HomeMy WebLinkAbout2012-07-18 - Agendas - FinalParks & Recreation Staff
Connie Edmonston, Director
Chase Gipson, Recreation Superintendent
Byron Humphry, Maintenance Superintendent
Alison Jumper, Park Planning Superintendent
Carole Jones, Park Planner
Melanie Thomas, Senior Secretary
Parks & Recreation Advisory Board
Steve Meldrum - Chair
Phillip Watson— Vice Chair
Teny Lawson
Jonathan Leonard
Phillip McKnight
John M. Paul
David Proffitt
Bill Waite, Jr.
Parks and Recreation Advisory Board Meeting
Special Meeting July 18, 2012 at 12:00 p.m.
Lake Fayetteville Marina Porch
1330 East Lake Fayetteville Road
Fayetteville, AR
Please note: The meeting will be held at Marina at Lake Fayetteville Park.
AGENDA:
1. Extension of Frisco Trail Project: Matt Mihalevich, Trails Coordinator.
Matt will be presenting to PRAB with three options to cross Martin Luther King
Boulevard in extending Frisco Trail. On July 11th, the Active Transportation Advisory
Committee voted to utilize the tunnel option (4-0-1 abstaining). PRAB is requested to
make a recommendation prior to going before the Street Committee. Attached is
information referring to this request for your review prior to meeting.
PRAB Motion:
2. Adjournment
Attachments:
1. MLK 3 Crossing Options
2. Project Consultant, Garver Engineering's Recommendation
3. MLK Trail Option Process
June 29, 2012 PRAB Agenda 1
Three Options:
-Above Grade (Bridge) Option
-Cost: $1,615,088
-At Grade (Crosswalk) Option
-Cost: $960,726
-Below Grade (Tunnel) Option
-Cost: $1,339,397
Wttv!lle
Above Grade (Bridge) Option
- Cost: $1,615,088
- Minimum 20 ft clearance
required by AHTD
- Large scale may not be
appropriate for the surrounding
neighborhood.
- Would require 360 degree fencing
to prevent objects from being
thrown into traffic on MLK
- Eliminates conflicts between
bicyclists and motorized traffic
- Long approach ramps (310')
avltville
ARKANSAS
www.accessfayetteville.org
At Grade (Crosswalk) Option
- Cost: $960,726
- MUTCD warrants are
required for the consideration
of a signalized intersection
- A very aesthetically pleasing
design was submitted by
Robert Sharp, but certain
elements such as bollards and
raised pavement, would not
be allowed. The streetscape
improvements could be a
separate project in the
future.
lattrville
ARKANSAS
www.accessfayetteville.org
Below Grade (Tunnel) Option
- Cost: $1,339,397
- Perceived as unsafe and prone to
graffiti
- Eliminates conflicts between
bicyclists and motorized traffic
- Shorter approach ramp (255') than
bridge option
- Minimal visual impact on the
surrounding neighborhood
- 4 tunnels already exist on
Fayetteville's trail system with
overall success
va"F�Ie eville
Prairie ST.-
wry 62,E
Conceptual Trail
Crossing Location
eft 41
-}
m,
rf
z
10-
0
\ CO
\\a
ARKANSAS
www.accessfayetteville.org
2049 E. Joyce Blvd.
Suite 400
Fayetteville, AR 72703
TEL 479.527.9100
FAX 479.527.9101
www.GaiverUSA.com
July 10, 2012
Chris Brown, PE
City of Fayetteville
113 W Mountain Street
Fayetteville, AR 72701
Re: Frisco Trail Recommendation
Dear Mr. Brown:
On March 20, 2012, Garver was hired to provide professional engineering services for the Frisco Trail
Extension between the existing terminus of the Frisco Trail at Martin Luther King Jr. (MLK) Boulevard
and Walker Park. Our services included performing an alignment study that examines the various
options for crossing MLK Boulevard and attending public input sessions. Below is a summary of those
activities to date:
April 30, 2012 — Public Input Session held on project site.
May 17, 2012 — Alignment Study submitted to City of Fayetteville.
June 7, 2012 — Public Input Session held at Senior Center.
June 26, 2012 — Reviewed alternatives with Arkansas State Highway and Transportation Department
(AHTD) District Engineer.
Three crossings were analyzed at MLK Boulevard: an above -grade crossing (bridge option), an at -
grade crossing (crosswalk option), and a below -grade crossing (tunnel option). The alignments follow
Tanglewood Branch in order to utilize the section of trail at Grove Apartments (former Sale Barn) and
to provide a connection with the future Tsa La Gi Trail. Exhibits for these options are included as an
attachment.
Above -Grade Crossing (Bridge Option)
The above -grade crossing is the Frisco Trail alignment that crosses MLK Boulevard with a bridge.
The crossing would include an approximately 153' bridge span with 310' ramps and necessitate the
closing of Gregg Avenue between MLK Boulevard and Prairie Street. The option is estimated to cost
$1,615,088 for all improvements.
At -Grade Crossing (Crosswalk Option)
The at -grade crossing is the Frisco Trail alignment that crosses MLK Boulevard with a crosswalk. The
crossing would be along Government Avenue and would necessitate a traffic signal at MLK
Boulevard and Government Avenue. The option is estimated to cost $960,726 for all improvements.
Below -Grade Crossing (Tunnel Option)
The below -grade crossing is the Frisco Trail alignment that crosses MLK Boulevard with a tunnel. The
crossing would include an approximately 126' tunnel with 225' ramps. The option is estimated to cost
$1,339,397 for all improvements.
Mr. Brown
July 10, 2012
Page 2 of 2
Based upon our findings from our alignment study and the public input sessions, Garver recommends
the below -grade crossing (tunnel option) with an at -grade pedestrian bypass for the crossing at MLK
Boulevard. A summary of those findings include:
• Public input indicated that the below -grade crossing was generally preferred.
• An at -grade pedestrian bypass crossing at the intersection of School Avenue provides trail
users an alternative option and addresses some public input concerns about tunnel safety.
• Per meeting with AHTD on June 261h, the State will not allow a traffic signal for an at -grade
crossing at Government Avenue without MUTCD warrants. Analysis shows the intersection of
Government Avenue and MLK Boulevard will not meet MUTCD signal warrants.
• Grade separation is safer for trail users and motorists.
• A below -grade crossing allows the most value for the money provided to the City.
Please call me if you have any questions.
GARVER, LLC
fess
Nathan Becknell, PE, PTOE
Project Manager
Attachments:
Alignment exhibits from June 7, 2012 Public Input Session (4 sheets)
X:\2011\11047140 -Fayetteville Frisco Multi -Use Trail\Correspondence\Outgoing\Brown 2012-07-10 Frisco Trail
Recommendation.doc
N
N
0
N
0
N
0
0
'-0
m
2r-
0.4-
00
W
0_
n YO
0 CC N
O�
Fa etteville Frisco Multi—Use Trail Drawin•s FFT_C002_PS.d•
L•
— —
CUP
any
Ian
Ela
kdrir-r-
:
I. 1I'lR
— — I
•
PROPOt MULTINLISeat
TRAILPPROX)ATEL
_ y '
3
1 ' RAMPS&
1531 PROPeltaRIDdE
[
r SAW
WILK JR BLVD
./ LL -1
knot
• i
MIANDOPIED 'RAILROAD
-
r. ` gr
APT -
1
i.
GOVERNMENT AVENUE
r �.
i
=r
r
•r .
•
L
y
1}
'Ja
vs: miL
}
•r
,4 -p
II
Y
G
r•
`tea
.4
4 W
STREAMSIDE
PROTECTIONAONE, :.
t '
PRIRJ STREET
4 ..
EXISTING TRAIL IINII
PI L ARY frR IL
AqpiMENT
S.1
xra
ssr
4 SP
IL 1
GNAL, TRAIL
NIENT
PtitiPOSED MULTIAIISE TRAIL
WITH APPRO IMASLI3-4111.
=
RAMP Y
= ..iiry,
.-
N. 115
,,.-�•
114
' IPM -Ir
Aa
‘XISTING ILRO TAE
'
TO EIAIN� IN CIAO
Y.
S �� / 'r
r
;6-.9" �n
r 1 y
a a 4
1•'},
1
'. At
ti4' y�irnw.:..= '.'
4
ROW 11
a
il^
L li
•
•
STREAMS/DE __
PROTECTION ZONE
L
PROPOSED TRAIL
BY OTHERS
al --1
45
Y s
3
w
GRAPHIC SCALE
60 0 30 60
( IN FEET )
BRIDGE OPTION
,.SCHOOL AVENUE
p
41;
1;
1
1
In
'
{ YI
120
a
W
J
Lu
1
U
BRIDGE OPTION
JOB NO.: 11047140
DATE: MAY, 2012
DESIGNED BY: DJC
DRAWN BY: DJC
BAR IS ONE INCH ON
ORIGINAL DRAWING
D-1'
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY.
DRAWING NUMBER
■
SHEET A' 1
NUMBER
N
m
0
N
0
0
m0"o
oIrr
�0
w�
d r
n YO
0 CC N
O�
Fa etteville Frisco Multi—Use Trail Drawin•s FFT_C001_PS.d•
PROPOSED BRIDGE
PTIO$ I"TRAIL:.
AII; HENT
PROPOSE,DiitithGE
PR;PRIPI =TRAIL
ALIGNMENT
i
rj^r
11
OPIPIONAL SIGNALIZED'.
INTERSECTION ,;'
f p
li
47
ler
r �.
MLFC JR BLVD
./ Lt -1
knot
tsI
}
•
ABANDONED RAILROAD
!! it
rr `YT
IPI
r.
1
ari
Z
2
•
la
- _ -
•
aaap
O
{
v
i.
=r
•
i
•
w
f
0
Iu
EZ
0
•
II
Y
.4
4 W
III
N ik•
a
147
-••4
STREAMSIDE
PRTETIOiIONE,:.
PRA—IRIE STREET
� J
EXISTING TRAILI la
- yl
•s: a
1..
•476, „isiay• • rvyl. ygti
6.
is-
• • •
'r y,�P'}
. 14
-45
it/
VISTING AI ROAD '"'E
.4 TO EIAIN INPLACE
fyyY-
S �� 7�' r
•
r
4
xra
t sr
IL' 11
il^
-
L li
•
STREAMS/DE -
PROTECTION ZONE
PROPOSED TRAIL
BY OTHERS
1;
3
w
GRAPHIC SCALE
60 0 30 60
( IN FEET )
120
AT GRADE OPTION
:] -
No-;lir
411
,.SCHOOL AVENUE
p
41;
1;
1
1
V'
1
- .I
r
{ YI
wi
Pi
Lu
J
W
Lu
>-
u_
U
AT GRADE OPTION
JOB NO.: 11047140
DATE: MAY, 2012
DESIGNED BY: DJC
DRAWN BY: DJC
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1'
IF NOT ONE INCH ON
THIS SHEET, ADJUST
SCALES ACCORDINGLY.
DRAWING NUMBER
■
SHEET
NUMBER A- s
Proposed
New Sidewalk
Connection d
¶'OEtevi1e
Frisco Trail
MLK Jr. South to Walker Park
CONCEPTUAL TRAIL LAYOUT
.APRIL 2012
0 100 200
Fa etteville Frisco Multi—Use Trail Drawin•s FFT_C003_PS.d•
1
1
L
176
STREAMSIDE
PROTECTION ZONE
I IT
AT GRADE OPTION
Ed
Z.
Mor
I Li
a
lar
air
iirre
` f
10J', JILFfiLVD
rda
1y.
:"i
1
LI C
•'k
ter.....
•
1 ■
Jtom
ef
PRAIRIE STREET
BRIDGE. ONION
5 '
" ,.
Y ! k ICh
, .3/4.
a TUNNEL f° "'n t
.1
. tel
,
r.
r.
--- " i
71 '
/1
•1
Cn
i. ii.,
I+j
i ii •4
,,..,
il,
, _,E,:ei,:.:.
_iv , ,-.
t.,..
' +,,...
FI.
�IjY1jI'in.
T • .
L
i
fi n,
rl
a 14
. re:. :: zwzi.<171._.,, . -1
S
1,1
• k
40. r
Z Ila Ili 1 •
.1 f.• •
L 3 -
4 +
v a041
iii yGti. 11: boa
,y
v44y �q
i1
PROPOSED iL .1 9TH. STREET 411'111
FF -
,.r
a1
i
12
.44
Mph
i
—1
BY
7•OTHERS
�:�A
Pip
a
:Jr• '
la•
t�
:
Tarte
THE CITY OF FAYETTEVILLE, ARKANSAS
ENGINEERING DIVISION
125 West Mountain
Fayetteville, AR 72701
Phone (9791944-3943
ARKANSAS
www.accessfayetteville.org
Frisco Trail Southern Extension
Public Input Process & Schedule
Process
Information Shared
Event Date
Garver Notice to Proceed
Contract signed and purchase order issued
Apr 1st 2012
Farmer's CoOp Meeting
Conceptual trail map and alignment discussion
Feb 24th 2012
Public Meeting #1
- 35 Attendees
Conceptual trail alignment presented along with a
board of images of at -grade signalized crosswalks
and tunnel crossings. A trail walk of the proposed
trail alignment followed.
Apr 30th 2012
Public Meeting #2
- 40 Attendees
Display the three conceptual crossing options for
MLK with pros and cons and cost estimates by
Garver using AHTD style meeting format. In
addition images will be presented with each type of
crossing illustrated.
June 7th 2012
Comment period
June 7th to 22nd
- 73 Comments
AHTD correspondence
Meet with AHTD to discuss the feasibility of the
options.
June 26
Active Transportation
Advisory Committee
Present the recommended crossing and trail
alignment based on Garver's recommendation..
July 1 lth
Parks and Recreation
Advisory Board
Present the recommended crossing and trail
alignment based on Garver's recommendation.
July 18th
Special Meeting
Street Committee
Present recommendations — request approval.
July 31st
Telecommunications Device for the Deaf TDD(479) 521-1316 113 West Mountain - Fayetteville, AR 72701