Loading...
HomeMy WebLinkAbout2015-02-10 - Agendas - Final CITY OF a e evl Iq AGENDA Y ARKANS Water, Sewer, and Solid Waste Committee February 10, 2015 5:30 P.M. (or immediately following City Council Agenda Session) City Hall — Room 326 Committee: Chairman Mark Kinion; Aldermen Sarah Marsh, Aldermen Martin Schoppmeyer, Aldermen John LaTour Copy to: Mayor Lioneld Jordan; Sondra Smith, Don Marr, Paul Becker, Lindsley Smith, Jeremy Pate, Chris Brown, Lynn Hyke, Peggy Bell, CH2M HILL, Brian Pugh, Jeff Coles, Megan Munro From: Tim Nyander, Utilities Director CALL TO ORDER ROLL CALL APPROVAL OF MEETING AGENDA OLD BUSINESS/UPDATES: a. Lake Sequoyah Sediment Removal Project We are continuing on the design of the project, and should be acquiring a grading permit in April, 2015. b. White River Use Attainability Analysis (Minerals) We have a meeting scheduled with ADEQ on February 18, 2015 to discuss the current status and next steps in this process. c. Ozone Disinfection System Project Update status of submittals and overall schedule. d. Pretreatment Ordinance The first reading on passage of the revised ordinance was held at the January 20'" Council Meeting. The second reading was held at the February 31 Council Meeting. The ordinance is currently out on Public Notice, and the third reading and Public hearing will be held during the February 17'" Council Meeting. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville,AR 72701 NEW BUSINESS: a. 1-49 & Garland Water and Sewer Relocation Design, Professional Engineering Services Contract Garver, LLC The 1-49 & Garland water and sewer relocation design is required for the planned AHTD interchange improvements (Job BB0414). Garver LLC was selected by a formal Engineering Selection Committee to perform the design of the water and sewer relocations associated with the interchange construction. A contract for final design has been negotiated with Garver LLC in the amount of$102,742.50. The contract has been reviewed by the AHTD Utilities Division. Due to the short time available, (final plans are due to AHTD on April 1, 2015) this design contract is being presented to the February 10, 2015 Agenda Session and the February 17, 2015 City Council meeting. The $102,742.50 contract is in addition to the previous $19,500.00 contract with Garver to prepare preliminary plans and preliminary estimates. Based upon the preliminary design, the current estimate for the utility relocation is $2,662,580.00. The current reimbursement ratio estimate is 72.3% reimbursable from AHTD. The actual reimbursement ration will be negotiate with AHTD after the plan submittal on April 1, 2015. b. Regional Park Bid Award Discussion The Construction bids were opened on February 6 and the bid results will be discussed. The proposed construction contract will be presented at the February 24, 2015 Agenda Session and the March 3, 2015 City Council Meeting. An amendment to the design contract with Garver LLC, to add Construction Phase Services, including required construction observation, in the additional amount of $71,200.00 will be presented at the February 24,2015 Agenda Session and the March 3, 2015 City Council Meeting. 2 Capital Projects Update Number Project Description Contractor Cost %Complete 1 Greenland Gravity Sewer Improvements Forsgren, Inc. $1,242,968.30 100% $577,221 In Design 2 White River Stream bank Restoration Design WCRC ETA 2015 3 Swr Rehab-Cured in Place Pipe City Wide Insituform $330,000 40% 4 South Mountain Pump Station Rehab Design/Const. In-House $200,000 75% Ramsey/Overcrest Sewer Replacement 5 Design Phase McClelland Engrs $228'644 20% Hwy 112 (Maple Street)Water and Sewer $1,256,345 6 Relocations AHTD Job 040582 Brothers Construction 18% West Water Transmission Line Survey and $1,000,000 7 Easement Acquisitions McClelland Engrs 30% 18-inch water main for Regional Park and $105,600 8 Kesslertans—DesignPhase Garver Engineer 95% Replace 4 Irrigation Reels for Biosolids $144,000 9 Management Site Keeling Company 50% 10 Noland Ozone Equipment BluelnGreen $1,780,825 50% Beaver Watershed $58,562 11 Cost Share for trend analysis in Beaver Lake Alliance 50% 12 BMS Thermal Dryer Bearing and Drive Shaft AIT,Services, Inc. $52,043.25 50% 000 13 Noland Transformer Repair(x2) Finalizing Specifications $100, 0% Noland VFD(4)and motor rebuild (4)for 14 aeration basin Evans Enterprises $46'470 25% 15 Noland Effluent Storage Reservoir Fence Finalizing Specifications $60,000 0% 16 Noland Ozone Construction 1L Bryson $867,010 0% 17 2015 SSES RJN $1,116,351 0% 18 Baxter and Mt.Sequoyah Tank Painting I Garver $149,900 0% PRESENTATIONS No Presentations ATTACHMENTS No Attachments ADJOURN Next Water, Sewer, Solid Waste Committee meets on Tuesday, March 10, 2015, 5:30 p.m., room 326. 3