, Classification and Service Levels 20-27
Public Areas 28
Work Hours Performed Chart 29
Program Report 30
Five Year Program Participation Comparison 31
Wilson Pool Report 32
Economic Impact Study 33
YRCC Program Report 34
Park Revenues 35
Annual HMR Tax Revenue Comparison 36
Monthly HMR Comparison Chart 37
Park Land Dedication Report 38
Park Land Dedication Acres and Funds 39
Park Land Dedication Chart 40
Volunteer Report 41
2008 PARKS AND RECREATION ADVISORY BOARD
Steve Meldrum Phil Jones
405 East Dickson 1375 River Meadows Drive
Fayetteville, AR 72701 Fayetteville,AR 72701
H)444-7510 W) 571-5461 C) 531-7896 W) 636-5380
Meldrum.sb(cDpg com Phillip ionesCcDnabhoiz.com
First Term/Replaced Jay Davidson First Term/Replaced Bob Davis
12/31/06 to 12/31/08 12/31/07 to 12/31/09
Valerie Biendara Darby Benson
1129 Fieldstone 435 Hawthorn Street
Fayetteville, AR 72704 Fayetteville, AR 72701
C) 530-1157 W) 442-0144 H) 879-5232 W) same
vnbien@cox.net DarbyBensonGyahoo.com
First Tenn/Replaced Stephen Langsner First Term/Replaced Jon Bitler
12/31/06 to 12/31/08 12/31/07 to 12/31/09
Craig T. Mauritson Bill Waite,Jr.
347 Village Dr 241 West Dickson Street
Fayetteville AR 72703 Fayetteville,AR 72701
H) 521-7168 W) 521-5750 C) 435-0456 H) 527-6725 W) 443-5432 C) 409-9099
craigmAnwaemail.com whwaite(&cox.net
Third Full Term/Replaced Jerry Bailey First Term/Replaced Milton Burke
12/31/06 to 12/31/08 12/31/07 to 12/31/09
Steve Hatfield Wade Colwell
3707 S Butterfield Trail 501 Forest
Fayetteville, AR 72701 Fayetteville, AR 72701
H) 443-3294 W) 387-2159 C) 387-2159 H) 521-2696 W) 521-2200 C) 466-8345
shatfieldrla(a)aol.com wade.colwell(a)wachoviasec.com
First Term/Replaced Fran Free Fifth Tenn/Replaced Craig T. Mauritson
12/31/06 to 12/31/08 12/31/07 to 12/31/09
1
Fayetteville Parks and Recreation
2008 Accomplishments
During the month of January, Parks and
— Recreation Staff remodeled the Yvonne
Richardson Center conference room, computer
room, office and entryway. These changes
allowed for donated items consisting of Wii's and
flat screen televisions to be installed and be used
by the public.
In February, the Adopt-A-Park and Adopt-A-Trail signs were redesigned to achieve
uniformity. New signs were installed at adopted sites in August and September.
On February 20th, at the Annual Arkansas Recreation and Parks Association
conference, Fayetteville Parks and Recreation was awarded the 2008 Program of the
Year for the Outdoor Adventure Camp. During the annual conference several staff
presented the following topics; It's Not Easy Bein' Green, Contracting Facilities for
Events: Friend or Foe?, Turf Wars and Trail Corridors, and Lean and Green: Creating
the Best with Less. Connie Edmonston, Past-President ARPA, was responsible for
organizing the conference.
During the month of February, Parks and Recreation Staff and various volunteers
contributed labor to plant 10,000 daffodil bulbs. These bulbs were planted at the Mud
Creek Trail trailhead, Happy Hollow intersections, Wilson Park and Wilson Park traffic
circles. The bulbs were donated from Brent and Becky's Bulbs in North Carolina.
On February 23rd and 24th, Parks and Recreation hosted the 13th Annual Arctic
Classic Softball Tournament at Gary Hampton Softball Complex. This year there were
13 teams with 200 participants playing a total of 26 games.
Vli LF
In March, Staff received a $2,500 donation
from the Fayetteville Firefighters Association
to support the Movies in the Park summer
program. This donation allowed Parks and
Recreation to provide two dive-in movies at
Wilson Park Swimming Pool and three movies
at Yvonne Richardson Community Center.
2
During Spring Break, Yvonne Richardson Center offered several programs including
Life Writing for Teens with June Jefferson, First Tee Golf with Tim Pscheier, Bowling at
Ozark Bowling Lanes, Graphic Arts for Youth with Sonia Gutierrez and an Easter Egg
Hunt with Masonic Eastern Stars. There were approximately 144 youth attending the
various events.
On March 19th, Staff was presented with E
$15,000 donation from the Rotary Club of
Fayetteville to assist in building a pavilion
at Gary Hampton Softball Complex. In July i0i
the Rotary Club of Fayetteville Pavilion at
Gary Hampton was completed and on
November 20th a ribbon cutting ceremny
was held at the pavilion.
In March, the City Council approved an ordinance rezoning 42 parks on approximately
591 acres located throughout the city from multiple zoning districts to P-1, Institutional.
In April, staff was awarded $22,000 in Community Development Block Grant funds to
fund programs at the Yvonne Richardson Community Center for 2008. These funds
were used to provide day trips to local pools, art events, bowling, Walton Art Center
performances, movies, etc during the summer. In May, twenty-three people from YRCC
attended the Walton Arts Center production "STOMP". Family Game Night was held on
June 5th to kick off the summer programming in which approximately 100 people
attended. Back to School Bash was held on August 16 with 500 people participating and
202 filled backpacks were given to school children.
Razorfest was held on April 26th. Eighteen volunteers operated the Yvonne Richardson
Community Center booth to hand out materials and run the Wii Nintendo game and
monitor the basketball shootout. YRCC was awarded $1,500 for their contributions
based on the Spirit Squad competition, $2,500 for the 7 on 7 Flag Football
Championship and $1,000 from Best Buy recognizing their volunteer hours.
3
David Lashley Park Grand opening was held on
May 14th with approximately 100 people
attending. Construction of Phase I began in
January 2008 and was completed in May 2008.
Park amenities include playgrounds for ages 2 —
12, a pavilion with two picnic tables, a bicycle
rack, two benches, associated sidewalks, an
entry sign and the planting of thirteen trees.
On May 28th, Sweetbriar Park Grand opening I�
was held to celebrate the replacement of the
playground and the installation of picnic tables III
and sidewalk. This project was assisted with
matching funds from the Arkansas Outdoor I �.
Recreation Grant.
On May 22, the Gulley Park BioSwale Grand Opening was held in conjunction with the
first concert of the Summer Concert Series. The University of Arkansas Landscape
Architecture class designed the parking lot and a $12,000 matching grant was received
by the Arkansas Forestry Commission for signage, brochures, vegetation and provided
some reimbursement to the U of A for design work.
On May 291h, five hundred Master Gardeners
from around the state visited Wilson Park.
Parks horticulture crew hosted a tour of the
gardens as part of the Master Gardener State
Convention. Nine docents were familiarized
with the garden program and plants, and they
_ assisted in all aspects of the tour. Staff and
^i volunteers devoted many hours in April and
_ May preparing the gardens for this event.
w" Roger Swain from PBS Victory Garden visited
Wilson Park during the event.
4
On June 11, Davis Park Grand opening was
held to celebrate the replacement of the
playground and installation of a half
basketball court and sidewalk. This project
was assisted with matching funds from the I
Arkansas Outdoor Recreation Grant.
i
Holland Park Grand opening was held on
June 20th. Amenities to this park include
pavilion, picnic tables, benches, trail and
playground.
On June 19th-22nd Fayetteville Parks and t ��
Recreation hosted the University of
Arkansas Solar Splash race at Lake
Fayetteville.
The America in Bloom judges visited Wilson
Park on Friday, June 20th. Fayetteville Parks
and Recreation was awarded the Tidiness
Category for all populations and National
` Champion for population 50,001 - 75,000.
` ' ' 5
Fayetteville Parks and Recreation and the Fayetteville Advertising and Promotions
Commission hosted the United States Specialty Sports Association's Youth Slow Pitch
Softball World Series on July 17-20th at the Gary Hampton Softball Complex. Thirty-one
teams from seven states participated in this event that brought approximately 1,395
people to Fayetteville for five days.
Fayetteville Advertising and Promotions Commission hosted the 16 and Under Premier
Baseball National Championship at White River Baseball Complex on July 30-August 2.
Thirty-six teams participated in an event that brought approximately 1,620 people to
Fayetteville for five days.
Staff finalized and submitted the Arkansas Outdoor Recreation 50/50 Grant application
to develop the 1.34-acre neighborhood park located on Fairlane Street. In December,
2008, PRAB voted unanimously to name the park land Doc Mashburn Park after Dr.
James Mashburn.
Wilson Park pool closed for the season on
August 18th with 17,485 people attending. In
2008, the pool was closed on Mondays and
opened two-weeks later than normal due to
budget cuts. Revenues for the pool were
$44,653 which is comparable to past years.
rA'
On August 20th, construction was - I
finalized on the Gulley Park Stream
Restoration project. The stream -
restoration demonstration project, located Fes:
in the Illinois River watershed, was funded
with an EPA 319 grant. The City's
Engineering Division provided the
required matching funds for the grant.
Construction was performed by Elk River
Construction from Colorado. Revegetation
was complete in early September. Park
Maintenance Staff assisted in the project by removing tree limbs prior to construction
and clearing top soil and rocks from the site after construction was completed. On
November 20th Staff hosted the Gulley Park Stream Restoration ribbon cutting.
6
The Gulley Park Summer Concert Series hosted six
concerts; May 22, Ultra Suede, June 5, ChaseMissy,
June 19th, Nace Brothers, July 3, Big Smith, July 24,
Benjamin del Shreve and August 7, Oreo Blue with a
ii.
total of 9,500 spectators.
NSA Adult Softball State Tournament on August 23 and 24th at Gary Hampton Softball
Complex.
One wood bench was donated and installed at Mud Creek behind Butterfield Trail
Village. Two benches were donated and installed at Gulley Park.
The 2008 youth programs consisted of 280
youth soccer teams with 2,760 participants, 31 I j
youth girls' softball teams with 443 participants,
542 youth camp participants with 8 sessions -
offered.
The adult softball leagues held three seasons
consisting of 230 teams with 3,124 participants =v
for 2008. The adult flag football league had 11
teams with 107 participants. The Women's
soccer league had 12 teams with 171
participants.
During the recreational program season, there were four concessions operated which
generates $3,367 in revenues for the City of Fayetteville.
The Wilson Park pool wall was removed by
Parks and Recreation Staff and reconstructed
with rock by Hammer and Chisel during the
month of September.
YM ti.
d «
ifa ih5 � r Wn r*'Hat CS'_ �5 •
7
On October 29th, staff held the Hoover � t p
Memorial Sculpture celebration. This
sculpture was donated by"Friends of
Maureen" on behalf of Steve, Sharon, Paul
and Maureen Hoover, who were outstanding
members of the community. The Sculpture
has been permanently placed on Frisco Trail.
This was the first art project associated with
the Fayetteville Arts Council.
One-hundred youth and parents attended the "Give Me a Voice" youth forums. These
events were hosted by the Yvonne Richardson Community Center to introduce the
center and the programs offered on October 23rd and November 8th.
The Wilson Park Art Walk was held on October 11th.
The Ozark Classic Cup Soccer Tournament was held at Lewis Soccer Complex as well
as other soccer fields in NW Arkansas on October 11tH
On October 18th, the Scull Creek Trail Grand Opening was held at Gordon Long Park.
N �
On October 23rd, Parks and Recreation Staff
conducted the fifth annual Volunteer Appreciation
luncheon at Veterans Memorial Park. This
luncheon was used to recognize volunteer groups
for their efforts in parks. Over thirty volunteers
participated.
The Harvest Moon Ultimate Frisbee Tournament was held at Lewis Soccer Complex,
White River Baseball Complex and Gary Hampton Softball Complex on November 1 st
and 2nd.
8
The Annual lighting ceremony and celebration for
Lights of the Ozarks was held on November
22nd and the lights were displayed through
December 31 st. This year there were over
400,000 lights. Staff received a grant of$10,000
from the Wal-Mart Corporate Foundation to
assist with Lights of the Ozark funding to
purchase LED lights. The A&P Commission
purchased $18,061 in lights, from the Sales Tax
Capital funds, the City spent $31,417. Parks
Maintenance Staff spent 3,000 man hours
installing the display of 5,700 strands of lights of
which over two-thirds were LED. The City's total cost including labor, fleet, utilities, lifts
and materials was $80,783. The total cost for the Lights of the Ozarks in 2008 was
$108,844.
The Yvonne Richardson Community Center hosted their annual Thanksgiving Dinner.
There were over 75 community members who were served hot meals. Over twenty
volunteers helped set up the event, serve food and clean up.
On November 21 st, the Square Gardens
Celebration was held to celebrate the
renovation of the Downtown Square.
In December, the development of Rodney Ryan Park was completed. This project
consisted of the construction of a pavilion with picnic tables, wiffleball field with
benches, playground area for ages 2-12 years old, shade tree plantings, bike rack and
ADA accessible parking area and sidewalks. Grand opening of the park will be on
March 26, 2009.
A signing ceremony was held on December 12th
at the Underwood -Lindsey Pavilion at Mt.
Sequoyah Woods for the transfer of
conservation easements to the Fayetteville
Natural Heritage Association.
,. _j, 9
The dedication of a pocket park located on the corner of spring and College Ave. was
held on December 30th. The pocket park was donated by George and Rosemary
Faucette and Mary Figone. The Square Garden Horticulture team installed the
landscaping that was designed by Alison Jumper, Park Planner.
This year's Christmas party at the Yvonne Richardson Community Center had over 260
attendees with 200 youth receiving gifts. The night consisted of a karaoke contest, door
prizes, and a bicycle giveaway. Twenty volunteers served food, assisted with
registration, distributed gifts and cleaned up.
Citiscapes recognized Fayetteville Parks and Recreation for four awards; Best place to
bicycle - Lake Fayetteville Trail System, Best place to jog or walk - Gulley Park, Best
Municipal Trail System - Fayetteville Trails, Best Public Park - Wilson Park.
During 2008, Parks and Recreation logged 12,808 volunteer hours. These volunteer
hours include PRAB, Tree and Landscape Committee, Yvonne Richardson Community
Center Board, volunteer coaches, mentors and chaperones, Master Gardeners and
Adopt a Park/Trail Groups. These volunteer hours are equal to $265,653 or over 6 full-
time employee hours.
s
The Yvonne Richardson Community Center had 1,096
y— participants in the "Make the Grade' program, 585
students attended summer field trips and 3,703
families received items from the monthly food basket
�`'' which is in sponsored by LifeSource International.
,. i
Construction of 20' x 24' pavilions in Gulley and Finger Parks began in October. The
concrete pavilion pads were poured in November and December.
Construction of the entry sign at Harmony Pointe Park was completed in November.
Construction of the Wilson Park Trail Bridge and
Crosswalk project began in November, 2008. The
bridge was installed on December 10, 2008, and
the bridge deck was poured on December 18,
2008. This trail extension to the castle area will
:xk
occur in 2009. t
10 'x5
2008 Advisory Board Guests
GUEST GROUP
Findlay Edwards American Soc.Civic Engineers U of A Use of Lake Fay for canoe races in Apr l 2008
Aaron Gabriel Habitat for Humanity Waiver for Park Land Dedication
Kim J Hesse Rausch Coleman Homes To name park at Walnut Crossing Holland Park
Andy Moore American Soc.Civic Engineers U of A Use of Lake Fay for canoe races in April 2008
Ted Brewer Habitat for Humanity Waiver for Park Land Dedication
Patsy Brewer Habitat for Humanity Waiver for Park Land Dedication
Walt Eilers Botanical Garden
I i T rd `Y 3•.• '.R Tr '4t Y'i i'
,Alai
Jeremy Pate City Planning
Miller,Boskus,Lark
Steve Miller Architects Money in lieu
John and Joann
Teas 1532 Shadowridge }� R
James Ingalls Northstar Engineering Money in lieu-$22,160
Walt Eilers Botanical Garden
Randy Werner Friends of Maureen Approval of the Hoover Memorial Sculpture
Howard Brill Fayetteville Rotary Club
Todd Jacobs Appian Centre for Design Money in lieu-$266,280
Jeremy Thompson H2 Engineering Money in Lieu-$10,200
Tracy Hoskins Paradigm Development To use the value of 1.51 acres to meet Park Land req.
m«i3u�i,;:"��
Was County Outdoor
Jeff Courtway Adventure Camp Waive fees at the lake for the group
Walt Eilers Botanical Garden
Susannah Patton NWAT
l�df:`t�:atsn s.°�9S ,Se.e.xl Mt�.1�•. tS4.>�'i�� w,.f�"�'�.. 3e.�,.. .� '&f�a�?€�� �,�'.�� �x��ri�c�,d&1�..�v.,•.'4xti's�<,S. .�'u
Blake Jorgenson Coco Mountain Ranch LLC Donate 5.06 acres of Lots 8 and 14
Sharon Hunt University of Arkansas Rename Eagle Park to Rodney Ryan Park
Name new pavilion at Gary Hampton as Rotary Club of
Howard Brill Rotary Club Fayetteville
Craig Edmonston University of Arkansas Rename Eagle Park to Rodney Ryan Park
Walt Eilers Botanical Gardens
Brian Washburn NW Arkansas Times ; �t
krsL ..?, �a
a"�. �s�:rUi.�:�,
Geoffrey Bates Bates and Associates Dedicate$8,160 in lieu of land
Aubrey Shepherd Aubinique.com
Walt Eilers Botanical Gardens
Skip Descant Morning News
Kim Green Heritage East Phase II-POA
Tracy Hoskins Paradigm Development y Dedicate$8,160 in lieu of land
Sarah Evans citizen
Skip Descourt Morning News
Todd Jacobs Appian Center for Design
Shereen Ghori student
Leina Lewis student
11
_ �.�.:re: •3��. .;_M_ 1i•°,.n ...�'rait 4 cuudci �i
Evan Nichues Appian Center for Design Dedicate 7.11 acres&Money in lieu$284,480
Lee Stewart Appian Center for Design Dedicate 7.11 acres&Money in lieu$284,480
Kevin Eads Lake Fayetteville Road Remove gate at Turner for access to parking lot
Lori Eads Lake Fayetteville Road Remove gate at Turner for access to parking lot
Lake Sequoyah Eagle Scout
Matt Owens project Build mile long trail along N side of Mt.Sequoyah
Scott F Davis NWA Times s
..�.. vai1F' aNr
, ...ic_ a _..
Walt Eilers BGSO
Todd Jacobs Southpass
Steve Aust Southpass
Trish Hallenbeck NWAT
Sarah Evans citizen
Walt Eilers BGSO �1
Jennifer Hazelrigs Leave No Trace Join the Leave No Trace program
Andy Feinstein Rauch Coleman $36,480 money in lieu for Coves Addition
Walt Eilers BGSO
Jonathan Story Name park on Faidane Doc Mashburn Park
12