HomeMy WebLinkAbout2015-03-10 - Agendas - Final CITY OF
aye evi le AGENDA
ARKANSAS
Water, Sewer, and Solid Waste Committee
March 10, 2015
5:30 P.M.
(or immediately following City Council Agenda Session)
City Hall — Room 326
Committee: Chairman Mark Kinion; Aldermen Sarah Marsh, Aldermen Martin Schoppmeyer,
Aldermen John LaTour
Copy to: Mayor Lioneld Jordan; Sondra Smith, Don Marr, Paul Becker, Lindsley Smith,
Jeremy Pate, Chris Brown, Lynn Hyke, Peggy Bell, CH2M HILL, Brian Pugh, Jeff
Coles
From: Tim Nyander, Utilities Director
CALL TO ORDER
ROLL CALL
APPROVAL OF MEETING AGENDA
OLD BUSINESS/UPDATES:
a. Lake Sequoyah Sediment Removal Project
The force main will be installed by City crews in March. The design for the rest of the project
will be submitted to Engineering in March.
b. White River Use Attainability Analysis (Minerals)
We have a meeting scheduled with ADEQ on March 19, 2015 to discuss the current status
and next steps in this process.
c. Ozone Disinfection System Project
We have received BluelnGreen's reworked submittals for the equipment and they have
been approved. The ozone equipment should be delivered to the site in late May or early
June. J.L. Bryson will begin preliminary construction in April or May.
Mailing Address:
113 W. Mountain Street www.fayetteville-acgov
Fayetteville,AR 72701
NEW BUSINESS:
a. Electrical Bus Duct Replacement- Noland Effluent Pump Motor
This project will replace approximately 42 linear feet of aged and damaged electrical bus
duct serving the Nolan's Effluent Pump Motor Control (2,000 amp; 480 volt; 3-phase). The
project design will be completed and advertised for bid March 2015. The estimates costs
associated are $75,000 - $100,000.
Capital Projects Update
Number Project Description Contractor Cost %Complete
1 White River Stream bank Restoration $577,221 In Design
Design WCRC ETA 2015
2 Swr Rehab-Cured in Place Pipe City Wide Insituform $330,000 40%
3 South Mountain Pump Station Rehab Design/Const.In-House $200,000 75%
Ramsey/Overcrest Sewer Replacement $228,644
4 Design Phase McClelland Engrs 50%
Hwy 112(Maple Street)Water and Sewer $1,256,345
5 Relocations AHTD Job 040582 Brothers Construction 18%
West Water Transmission Line Survey and $1,000,000
6 Easement Acquisitions McClelland Engrs 30%
Replace 4 Irrigation Reels for Biosolids $144,000
7 Management Site Keeling Company 50%
8 Noland Ozone Equipment BluelnGreen $1,780,825 50%
Beaver Watershed $58,562
9 Cost Share for trend analysis in Beaver Lake Alliance 50%
10 BMS Thermal Dryer Bearing and Drive Shaft AIT,Services, Inc. $52,043.25 50%
11 Noland Transformer Repair(x2) Finalizing Specifications $100,000 25%
Noland VFD(4)and motor rebuild (4)for $46,470
12 aeration basin Evans Enterprises 25%
13 Noland Effluent Storage Reservoir Fence Finalizing Specifications $60,000 0%
14 Noland Ozone Construction 1L Bryson $867,010 0%
15 20155SES RJN $1,116,351 5%
16 Baxter and Mt.Sequoyah Tank Painting Garver $149,900 0%
17 1-49&Garland Relocation Design Garver $102,742.50 25%
18-inch Water Line Installation Regional $707,007.50
18 Park(Contractor Portion) Goodwin&Goodwin 0%
2