Loading...
HomeMy WebLinkAbout2004-05-24 - Agendas - Final iS FAYETTEVILLE THE CITY OF FAYETTEVILLE,ARKANSAS 125Mountain St. Fayetteville,AR 72701 Telephone:(479)575-8267 PLANNING DIVISION CORRESPONDENCE AGENDA FOR A MEETING OF THE PLANNING COMMISION Monday, May 24,2004, 5:30 p.m. Room 219, City Administration Building The following items will be considered: Approval of Minutes from the May 10,2004 meeting. Consent: 1. VAC 04-1070: Vacation (ESTATES AT SALEM HILLS,206): Submitted by GERALD TOMLINSON for property located at WEST SALEM ROAD. The property is in the Planning Area and contains approximately 1.95 acres. The request is to vacate a portion of Right-of-Way. Planner: JEREMY PATE New Business: 2. LSD 04-1052: Large Scale Development(KERSHNER BUSINESS CENTRE, 173): Submitted by JAMES KOCH for property located at SE CORNER OF STEELE BLVD & VAN ASCHE DRIVE. The property is zoned C-2, THOROUGHFARE COMMERCIAL and contains approximately 1.49 acres. The request is to approve the development of a 17,747 s.f. office building with 42 parking spaces proposed. Property Owner: TRAVIS KERSHNER Planner: JEREMY PATE 3. ADM 04-1063: Administrative Item (LSD EXTENSION FOR DUNCAN APTS., 561): Submitted by MANDY BUNCH for property located at DUNCAN AVENUE, S OF 6TH STREET. The request is to extend the approval of LSD 03-13.00. Planner: JEREMY PATE 4. ADM 04-1068: Administrative Item (JERNIGAN, 524): Submitted by JIM JERNIGAN for property located at 604 BLAIR AVENUE. The request is to revise the site plan for the Conditional Use at the subject property. Planner: SUZANNE MORGAN 5. ADM 04-1086: Administrative Item(LUSHBAUGH, 484) was submitted by Brad Lushbaugh for property located at 418 W. Meadow, the northeast corner of Meadow St. and West Ave. The property is zoned R-O, Residential Office. The request is to approve the use of two on-street parking spaces to serve intermittent parking demands of the subject property as provided in §172.06(D) of the Unified Development Code. Planner: DAWN WARRICK All interested parties may appear and be heard at the public hearings. A copy of the proposed amendments and other pertinent data are open and available for inspection in the office of City Planning(575-8267), 125 West Mountain Street,Fayetteville,Arkansas. -All interested parties are invited to review the petitions. Interpreters or TDD for hearing impaired are available for all public hearings;72 hour notice is required. For further information or to request an interpreter,please call 575-8330. ORDER OF PLANNING COMMISSION MEETING A. Introduction of agenda item—Chairman B. Presentation of Staff Report C. Presentation of request—Applicant D. Public Comment E. Response by Applicant/Questions &Answer with Commission F. Action of Planning Commission(Discussion& Vote) NOTE TO MEMBERS OF THE AUDIENCE If you wish to address the Planning Commission on an agenda item raise your hand when the Chairman asks for public comment. He will do this after he has given Planning Commission members the opportunity to speak and before a final vote is taken. Public comment will only be permitted during this part of the hearing for each item. Once the Chairman recognizes you, go to the podium at the front of the room and give your name and address. Address your comments to the Chairman, who is the presiding officer. He will direct them to the appropriate appointed official, staff member or others for response. Please keep your comments brief, to the point, and relevant to the agenda item being considered so that everyone has a chance to speak. Please, as a matter of courtesy, refrain from applauding or booing any speakers or actions of the Planning Commission. 2004 Planning Commissioners Nancy Allen Jill Anthes Candy Clark James Graves Christine Myres Alan Ostner Loren Shackelford Sean Trumbo Christian Vaught FAYETTEVILLE PC Meeting of May 24, 2004 THE CITY OF FAYETTEVILLE,ARKANSAS 113 W. Mountain St. - Fayetteville,AR 72701 Telephone:479-575-5264 PLANNING DIVISION CORRESPONDENCE TO: Fayetteville Planning Commission Members THRU: Dawn Warrick, AICP, Zoning & Development Administrator FROM: Suzanne Morgan, Associate Planner Matt Casey P.E. Staff Engineer DATE: May 17, 2004 VAC 04-06.00: Vacation (Estates at Salem Hills, pp 206) was submitted by Tom Hennelly of Tomlinson Engineering on behalf of Gerald Tomlinson for property located at The Estates at Salem Hills subdivision. The property is located in Washington County in the City of Fayetteville Planning Area. The request is to vacate a portion of the existing right of way located along the west and north sides of the subject property. Planner: Jeremy Pate Findings: See the attached maps and legal descriptions for the exact locations of the requested utility easement vacation. Background: A 45' right of way exists that extends north of the intersection of West Salem Road and Rupple Road through this property. A 50' right of way exists that extends west of the intersection of Howard Nickel Road and Salem Road through this property. The Planning Commission approved The Estates at Salem Hills preliminary plat on July 14, 2003 with a condition that the right of way be vacated and that the master street plan alignment be amended. On August 5, 2003 the City Council considered the amendment to the master street plan alignment. The City Council passed a resolution for this amendment at this meeting. The right of way will now need to be vacated in order to comply with the conditions of approval for the preliminary plat. Request: The applicant requests to vacate a portion of the existing right of way as described and depicted in the attached documents. The applicant has submitted the required notification forms to the utility companies and to the City. The results are as follows: UTILITIES RESPONSE Ozarks Electric No Objections AEP/SWEPCO No Objections Arkansas Western Gas No Objections SW Bell No Objections May 24,2004 Planning Commission VAC 04-06.00(Estates At Salem Hills) Page 1.1 CITY OF FAYETTEVILLE: RESPONSE Water/Sewer No Objections Transportation No Objections Solid Waste No Objections Engineering No Objections Recommendation: Staff recommends approval of the proposed right of way vacation 04-06.00. PLANNING COMMISSION ACTION: yes Required Approved Denied Date: May 24, 2004 The "CONDITIONS OF APPROVAL", beginning on page one of this report, are accepted in total without exception by the entity requesting approval of this development item. By Title Date CITY COUNCIL ACTION: yes Required Approved Denied Date: May 24,2004 Planning Commission VAC 04-06.00(Estates At Salem Hills) Page 1.2 Survey Description Of Right of way Vacation Part of the SW /4 of the NW '/4 and part of the NW '/4 of the SW %4 of Section 29, Township 17 North, Range 30 West, in Washington County Arkansas, and being more particularly described as follows; Commencing at the Southwest corner or said NW '/4 Of the SW '/4, said point being a found 1/2" rebar, and the POINT OF BEGINNING, thence NO2°26'05"E 1338M feet to a found %2" rebar,thence S87'57'1 8"E 705.22 feet, thence S02`02'42"W 50.00 feet,thence N88°08'42"W 660.56 feet, thence S02"26'05"W 1228.24 feet, thence N87`50'08"W 45.00 feet to the P.O.B., less and accept the Right of Way shown on the final plat of the Estates at Salem Hills as per final plat on file at the office of the Circuit Clerk of Washington County, Arkansas, containing 1.25 acres more or less. May 24,2004 Planning Commission VAC 04-06.00(Estates At Salem Hills) 'Page 1.3 RESOLUMON NO.125-03 A RESOLUTION AMENDING THE MASTER STREET PLAN, DEDICATING`90 FEET OF RIGHT OF WAY ALONG HOWARD NICKELL ROAD THROUGH THE ENTIRE PROPOSED DEVELOPMENT IN ` A DIFFERENT ALIGNMENT TO COMPLETE A CONNECTION WITH THE FUTURE EXTENSION OF .RUPPLE ROAD NORTH WHEREAS;the new alignment of Howard Nickell Road and Rupple Road fulfill the intent of the Master Street Plan;and WHEREAS,the new alignment of Howard Nickell Road:and Rupple. Road will be beneficial to the City of Fayetteville's policy of connectivity;and WHEREAS,this amendment to the Master Street Plan provides connectivity with less topography constraints. BE TT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,ARKANSAS: ' Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves the change in Master Street Plan as noted above and more particularly shown on Exhibit A(attached): PASSED and APPROVED this the 191h day of August,2003. APPROVED: By: DAN GOODY, M or ATTEST: By SONDRA SMITH,City Clerk 4,1004 Plannl Co fission VAC 04-06.00(Estates At Salem Hills) Page 1.4 � ) PPL 03-11.00 Tomlinson �/ auM4JLC6. Page 3 t t t 1 11 P. t - a V y, h r � � i a �E a 0 NNI em m� Z o A 'Z �•f N 2 R yyT O co a -• o • 2• y 4,2004 Plain o mission 1:5 The-Estates at Salem �1Ws ,, a Page VAC04-06.00 ESTATES AT SALEM HILLS Close Up View 1„ - d t T Y e^LQ4v >.c _ f �. �"�.,� ,^i i 5' ��'•SYt �µ� ��-♦t2 V'SA. P r� �-� t�-„'Y�6` '4'. "{.F� 3�'v'�S .a t�eh''S ��µ ``:� •"1 •'a�,p�"'J Y '.L`S� C�lStt '� r rX•r'bK"2.5'" 2 Y< 3 n � �y p 4 s 1$ J,n .�- f `u'` 3t w5Y p it rn' �.a`a'4��i t �. � �. •'�'ty"* �e i � iri`" c � a ���� ���1 tf. l�,m to ", i 'P t�z.� �.•+� ��a"� r �,'� a „�a e� �'s+�sn .+�` Jct )Y'.r a � .,� ,4 *v 5�• F.. s Y > 7yta 1 1. 4vrs f 1�$`1y � � f _ '3 yN� d"��'`St` '3,IY-+'Se +a^ aro-' '.t•.a`a;f s"GJs is " Via- �..;�a_�.�.. i"�z n, . .,�:? �' ',~,�..h�� ..�,�'•��'�' t y,..� ,,� � �r � _2 Overview Legend e,000 8 Overlay District asseneas,Principal Avenel —FLOODWAY Master Street Plan r®aa Minor Arterial —100 YEAR Water Street Plan Oollaclor -^—^^500 YEAR Freeway) xpresaway Mt• R'ustanc Colleclor LIMIT OF STUDY _ City Limits — — - BaseLine Profile Ontsme City BM VAC04-06.00 May 24,2004 Planning Commission 0 175 350 700 1,050 I,X6C 04-06. 0(Estates At Salem Hills) Peet Page 1.6 VAC04-06.00 ESTATES AT SALEM HILLS One Mile View N'} �a'dx &a3�`` �d `�-f�4^r '3 �' ta^ �'Ar i'e;' �i-`�v �, f�f d'v •� ''+� E�#s n� r S 'v� Ia.S'i ��,.i wtl c ?'s'Y•. y��'/ �' � � .a �: is. Ya R•. �� { -. S g ( I u Y— f� i � RSF1v . -�id 8'• d-.r- I p 4 ?.. iz� - e m . v� Ts a -4 {• {RA F yv ( t RA H � I {Sk#ktkv [L�'t�--�Ir 0 �.`'� ��.�S ��"�a 4` t��t)q r »k{ xt�`u'�K � '*' � —�� Pki:L'-tai���.c-, fib• .+ T- � .5° . Y# .^ i.*� d �� i' ib,a t )•y hw 9-'D. r'10 ' x. z r 1 RSR< x a-i r I { r i Iiro? ;1- j cvzo 3 � RSFC RS SR .l.. 5 ryt'ih �' illll +.r.''� �.a hfrd.3$''..&r°=, _xs. w..as' °'".:..hR -.� `"�r,'•wa's:. `,:s Overview Legend _ Subject Property Boundary Master Street Plan r E _ VAC04-06.00 1- 8..+Planning AreaRreewaypressway L: 800oaPrincipal Arterial o Overlay District (`'n Streets 0000_0Mlnor Arterial N Esisiing L I City Limits /%e Collecbr ME Pla""etl Outside City Histoaccolleder May 24v 2004 -- -- �4 Planning Commission z VAC 04- 6.00(Estates At Salem Hills) 0 0.1 0.2 0.4 0.6 O.Miles Page 1.7 FAYETTEVILLE PC Meeting of May 24, 2004 THE CITY OF FAYETTEVILLE,ARKANSAS 113 W. Mountain St. Fayetteville,AR 72701 Telephone:501-575-8264 PLANNING DIVISION CORRESPONDENCE TO: Fayetteville Planning Commission FROM: Jeremy Pate, Associate Planner Matt Casey, Staff Engineer THRU: Dawn Warrick, A.I.C.P., Zoning&Development Administrator DATE: May 18, 2004 LSD 04-1052: Large Scale Development(KERSHNER BUSINESS CENTRE): Submitted by JAMES KOCH for property located at SE CORNER OF STEELE BLVD &VAN ASCHE DRIVE. The property is zoned C-2,THOROUGHFARE COMMERCIAL and contains approximately 1.49 acres. The request is to approve the development of a 17,747 s.f. office building with 42 parking spaces proposed. Property Owner: TRAVIS KERSHNER Planner: JEREMY PATE Findings: Proposal: The applicant proposes to construct a new two-story office building at the corner of Van Asche Drive and Steele Boulevard, in Steele Crossing Subdivision. The development is comprised of 17,747 square feet professional office space, with 42 parking spaces proposed. Forty-two (42)parking spaces is within the allowable parking ratio (+/- 30%) for professional office development. Surrounding Land Use/Zonin : Direction Land Use Zoning North Vacant, Lot 8 C-2,Thoroughfare Commercial South Target, Lot 7 C-2, Thoroughfare Commercial East Vacant, Lot 15 C-2, Thoroughfare Commercial West Vacant, Lot 6 C-1,Neighborhood Commercial Right-of-way being dedicated: Sufficient right-of-way exists along Van Asche Drive and Steele Blvd. to meet Master Street Plan requirements. Street Improvements: Street improvements, including six-foot sidewalks, were constructed with the overall Steele Crossing subdivision. New curb cuts shall meet City of Fayetteville design standards, and sidewalks are to be constructed through the drives. Adjacent Master Street Plan Streets: Van Asche Drive, Collector; Steele Boulevard, Minor Arterial K.WeportA20041PC Reports105-24-041LSD 04-1052(KERSHNER BUSINESS CE"M)14. 2004 Planning Commission LSD 04-1052(Kershner) Page 2.1 2 Water/Sewer: Water and sewer lines exist to serve the proposed development. Tree Preservation: Existing: 27% Preserved: 23% Required: 15%, No mitigation required. Background: A Large Scale Development application was originally submitted in April 01,but was tabled due to discussion regarding development within the deed-restricted tree preservation area. The project was again submitted April 15 and reviewed at the Technical Plat Review of April 28, 2004. The Subdivision Committee forwarded the project to the full Planning Commission on May 14, with instructions for the developer to investigate the potential for relocating the dumpster to the Target lot, off of the service drive. There have been no identified concerns with the development, with the exception of development within the deed-restricted area and relocation of the dumpster. The applicant indicates that attempts to gain approval to relocate the trash enclosure off-site to the Target lot failed, and the developer intends to screen as required. Recommendation: Staff recommends approval of LSD 04-1052 with the following conditions: Conditions of Approval: L Planning Commission determination of Commercial Design Standards. Stafffinds the proposed building to meet all Commercial Design Standards. 2. A letter of authorization allowing the applicant to develop the subject property shall be submitted for the Planning files,prior to final approval. 3. Trash enclosures shall be screened on a minimum of three(3) sides with materials that are complimentary to and compatible with the proposed building. Access to the enclosure shall not be visible from the street, pursuant to city ordinance. Staff recommends the enclosure be gated at its entry with wrought iron or similar, to ameliorate the impact of view from both Van Asche Drive and Steele Boulevard. 4. Parking lot lighting shall be a maximum 35 feet in height, utilizing full cut-off sodium fixtures that are shielded and directed downward, away from adjacent properties. 5. Sidewalks shall be constructed through the proposed drive, pursuant to city ordinances. 6. Any future proposal for landscape development within the deed-restricted tree preservation easement shall be approved by the Landscape Administrator. Standard Conditions of Approval: 7. Plat Review and Subdivision comments (to include written staff comments q9 provided K.IReportsPOMPC Reports 105-24-MUD 04-1052(KERSHNERBUSINESSCE)NH)14,2004 Planning Commission LSD 04-1052(Kershner) Page 2.2 3 to the applicant or his representative, and all comments from utility representatives - AR Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications) 8. Staff approval of final detailed plans, specifications and calculations(where applicable) for grading, drainage, water, sewer, fire protection, streets (public and private), sidewalks,parking lot(s) and tree preservation. The information submitted for the plat review process was reviewed for general concept only. All public improvements are subject to additional review and approval. All improvements shall comply with City's current requirements. 9. Large scale development shall be valid for one calendar year. 10. Prior to the issuance of a building permit the following is required: a. Grading and drainage permits b. Separate easement plat for this project that shall include the tree preservation area. C. Project Disk with all final revisions d. Completion of all required improvements or the placement of a surety with the City(letter of credit,bond, escrow) as required by§158.01 "Guarantees in Lieu of Installed Improvements" to guarantee all incomplete improvements. Further, all improvements necessary to serve the site and protect public safety must be completed,not just guaranteed, prior to the issuance of a Certificate of Occupancy PLANNING COMMISSION ACTION: yes Required Approved Denied Date: May 24,2004 The"CONDITIONS OF APPROVAL", beginning on page one of this report, are accepted in total without exception by the entity requesting approval of this development item. By Title Date KIReportsUO041PCReportsl05-24-040D 04-/052(IERSHNER BUS/NESS CENHY).245 2004 Planning Commission LSD 04-1052(Kershner) Page 2.3 FAYETTEVILLE THE CITY OF FAYET EVRLE,ARKANSAS PLANNING DIVISION To: CEI Engineering Inc. Copy: Jeremy Pate,Associate Planner From: Craig Carnagey, (Landscape Administrator) Date: May 12, 2004 Subject: Subdivision Committee Review for Kershner Business Center TREE PRESERVATION Any future proposal for landscape development within the existing tree preservation easement will require approval from the Landscape Administrator. LANDSCAPE PLAN None May 24,2004 Planning Commission LSD 04-1052(Kershner) Page 2.4 FAYETTEVILLE SD Meeting of May 14, 2004 " THE CITY OF FAYETCEVILLE,ARKANSAS 113 W. Mountain St Fayetteville,AR 72701 Telephone:(479)575-8264 TREE PRESERVATION and PROTECTION REPORT To: Fayetteville Subdivision Committee From: Craig Carnagey, Landscape Administrator Copy: Jeremy Pate, Associate Planner Date: May 14, 2004 ITEM#: LSD 04-1052 BACKGROUND: Requirements Submitted: ✓ Initial Review with the Landscape Administrator ✓ Site Analysis Map Submitted ✓ Site Analysis Written Report Submitted ✓ Complete Tree Preservation Plan Submitted Canopy Measurements: acres 1.49 square feet 642823 acres .41 square feet 17,720 percent of site area 27% acres .35 square feet 14,995 percent of total site area 23% FINDINGS: The tree preservation area for this project was previously delineated with the process of the Steele Crossing Commercial Subdivision. A tree preservation easement does exist on this lot. No disturbance or removal of trees within this easement is permitted. Any future landscape development within this area will require the submittal of a plan to be approved by the Land* 4,2004 Planning C mission Administrator and City Council. LSD 04-1052(Kershner) Page 2.5 FAYETTEV"ILLE THE CITY OF FAYETTEVILLE,ARKANSAS 113 W. Mountain St. Fayetteville,AR 72701 Telephone:(479)575-8264 LANDSCAPE REVIEW SHEET Item#: LSD 04-1052 Project: Kershner Business Center Location: Steele Blvd. and Van Asche Dr. Developer: Travis Kershner Contact: CEI Engineering Applicable Requirements: Plan Checklist: /submitted by applicant Xrequested ./ wheel stops/curbs ✓ irrigation .� edged landscape beds indicated ✓ species of plant material identified size of plant material at time of installation indicated ✓ interior landscaping - - . - narrow tree lawn(8'min. width, 17'min. length/1 tree per 15 spaces) tree island 10'min. width/I tree per 12 spaces) 0,*imeter landscaping de and rear property lines(5'landscaped)jacent to street RO.W(1S'greenspace exclusive for landscaping/1 reet tree every 30 L.F., a continuous planting ofshrubs andground ver-SO% evergreen) amendments notes include that soil is amended and sod removed ching notes indicate mulching around trees and within landscape beds. ✓ planting details according to Fayetteville's Landscape Manual ✓ greenspace adjacent to street R.O.W.(15'wide) ✓ street trees planted every 30' L.F. along R.O.W. ✓ outdoor storage screened with landscaping WO ffil i WO, landscaped area(12' min.) a 24,2004 Planning Go mission LSD 04-1052(Kershner) K.'ICraigIPROJECTSILSD-041Ker3chner BusinesslLandscapeReviewForm.doc Page 2.6 fence required outdoor storage screened with landscaping non-residential landscape screen when adjacent to residential zones landscape requirement for setback reduction greenspace adjacent to street R.O.W.(25' wide) street trees planted every 301L.F.along R.O.W. 25%of total site area left in greenspace(80%landscaped) parking lots and outdoor storage screened with landscaping Recommendation: Approval of LSD 04-1052 Conditions of Approval- May 24,2004 Planning Commission LSD 04-1052(Kershner) K.ICraigIPBOJECTSILSD-041Kerschner BusinesslLandscapeReviewForm.doc Page 2.7 05-10-04:09:59AM:Farmers„-I:nsurance ;479-571-1590 # 2/ 2 NANCHAR, INC. and MSB PROPERTIES, LLC d/b/a CMN PROPERTiOFdS SPrkgdale,Ark� 72765 April 15, 2004 Jim smith Friday Eldredge&.Clark 3425 N. Futrall Dr. Suite 103 Xhyetteville..AR 72703 Re. CMN BUSINESS PARK IT(STEBLE CROSSING)ARCHrItCTURAL REVIEW COMMCrME Dear Jim: This letter is to confirm that the;Architectural Review Committee (the "ARC-) met on April 13,.20041.and;reviewed:4Wd:approved.the proposed exterior elevations and building design for the,develPprnent and construction of a two story commercial office building that Kershner Properties;.LLC proposes to build on Outparcel 3 (part of Lot 7C), Steele Crossing Shopping Center,.CMN Business Park 11, as submitted to the ARC by your firm in elevations. last week. Please feel free to call Brian Shaw or Micki Harrington, our legal counsel,N you have any questions. Sincerely, C14fN BIjsn-im P.An 11 ARCM1713CTURAL REVIEW. .COMMITTEE . Marjorie S. Brooks, Chairperson By Michele A. Harrington, attorney-in-fact cc: . Charlotte Steele, Marjorie:Brooks Nancy,Rubeck Brian,Shaw - Irwin&Saviers Springdale James Koch- CEI Engineering Associates, Inc., -Dawn Warrick-City of Fayetteville Zoning and Development Administrator May 24,2004 Planning Commission LSD 04-1052(Kershner) Page 2.8 ceAomc� 17 /LOT 7C OUTLOT 643`PU�15FA�' ,.-�. �`r. w J T�;' in 51 ` �•� `/ss'J �wvJ >W^`s«,y.�3& ,s` �• �[ sm ` 3" eon 10 �"./ 7 'ai E�E•,, t IOC F ��3 $ . .. ... .............. /�f(t Ila f � // � u.Rz• „hi'�iiiiS.?^i(e.'>.:i�:iii:eicn:::.`.�.:°i:�;%:.!Ir,'J - // ♦ �^ ttP. � sRuw !r/ '�•� \ o w w 1s o enmwc '���, '.m :i"� �<Sr ;y 'i'2:ii�'nx 2F n � r �PARRICA 1 + i'\C 91E REiid1Y0AK a �r e u ROAT l 410,020 SF szs7e fi^�Q a� 8.4128 AC S /JA,IJCh'A.P., Wa ! toe 4 T1O7 ?A%al DRIVE _ - t•' 4 ::.............. ''"<as, SPRP:rGD.ALE, AR 72762 /' MAkJOR'E S7ME B80 P KS, ::. •...__. 'sE.utgalmwiu.twaFlxgO{gwg�np p Sw - uA�RY�p A�xrE iLGmto M'3fA'i • w Sasg' 'W m...; ZON"MG 0-2 JRADa Pit 3lLfNl IJ/1J .. .. of o�oya�r/r�e u�Of 1 nyR ,, _ 3 4? 94 424,767 SF r e• v Y- FFE = 1212.00 BY OS Ra LOT 7 5,e iHPR TARGETRACT aRe ws male E' (S �oiva i 441542.6 �'�NAJ, -pUJ!F9R Rt AnON 10.13±51""'s/vR.4,y�,/A/C alwwc Ax0 I ZONING: C-2'OfTIE ` 1 M S I 1A 10 IKE RACK Pm PIAxS _ _ F.F.E. _ IOC BA 11N IIB d ,a.eC ssa• -11K MAI' `tJ. .,? qp0, I1K 1E 1zo.sa• A J �v. . 3:,/h'-i- .,; r_ r.Pt.,. ,yn,:✓- yY.;i;���(,<i^ti. x1. ��j.•: a.;<1 5 . . .:......... ... :::: '. i. . ,;:........:�..:.: ........_........... � ..... .. ;;;;;�;::.?... ................ �i"�.,� ::: IQ( as ay 24,2004 ::::.::::::::::::as;:;;: ::n;;z:>;::aa:.t•;.:-:.::::::::.-:::::::::::............_:':'�::._........... � r. 1 Commisslon a +' m I (�d a� d o , ����•� _10' 2(Kershner) Page 2.9 .,, .n rR" _. ITmn 10 10 NSSSe�i a' i • s < '',i n n b �`y' rrr�� 5 'Ex✓ "nrr ,fir,✓sFs.nss »�} ��`"'` �aY1 '�� `� aux s -'��`'b-gc..ytx-$a� u-+ � t,,*�.4�'�., "� Legend z �» � � v a�Te S�Y.t,`��z a�� '�'''�:'�tc ✓x'.,� �, f+ '�r�`_ �,�..� rr'�*'� '�„ �-,�f`"�y.,=. �:p��rte?mac-"`� ","`�"?-' �� v. � ��s.� • WAY I' •O. II` Out'd-c�y OM D1 -1052 IIS 0 75 150 300 450 .00 I LSD04-1052 KERSHNER BUSINESS CENTER One Mile View R-A R-0 1 I I \I R-0`-; i IRA IQpyVATE D. I �MAOZipygp_La. _ RA I I SMF Gz I 4w1 i�I�ti,IlllI -2 - 1 I L r l G2 l I RA Gi I —art I ! 111M � r � o — !G2 1 R-0 I R-0 � 0o I ( ' y � ly'� c` •G� -` F I Gz-fly uu�11 E- cc5� J -a3�2-- lrr� c I o / G2 - IFJo2 G2 ��aa I L IZ -J IG2 i l o� a`R`O / Jl1 R-0 G2 - ',/� RSF� .L�•— 11• ._ ,1-- '. �- -'I �� �R"^_�;+-R-o- j \ � �- fRs ,�i'RSF-a Gz �� j-{I T7_r_I4��,r.,§ ILP-4v R-0 ham' it 7 RA 11�I�flNlil P1 " L } F `I A t I r� 1{i .I IRA , I RS(F` I _II'.LL�"T I"li-_ ¢Iq� -l—t- 1 R A �ccc'c I > 1 411 i 1 I ,I �I nr-r I -t I-- i-- ill"Lhssa I 4 ,I �F���-9 1—C-'IT. �t1 J I-,��I �'-RSF1 l RMF 2 R-0 •`I .::t 1 i IMF24 RMI 4 1 G : YI T 'C-RSFi-sA �. Overview Legend _ Subject Property Boundary Master Street Plan LSD04-1052 "�.o Planning Area Fre ay/Expresswey L, rp000g Streets Overlay District Oq ' Fnnupai Aderal oo�coo -. MinorAderial City Limits conector �I Plannetl �w_� � :Outside City ���� H6bnc Cogedor May 24 200 L1 _---' Planning Commissio 0 0.1 0.2 0.4 0.60. LSD 04-1052(Kershner Miles Page 2.11 F+ AYETTEVILLE PC Meeting of May 24, 2004 THE CITY OF FAYETTEVILLE,ARKANSAS 113 W. Mountain St. Fayetteville,AR 72701 Telephoner 479-575-8267 PLANNING DIVISION CORRESPONDENCE TO: Fayetteville Planning Commission FROM: Jeremy Pate, Associate Planner THRU: Dawn Warrick,AICP, Zoning& Development Administrator DATE: May 18, 2004 ADM 04-1063: Administrative Item(Duncan Ave. Apts) to request an extension of the expiration date of the Large Scale Development 03-13.00 approved by the Planning Commission. Planner: Jeremy Pate. The current request(ADM 04-1063) is to extend LSD 03-13.00 (Duncan Ave.Apts)large scale development approval for one year, to expire on May 27, 2005. Background: Large scale development approval for this project was granted by the Planning Commission with an 8-0-0 vote on May 27, 2003 with a condition that the approval would be valid for one calendar year. The approval is for a multifamily apartment development west of Duncan Avenue, north of 12th Street. The development includes 36 units in three buildings with a total of sixty bedrooms. Current Status: A building permit has been requested however issuance of the permit is pending. The applicant has requested an extension of the Planning Commission approval in order allow permitting of this development without having to take it back through the development review and approval process. A letter from the applicant is included. Several conditions of approval, including a property line adjustment, easement plat, and Board of Adjustment approval for a variance have been accomplished. Based on the current status of the project,however, the applicant finds it necessary to request additional time in order to complete required directives. Recommendation: Staff recommends approval of an extension until May 27, 2005. After the May 27, 2005 expiration date, the Large Scale Development is required, by ordinance, to be resubmitted in total for Planning Commission approval, in accordance with all development regulations. PLANNING COMMISSION ACTION: yes Required Approved Denied Date: May 24, 2004 K:IRepoml20041PCReportsIO5-24-04LIDM 04-1063(Duncan Ave.Apts).doc May 24,2004 Planning Commission ADM 04-1063(Duncan Ave Apts.) Page 3.1 166.20 Expiration Of Approved Plans And Permits (A) Applicability. The provisions of this section apply to all of the following plans and permits: (1) Preliminary plats; (2) Planned zoning district developments; (3) Conditional uses; (4) e (5) Lot splits; (6) Physical alteration of land permits; (7) Storm water, drainage, and erosion control permits; (8) Tree preservation plans; (9) Sign permits; and, (10)Floodplain development permits. (B) One-year time limit. (1) Tasks to be completed. All of the above-enumerated plans and permits are conditioned upon the applicant accomplishing the following tasks within one(1)year from the date of approval: (a) f c: irenovation or . tr and/or, (b) For a lot split, record a deed or survey at the Washington County Circuit Clerk's Office, stamped for recordation by the City Planning Division; and/or, (c) Receive a Certificate of Zoning Compliance; and/or, (d) Receive all permits and approvals required by City, State, and Federal regulations to start construction of the development or project. Expiration. If the required task(s)are not completed within one(1)year from the date of approval or during an allowed extension period,all of the above-enumerated plans and permits shall be rendered null and void. K:IReportr120041PCReports105-24-04WDM04-1063(Dunn Ave.Apls).doc May 24,2004 Planning Commission ADM 04-1063(Duncan Ave Apts.) Page 3.2 } R EB LandWorks,I Inc. PO Box 3432, Fayetteville, Arkansas 72702-3432 phone 479.444.7769 fax 479.444.7793 May 7, 2004 RECEIVED Mr.Jeremy Pate, Associate Planner MAY } O ZOO4 City of Fayetteville 113 W. Mountain PLANNING DIV. Fayetteville, Arkansas 72701 RE: Large Scale Development Approval LSD 03-13.0 Duncan Avenue Apartments, Fayetteville, Arkansas Dear Mr. Pate: Please accept this correspondence as the request for an extension on the Large Scale Development approval for the above referenced project. The LSD was approved by the Planning Commission at their May 27, 2003 meeting. The following is an update: 1)'' We Pave-obtained our wetlands permit and approval of the mitigation plan. 2) We have obtained approval from Engineering on the construction drawings. 3) We have obtained approval on the utility lines from the Arkansas Health Department. 4) ' A'submittal has been made to the Inspections Department for a building permit_ This project has several extenuating issues that have delayed us from finalizing approvals within the allotted time frame. We have off-site sanitary sewer work that will be done by a pipe-bursting method, and had additional time associated with the wetlands permitting and the approval of the mitigation plan. The owner was also contacted by the City Tree and Trails Task Force Committee late in 2003 to discuss a possible purchase of the land. This consideration terminated in February of this year. We plan to submit the additional information requested by the Inspections department to obtain the building permit, record the property line adjustment, and prepare the park deed to - finalize the project within the next month to start construction this summer. Please call if you need additional information or data for your consideration. Best Regards: Mandy R. Bumffi,PE C: Mr.James Mathias May 24,2004 Planning Commission ADM 04-1063(Duncan Ave Apts.) Page 3.3 i Oilzm SS ....o. ......... 33 a(wanv�mx+na N I I � I. �a,D. I Z — FYIz< b� Y Z ~ °. I 5 +1 Hill 19 01 I I ~m it, SOO IM 1. AMI, \ Vp V I yo pZq q S � 2N w � 3 J ; .... ................ ............. of I 1 va I n a 24,.2004 as X--r %-- %— W sMY 3�A.Zf20M AUOM IISSaw AlAl 04-1063(I)uncan Ave Apts.) Page 3.4 — a� PHI 1 P IVSD 03-13.00 Page I FAYLTTEVILLE PC Meeting p£May 291 1003 TIIE CITY OFTAYE1TEVILLE,ARKANSAS 113 W. Mountain St Fayetteville,AR 7270i Telephone:501-575$267 PLANNIDIVISION CORRESPONDENCE TO: Fayetteville Planning Commission Members FROM: Jeremy Pate,Associate Planner Matt Casey, Staff Engineer THRU: Dawn Warrick,AICP,Zoning&Development Administrator DATE: May 27, 2003 Project: LSD 03-13.00:Large Scale Development(Duncan Avenue Apts)bias submitted by Mandy Bunch on behalf of James Mathias of Mathias Rentals for proaielty located west of Duncan Avenue and north of 12th Street. The property is,zoned R-2, Medium Density Residential and contains approximately 2.0 acres with i6 units in three (3)buildings (60 bedrooms) and 66 parking spaces with a 0.466 acre parkland dedication proposed. Findings: Proposal: The applicant proposes 4o construct three (3) buildings containing 36 units consisting of one-and two-bedroom apartments for a total of sixty(60)bedrooms. Parking: ADA: 3 spaces Regular: 63 spaces Bicycle: 2 racks Existing Development: None Surrounding Land Use and Zoning: Direction Land Use Zoning North Single family homes R-2,Medium Density Residential South Single family homes R-2,Medium Density Residential East .Single family homes R-2, Medium Density Residential West Industrial Food Processing I-2, General Industrial Density: Allowable Density in R-2 Zoning: 4-24 Units Per Acre Proposed Density: 36 units on 2.0 acres= 18 Units Per Acre Water: A 6"water line exists along Duncan Ave to serve the proposed development. Sewer: A 6"sewer line exists along Duncan Ave. (to be replaced with new 8" PVC for approximately 650 feet by the developer to serve the proposed project.)All existing service lines K.IReporl L?003WCREPOR7S105-2711SD 03-13.00(DUACANAVEAP7S).doc May 24,2004 Planning Commission ADM 04-1063(Duncan Ave Apts.) Page 3.5 LSD 03-13.00 _ Page 2 will be connected to the new 8"sewer line by the developer. Right-of-way being dedicated: 25' from centerline along Duncan Avenue per MSP requirements for an historic collector street_ Street Improvements Proposed: Duncan Avenue shall be improved a minimum of,14 feet from centerline,with curb and gutter, storm drains,and a sidewalk along the west side. Adjacent Master Street Plan Streets: Duncan is an Historic Collector. Tree Preservation: Existing: 27.24% Preserved: 14.051/o Required: 20% Mitigation: On Site (16 Trees) Park Land Dedication: The PRAB has determined that 0.466 acres shall be dedicated for parkland,with payment of$2266.25 for the balance to meet the City requirements. Wetland Delineation: USA-COE has concurred with wetland delineation. The proposed plan is under review for Nationwide 404 permit approval. (See attached letter.) Background- At the Subdivision Committee meeting of April 03, 2003,the applicant proposed 48 units(80 bedrooms), with 87 parking spaces on 2.46 acres (a density of+/- 19.5 DU/acre). The item was tabled pending the provision of further information. The current proposal is for 36 units(60 bedrooms)with 66 parking spaces on 2.0 acres (a density of+/-18 DU/acre). A parkland dedication of 0.466 acres is included with the current proposal. This proposal was heard by the Subdivision Committee on May 15,2003. The Subdivision Committee forwarded the Large Scale Development to the full Planning Commission subject to all staff comments. Public comment and Subdivision Committee discussion included drainage,density and a privacy fence. RECOMMENDED MOTION: Staff recommends approval of the large scale development with the following conditions: Conditions of Approval- A. Planning Commission determination of offsite sanitary sewer improvements. Staff is recommending that the existing sanitary sewer line be replaced for approximately 650' with a new 8"PVC line to provide sufficient capacity to serve this development.All existing service lines shall be connected to the new 8"sewer line at the cost of the developer. KMeports120031PCREPOR7S105-27VSD 03-13.00(DUACANAVEAP7S)ldoe May 24,2004 Planning Commission ADM 04-1063(Duncan Ave Apts.) Page 3.6 LSD 03-13.00 Page 2. Dedication of ROW 25' from centerline along Duncan Avenue per MSP requirements for an historic collector street shall be required prior to filing. 3. Duncan Avenue shall be improved by the developer a minimum of 14' from centerline, with curb and gutter, storm drains, and a 6' sidewalk along the west side of Duncan Avenue in accordance with the Master Street Plan and Chapter 171 of the Unified Development Ordinance. 14, The Board of Adjustment must approve a variance of the required frontage for the 01-14.00 project. Lot width minimum for multifamily development is 90 feet(§161.06). The %0p variance request is for+/-46.49 feet of frontage for the lot which will remain after the parkland is split off to be dedicated to the City. 5. . A Lot Line Adjustment to create the 0.466 acre parkland tract shall be approved prior to the issuance of a building permit. 6_ All overhead electric lines less than 12 kv shall be placed underground. 7. An 8 foot privacy fence shall be constructed along the south property line. Standard Conditions of Approval: 8. Plat Review and Subdivision comments (to include written staff comments provided to the applicant or his representative, and all comments from utility representatives-AR Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications) 9. Staff approval of final detailed plans, specifications and calculations (where applicable) for grading, drainage,water, sewer,fire protection, streets(public and private), sidewalks, parking lot(s)and tree preservation. The information submitted for the plat review process was reviewed for general concept only. All public improvements are subject to additional review and approval- All improvements shall comply with City's current requirements. 10. The PRAB has determined that 0.466 acres shall be dedicated for parkland;with payment of$2266.25 for the balance to meet City requirements. 11. Sidewalk construction in accordance with current standards to include a minimum 6' wide sidewalk along Duncan Avenue. 12. Large scale development shall be valid for one calendar year. 13. Prior to the issuance of a building permit the following is required: a. Grading and drainage permits b. Separate easement plat for this project that shall include the tree preservation area. K.-Tepor&2003WREPOR7S105-27USD 03-13.00(D[ACANA VE AP7S).d" May 24,2004 Planning Commission ADM 04-1063(Duncan Ave Apts.) Page 3.7 LSD 03-13.00 Page 4 C. Project Disk with all final revisions A. Completion of all required improvements or the placement of a surety with the City(letter of credit, bond,escrow)as required by§158.01 "Guarantees in Lieu of Installed Improvements to guarantee all incomplete improvements. Further, all improvements necessary to serve the site and protect public safety must be completed,not just guaranteed,prior to the issuance of a Certificate of Occupancy e. Parks fees paid and/or deed recorded and copy received. PLANNING COMMISSION ACTION: es Required Approved Denied Date: May 27,2003 Comments: The"CONDITIONS OF APPROVAL",beginning on page one of this report, are accepted in total without exception by the entity requesting approval of this development item. By Title Date KlReports120031PCREPOR7S105-27VSD03-13.00(DUPCANAVEAP7S).doc May 24,2004 Planning Commission ADM 04-1063(Duncan Ave Apts.) Page 3.8