HomeMy WebLinkAbout2007-09-24 - Agendas - FinalTayelteyi;le
113 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 575-8267
AGENDA FOR A MEETING OF THE
PLANNING COMMISSION
Monday, September 24, 2007, 5:30 p.m.
Room 219, City Administration Building
ORDER OF PLANNING COMMISSION MEETING
A. Introduction of agenda item — Chair
B. Presentation of Staff Report
C. Public Comment
D. Presentation of request — Applicant
E. Questions & Answer with Commission
F. Action of Planning Commission (Discussion & Vote)
NOTE TO MEMBERS OF THE AUDIENCE
If you wish to address the Planning Commission on an agenda item please queue behind the podium when
the Chair asks for public comment. Public comment occurs after the Planning Staff has presented the
application and will only be permitted during this part of the hearing for each item. Members of the public
are permitted a maximum of 10 minutes to speak; representatives of a neighborhood group will be allowed
20 minutes. The applicant/representative of an application before the Planning Commission for
consideration will be permitted a maximum of 20 minutes for presentation.
Once the Chair recognizes you, go to the podium at the front of the room and give your name and address.
Address your comments to the Chair, who is the presiding officer. He/She will direct them to the
appropriate appointed official, staff member or others for response. Open dialogue will not be permitted:
please ask any questions, and answers will be provided once public comment has been closed. Please keep
your comments brief, to the point, and relevant to the agenda item being considered so that everyone
has a chance to speak.
Please, as a matter of courtesy, refrain from applauding or booing any speakers or actions of the Planning
Commission.
2007 Planning Commissioners
Jill Anthes
Lois Bryant Matthew Cabe
James Graves Porter Winston
Audy Lack Christine Myres
Alan Ostner Sean Trumbo
WeAyifle
TENTATIVE AGENDA
113 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 575-8267
AGENDA FOR A MEETING OF THE
PLANNING COMMISSION
Monday, September 24, 2007, 5:30 p.m.
Room 219, City Administration Building
The following items will be considered:
Consent:
1. Approval of the minutes from the September 10, 2007 Planning Commission meeting.
2. PPL 07-2534: Preliminary Plat (540 FLEX, LLC, 363): Submitted by STEVE BRANNAN for
property located at S END OF N. SHILO DRIVE, S OF THE POINT WEST SUBDIVISION. The
property is zoned I-1, HEAVY COMMERCIAL/LIGHT INDUST and contains approximately 12.29 acres.
The request is to develop a 3 -lot commercial subdivision with 2 lots proposed in Phase 1.
Planner: Jesse Fulcher
3. ADM 07-2745: Administrative Item (ECLIPSE DISPLAYS): Submitted by BATES &
ASSOCIATES for property located at 602 Pump Station Road. The request is to extend the approval of the
approved LSD 06-2253 for one year. Planner: Dara Sanders
4. ADM 07-2748: Administrative Item R-PZD 06-2190 (WOODBURY, 137): Submitted by H2
Engineering, Inc. for property located on the south side of Zion Road and east of Taliesin Lane. The
property is zoned R-PZD 06-2190, Woodbury and contains approximately 11.66 acres. The request is to
change the zoning criteria in Planning Area 2 to modify the setback off of the private drive from 15' to 5'.
Planner: Andrew Garner
Old Business:
5. CUP 07-2666: Conditional Use Permit (VERIZON WIRELESS SANG AVENUE, 481): Submitted
by WOODEN, FULTON & SCARBOROUGH, P.C. for property located at THE SANG AVENUE
WATER TOWER SITE. The property is zoned RSF-4, SINGLE FAMILY - 4 UNITS/ACRE and contains
approximately 0.13 acres. The request is for a 150' wireless communication facility on the subject
property. Planner: Andrew Gamer
THE APPLICANT REQUESTS THIS ITEM BE TABLED TO OCTOBER 08, 2007.
New Business:
6. ADM 07-2739: Administrative Item (MARKETPLACE EXPRESS): Submitted by
CamargoCopeland Architects, LLP requesting a waiver from exterior lighting regulations to allow
neon/LED lighting in excess of 75% of the building's linear facade length. Planner: Andrew Garner
7. LSD 07-2696: Large Scale Development (TRINITY FELLOWSHIP CHURCH, 252): Submitted by
TRINITY FELLOWSHIP ASSEMBLY OF GOD CHURCH for property located at 1100 ROLLING
HILLS DRIVE. The property is zoned RSF-4, SINGLE FAMILY - 4 UNITS/ACRE and R -O, Residential
Office and contains approximately 7.19 acres. The request is for a 24,120 s.f. church with associated
parking. Planner: Andrew Gamer
S. LSD 07-2676: Large Scale Development (KANTZ CENTER/STARBUCKS, 371): Submitted by
CRAFTON, TULL, SPARKS & ASSOC. for property located NW OF CITIZENS DRIVE AND
CROSSOVER RD. The property is zoned C-1, NEIGHBORHOOD COMMERCIAL and contains
approximately 1.76 acres. The request is for a large scale development with 9,075 s.f. of office, retail and
restaurant space and a 1,750 s.f. coffee shop with associated parking for the development.
Planner: Jesse Fulcher
9. VAC 07-2722: Vacation (MENNINGER, 523): Submitted by ALAN REID for property located at 301
S. WEST AVENUE. The property is zoned DG, DOWNTOWN GENERAL and contains approximately
0.12 acres. The request is to vacate 3 rights-of-way: the alley along the west side of the property, a portion
of West Avenue along the east side of the property and the unconstructed extension of South Street on the
north side of the subject property. Planner: Jesse Fulcher
All interested parties may appear and be heard at the public hearings. A copy of the proposed amendments and other pertinent data
are open and available for inspection in the office of City Planning (575-8267), 125 West Mountain Street, Fayetteville, Arkansas. All
interested parties are invited to review the petitions. Interpreters or TDD for hearing impaired are available for all public hearings; 72
hour notice is required. For further information or to request an interpreter, please call 575-8330.
naye levie
A R KA NSA5
THE CITY OF FAYETTEVILLE, ARKANSAS
PC Meeting of September 24, 2007
PLANNING DIVISION CORRESPONDENCE
TO: Fayetteville Planning Commission
FROM: Jesse Fulcher, Current Planner
Matt Casey, Assistant Engineer
THRU: Jeremy Pate, Director of Current Planning
DATE: September 19, 2007
125 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 575-8267
PPL 07-2534: Preliminary Plat (540 FLEX, 363): Submitted by STEVE BRANNAN for
property located at S END OF N. SHILOH DRIVE, S OF THE POINT WEST SUBDIVISION.
The property is zoned I-1, HEAVY COMMERCIAL/LIGHT INDUST and contains
approximately 12.29 acres. The request is to develop a 3 -lot commercial subdivision with 2 lots
proposed in Phase 1.
Planner: Jesse Fulcher
Findings:
Property: The subject property contains approximately 12.29 acres and is zoned I-1, Heavy
Commercial/Light Industrial, subject to a Bill of Assurance from 1981. The property is located
west of I-540 and is located within the Design Overlay District.
Proposal: The applicant requests preliminary plat approval to create 2 lots for development
within Phase I, with approximately 6.89 acres remaining undeveloped in Phase II (Lot 3).
Surrounding Land Use and Zoning:
Direction
Land Use
Zoning
North
Industrial
I-1
South
Vacant property/Residential
R -A
East
I-540
N/A
West
Pine Valley Subdivision
RMF -24
Water and Sewer System: Water and sewer shall be extended to serve the proposed
development.
Adjacent Master Street Plan Streets: North Shiloh Drive (Collector Street) and I-540
Right-of-way to be dedicated: Dedication in the amount of 70' for the extension and construction
of N. Shiloh Drive through the subject development is required.
K:IReports120071PC Reports109-24-071PPL 07-2534 (540 Flex).doc
September 24, 2007
Planning Commission
PPL 07-2534 540 Flex
Agenda Item 2
Page 1 of 12
Street Improvements: Staff recommends the construction and extension of N. Shiloh Drive
through Phase I with a hammer -head turn around provided at the southern property line. Shiloh
Drive shall be constructed as a 30' street section with curb and gutter, storm drainage and 5'
sidewalks.
Connectivity: There is an existing street stub -out (W. River Ridge Drive) from the residential
subdivision to the west that intersects Phase II and un -constructed right-of-way for Sycamore
Avenue adjacent to the south property line of Phase II. Future connection to these streets has not
been evaluated with Phase I, and will be reviewed with development adjacent to that property.
The location of I-540 adjacent to the east property line prohibits connectivity to the west.
Tree Preservation: A tree preservation waiver has been submitted and approved by the Urban
Forester.
Public Comment: Staff has received written correspondence from an adjacent property owner in
the Pine Valley Subdivision that is concerned with development in the floodplain and the
potential for flooding.
Recommendation: Staff recommends approval of PPL 07-2534 with the following conditions:
Conditions of Approval:
1. Planning Commission determination of street improvements. Staff recommends the
construction ofN. Shiloh Drive through Phase I with a hammerhead turn -around
constructed at the terminus of the street. The street shall be constructed as a 30' street
section with curb and gutter, storm drains and 5' sidewalks on both sides of the street.
The sidewalk on the west side of the street shall connect to the existing sidewalk on
Shiloh Drive.
9/13/17 SC: THE SUBDIVISION COMMITTEE FOUND IN FAVOR OF THE
RECOMMENDED STREET IMPROVEMENTS.
At the time of development, each lot will be reviewed for the Shiloh Drive bridge
assessment area, based upon the traffic being generated. Because each property is
located within the Design Overlay District, development of all lots shall be reviewed
through the large scale development process.
3. Sidewalks along the Shiloh Drive shall be installed or guaranteed prior to recordation of
the final plat.
Right-of-way dedication in the amount of 70' for N. Shiloh Drive shall be dedicated by
the final plat.
5. Street lights shall be installed at all intersections and with a maximum separation of 300'
prior to signing the final plat.
K:IReporas120071PC Reports109-24-071PPL 07-2534 (540 Flex).doc
September 24, 2007
Planning Commission
PPL 07-2534 540 Flex
Agenda Item 2
Page 2 of 12
6. Future development of the property shall be limited to Lots 1 and 2. Phase II (Lot 3)
shall not be developed until such time that infrastructure is extended through the property
to serve future developments.
The hammerhead turn -around shall be located within a temporary access easement that
shall be void after the extension of this street.
8. Commercial Design Standards, parking lot design, cross access between lots and to
adjacent properties, landscaping requirements, curb -cut location, screening, etc. shall be
evaluated at the time of development of each lot, be it a building permit or Large Scale
Development. Location within the Design Overlay District requires large scale
development review for any development.
9. The P.O.A. for the subdivision or owner of any detention pond lot shall be responsible for
maintenance of any detention ponds that may be constructed.
10. As noted on the plat, development of the property and all future owners of the proposed
lots shall comply with all conditions of the Bill of Assurance, which prohibit the use of
the properties for; Use Unit 18, Gasoline Service Stations; Use Unit 22, Manufacturing;
and Use Unit 27, Wholesale bulk petroleum storage facilities with underground storage
tanks, or truck stops.
11. Label Phase II also as Lot 3 on the plat.
Tree Preservation and Landscape Plan Conditions:
12. All landscape requirements, including but not limited to street trees, parking lot trees,
screening, and detention pond plantings shall be required at the time of building
permit/large scale development review.
Trails Conditions:
13. As noted on the plat, a 25' trail and utility easement shall be platted along the eastern
property line from the existing public right-of-way of Sycamore Avenue to the north
property line.
Standard Conditions of Approval:
14. Signs indicating the future extension of right-of-way shall be posted at the end of all
street stub -outs prior to filing the final plat.
15. All street names and addresses shall be approved by the 911 coordinator.
16. Plat Review and Subdivision comments (to include written staff comments provided to
the applicant or his representative, and all comments from utility representatives - AR
Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications).
K:IRepons120071PCRepor/s109-24-07PPL 07-2534 (540 Flex).doc
September 24, 2007
Planning Commission
PPL 07-2534 540 Flex
Agenda Item 2
Page 3 of 12
17. Staff approval of final detailed plans, specifications and calculations (where applicable)
for grading, drainage, water, sewer, fire protection, streets (public and private),
sidewalks, parking lot(s) and tree preservation. The information submitted for the plat
review process was reviewed for general concept only. All public improvements are
subject to additional review and approval. All improvements shall comply with City's
current requirements.
18. All overhead electric lines under 12Kv shall be relocated underground. All proposed
utilities shall be located underground.
19. Impact fees for fire, police, water, and sewer shall be paid in accordance with City
ordinance.
20. Preliminary Plat approval shall be valid for one calendar year.
Additional conditions:
Planning Commission Action: ❑ Approved ❑ Denied ❑ Tabled
Motion:
Second:
Vote:
Meeting Date: September 24, 2007
K:IRepons120071PC Reports109-24-07IPPL 07-2534 (540 Flex).doc
September 24, 2007
Planning Commission
PPL 07-2534 540 Flex
Agenda Item 2
Page 4 of 12
e
ARKANSAS
PC Meeting of September 24, 2007
THE CITY OF FAYETTEVILLE, ARKANSAS
PARKS AND RECREATION DIVISION CORRESPONDENCE
113 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 444-3470
To: City of Fayetteville Planning Commission
From: Sarah K. Patterson, Urban Forester
Date: September 7, 2007
ITEM #: PPL 0'7-2534: Preliminary Plat (540 Flex LLC)
TREE PRESERVATION PLAN
1. A Tree Preservation Waiver has been submitted and approved by the Urban
Forester. No trees exist on this site.
LANDSCAPE REGULATIONS
1. As each of these lots comes through the building permit/large scale
development process, all landscape requirements will have to be met at that
time This will include but not be limited to; street trees, parking lot trees,
screening shrubs, and detention planting if applicable.
September 24, 2007
Planning Commission
PPL 07-2534 540 Flex
Agenda Item 2
Page 5 of 12
av evi
ARKANSAS.
THE CITY OF FAYETTEVILLE, ARKANSAS
ENGINEERING DIVISION - TRAILS CORRESPONDENCE
113 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 444-3416
mmihalevich@ci.fayetteville.ar.us
To: Steve Brannan
From: Matt Mihalevich, Trails Coordinator
Date: September 19, 2007
Subject: Planning Commission Review Comments
ITEM #: PPL 07-2534: Preliminary Plat (540 Flex, LLC, 363)
TRAIL COMMENTS
1. Shiloh Trail is identified on the Fayetteville Alternative Transportation and
Trail (FATT) Master Plan to be located along the east edge of this property.
The trail will be 12' wide and follow the west side of Interstate 540 from Hwy
112 south to Cato Springs Rd.
The multi -use trail easement as shown on this plat looks good. The
easement shall extend south to meet the existing 40 foot right of way of
Sycamore Street (un -constructed). Show this existing right of way.
2. Hamestring Creek Trail is also identified on the FATT plan and us under
construction within the Sycamore Street right of way along the south of this
property. Please notify the trails coordinator if any work will be done on or
across this trail.
September 24, 2007
Planning Commission
PPL 07-2534 540 Flex
Agenda Item 2
Page 6 of 12
Fayetteville Fire Department
303 W Center
Fayetteville, AR 72701
575-8365
TECH PLAT REVIEW COMMITTEE
Item: PPL 07-2534 (540 Flex, LLC)
Presented by: Presley, Brannan, & Associates
Reviewed by: Dale Riggins — August 28, 2007
FIRE DEPARTMENT REQUIREMENTS:
1. Arkansas Fire Code 505.1: Address numbers. New and existing buildings shall
have approved address numbers, building numbers or approved building
identification placed in a position that is plainly legible and visible from the street
or road fronting the property.
2. Arkansas Fire Code D103.4 Turnarounds. The proposed temporary turnaround
must meet the requirement of being built to hold up 75,000 lbs.
3. Keep in mind the requirement for hydrants for sprinklered building.
If you have any question please feel free to contact me or the Fire Marshal at any
time
Dale Riggins
Dale Riggins
Fayetteville Fire Department
September 24, 2007
Planning Commission
PPL 07-2534 540 Flex
Agenda Item 2
Page 7 of 12
BILI. OP ASSURANCE
OF
JOHN MAGUIRE, STERLING ANDERS AND JAMES
This declaration of a 13i11 of Assurance mail,' this T day of
• 1981, by JOHN MAGUFRE, tii'JRI.ING ANDERS, and
JAMES POTTS, owners of the Io11owina described real estate located
in the City of Fayetteville, Washington County, Arkansas, and more
particularly described as follows, to -wit:
SEE ATTACHED SIZE!'.:', MARKED EXHIBIT A
WHEREAS, the aforesaid owners of the real property described
above have secured the approval of the Fayetteville City Planning
Commission and Fayetteville City Board of Directors to amend the
Fayetteville zoning map and'rezone the above described property from
A-1, Agricultural District and R-1, Low Density Residential District.
to 1-1, Heavy Commercial and Light Industrial District.
WHEREAS, the owners have ,remised and agreed to subject the
development of said real estate pursuant to certain covenants and
restrictions 'pertaining to same; and
WHEREAS, the owners are desirous of making a declaration of the
same in the form of this Hill of Assurance with the intention of
guaranteeing the preservation of certain values and amenities in the
coimaunity and to bind themselves, their successors and assigns and
the aforedescribed real estate and its subsequent owners with the
obligations and restrictions hereinafter set forth for all present and
future development and use of said property.
NOW, THEREFORE, the owners declare that the above described real
property shall be held, developed, transferred, sold, conveyed, and
occupied subject to the covenants and restrictions herein set forth.
1.
The above said property shall not be developed for any use
ii
RECEIVED
AUG 15 2007
CITY OF FAYE'TTEVILLE
PLANNING DIVISION
Li iO3O 460
er 24, 2007
Commission -
534 540 Flex
genda Item 2
Page 8 of 12
Bill of Assurance
Page Two
described in use units 18, 22, and 27, of Article 5, Sec. VIII (including
truck stops) of the Fayetteville Zoning Cede, and Appendix A thereto,
without prior approval of the Board of Directors of the City of Fay-
etteville, Arkansas.
JOHN MAGUIRE a- o
JOHN MAGUIRE 'P
STERLING NDERS
ACKNOWLEDGMENT
STATE OF ARKANSAS )
)SS.
COUNTY OP WASHINGTON)
BE IT REMEMBERED that on this day came before the undersigned,
a Notary Public, within and for the County aforesaid, duly cermiissioned
and acting, JOHN MAGUIRE, STERLING ANDERS and JAMES POTTS, to me well
known, who acknowledged that they executed the foregoing Bill of
Assurance for the consideration and purposes therein mentioned and
set forth.
WITNESS my hand and seal as such Notary Public this / day of
September, 1981.
My,,,Commission Exp
ho
U
Notary Public
05:
A
k�li( �J`t) 4C1
Se ;e'E -r24,2007
Piaommission
PPL r_,. �- :4 540 Flex
nda Item 2
age 9 of 12
JAMES E. POTfS, STERLING P. ANDERS & JOHN MAGUIRE
All that portion in the Southeast Quarter of the Southeast Quarter and
the South Half of the Northeast Quarter of the southeast Quarter 1n
Section 6 in Township 16 North of Range 30 West that lies west of U,
S. to mitt: Beginningsg at the Southwest cmoorner ofthe
follows:
71 Southeast Quarter
Of the Southeast Quarter of said Section 6, and running, thence North
85 degrees 33' East 54.66 feet to the west right of way of Highway
71 Bypass, and running, thence along said Highway right of way the
following bearings and distances: North 31 degrees 11' East 262.13
feet; North 33 degrees 51' East 299.57 feet; North 32 degrees 07 minutes
East 326.9 feet; North 31 degrees 58' East 651.86 feet; North 30
degrees 26' East 765.6 feet; thence North 89 degrees 48' West 1257.72
feet, thence South 07 degrees 17' West 658.69 feet to the Southwest
Corner of the Northeast Quarter of the Southeast Quarter of said
Section 6, thence South 0 degrees 07' West 1313.05 feet to the point
of beginning. Containing 30.19 acres, more or less. LESS AND EXCEPT
the following, to -wit: Part of the Southeast Quarter of the Southeast
Quarter of Section 6, Township 16 North, Range 30 West, Washington
County, Arkansas. more particularly described as follows: Starting
at the Northwest corner of the'Southeast Quarter of the Southeast
Quarter of Section 6; thence North 89 degrees 05' East along the
North line thereof a distance of 1205.5 feet to a point on the Easterly
existing right of way Line of U.S. Highway #71; thence South 33 degrees
15' West along said existing right of way line a distance of 12.0 feet
to a point; thence South 31 degrees 01' West along said existing right
of way line a distance of 106.1 feet to a point on the Easterly proposed
right of way line of U.S. Highway #71; thence North 89 degrees 05' East
along said proposed right of way line a distance of 138.4 feet to the
point of beginning; thence continue North 89 degrees 05' East a distance
of. 10.0 feet to a point on the Westerly existing right of way line of
Porter Road; thence South 01 degrees 38' East along said existing right
of way Line a distance of 90.9 feet co a point on the Westerly proposed
right of way line of Porter Road; thence North 12 degrees 57' West
along said proposed right of way line a distance of 51.0 feet to a
point; thence North 01 degrees 38' West along said proposed right of
0.02lAcrea, moreaoreless.l .0ALfOe
LO, t LESSCANDpEXCEt PTfthegfollo ing,, to-witning
Part of the Northeast Quarter of the Southeast Quarter of Section 6,
Township 16 North, Range 30 West, Washington County, Arkansas, more
particularly described as follows: Starting at the Southwest corner of
the Northeast Quarter of the Southeast Quarter of Section 6; thence
North 89 degrees 05' East along the South line thereof a distance of
875.6 feet to a point on the Westerly proposed right of way line of
U.S. Highway #71 for the point of beginning; thence North 20 degrees
31' East along said proposed right of way line a distance of 381.0 feet
to a point; thence North 09 degrees 46' East along said proposed right
of way line a distance of 306.0 feet to a point; thence North 89 degrees
16' East a distance of 187.9 feet to a point on the Westerly existing
right of way line of U.S. Highway #71; thence South 29 de rees 28'
West
along
said
naright
cgres,ne a ance moreof or�lesOs.£eet to
the point ofbeginning ndontainin1.16 Ac
c231050 412
Sep,;_. ber24,2007
Plan, • Commission
PPL 534 540 Flex
genda Item 2
Page 10 of 12
PPL07-2534
Close Up View
FLEX, LLC
Overview
September 24, 2007
Planning Commission
PPL 07-2534 540 Flex
Page 11 of 12
Overview
Legend
Subject Property
�°1d�ila PPL07-2534
Boundary
er.i Planning Area
m000
0 00a Overlay District
0Outside City
0 0.25 0.5
Legend
IS Hillside -Hilltop Overlay District
M
iles
September 24, 2C
Planning Commiss
PPL 07-2534 540 F
Ao Itcr
07
on
ex
2
Page 12 of 12
THE CITY OF FAYETTEVILLE, ARKANSAS
PC Meeting of September 24, 2007
PLANNING DIVISION CORRESPONDENCE
TO: Fayetteville Planning Commission
FROM: Dara Sanders, Associate Planner
THRU: Jeremy Pate, Director of Current Planning
DATE: September 17, 2007
125 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 575-8267
ADM 07-2745: Administrative Item (ECLIPSE DISPLAYS): Submitted by BATES &
ASSOCIATES for property located at 602 Pump Station Road. The request is to extend the
approval of the approved LSD 06-2253 for one year.
Planner: Dara Sanders
BACKGROUND
Property Description: The subject property is located at the north of Pump Station Road, east of City
Lake Road and is zoned I-2, General Industrial.
Background: The original Large Scale Development was approved by the Subdivision Committee
on September 28, 2006 for the construction of a 39,000 square foot warehouse building with
minimal (3,000 SF) interior office space for Eclipse Displays, Inc. and will be used for trade -show
exhibits and storage. The reason that the construction of the project has been delayed is due to the
transfer of title process from the City of Fayetteville to Richard Johnson. Several items to obtain a
permit have been completed, including Arkansas Department of Environmental Quality (ADEQ)
permits and Engineering approval of construction plans.
Proposal: The applicant requests to extend the approval of the Large Scale Development for one
year, to expire on September 28, 2008. The Planning Department received the applicant's extension
request on September 14, 2007, within the required one year time limit. Should this extension be
granted, all permits are required to be issued before the one-year extended deadline. If the permits are
not issued prior to September 28, 2008, all of the approved plans for the project shall be rendered
null and void.
RECOMMENDATION
Planning Staff recommends approval of ADM 07-2745, the requested extension to the LSD 06-2253,
with the following conditions:
1. The applicant shall be allowed until September 28, 2008 to receive all required building
permits. If all permits have not been received by this time, the Large Scale Development
K:IReporls120071PC Reports109-24-071ADM 07-2745 (Eclipse Displays Extension).doc
September 24, 2007
Planning Commission
ADM 07-2745 Eclipse Displays
Agenda Item 3
Page 1 of 10
approval shall be revoked.
2. All other conditions of approval for the project shall remain applicable.
DISCUSSION
The City of Fayetteville Unified Development Code (UDC) Section 166.20(b) gives the Planning
Commission authority to extend approval of a large scale development one additional year from the
original approval. In order to extend this approval, the applicant must: (1) request the extension
prior to the one year time limit, and (2) show good cause why the tasks could not reasonably be
completed within the normal one year. If the one year extension is granted, it is within this time that
the applicant shall receive all permits and approvals as required by City, State, and Federal
regulations to start construction of the development or project.
(1) The applicant has submitted the extension request to the Planning Division on September 14,
2007, prior to the one year time limit ending on September 28, 2007.
(2) The applicant has stated that the transfer of title process has delayed this project, but that they
plan to move forward upon resolution of this matter.
K: IRepons120071PC Reports109-24-071ADM 07-2745 (Eclipse Displays Extension).dec
September 24, 2007
Planning Commission
ADM 07-2745 Eclipse Displays
Agenda Item 3
Page 2 of 10
CHAPTER 166: DEVELOPMENT
166.20 Expiration Of Approved Plans
And Permits
(A) Applicability. The provisions of this
section apply to all of the following plans
and permits:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Preliminary plats;
Planned zoning district developments;
Conditional uses;
Large-scale developments;
Lot splits;
Physical alteration of land permits;
Storm water, drainage, and erosion control
permits;
(8) Tree preservation plans;
(9) Sign permits; and,
(10) Floodplain development permits.
(B) One-year time limit.
(1) Tasks to be completed. All of the above -
enumerated plans and permits are
conditioned upon the applicant
accomplishing the following tasks within
one (1) year from the date of approval:
(a) For any renovation or new
construction, receive a building
permit; and/or,
(b) For a lot split, record a deed or
survey at the Washington County
Circuit Clerk's Office,
stamped for recordation by the City
Planning Division; and/or,
(c) Receive a Certificate of Zoning
Compliance; and/or,
(d) Receive all permits and approvals
required by City, State, and Federal
regulations to start construction of
the development or project.
(2) Extensions. Prior to the expiration of the
one (1) year time limit, an applicant may
request the Planning Commission to
extend the period to accomplish the tasks
by up to one (1) additional year. The
applicant has the burden to show good
cause why the tasks could not reasonably
be completed within the normal one (1)
year limit.
Expiration. If the required task(s) are not
completed within one (1) year from the
date of approval or during an allowed
extension period, all of the above -
enumerated plans and permits shall be
rendered null and void.
(C) Three-year time limit.
(1) Tasks to be complete. All of the above -
enumerated plans and permits are also
conditioned upon the applicant completing
the project and receiving final inspection
approval and/or a final Certificate of
Occupancy permit within three (3) years
from the date of issuance of a Building
Permit.
(2) Extensions. Prior to the expiration of the
three (3) year time limit, an applicant may
request the Planning Commission to
extend the three (3) year period to
complete the project by up to two (2)
additional years. The applicant has the
burden to show good cause why the
project could not reasonably be completed
within the three (3) year time limit.
(3) Expiration. If the applicant fails to meet
the requirements of subsection (C)(1)
within three (3) years from the date of
issuance of a Building Permit or during an
allowed extension period, all of the above -
enumerated plans and permits shall .be
rendered null and void.
K:Vteparts120071PC Reports109-24-07IADM07-2745 (Eclipse Displays Extension).doc
September 24, 2007
Planning Commission
ADM 07-2745 Eclipse Displays
Agenda Item 3
Page 3 of 10
Bates
Associates Inc.
Civil Engineering Surveying
3561 N. College / Fayetteville, AR 72703
P11: 479-442-9350 * FAX: 479-521-9350
September 14, 2007
City of Fayetteville
Planning Department
113 West Mountain
Fayetteville, AR 72701
Dear City of Fayetteville,
The developer is requesting for a one year extension to obtain all necessary permits for construction for
the Large Scale Development Eclipse Displays LSD 06-2253. Eclipse Displays was approved by the
Subdivision Committee on September 28, 2006. The timeline of approvals is as follows:
• September 28, 2006 — Received Subdivision Committee approval
• January 9, 2007 — Completed NPDES for small construction site for ADEQ
• March 15, 2007 — Received City of Fayetteville approval for construction plans
The following items we are still waiting on approval and/or action:
• Transfer of title from the City of Fayetteville to Richard Johnson
• Arkansas Department of Health approval for sanitary sewer & water
• Easement Plat
• Grading Permit
• Building Permit
Many of the items that are have not been completed are all awaiting the transfer of title from the City of
Fayetteville to Richard Johnson. If you have any questions or comments, please feel free to contact us at
your convenience.
Thank you,
Chris Waller, E.I.
September 24, 2007
Planning Commission
ADM 07-2745 Eclipse Displays
Agenda Item 3
Page 4 of 10
LSD 06 -2253
Page 1
PC Meeting of September 28, 2006
THE CITY OF FAYETTEVILLE, ARKANSAS
PLANNING DIVISION CORRESPONDENCE
125 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 575-8267
TO: Subdivision Committee Members
FROM: Suzanne Morgan, Current Planner
Matt Casey, Assistant City Engineer
THRU: Jeremy Pate, Director of Current Planning
DATE: September 26, 2006 Updated October 3, 2006
LSD 06-2253: Large Scale Development (ECLIPSE DISPLAYS, INC., 603): Submitted by
BLEW, BATES & ASSOCIATES for property located at 602 PUMP STATION RD. The
property is zoned I-2, GENERAL INDUSTRIAL and contains approximately 9.60 acres. The
request is for 39,000 s.f of warehouse and office space with associated parking.
Planner: Suzanne Morgan
Findings:
Property & Proposal.: The subject property is located at the north of Pump Station Road, east of
City Lake Road and is zoned I-2, General Industrial. The applicant requests approval for the
construction of a 39,000 square foot warehouse building with minimal (3,000 SF) interior office
space for Eclipse Displays, Inc. and will be used for trade -show exhibits and storage. A parking
lot with 24 stalls is proposed; this is the minimum allowable parking spaces for the uses
proposed.
Table 1
Surrounding Land Use and Zonin
Direction from Site
Land Use
Zoning
North
Vacant (Town Branch Floodplain)
I-2
South
Single family and Vacant property
R -A & I-2
East
Vacant
I-2
West
Industrial
I-2
Right-of-way being dedicated: An additional 5' of property for a total 45' right-of-way from
centerline right-of-way of Pump Station Road, a Minor Arterial street.
Water/Sewer: Water and sewer service is available to the property.
Street Improvements: Staff recommends the construction of a 6' sidewalk adjacent to the right-
of-way along the entire property boundary.
K:IReports120061SC Reports109-28-061LSD 06-2253 (Eclipse Displays, Inc.).doc
September 24, 2007
Planning Commission
ADM 07-2745 Eclipse Displays
Agenda Item 3
Page 5 of 10
LSD 06 -2253
Page 2
Commercial Design Standards: The proposed development is primarily industrial in nature and
is not required to comply with commercial design standards, which are directed towards
development of commercial (office and retail) uses.
Landscape Plan: Staff has reviewed the landscape plan and finds that the proposed landscaping
meets ordinance requirements.
Tree Preservation:
Existing Canopy: 20.3%
Preserved Canopy: 15.4% (see conditions of approval as this number
may change)
Required Canopy: 15%
Mitigation: None required unless the canopy goes below 15%
Recommendation: Staff recommends approval of LSD 06-2253 with the following
conditions:
Conditions of Approval:
1. Planning Commission determination of street improvements. Staff recommends
construction of a 6' sidewalk at the right-of-way line for the entire length of the property
adjacent to Pump Station Road.
2. Street lights required on Pump Station Road shall be guaranteed or installed prior to
issuance of a building permit.
3. Dedication of an additional 5' right-of-way on Pump Station Road fora total 45' right-of-
way is required by separate document or easement plat prior to issuance of a building
permit.
4. All proposed signs shall be permitted separately from the large scale development
proposal, by a Sign Permit application and Certificate of Zoning Compliance.
5. Should the tree canopy preservation fall below the minimum 15%, mitigation will be
required as required by the Unified Development Code and approved by the Urban
Forester.
6. The applicant shall modify the Tree Preservation Plan to address the following issues:
a. Staff would recommend revising the fencing along trees 2 and 3 if the intent is to
safe these for the time being.
b. Please revise tree number 8 to show removal and the fencing to along tree 9 and
10 to follow the limits of grading not the dripline.
c. Please include the City of Fayetteville's 14 Standard Notes for Protection of Tree
and Natural Areas and the corresponding fencing diagram on the construction
drawings.
K:IReports120061SC Reports109-28-061LSD 06-2253 (Eclipse Displays, Inc).doc
September 24, 2007
Planning Commission
ADM 07-2745 Eclipse Displays
Agenda Item 3
Page 6 of 10
LSD 06 -2253
Page 3
7. The applicant shall modify the plat to address the following issues:
a. Show the adjacent property lines to the south, and show a 100' building setback
from the front (south) property line north of the adjacent R -A zoning. It is not
anticipated for this modification to effect the location of the structure.
b. Modify the plat page number to 603.
c. The dumpster pad shall be widened to 15' per Solid Waste requirements.
Standard Conditions of Approval:
8. Plat Review and Subdivision comments (to include written staff comments provided to
the applicant or his representative, and all comments from utility representatives: AR
Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications).
9. Staff approval of final detailed plans, specifications and calculations (where applicable)
for grading, drainage, water, sewer, fire protection, streets (public and private),
sidewalks, parking lot(s) and tree preservation. The information submitted for the plat
review process was reviewed for general concept only. All public improvements are
subject to additional review and approval. All improvements shall comply with City's
current requirements.
10. Any required trash enclosure shall be screened with access not visible from the street.
The trash enclosures shall be constructed with materials that are complimentary to and
compatible with the proposed building. A detail of the proposed screening shall be
submitted and approved by the Planning Division prior to issuance of the building permit.
Any additional dumpsters located on site shall be screened from the right-of-way.
11. All mechanical/utility equipment (roof and ground mounted) shall be screened using
materials that are compatible with and incorporated into the structure. A note shall be
clearly placed on the plat and all construction documents indicating this
requirement.
12. All exterior lights shall be reviewed at the time of building permit submission for
compliance with the Outdoor Lighting Ordinance.
13. All existing utilities below 12kv shall be relocated underground. All proposed utilities
shall be located underground.
14. Large scale development shall be valid for one calendar year.
15. Prior to building permit, a cost estimate for all required landscaping is to be submitted to
the Landscape Administrator for review. Once approval is gained, a guarantee is to be
issued (bond/letter of credit/cash) for 150% of the cost of the materials and installation of
the plants. This guarantee will be held until the improvements are installed and
inspected, at the time of Certificate of Occupancy.
16. Prior to the issuance of a building permit the following is required:
a. Grading and drainage permits
b. An on-site inspection by the Landscape Administrator of all tree protection
K: IReports12006ISC Reports109-28-061LSD 06-2253 (Eclipse Displays, Inc.).doc
September 24, 2007
Planning Commission
ADM 07-2745 Eclipse Displays
Agenda Item 3
Page 7 of 10
LSD 06-2253
Page 4
measures prior to any land disturbance.
c. Separate easement plat for this project that shall include the tree preservation area
and all utility easements.
d. Project Disk with all final revisions
e. One copy of final construction drawings showing landscape plans including tree
preservation measures submitted to the Landscape Administrator.
17. Completion of all required improvements or the placement of a surety with the City
(letter of credit, bond, escrow) as required by Section 158.01 "Guarantees in Lieu of
Installed Improvements" to guarantee all incomplete improvements. Further, all
improvements necessary to serve the site and protect public safety must be completed,
not just guaranteed, prior to the issuance of a Certificate of Occupancy.
Additional Conditions:
a. Monitor the number of parking spaces and require bike racks at the time of
building permit if required by ordinance.
b. Remove any visible barbed wire fencing.
c. Investigate whether the equestrian trail is a city trail. 9-28-06 (SM) Per Matt M,
the equestrian trail is not a city trail:
Subdivision Committee Action: T Approval:' Forwarded to P.C. Tabled
Motion: Anthes
Second: Bryant
Vote: 3-0-0
Meeting Date: September 28, 2006
Cotmnents: Elizabeth McKee addressed the Subdivision Committee and stated that there
was an equestrian trail that ran through the northern portion of the property. She would
request that the applicant allow the continued use of the trail, that the trees remain, and
address the sewage issues on the back of the property.
The "Conditions of Approval" listed in thereport above are accepted in total without exception
by the entity requesting approval of this development item.
Signature Date
1<:IReports120061SC Reports109-28-061LSD 06-2253 (Eclipse Displays, Inc.).doc
September 24, 2007
Planning Commission
ADM 07-2745 Eclipse Displays
Agenda Item 3
Page 8 of 10
LS D06-2253
Close Up View
ECLIPSE DISPLAYS, INC
Overview
Legend
g0000ooOo Overlay District — FLOODWAY -----500 YEAR
m
— 100 YEAR — — LIMIT OF STUDY
— — - Baseline Profile
O Fayetteville
1 Outside City
15006-2253
vectorGDB.Footpnnt_2004
Hillside -Hilltop Overlay District
0 125 250
500 750 1,000
Feet
September 24, 200
Planning Commissio
ADM 07-2745 Eclipse Display
Agenda Item
ECLIPSE DISPLAYS, INC
SUBJECT PROPERTY -F
Overview
Legend
Subject Property
...i:i LSD06-2253
Boundary
- Planning Area
!Pop0o Overlay District
Outside City
0 0.25 0.5
Legend
Hillside -Hilltop Ov
1
M
erlay District
September 24, 2(07
Planning Commiss on
'es ADM 07-2745 Eclipse Displays
Agenda Item 3
10
aye loo
THE CITY OF FAYETTEVILLE, ARKANSAS
PC Meeting of September 24, 2007
PLANNING DIVISION CORRESPONDENCE
TO: Planning Commission Members
FROM: Andrew Gamer, Senior Planner
THRU: Jeremy Pate, Director of Current Planning
DATE: September 18, 2007
125 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 575-8267
ADM 07-2748: Administrative Item R-PZD 06-2190 (WOODBURY, 137): Submitted by H2
Engineering, Inc. for property located on the south side of Zion Road and east of Taliesin Lane. The property
is zoned R-PZD 06-2190, Woodbury and contains approximately 11.66 acres. The request is to change the
zoning criteria in Planning Area 2 to modify the setback off of the private drive from 15' to 5'.
Property Owner:
Planner:
BACKGROUND
Philip/Martin Development Partner, LLC
Andrew Garner
Property Description and Background: The subject property consists of approximately 11.66 acres located on
the south side of Zion Road, approximately 0.3 miles west of Crossover Road. The Fayetteville City Council
approved R-PZD 06-2190 (Woodbury) on October 3, 2006 for zoning and development approval of a
residential development with 67 single family dwellings and 45 multi -family dwellings in two Planning Areas:
The multi -family portion of the development is situated along Zion Road, with parking located in the rear,
accessed from a private drive.
Proposal: The applicant requests a modification to the approved zoning criteria for Planning Area 2 (the
multi -family portion of the development) to change the building setback off of the private drive from 15' to 5'.
A copy of the revised zoning criteria and plat are included with this report. Setbacks along both Zion Road
and woodbury Drive are 10' from the right-of-way.
RECOMMENDATION
The original PZD booklet and zoning criteria for this development listed a 15' building setback off of the
private drives for Planning Area 2. However, the site plan and plats depicted a portion of the buildings being
located 5' off of the private drive. The applicant's request would clarify the setback for Planning Area 2 to be
consistent with the 5' setback off of the private drive as depicted on the original site plans. This request would
not alter the character or nature of the development in any way. Staff recommends in favor of the request.
Planning Commission Action: Approved Tabled Denied
Motion:
Second:
Vote:
Meeting Date: September 24, 2007
K: IReports120071PC Reports109-24-071ADM07-2748 (Woodbury PZD Modification).doc
September 24, 2007
Planning Commission
ADM 07-2748 Woodbury
Agenda Item 4
Page 1 of 8
412
ENGINEERING, INC.
September 13, 2007
City of Fayetteville City Council
113 West Mountain Street
Fayetteville, AR 72701
RE: WOODBURY—REVISION TO APPROVED RPZD 06-2190
Dear Council Members,
We are requesting a revision to approved RPZD 06-2190 Woodbury. The purpose of this
revision is to clarify the building setback for the attached units in Planning Area 2 off of private
drives. In our initial submittal, the plan sheets showed a 5 foot setback off of private drives for
the structures in Planning Area 2. Unfortunately, the PZD Narrative reflected a 15 foot setback
for Planning Area 2 off of private drives. All of the plans that were submitted and approved with
the initial RPZD depicted a 5 foot setback and buildings were placed according to the 5 foot
setback. This revision / clarification will allow buildings in Planning Area 2 to be built as was
originally depicted on the approved plans, not according to what is currently listed in the
narrative.
In order to clarify this building setback issue, we are requesting the allowance of a revision to
RPZD 06-2190 Woodbury. Thank you for your consideration in this matter.
Jerem Tho i pson, P.E.
Proje Engineer
H2 Engineering
September 24, 2007
Planning Commission
ADM 07-2748 Woodbury
2758 Millennium Drive Suite 1 Fayetteville. Arkansas 72703 Phone: 479.582.4234 Fax: 479.6412S
Page 2 of 8
PLANNING AREA 2
PERMITTED USES
UNIT
DESCRIPTION
UNIT 1
CITY-WIDE USES BY RIGHT
UNIT 26
MULTI -FAMILY DWELLINGS
CONDITIONAL USES
UNIT
DESCRIPTION
UNIT 2
CITY-WIDE USES BY CONDITIONAL USE PERMIT
UNIT 12
OFFICES, STUDIOS, AND RELATED SERVICES
UNIT 13
EATING PLACES
UNIT 15
NEIGHBORHOOD SHOPPING GOODS
UNIT 16
SHOPPING GOODS
UNIT 24
HOME OCCUPATIONS
LAND USE DENSITY / INTENSITY
TOTAL PLANNING AREA SIZE: 2.62 ACRES
TOTAL NUMBER OF RESIDENTIAL UNITS: 45
NON-RESIDENTIAL SQUARE FEET: NOT APPLICABLE
RESIDENTIAL DENSITY: 17.2 UNITS PER ACRE
BULK AND AREA REGULATIONS
AREA REGULATIONS
LOT WIDTH MINIMUM: 18 FT
LOT AREA MINIMUM: 1,100 SF
LAND AREA PER BUILDING UNIT: 2,536 SF
USE MAXIMUMS
A MAXIMUM OF 20,000 SF OF THIS PLANNING AREA MAY BE
UTILIZED FOR CONDITIONAL USE UNITS 12, 13, 15, AND 16.
SETBACK REQUIREMENTS
FRONT -ZION: 10 FT
FRONT-WOODBURY DRIVE: 10 FT from R/W (Back of Curb)
FRONT -PRIVATE DRIVES: 5 FT from Access Easement
SIDE -PROPERTY LINE: 10 FT
MIN. BETWEEN BUILDINGS: 6 FT
HEIGHT
Structures in this Planning Area are limited to a building height of 45 feet
as measured from the lowest point of the structure at the historic grade.
The height of a proposed structure may only be increased above 45 feet
by obtaining a variance after hearing by the Planning Commission.
September 24, 2007
Planning Commission
ADM 07-2748 Woodbury
Agenda Item 4
Page 3 of 8
BUILDING AREA
MAXIMUM: 65%
SITE PLANNING
LANDSCAPING
A Landscape Tree shall be planted every 30 feet of public and private
street frontage, and along the pedestrian walkways as indicated on the
landscape plan.
PARKING
Parking in this Planning Area will occur in garages in the individual units.
The Woodbury covenants are very specific that garages are to be used for
parking vehicles, not for storage. All units in this Planning Area are 2
bedroom units and will have a 2 -car garage to match the number of
bedrooms in the unit. This satisfies the parking requirements for those
units.
ARCHITECTURAL DESIGN STANDARDS
Structures shall be built using brick, stone, and stucco with lap and shingle
siding, consistent with the building elevations included in the project
booklet.
September 24, 2007
Planning Commission
ADM 07-2748 Woodbury
Agenda Item 4
Page 4 of 8