Loading...
HomeMy WebLinkAbout2015-03-23 - Agendas - Final CITY OF a e evl jq AGENDA Y ARKANS Draft Agenda Planning Commission Meeting March 23, 2015 5:30 PM 113 W. Mountain, Room 219 Members: Tracy Hoskins (Chair), Ron Autry (Vice Chair), Ryan Noble (Secretary), Sarah Bunch, William Chesser, Kyle Cook, Craig Honchell, Janet Selby, and Porter Winston. City Staff: Andrew Garner, City Planning Director Call to Order Roll Call Presentations Presentation of Service Award to Commissioners Winston and Honchell. Consent 1. Approval of the minutes from the March 9, 2015 meeting. 2. VAC 15-4986: Vacation (2991 LABORDITE DRIVE/CRYSTAL SPRINGS SUBDIVISION PH. III, 246): Submitted by RIVERWOOD HOMES, LLC for properties located at 2991 LABORDITE DRIVE. The property is zoned RSF-4, RESIDENTIAL SINGLE FAMILY, 4 UNITS PER ACRE and contain approximately 0.07 acres. The request is to vacate a portion of an existing 35' utility easement. Planner: Andrew Garner 3. PPL 15-4988: Preliminary Plat (MARK MILLS LN. & WINDSWEPT DR./SUMMIT PLACE SUBDIVISION, 329): Submitted by BLEW &ASSOCIATES for property located at MARK MILLS LN. & WINDSWEPT DR. The property is zoned RSF-4, RESIDENTIAL SINGLE FAMILY, 4 UNITS PER ACRE and NC, NEIGHBORHOOD CONSERVATION and contains approximately 16.58 acres. The request is for a 45 lot single-family subdivision. Planner: Andrew Garner Old Business None New Business 4. CUP 15-4957: Conditional Use (502 W. MAPLE STREET/PI BETA PHI HOUSE, 445): Submitted by DEVELOPMENT CONSULTANTS, INC. for property located at 502 W. MAPLE STREET. The property is zoned RMF-40, RESIDENTIAL MULTI FAMILY, 40 UNITS PER ACRE and contains approximately 1.62 acres. The request is for additional parking. Planner: Quin Thompson Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville,AR 72701 5. LSD 15-4956: Large Scale Development (502 W. MAPLE STREET/PI BETA PHI HOUSE, 445): Submitted by DEVELOPMENT CONSULTANTS, INC. for property located at 502 W. MAPLE STREET. The property is zoned RMF-40, RESIDENTIAL MULTI FAMILY, 40 UNITS PER ACRE, and contains approximately 1.62 acres. The request is for construction of an approximately 42,000 square foot, 37 unit sorority house with associated parking. Planner: Quin Thompson 6. Election of Planning Commission Officers for 2015. The following items have been approved administratively by staff: • LSP 14-4996: Lot Split (1591 W. NETTLESHIP STJUNIVERSITY BROWNSTONES, 521): Submitted by BLEW & ASSOCIATES for properties located at 1591 W. NETTLESHIP ST. The properties are zoned RMF-24, RESIDENTIAL MULTI FAMILY, 24 UNITS PER ACRE and contain approximately four lots consisting of 0.96 acres. The request is to split the property into 8 lots. Planner: Quin Thompson • LSP 15-4985: Lot Split (NW CORNER OF BERSEIS DR. & CASSIUS LN./LOT 62 LIERLY LANE S/D, 244): Submitted by JORGENSEN & ASSOCIATES for property located at NW CORNER OF BERSEIS DR. & CASSIUS LN. The property is zoned RSF- 4, RESIDENTIAL SINGLE FAMILY, 4 UNITS PER ACRE, and contains approximately 3.70 acres. The request is to split the property into four tracts containing approximately 3.11, 0.19, 0.19, and 0.19 acres each. Planner: Quin Thompson • LSP 15-4992: Lot Split (SOUTH OF 3321 ARCHIE WATKINS RD./HAMBLEN, 750): Submitted by KELLYE HAMBLEN for property located SOUTH OF 3321 ARCHIE WATKINS RD. The property is in the FAYETTEVILLE PLANNING AREA, and contains approximately 40.22 acres. The request is to split the property into two tracts containing approximately 15.00 and 25.22 acres and for a variance of lot frontage. Planner: Quin Thompson • FPL 15-4990: Final Plat (NE OF GULLEY & E. MAYWOOD RDJOVERTON WEST SUBDIVISION, 220): Submitted by JORGENSEN & ASSOCIATES for property located NE OF GULLEY & E. MAYWOOD RD. The property is in THE FAYETTEVILLE PLANNING AREA and contains approximately 14.91 acres. The request is for final plat approval of a residential subdivision with 13 single family lots. Planner: Andrew Garner • LSP 15-5021: Lot Split (727 N. STORER AVE./J. SMITH, 444): Submitted by BATES & ASSOCIATES for property located at 727 N. STORER AVE. The property is zoned RMF- 40, RESIDENTIAL MULTI-FAMILY, 40 UNITS PER ACRE, and contains approximately 0.17 acres. The request is to split the property into two tracts containing approximately 0.07 and 0.10 acres. Planner: Andrew Garner Announcements 2 Adjourn NOTICE TO MEMBERS OF THE AUDIENCE: All interested parties may appear and be heard at the public hearings. If you wish to address the Planning Commission on an agenda item please queue behind the podium when the Chair asks for public comment. Once the Chair recognizes you, go to the podium and give your name and address.Address your comments to the Chair, who is the presiding officer. The Chair will direct your comments to the appropriate appointed official, staff, or others for response. Please keep your comments brief, to the point, and relevant to the agenda item being considered so that everyone has a chance to speak. Interpreters or TDD, Telecommunication Device for the Deaf, are available for all public hearings; 72 hour notice is required. For further information or to request an interpreter, please call 575-8330. As a courtesy please turn off all cell phones and pagers. A copy of the Planning Commission agenda and other pertinent data are open and available for inspection in the office of City Planning (575-8267), 125 West Mountain Street, Fayetteville, Arkansas. All interested parties are invited to review the petitions. 3 CITY OF Taye ARKeAN SAS le MINUTES AN Planning Commission March 9, 2015 5:30 PM City Administration Building in Fayetteville, AR, Room 219 Members: Tracy Hoskins - Chair, Ron Autry- Vice-Chair, Ryan Noble — Secretary, William Chesser, Kyle Cook, Craig Honchell, Porter Winston, Janet Selby, and Sarah Bunch City Staff: Andrew Garner— City Planning Director, Jesse Fulcher— Senior Planner, Quin Thompson — Planner, Cory Granderson — Staff Engineer, and Kit Williams—City Attorney 1. Call to Order: 5:30 PM, Tracy Hoskins 2. In Attendance: Craig Honchell, William Chesser, Kyle Cook, Tracy Hoskins, Porter Winston, Ron Autry, Sarah Bunch Absent: Ryan Noble and Janet Selby Staff: Andrew Garner, Quin Thompson, and Kit Williams 3. Consent Agenda: Approval of the minutes from the February 23, 2015 meeting. LSP 15-4992: Variance (ARCHIE WATKINS RD./HAMBLEN): Submitted by Kellye Hamblen for property located south of Archie Watkins Road. The property is located in Washington County and within the One Mile Planning Area and contains approximately 40.22 acres. The request is for a variance of the minimum street frontage and City water service access requirements. Motion: Commissioner Cook made a motion to approve the consent agenda. Commissioner Chesser seconded the motion. Upon roll call the motion passed with a vote of 7-0-0. Mailing Address: Planning Commission 113 W. Mountain Street www.fayetWRVAf.� Fayetteville,AR 72701 Agenda Item 1 03-09-2015 Minutes Page 1 of 4 4. New Business: ADM 15-4995: Administrative Item (ACTIVE TRANSPORTATION PLAN AND MAP): Submitted by CITY STAFF. The Active Transportation Plan and Map is an update of the 2003 Fayetteville Alternative Trails and Transportation Plan and it will be utilized to plan, prioritize and implement bicycle and pedestrian policy and infrastructure improvements in the future. Leif Olson, Long Range Planner, read the staff report. William Chesser, Commissioner, complimented the quality of the graphic presentation of the plan. Porter Winston, Commissioner, agreed and added that the future trail maps were useful for the planning of residential and commercial projects. Tracy Hoskins, Chair, asked where information could be found that would give estimated completion dates for the future trails. Matthew Mihalevich, Trails Coordinator, said that that information was regularly presented at the Active Transportation Advisory Committee meetings, where the trail construction schedule is presented for a projected 5 year period. He said that some trails on the west side were scheduled in the next 5 years. Hoskins said that he had considered tabling the item to allow for further review and comment, but as it appeared to be a guiding document [rather than a technical document] he was in favoring of forwarding. Motion: Commissioner Cook made a motion to forward ADM 15-4995 to the City Council with a recommendation for approval. Commissioner Autry seconded the motion. Upon roll call the motion passed with a vote of 7-0-0. Planning Commission March 23,2215 Agenda Item 1 03-09-2015 Minutes Page 2 of 4 RZN 15-4953: Rezone (1195 S. CURTIS AVEJAMERICAN LEGION, 564): Submitted by ENGINEERING SERVICES, INC. for property located at 1195 S. CURTIS AVENUE. The property is zoned RSF-4, RESIDENTIAL SINGLE FAMILY, 4 UNITS PER ACRE and contains approximately 6.81 acres. The request is to rezone the property to RMF-24, RESIDENTIAL MULTI FAMILY, 24 UNITS PER ACRE. Quin Thompson, Current Planner, read the staff report. Daniel Lazenby, applicant, said he was present to answer questions. Christopher Barker, neighbor, said he was concerned with multi-family development due to the impact it could have on property values. He referenced a University of Pennsylvania study showing that increased crime rates and lowered property values have been linked to multi- family development. He said that crime is an issue currently with the nearby apartment development to the north. He said he did not support the rezoning request, saying the neighborhood would become less safe and require a higher Police presence. Roy Cordeen, Landowner to the south, said that he was not present to oppose the rezone, but is concerned about existing water runoff problems onto from this property onto his mobile home park. Salma Lopez, neighbor, said that she owns a house in the neighborhood directly to the east, and that her parents own two houses in the same neighborhood. She said she was opposed to the rezone due to the increased traffic that it would bring to her street (Curtis Ave) in an area where her 6 year old child plays. Alison McTaggart, neighbor, said that she opposed further multi-family development because she feared it would increase existing problems, such as gunshots and vandalism that occur. Tracy Hoskins, Chair, asked if the future development plan for the site would be for subsidized housing. Staff replied that planning was unaware of any development plans, adding that none had been submitted. Hoskins asked staff whether water runoff issues would be addressed at the development stage. Andrew Garner, City Planning Director, replied that water runoff is a development issue. He added that staff had contacted the Police Department seeking comment, and that none had been given. He said that staff would contact the Police Department again after the hearing. Porter Winston, commissioner, asked staff about future street stub-outs and connectivity. Hoskins asked if a connection could be required to the west, where there is a large tract of undeveloped land. Garner replied that connectivity cannot be required of multi-family development. Planning Commission March 23,2($15 Agenda Item 1 03-09-2015 Minutes Page 3 of 4 Lazenby said that there were no plans to develop the property at this time. Craig Honchell, Commissioner, pointed out that the surrounding zoning is RMF-24, and he wanted the public to understand that compatibility with surrounding properties was the deciding factor for him. Motion: Commissioner Honchell made a motion to forward RZN 15-4953 to the City Council with a recommendation for approval. Commissioner Bunch seconded the motion. Upon roll call the motion passed with a vote of 7-0-0. 5. Reports: No reports 6. Announcements: Subdivision Committee meets this Thursday, March 12, 2015. 7. Adjournment Time: 6:17 PM 8. Submitted by: City Planning Division Planning Commission March 23,2415 Agenda Item 1 03-09-2015 Minutes Page 4 of 4 CITY OF a e evi Ie PLANNING COMMISSION MEMO Y ARKANSAS TO: Fayetteville Planning Commission FROM: Andrew Garner, City Planning Director MEETING DATE: March 23, 2015 SUBJECT: VAC 15-4986: Vacation (2991 LABORDITE DRIVE/CRYSTAL SPRINGS SUBDIVISION PH. III, 246): Submitted by RIVERWOOD HOMES, LLC for properties located at 2991 LABORDITE DRIVE. The property is zoned RSF-4, RESIDENTIAL SINGLE FAMILY,4 UNITS PER ACRE and contain approximately 0.07 acres. The request is to vacate a portion of an existing 35-foot utility easement. RECOMMENDATION: Staff recommends forwarding VAC 16-4986 to the City Council with a recommendation for approval. BACKGROUND: Property and background. This property is lots 138, 147, 148, and 149 in the Crystal Springs Subdivision which is zoned RSF-4, Residential Single Family Four Units per Acre. The lots are undeveloped and contain a 35-foot utility easement along the northern property line. The surrounding zoning and land use is listed in Table 1. Table 1 Surroundin Land Use and Zoning Direction Land Use zoning North, South, East, West Single family dwellings RSF-4 Proposal: The applicant requests to vacate portions of the northern 35-foot utility easement, as shown on the attached plans, to provide additional room for development on the lots. DISCUSSION: Vacation Approval: The applicant has submitted the required vacation forms to the City utility departments and applicable franchise utilities, with the following responses: UTILITIES RESPONSE Cox Communications No objections AEP/SWEPCO No objections Source Gas No objections AT&T No objections Mailin Address: Planning Commission 113 W. Mountain Street , ,Mar3eyllle-al:gov Fayetteville, AR 72701 15-4986 Crystal Springs SD PH III Page 1 of 12 Ozarks Electric No objections CITY OF FAYETTEVILLE RESPONSE Water/Sewer To be provided Trash & Recycling No objections Transportation Not applicable Public Comment: No public comment has been received. Recommendation: Staff recommends forwarding VAC 15-4986 to the City Council with a recommendation for approval subject to the following conditions: Conditions of Approval: 1. Prior to the City Council agenda request being submitted for this item the applicant shall provide the City Planning Division with the utility permission form from the City Water and Sewer Department. 2. Any relocation or damage to utilities and associated new easement dedication shall be at the owner/developer's expense. PLANNING COMMISSION ACTION ❑ Forwarded - ❑ Denied ❑ Tabled Date: March 23, 2015 Motion: Second: Vote: Notes: BUDGET/STAFF IMPACT: None Attachments: • Petition to Vacate • Utility Approvals • Easement Vacation Exhibit • One Mile Map • Close Up Map Planning Commission March 23,2015 GAETC\Development Services Review\2015\Development Review\15-4986 VAC 2991 Labordite Dr. Agenda Item 2 (Crystal Springs SD Ph III)\03 Planning Commission\3-23-2015\Comments and Redlines 15-4986 Crystal Springs SD PH III Page 2 of 12 Riverwood Homes, LLC Residential Contractor&Developer 1533 W. Enterprise Drive Fayetteville,Arkansas 72704 Mark Marquess 479-435-2088 Charles Sloan 479-530-4506 markm@riverwoodhomesnwa.com charlies®riverwoodhomesnwa.com PETITION TO VACATE EASEMENT LOCATED IN LOTS 138,148,&149,CRYSTAL SPRING SUBDIVISION, PHASE III,CITY OF FAYETTEVILLE,ARKANSAS TO: The Fayetteville City Planning Commission The Fayetteville City Council I,the undersigned,being all owners of the real estate abutting the easement hereinafter sought to be abandoned and vacated, lying in Lots 138,148&149 Crystal Springs Subdivision, Phase III, City of Fayetteville,Arkansas,a municipal corporation, petition to vacate and easement which is described in the attached legal description. That the abutting real estate affected by said abandonment of the easement are Lots#137, 139, 147, 150,&164 In Crystal Springs Subdivision, Phase III, Lots#12, 13, 14,15, 16, 17 in Cobblestone Subdivision,Phase I, and Lot#54 in Cobblestone Subdivision, Phase Il, City of Fayetteville used by the public for a period of many years,and that public interest and welfare would not be adversely affected by the abandonment of the portion of the above described easement. The petitioners pray that the City of Fayetteville,Arkansas abandon and vacate the above described real estate, subject, however,to the existing utility easements as required,and that the above described real estate be used for their respective benefit and purpose as now approved by law. The petitioners further pray that the above described real estate be vested in the abutting property owners as provided by law. WHEREFORE,the undersigned petitioners respectfully pray that the governing body of the City of Fayetteville,Arkansas,abandon and vacate the above described real estate,subject to said utility and sewer easements,and that title to said real estate sought to be abandoned be vested,in the abutting property owners as provided by law,and as to the particular land the owners be free from the easements of the public for the use of said easement. Dated this 26th day of January,2015. Mark Marq —Riv wood Homes, LLC Planning Commission March 23,2015 Agenda Item 2 15-4986 Crystal Springs SD PH III Page 3 of 12 U•IAL-11'Y APPROVAL FORM NUR RIGII I'-OV-WAV,ALLEY,ANO Ir1111.11V FASKMIRA f VACATIONS DATE: 10123114 Lrru.rrY COMPANY: Cox Communications -Chad Hodge Al-NACANTNAMI:: RiverwnodHornes LLG A%•LICANTVII0NL: 479-282-0406 RIUQUCS'I All VACATION(app/lemN mwsr rbeck nll/ha+npplyI: &I Utility Easement ❑ Rightoll-way foraticy i r streets and all utility asctnents located within the vacated r gbt-ot=way. ❑ Alley ❑ Street tight-of-way I have been notified of the petition to vacate the rodosving lalley,easemeur, riFhr-a¢n'Ry1.described as toliows: General location/Address Utility Easement on Lots 138,147.148, and 149 in Crystal S lin s Phase III, Fay., III (:AT'f.4CHlegrdrlerrrlpitaaarr�{gmpb)rrepresenlaflunuJ'wkn!)sbelnRcut•arerl-J[1RYiLY) UTILITY COMPANY CONIAIENTS: ❑ No objections to the vacation(%)described above.and no comments. ❑ No objections to die vecation(s)described above,provided rolluwing described casements are retained. (State the location,dimensions.and purpose brlow.l jJ No objections provided the following conditions am moo Any at}jage to or relocation of existent. facilities will he at the owners/developers exnenxe. Sign LutroorLtility mpan, Reprcuntative Tide Dtrrxihr.?hl.i P.,au 5 Planning Commission March 23,2015 Agenda Item 2 15-4986 Crystal Springs SO PH III Page 4 of 12 UTILITY ArPROVAL FORM FOR RIGI1T-OF-WAY,ALLCsv,ANU D'I'II.rry FASEMRN'1'vACATIONS DATE: 3/17/15 LITILA Y'COMPANY: John Lee-SWEPCO .A PPL I CA N'1' VA N1 I': Riverwood Homes. LLC .AI'I'IACANr 1'I K)N L: 479-262-0406 RLQUETI ED VACATION (opplicanl must cheek rill that apply): 5d Utility Easement ❑ flight-of-way for al Icy or streets and all utility casumcnts located within the vacamd right-of.way. ❑ Alley ❑ Street Iight•uC-way I have been notified of the petition to vacate the following talky, easement, Hghr-af-eray).described as follows! General location/Address Utility Easement on Lot#138,1.48,1-49 In Crystal Springs Phase III ® (,477.4('81egeAllescriptlonnndgraphlrrepresentrrtivitot'wJnrtisbe.ingctrcared-SIIRFEq `UUTILITY COMPANY COMN,IENTS: UI. No obiectiuns to the vacation(s)described above,and no comments. �❑ No objections to dtc rruation(s)described above, provided I"ollowing described easententa are retained. (Stale the location.dimensions.and purpose below,) ❑ No oboctions provided the following conditions an met: L2;:, Signtltwe of S41ity Company Representative ZiST�Ki/foT/oN �CrlvEE/L Title Dva=mh¢r?p/1 F«ev S Planning Commission March 23,2015 Agenda Item 2 15-4986 Crystal Springs SD PH III Page 5 of 12 UTILITY-AYYROYAL NORM FOR BIGIIT-OF-WAY,ALLEY,AND UTILITY RASRNIRNT VACATIONS DATE: 10/23/14 UTILITY COMPANY: Source Gas APPLICANT NAME; R'yetwnndHAmen. LLO AVVLICANT rIIDNt:: 479-252-0408_ RCQUGS'TGD VACATION(appitcaer mist cberk all that app!!}is 5a Utility Easement ❑ Right-ot-way thr alley or sircats and all utility casements located within the vacated nght-of-stay. ❑ Alley ❑ Street right-uf-way I have been notified of the petition to vacase the following(allev,easement, rirhr of-+ca1q.described as follows: Central location/Address Utility Easement Lots 138, 147, 148, and 149 in Crystal Springs Phase III, Fay., 6 (47'TACII legaf descravion rtardgropfrtt,represenraHan 11f'what Is belag uecnred-SUR Y01) UTILITY COMPANY COMME\TS: 21 No ubiections to the vacation(s)described above.and no co+nmeuts. ❑ No ub1ccliuns to the vi aalion(s)described above, provided following described casements are retained. (Slate tltc location,dimension,,and purpose below.) ❑ No objections Provided the following condition,are mer: Slguaturc o!'Liility Company ftv rc tasiye Title Decenih v 10ld Fueuy Planning Commission March 23,2015 Agenda Item 2 15-4986 Crystal Springs SD PH III Page 6 of 12 U'I'lLt'fY ArrRUYAL NORM F'OR RIG II 1-OF-q Al',ALLHY,;AN I) Irlm.rry FAVF.\IF.N"I-vAe'.A'rl(iNV DATF. 10/23/14 Lrrlt.I'll Y COMPANY AT&T - Jeff Hamilton APrt.lf•.ANTNANIF: -._. RiveE=odHornes,lLC- -- AITLIC.ANI I`II()NI.._ 479-282-0406)_ RCl1UL;S'I CO VAC'.4'rIUN fnppliaurl must rber8 nlllhnl npplyr. Utility Easement ❑ Right-of-way for alley or%trcctk and all utility casements located within the vacated right-ot-way. ❑ Alley ❑ StreetIightar-way I have been notitted of the petition to vacate the tollowinglalleV, cose)nenR Hgh/-01-rt'to).described as tollows. General location/.address Utility Easement on Lots 138 147 148 and 149 in Crystal 5 rim s Phase III 5ay., W (ATTACU kcal descrtpliort rrrud;rupldr reprrsenlnHon uf'wfrtrl is befrrg vuc(Fled-SURVEY) UTILITY COMPANY CONIh1ENTS: ❑ No ob.jecliuns to the vacation(s)described above.and no comments. ❑ No ubiecliuns to the vacaliou(s)dcsciibed above,provided following de)cribcd easements are retained. (State the lucatium dintcttsiotu,and purpuse bcluw.) l,K No objection; ro�idcd the lullawing conditions arc met: If any AT&T facilities are damaged or require relocation will be the responsibility of thy± developer/property owner. �Ir > / SSiiraintjmfl.tllily Company Ropresoritativc lJ ' MGR OSP Ping & Engrg Design Title /1;enuh:r]pl i Planning Commission March 23,2015 Agenda Item 2 15-4986 Crystal Springs SD PH III Page 7 of 12 UTILITY APPROVAL NORM FOR RlGI1T-UN-WAY,ALLEY,AND UTILITY p.AgIRY1V.NT V A('A'1'10N% DATE.: 10/23/14 i ITILrl Y COMPA\V: Ozark Electric - Greg McGee APPIAC.ANT NANIC: _�ivenNooA-HDmes. LLC nrPl,IcnNr Pn(INL. 479-282-0408 RL:QLiCS'I'ED VACA9'lON(appllaur(must cheek a I(hal appOYI: Ud Utility Easement ❑ Itight-nf-way for alley or streets and all utility,casements located within the vacated right-ot-way. ❑ Alley ❑ Street right-ur-way 1 have been notitied of the petition to vacate the following I alley, easerneal, right-of inlay).described as follows: General location l Address Utility Easement on Lots 138, 147, 148, and 149 in Crystal Springs Phase III, Fay., p (,4TT.401legal descrlpilnnt n_rrl graph Ir rep resenladan oj'whar is being vacated-S(IRV'GY) UTILTTS'COMPANY COMMENTS: KI No objeclionS to the vacation(*)described above.and no emnntents. ❑ No otiiccLiuns to the vacation(*)described above. provided following described casculenlb are retained. ($laic die location.dintensiom.and parpu*e below.) ❑ No vbjeclions provided the following conditions arc met: iigna re urClil - Company Representative Lead Staking Tech Title Oeeewbe,1013 Par,t Planning Commission March 23,2015 Agenda Item 2 15-4986 Crystal Springs SD PH III Page 8 of 12 UTALPI'Y APrRoVAL FOKh1 FOR RIG II C-UN-NAY, ALL EI',ANTI 11TILITV PASRIIENT V ACA'1'ION5 DATY: 10/23/14 CITILI'I Y COMPANY. Maury Nelson -Solid Waste Al`I'LICANT N.ANIE: Rjver=.Qddtio0lP-s-LLC •AI•PLu ANI I'IIUNL. 479-282-0406 RLQI,CS'LLD V'AC'ATION(appllaral mnsf ebrefi nil fbnf opplpr; I1A Utilin-Easement ❑ Right-of-way for alley or streets and all uhltty casements located within the vacated right.ot-way. Cl Alley ❑ SLreel tigbbol=way I have been notified of the petition to vacate the following In/4qy,amemenl, rigbr-of-wral I.described as tollotvs: General location/Address Utility Easement on Lot 138, 147, 148, and 149 in Crystal Springs Phase III, Fay, W (ATTAC'Il legrrhlrsrrJpflan and grr[p7d r represenuntore t Jj wiurf is being scared-SCR IVEY) UTILITY COVPANY CONMIENTS No ubjecliuns Lo Lhc vacalio dsj described above.and no comments. l� NO ubieclimn to the vacaliva(s)described above.provided lolluwviog dexribed cuaemenls are retaiaed (Sidle the IUCUUVII,dimensions,and purpose I)elo.�,) ❑ No objections pro,ided the h llov.inp conditions arc mct; Srgr ore of Utility Company RepresnWtivo Ce.x..'a-f So fes keg Title Planning Commission March 23,2015 Agenda Item 2 15-4986 Crystal Springs SD PH III Page 9 of 12 EMU ! 53€I - sa �8z_n•"AF�W�R6_„'F-°"� 'a” a l V . a bL2b L6'S9T 3,bS,96>2ON I " N � _ I:' A AO '<A Lsy 5 �'wesa — s r. •sz o II� �' rn �39i9 •sF'y nr 1 a " rF Z b1 nil s���Isa v p J ^ z A,t Lb>20S i °n 9� ooatt a r 4: Sp2 �q sS.a os )\ wCO rn�. ti o a � N IIS co L` 'ti pU OD W IJI W '�' .SO'OLT • DO 3„bS•EEo� � '- WirP .90'06 ',00'08 00'08 0 I'oS w -� x w � � I f 1�qm rn 7: C w x v� w a 7 N w I — V w I d mLLJ 03 _ 3 a i, y?I •.00'06 00'08 m uh Ma• �a ,p0'08 AINlz M bS,EE,ZOS Ilo � N [[IMII, 11 It 00,001 ss„a8b'LL G��II Planning Commission March 23,2015 Agenda Item 2 15-4986 Crystal Springs SD PH III Page 10 of 12 VAC15-4986 CRYSTAL SPRINGS PHASE 3 Close Up View ij J W2 RSF4 Q F O W W j 1I1III u � ,l MIRAMAR DR �I SUBJECT PROPERTY 1 RSF.4 i CRYSTAL DR D Legend nos -Use Trail (Existing) Fut! re Trails VA! 15-4986 �1er,14„Fayetteville City Li its Footprints 2010 — Hillside-Hilltop Ovi rlay District Design Overlay Di 3trict Design Overlay Di trict 0 37.5 75 150 225 300 ------ Planning Area Feet Planning Commission March 23,2015 Age da lie 2 15-4986 Crystal Springs SD PH III Page 11 of 12 VAC15-4986 CRYSTAL SPRINGS PHASE 3 One Mile View F c ? � � a FOREST VIEW RD ' 0'p > < I nsv-. 3 C AR RtOGEL O RF 2 - I1 R J•i 1. .. SALEM D_ - . ' CS it Ru.. I o •f• I J RA � .I •�� 1 a _ I RA r'}tAzo. ' Y _ 1' RA SUBJECT R . PROF ' , I '1I L RFiI_zWEIR RD A3 _ ...M eN� K 11 wiKARaR72 RSF 4RSF<. -•. - R�-, ypEt GYPSUM DRr-w OPzo1'1 „1 J ., �N I RSF-a _.j.."o kA. (BARITE DRL RSF! RSFF IE L ,LD1...•• J1� �, DR li PPz ZII sF FROUSE RDRIW L' I RSF♦1 I-I CRYSTAL DR! y, I vN�• i4 RSF:4 RSF�41RA-4 U1 MARSHST 1�4 •� �S" _ -'� �i _- CPZD t !I TANYARD OR - VAS 3, FCO EDR RSF4' P �` ;F6.5S1j Rflzbi r _ RSF-1 / nsr, xp4YER E4�`R/.�� 11.1 F4.. .. ILL�r Rp - RSF!:s ,RISE.IAz '�•'_'....>• /OR SONG DRi RSF 4F RSF CPL3 / i F1 ft^yF< 1 FF y t R 9 T v1 J{EARNHARDT 1 n11 R i>L 7t8P74�-941 r=ylp RSF-1 C,. _ RSF. MCLARENDR_ ........... - S 'I. -' RIA > a� LORE .�. ` - ., PRIVA?E 2589 pRNINQMIS7 pji - RSF4 R ftaF.4 L RSF.4 RSFI RS-4 [?WOOD DRI Exl `n �' O. pc A +" RSFyW P I y .� RSF.4 '1 �J.( g) 'm I QUAIL DR '117 • - asF•4 --U A. _�R DRAKESTONE ST RSF-4 I RA. kF�i 1 - INA w NA RSF-J DOVE DR i r. RSF 4 ftsF-1 o y raEnoczwLARK Trap xlsting) RSFI !_ QtJN'F.GDM Rq� _ a�D RA RO �: 1 RO RSF.4RSF4`i M1. -PI— •.. SEI. O i. 6�fs RSF1 rR3F 4 y RSFI P 1 m 11 RfiF•11rfl3F 4• 1 a _ +A , P4 P-1 RSF-4 Overview 'Legend Hillside-Hilltop Overlay District) Subject Property Design Overlay District Boundary Plan ing Area Fayetteville - _1 0 0.25 0.5 1 Mles Planning Commission March 23,2015 Agenda Item 2 15-4986 Crystal Springs SD PH III Page 12 of 12 CITY OF aye evi le PLANNING COMMISSION MEMO ARKANSAS TO: Fayetteville Planning Commission FROM: Andrew Garner, City Planning Director Corey Granderson, Staff Engineer MEETING: March 23, 2015 SUBJECT: PPL 15-4988: Preliminary Plat(MARK MILLS LN. &WINDSWEPT DR./SUMMIT PLACE SUBDIVISION, 329): Submitted by BLEW & ASSOCIATES for property located at MARK MILLS LN. & WINDSWEPT DR. The property is zoned RSF-4, RESIDENTIAL SINGLE FAMILY, 4 UNITS PER ACRE and NC, NEIGHBORHOOD CONSERVATION and contains approximately 16.58 acres. The request is for a 45 lot single-family subdivision. RECOMMENDATION: Staff recommends approval of PPL 15-4988 with conditions of approval. BACKGROUND: This property is the Summit Place subdivision which contains 30.56 acres on the south side of Township street approximately 500 feet east of College Avenue. The site is within the Hillside Hilltop Overlay District (HHOD), is partially wooded and contains significant topography change. The site transitions from 1,310 feet above mean sea level (AMSL) in the northwest corner to a hilltop located at 1,500 feet AMSL in the southeast corner of the site, an elevation change of approximately 200 feet. Slopes vary in percent gradient from 10% to greater than 20%. Access is only currently available from Township Street with a street stub-out in the southwest corner of the site. The final plat for the Summit Place Subdivision was filed of record on January 22, 2008. This final plat created 50 single family lots. The property was rezoned in July of 2011 from RSF-4, Residential Single Family Four Units Per Acre to Neighborhood Conservation (NC), the subdivision was then re-platted into smaller lots and several homes were built on the smaller lots. In September 2014 the eastern portion of the site was rezoned back to RSF-4. The surrounding zoning and land uses are depicted in Table 1, Table 1 -Surroundin oning and Land Use Direction Land Use Zoning from Site North Multi-and single-family RMF-40, Residential Multi-Family Forty Units Per residential; Commercial Acre/C-2, Thoroughfare Commercial South Undeveloped, scattered RSF4, Residential Single-Family Four Units Per Acre residences East Single family residential RSF-4, Residential Single-Family Four Units Per Acre West Commercial (College Avenue C-2, Thoroughfare Commercial commercial corridor anning Commission Mailing Address: March 23,2015 113 W. Mountain Street www.f%gWiligoggov Fayetteville, AR 72701 15-4988 Summit Place SD Page 1 of 23 Proposal:The applicant proposes to re-plat 16.58 acres of the Summit Place subdivision into 45 single family lots. This preliminary plat would leave the existing lots in the southwest portion of the site and create larger lots (approximately half-acre lots) in the recently rezoned RSF-4 portion of the site. Infrastructure improvements associated with this preliminary plat include the construction of a turn lane along the site's Township Street frontage and minor water and sewer improvements. Water and Sewer System:Two sanitary sewer line extensions approximately 130 feet in length each are required along Ozark View Drive and Champion Drive, and one water line extension approximately 120 feet in length along Freshwater Avenue is required in addition to minor utility work to serve lots created by this re-plat. Adjacent Master Street Plan Streets: Township Street (Collector Street) Right-of-way to be dedicated: Adequate right-of-way was dedicated for Township Street and all interior streets with the filing of the original Summit Place Final Plat. However, additional right-of- way dedication will be required for the Residential Streets in this neighborhood (Freshwater Avenue, Ozark View Drive, Champion Drive, and Windswept Drive).The Master Street Plan cross section for a Residential Street has increased from 40 feet to 43 feet since this neighborhood was developed in 2008. The additional right-of-way dedication is primarily to accommodate sidewalk on both sides of the street. The additional 1.5 feet of right-of-way on each side of these streets should not impact the existing infrastructure. Access and connectivity: The subdivision is accessed by two streets onto Township Street with approximately 450 feet of separation. All interior streets have been constructed and were dedicated with the filing of the Summit Place Subdivision. Marks Mill Lane stubs out in the southwest corner of the site for future street connectivity. A full re-evaluation of the block length and interior street layout is not warranted given the limited scope of this re-plat. Street Improvements: A turn lane for westbound traffic turning into the primary subdivision entrance off of Township Street is required per the most recent Summit Place re-plat in 2011. All interior streets are required to have sidewalks in accordance with the Master Street Plan. The applicant is requesting a variance for sidewalk only to be constructed on the east side of Freshwater Avenue because no new residential lots are being created along this section of street and steep topography exists along the west side of the street. Staff recommends in favor of this variance. Multi-use Trail: The Fayetteville Alternative Transportation and Trails (FATT) Master Plan identifies a future multi-use trail to be located along the south edge of the Summit Place property connecting to Overcrest Street at the southeast corner of the property. Due to the steep topography, an alternative route can follow on-street along Champion Drive and switch back to Marks Mill Lane. This proposed route will necessitate the construction of a multi-use trail and dedication of easement from Overcrest Street to Champion Drive, approximately 300 feet. Staff recommends the following trail improvements: • Construct an 8-foot wide concrete trail from the southeast corner of the property at Overcrest Street, northwest to Champion Drive. The location of the trail shall be coordinated with Matt Mihalevich, Trails Coordinator, and should be situated to minimize the slope of the trail and to save significant trees. An access ramp shall be included at the trail intersection with Champion Drive and the cul-de-sac at Overcrest Street. • A 20-foot wide multi-use trail easement shall be dedicated on the final plat. Planning Commission March 23,2015 G:\ETC\Development Services Review\2015\Development Review\15-4988 PPL Mark Mills Rd.&Windswept Ln. Agenda Item 3 (Summit Place SD)\03 Planning Commission\03-23-2015\Comments and Redlines 15-4988 Summit Place SD Page 2 of 23 Tree Preservation: Existing Canopy: 78% Preserved Canopy: 57% Required Canopy: 30% Tree Mitigation: not required Parks: On September 12, 2005, the Park and Recreation Advisory Board (PRAB) recommended accepting money in lieu of land for 50 single family units due to the development's proximity to Gulley Park. Fees were paid for the final plat in January 2008 in the amount of $27,750. On February 7, 2011, the Park and Recreation Advisory Board again recommended accepting money in lieu of land for the additional lots, due to the development's proximity to Gulley Park, Craft Park, Brooks-Hummel Nature Preserve and Gordon Long Park. Parks fees in lieu of land dedication were paid prior to the most recent re-plat in the total amount of$26,880 (28 single family units at $960/unit). Credit was given for the $27,750 previously paid resulting in a credit of $870. On October 6, 2014, PRAB reviewed the project and recommended accepting money in lieu to satisfy the park land dedication ordinance. Fees in the amount of$40,530 are due as follows: 45 single family units at$920/unit = $41,400 Credit = -870 Balance = $40,530 Public Comment: Staff has received comment from an adjoining property owner to the southwest concerned with storm water runoff and an adjoining property owner to the southeast commented that they would like a street stub-out to their property from this site. RECOMMENDATION: Staff recommends approval of PPL 15-4988 with the following conditions. Conditions of Approval: 1. Planning Commission determination of street improvements. Consistent with the previously approved conditions from the Summit Place re-plat (PPL 11-3902), staff recommends a turn lane for westbound traffic turning into the primary subdivision entrance, Marks Mill Lane. This turn lane should provide adequate stacking distance and transition rates for design speed as approved by the City Engineering Division. This improvement is required to completed prior to final plat. SUBDIVISION COMMITTEE RECOMMENDED IN FAVOR OF THIS CONDITION (03-12-15) 2. Planning Commission determination of multi-use trail improvements. As discussed earlier in this report, staff recommends the following trail improvements: • Construct an 8-foot wide concrete trail from the southeast corner of the property at Overcrest Street, northwest to Champion Drive. The location of the trail shall be coordinated with the Trails Coordinator, and should be situated to minimize the slope of the trail and to save significant trees. An access ramp shall be included at the trail intersection with Champion Drive and the cul-de-sac at Overcrest Street. • A 20-foot wide multi-use trail easement shall be dedicated on the final plat. • This improvement is required prior to final plat. SUBDIVISION COMMITTEE RECOMMENDED IN FAVOR OF THIS CONDITION (03-12-15) 3. Planning Commission determination of a variance of UDC Section 166.04.B.3.f. for sidewalk to be only on the east side of Freshwater Avenue. Staff recommends in favor of this variance Planning Commission March 23,2015 G:\ETC\Development Services RevievA20151Development Review\15-4988 PPL Mark Mills Rd.&Windswept Ln. Agenda Item 3 (Summit Place SD)\03 Planning Commission\03-23-2015\Comments and Redlines 15-4988 Summit Place SD Page 3 of 23 given that this subdivision will not be creating any new residential lots along the subject section of Freshwater Avenue and low pedestrian volumes in the area. In addition, there is a very steep drop in this area of the site and greenspace and sidewalk would require substantial fill and/or retaining walls. SUBDIVISION COMMITTEE RECOMMENDED IN FAVOR OF THIS CONDITION (03-12-15) 4. Planning Commission determination of parkland dedication or fees-in-lieu. The Parks and Recreation Advisory Board and applicant recommend parks fees in lieu of land dedication in the amount of$40,530 prior to signing of the final plat. The payment of these fees may be phased based on the number of lots being created with each final plat, in accordance with City ordinance. SUBDIVISION COMMITTEE RECOMMENDED IN FAVOR OF THIS CONDITION 03-12-15 5. The applicant shall dedicate additional right-of-way in conformance with the Master Street Plan for the Residential Streets in this neighborhood (Freshwater Avenue, Ozark View Drive, Champion Drive, and Windswept Drive) for a total of 43' right-of-way. 6. Preliminary plat approval is valid for one year. All permits to complete construction for all lots within this preliminary plat are required to be obtained within one(1)year, subject to extensions in accordance with the Unified Development Code. 7. All tree preservation, landscape, engineering and fire department conditions included herein shall apply. All revisions shall be addressed prior to construction plan approval. Standard conditions of approval: 8. Impact fees for fire, police, water, and sewer shall be paid in accordance with City ordinance. 9. Plat Review and Subdivision comments (to include written staff comments provided to the applicant or his representative, and all comments from utility representatives:AR Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications). 10. Staff approval of final detailed plans, specifications and calculations (where applicable)for grading, drainage, water, sewer, fire protection, streets (public and private), sidewalks, parking lot(s) and tree preservation. The information submitted for the plat review process was reviewed for general concept only. All public improvements are subject to additional review and approval. All improvements shall comply with City's current requirements. 11. All exterior lights shall comply with the City lighting ordinance. Manufacturer's cut-sheets are required for review and approval prior to issuance of a building permit. 12. All mechanical/utility equipment (roof and ground mounted) shall be screened using materials that are compatible with and incorporated into the structure. A note shall be clearly placed on the plat and all construction documents indicating this requirement. 13. Trash enclosures shall be screened on three sides with materials complimentary to and compatible with the principle structure. Containers may also be screened from view of the street by the principal structure or vegetation. Elevations of the proposed dumpster enclosure shall be submitted to the Planning and Solid Waste Divisions for review prior to building permit. Planning Commission March 23,2015 GAETC\Development Services Review\2015\Development Review\15-4988 PPL Mark Mills Rd.&Windswept Ln, Agenda Item 3 (Summit Place SD)\03 Planning Commission\03-23-2015\Comments and Redlines 15-4988 Summit Place SD Page 4 of 23 14. All freestanding and wall signs shall comply with ordinance specifications for location, size, type, number, etc. Any proposed signs shall be permitted by a separate sign permit application prior to installation. Freestanding pole signs and electronic message boards (direct lighting) are prohibited in the Design Overlay District. 15. All existing utilities below 12kv shall be relocated underground. All proposed utilities shall be located underground. 16. Preliminary Plat development shall be valid for one calendar year. 17. Prior to building permit, a cost estimate for all required landscaping is to be submitted to the Landscape Administrator for review. Once approval is gained, a guarantee is to be issued (bond/letter of credit/cash) for 150% of the cost of the materials and installation of the plants. This guarantee will be held until the improvements are installed and inspected, at the time of Certificate of Occupancy. 18. Prior to the issuance of a building permit the following is required: a. Grading and drainage permits b. An on-site inspection by the Landscape Administrator of all tree protection measures prior to any land disturbance. C. Separate easement plat for this project that shall include the tree preservation area and all utility easements. d. Project Disk with all final revisions e. One copy of final construction drawings showing landscape plans including tree preservation measures submitted to the Landscape Administrator. f. Completion of all required improvements or the placement of a surety with the City (letter of credit, bond, escrow) as required by Section 158.01 "Guarantees in Lieu of Installed Improvements"to guarantee all incomplete improvements. Further, all improvements necessary to serve the site and protect public safety must be completed, notjust guaranteed, prior to the issuance of Certificate of Occupancy. Planning Commission Action: O Approved O Forwarded O Denied Meeting Date: March 23, 2015 Motion: Second: Vote: BUDGET/STAFF IMPACT: None. Attachments: • Trails Coordinator comments • Parks Division comments • Engineering Division comments • Urban Forestry comments • Applicant's letters and variance request • Site plan • Close Up Map • One Mile Map Planning Commission March 23,2015 GAETC\Development Services Review\2015\Development Review\154988 PPL Mark Mills Rd.&Windswept Ln. Agenda Item 3 (Summit Place SD)\03 Planning Commission\03-23-2015\Comments and Redlines 15-4988 Summit Place SD Page 5 of 23 CITY OF Ye ev0 le A R KANSAS PARKS AND RECREATION TO: Planning Division FROM: Carole Jones, Park Planner II DATE: March 9, 2015 SUBJECT: Parks& Recreation Subdivision Committee Review Comments ***kR**#R######*#*******R*RRRk#krt#****rt*#k#****#*#*****rtkR***k*R*****rt!k##*****Rrtkk*k*rt*rtkk#kk#kkR*f******#** Meeting Date: March 12, 2015 Item: PPL 15-4988 (Summit Place, 329) Park District: NE Zoned: RSF-4 and NC Billing Name &Address: Elite Equity Group of Arkansas, LLC 6077 SW Regional Airport Blvd. Bentonville, AR 72712 Current Land Dedication Reauirement Money in Lieu Single Family @ 0.023 acre per unit = acres 45 @ $920 per unit= $41,400 Multi Family @ 0.014 acre per unit= acres @ $560 per unit= $ COMMENTS: • The original development was reviewed by PRAB in September 2005 for 50 single family units. A recommendation of money in lieu was given at that time. The developer paid $27,750 on January 22, 2008 (50 single family units @ $555/unit). • In February 2011, PRAB recommended accepting money in lieu for an additional 119 single family units. The subdivision was re-platted, and 28 single family units were platted on the west side of the property as Phase I resulting in fees of$26,880 (28 single family units @ $960/unit). Credit was given for the $27,750 previously paid resulting in a credit of$870 ($27,750 - $26,880). • On October 6, 2014, PRAB reviewed the project and recommended accepting money in lieu for 28 single family units to satisfy the park land dedication ordinance due to the development's proximity to Gulley Park, Craft Park and Ridgeway View. • Fees in the amount of$40,530 are due and calculated as follows: 45 single family units @ $920/unit=$41,400 Credit= $ -870 Balance = $40,530 • The actual amount of fees will be determined by the actual number of units and the parks fee formula at Planning Commission approval of the Preliminary Plat. Mailing Address: PARKS & RECREATION 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville,AR 72701 Planning Commission March 23,2015 Agenda Item 3 15-4988 Summit Place SD Page 6 of 23 THE CITY OF FAYETTEVILLE,ARKANSAS a etKOAle ENGayette NG DR 72701 ISION IISWmtMountaln 1Faprtevllk,AR 73701Phm (479)M 3443S a(�essfayettev ill e,mg ENGINEERING DIVISION - TRAILS CORRESPONDENCE To: Planning Commission From: Matt Mihalevich, Trails Coordinator Date: February 13, 2015 Subject: Summit Place -Trail Comments ITEM #: LSD 15-4989: PPL Summit Place TRAIL COMMENTS The Fayetteville Alternative Transportation and Trails (FATT) Master Plan identifies a future multi-use trail to be located along the south edge of the Summit Place property connecting to Overcrest Street at the southeast corner of the property. Due to the steep topography, an alternative route can follow on-street along Champion Drive and switch back to Marks Mill Lane. This proposed route will necessitate the construction of a multi-use trail and dedication of easement from Overcrest Street to Champion Drive. 1.) Construct an 8' wide concrete trail from the south east corner of the property at Overcrest Street, northwest to Champion Drive. The location of this trail shall be coordinated with Matt Mihalevich, Trails Coordinator and should be situated to minimize the slope of the trail and to save significant trees. An access ramp shall be included at the trail intersection with Champion Drive and to the Cul-de-Sac at Overcrest Street. 2.) The tree preservation easement will need to be modified to subtract the area of this easement. 3.) Dedicate a 20' wide multi-use trail easement for the trail connection on the final plat. Telecommunications Device fof the Deaf TDDt479)521-1316 113West Mountain-Fayetteville,AR 72701 Planning Commission March 23,2015 Agenda Item 3 15-4988 Summit Place SD Page 7 of 23 CITY OF SVARKANSAS le y Date: March 9, 2015 Subdivision Committee Staff Memo To: Andrew Garner, Planning Director From: Corey Granderson, Staff Engineer Re: Plat Review Comments Development: PPL 15-4988 Summit Place Subdivision Re-plat Engineer: Blew and Associates, PA Plan Comments: 1. Township turn lane widening and all associated improvements will be reviewed in depth at construction level review. These improvements must be completed, accented, and maintenance bonded prior to engineering sign-off on the final plat for this subdivision. 2. All utility work associated with this re-plat must be completed prior to final plat approval. Standard Comments: 1. All designs are subject to the City's latest design criteria(water, sewer, streets and drainage). Review for plat approval is not approval of public improvements, and all proposed improvements are subject to further review at the time construction plans are submitted. 2. Any damage to the existing public street due to construction shall be repaired/replaced at the owner/developers expense 3. Water and sewer impact fees will apply for the additional impact to the system. The fees will be based on the proposed meter size and will be charged at the time of meter set. 4. Note,the following portions of all projects will typically not be reviewed by the Engineering Division until time of construction-level review(unless specifically requested at plat review): o Storm Sewer pipe/inlet sizing, gutter spread, profiles, or utility conflicts o Sanitary Sewer pipe sizing, profiles, or utility conflicts o Waterline fittings, callouts, or utility conflicts o Street profiles o Fine grading/spot elevations Special Comments: 1. The Engineer of Record shall: a. Review and approve material submittals. Approved submittals shall be submitted to the City for concurrence before grading permit is issued. b. Perform"Full Time" Inspection for the utility installation and shall be"In- Charge"of the approval testing. c. Provide a qualified representative for all testing and inspection. d. Schedule testing with the Public Works Inspector. Mailing Address: ENGINEERING 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Planning Commission March 23,2015 Agenda Item 3 15-4988 Summit Place SD Page 8 of 23 e. Authorize geotechnical testing laboratory to provide reports directly to City in PDF format. Reports shall be submitted in a timely manner. f. Prepare material data sheets and test reports required by the specifications. g. Insure that daily inspection reports and data sheets are submitted to the City of Fayetteville's public works inspector weekly in PDF format. 2. 2012 Standard Water& Sanitary Sewer Specifications&Details apply 3. Demolition shall not begin until the appropriate erosion control measures and required tree preservation fencing are installed 4. Prior to Project Acceptance (Final Plat, Certificate of Occupancy, or Temporary Certificate of Occupancy)the following items must be performed or provided to the satisfaction of the Engineering Department: a. The work shown on the civil site package must be complete and the items on the final punch list completed. b. Vegetation must be established in accordance with Section 169.06 of the UDC and perimeter controls removed. c. One (1) set of as-built drawings of the complete project(excluding details) as a hard copy and in Tiff or PDF format; i. Public infrastructure and services shall be surveyed after installation in relation to easements, property lines, and rights-of-way. 1. More than 2 ft deviation of design alignment of shall require new easement dedication or adjustment of the utility/storm drain. ii. Sanitary Sewer, and Storm Drainage (Including Private) elevations must be verified and updated. (Elevations out of design tolerance must be corrected) iii. Professional surveyor shall provide stamp drawings specifically identifying the limits of as-built survey performed. d. Unit price construction costs for review and approval and a single 2 year maintenance bonds in the amount of 25% of the public improvements; e. Certification that the streets, sidewalk, storm sewer, water, fire line, and sewer lines, etc., were installed per approved plans and City of Fayetteville requirements; i. Provide all Inspection Reports; approved submittals; Data Forms from Utility Specifications (Including Consultants sewer TV report); compaction test results, etc... f Surveyor's Certification of Compliance for monuments and property pins. Planning Commission March 23,2015 Agenda Item 3 15-4988 Summit Place SD Page 9 of 23 w CITY OF • lay e evi le URBAN ARKANSAS FORESTRY TREE PRESERVATION AND PROTECTION—Chapter 167 To: Jorge Du Quesne, Blew&Associates, PA From: Ken Eastin, City of Fayetteville Urban Forestry CC: Andrew Garner, City Planning Director Date: 23 March, 2015 Subject: PPL 15-4988 Marks Mill &Windswept(Summit Place) PLANNING COMMISSION Review Comments Requirements Submitted.' No Initial Review with the Urban Forester NIA Site Analysis Map Submitted if justification is needed NIA Site Analysis Written Report Submitted (if justification is needed Yes Com lete Tree Preservation Plan Submitted Yes Tree Mitigation Table on Plans NIA Tree Preservation Wavier Submitted Tree Preservation Calculations Acres Square Feet % Total Site Area* 550,766 100% Zoning RSF-4-HHOD Site 30 Percent Minimum 165,230 30% -Existing Tree Carl 428,359 78% Tree Canopy Preserved 313,994 57% Tree Canopy Removed-On-site 114,365 21% Tree Canopy Removed-Off-site 0 Tree Canopy Removed-Total 114,365 21% On-Site Removal Below Minimum 0 Total Mitigation (On-site below min. +Off-Site Removed) 0 • Total Site Area* is property line minus Master Street Plan ROW, existing easements, and Dedicated Parkland • Existing Tree Canopy* is total tree canopy minus Master Street Plan ROW and existing easements Mailing Address, URBAN FORESTRY 113 W. Mountain Street warw.fayeWvi11Q-aov Fayetteville, AR 72701 March arch 2 mmission 23,2015 Agenda Item 3 15-4988 Summit Place So Page 10 of 23 Tree Canopy Mitigation. NOT REQUIRED- Canopy Below Preservation Forestation Base Number of 2"caliper Required Priori ty/TvDe Densis ft2 trees to be planted ft2 High Priority 218 ft2 Mid Priority 290 ft2 Low Priority 436 Total Mitigation Mitigation Type Requested Qty Each Total Cost On-site Mitigation Off-site Mitigation Tree Escrow $675 Total Mifi anon_ Mitigation Type Requested: ❑ On-Site ❑Off-Site ❑ Tree Escrow ❑ Not Requested Yet Mitigation Type Requested Approved: ❑YES ❑ NO TREE PROTECTION PLAN CHECKLISTS AND COMMENTS: Plan Checklist. NA =not applicable Yes—submitted by applicant No=required by City Code but not included on submitted plan The Site Analysis Plan [167.04(H)(1)] Tech Plat SD PC Site Analysis Plan Components No Yes Yes 5 year aerial check on existing trees Yes Yes Yes Property Boundary No NIA NIA Natural Features 100ft beyond property line shown Yes Yes Yes Existing Topography with slopes < 15%highlighted No No Yes Soils No No Yes Si nificant Tree (s): 24", 18"and 8" DBH No No` Yes Table listing Sig. Trees with species, size, health, priority No No' Yes Grouping of Trees: all other trees that do not meet significant requirements No No" Yes Table listing Grouped Trees with average species, size, health, priority Yes Yes Yes All existing utilities NIA NIA NIA All perennial and intermittent streams with approximate center line NIA NIA I NIA I Flood Tains/Floodwa s Y esYes Yes Existingstreet, sidewalk or bike path ROW NNo No No Submitted Site Analysis Plan * Revised inventory of tree canopy completed with this Preliminary Plat application. 2 Planning Commission March 23,2015 Agenda Item 3 15-4988 Summit Place So Page 11 of 23