Loading...
HomeMy WebLinkAbout2008-05-13 - Agendas Supplement Saye ev le WATER/SEWER COMMITTEE AGENDA SUPPLEMENT Meeting Date of May 13, 2008 COMMITTEE: Chairman Kyle Cook; Aldermen: Lioneld Jordan, Bobby Ferrell, Adella Gray COPY TO: Mayor Dan Coody, Sondra Smith, Gary Dumas, Paul Becker, Susan Thomas, Tim Conklin, Jeremy Pate, Ron Petrie, Shannon Jones, Tom Hubbard, Peggy Bell, Lynn Hyke, OMI FROM: David Jurgens, Water and Wastewater Director A meeting of the Fayetteville Water and Sewer Committee is planned for May 13, 2008, at 5:15 PM, in Room 326, Fayetteville City Hall, immediately following the City Council Agenda Session. This is a supplement to the previously published agenda. 1. WSIP EL-2 Change Order#2 with Rosetta Construction in the amount of$32,086.87 is attached. This project is the 25,000 foot 42" gravity sewer transmission main from the Happy Hollow lift station to the Noland WWTP, paralleling the existing 36" main. This change order is required to add an interconnection between the parallel 36" and 42" sewer lines, and to make a modification to the junction box at the upstream end of the pipeline as underground field conditions differed from what was expected. $697,913.13 will remain in the contingency after this change order. 2. Greenland Wastewater Agreement/System Purchase information is attached including a staff memo describing the proposed process for negotiating the Greenland wastewater system agreement objectives and ownership transition, and a resolution from the Greenland City Council stating Greenland's desire to transfer ownership of the system to Fayetteville. 3. Water/Sewer Committee Meeting is proposed for Tuesday, June 10, 2008, 5:15, room 326 (following Agenda Session). Attachments: WSIP EL-2 Change Order#2, Rosetta Construction Greenland Information Packet WSIP Construction Schedule and Cost Update W&S committee agenda supplement 13May08 aye edl le f RKAN5A5 Mayor's Approval CONTRACT REVIEW MEMO To: Mayor Dan Coody n From: David Jurgens, Water and Wastewater Director \ ' Fayetteville Sewer Committee Date: 13 May 08 Subject: Approval of Change Order Number 2 to the construction contract with Rosetta Construction for WSIP Subproject EL-2 in the amount of$32,086.87 RECOMMENDATION City Staff recommends approval of Change Order Number 2 to the construction contract with Rosetta Construction for WSIP Subproject EL-2 in the amount of$32,086.87. BACKGROUND This project is the 25,000 foot 42" gravity sewer transmission main from the Happy Hollow lift station to the Noland W WTP, paralleling the existing 36"main. This line will receive flows from the new Mally Wagnon Road lift station, WSIP subproject EL-1, currently being built by Garrey Construction. Construction is proceeding well with the job is over 66% complete. DISCUSSION This change order is required to add an interconnection between the parallel 36" and 42" sewer lines, and to make a modification to the junction box at the upstream end of the pipeline as underground field conditions differed from what was expected. BUDGET IMPACT A $730,000 contingency was approved with this contract. $697,913.13 will remain in the contingency after this change order. EL-2 Chg Ordr 2 CCMemoMayo8 CHANGE ORDER MAY 12 �'02 70yeeve e Contract Number EL-2 G�fV�f3 �IiDVIII� /// YN.' ARKANSAS Contract Title EL-2 Gravity Line Change Order No. 2 Date of issuance May 8,2008 To Contractor: Rosetta Construction ORDINANCEIRESOLUTION: The Contract is changed as follows: Effective May 8,2008 Add 36"gravity sewer pipe interconnect between proposed 42"Manhole 6 and the existing 36"sewer. Core Drill proposed Manhole 6 for new 36"gravity sewer pipe connection including water stop gasket. Construct manhole on the existing 36 sewer adjacent to Manhole 6. Eliminate the proposed manhole on the existing 36"sewer at proposed 42"sewer Station 54+99;Right. Revise the proposed 11'x72'junction box to 8x21',add an additional access hatch,and add hand lift gates. Revise the alignment of the proposed 8'x44'junction box,delete 2'square grate,and add integral hatch grating. Attachments: Revised construction drawings C3,C4,C19,D9,and D10 Bid Bid Previous Unit Contract Revised Revised Original Revised Item Item Estimated of Unit Estimated Unit Estimated Estimated No. Description Quantity Measure Price Quantity Price Cost Cost 27.3 36"Gravity Sewer Pipe 180 LF $190.00 204 $190.00 $34,200.00 $38,760.00 17.3 36"Gravity Sewer Pipe Trench 180 LF $1.00 204 $1.00 $180.00 $204.00 Excavation and Backfill 71.3 Connect 36"Gravity Sewer Pipe to 0 EA $0.00 1 $4,450.20 $0.00 $4,450.20 Existing Manhole 62.31) Modify Existing Manhole 20 EA $300.00 19 $300.00 $61000.00 $5,700.00 i 58.3 11'xlTlunction Box 1 LS $50,000.00 I $75,352.67 $50,000.00 $75,352.67 59.3 8'x44'lunction Box 1 LS $100,000.00 1 $98,000.00 $100,000.00 $98,000.00 j Summation of Cost $190,380.00 $222,466.87 Net Cost for this Change Order $32,086.87 ' Not valid until signed by the Owner The original Contract Price was $ 10,431,995.00 Net change by previously authorized change orders ............................._......._...... ........._... ..............._........__.. - ...........__.........._.......................__..._....................................................._....__..................._. $ i The Contract Price prior to this Change Order was _ _ $ 10,431,995.00 The Contract Price will be increased by $ 32,086.87 The new Contract Price including this Change Order will be $ 10,464,081.87 The Contract Time(s)will remain unchanged 0 calendar days j Required dates of Competion as of the date of this Change Order therefore are: Substantial Completion -- _ 13-Sep-08 Final Completion - - _ _ 13-Oct-09 NOTE: This summary does not reflect changes in the Comract Price or Time(s)which have been authorized by Work Change Directives not incorporated in this or previous Change Orders. ARVE ,JEN `V ERS — City of Fayetteville i BY J DATE BY DATE Roset y Construction BY E TIC "�� 11 y -1111 nNSA Water/Sewer Committee Meeting of May 13, 2008 WATER/SEWER COMMITTEE MEMO To: Mayor Dan Coody Fayetteville Sewer Committee From: David Jurgens, Water& Wastewater Director (1'll d'Or Date: May 10, 2008 Y Subject: Greenland Wastewater Services Contract and/or astewater System Acquisition ACTION REQUIRED Determine the future ownership of the Greenland wastewater system, and/or negotiate a new Wastewater Services Contract between the Cities of Fayetteville and Greenland. BACKGROUND The Wastewater Services Contract between the Cities of Fayetteville and Greenland expires in December, 2008. The City of Greenland has passed a resolution requesting the City of Fayetteville take ownership of the wastewater collection system, which consists of approximately 65,000' of pipe, 270 manholes, and two lift stations. The Cities of Fayetteville and Greenland have a 30 year partnership in wastewater collection and treatment, the conditions for which have been agreed upon in two 15 year duration contracts. The current contract,adopted in 1993, expires in 2008 and has become obsolete due to the growth, system upgrade and rehabilitation needs,and other circumstances. DISCUSSION Ultimately, the wastewater systems can provide more efficient and better service when engineering principles are applied without the constraints of political boundaries. With that perspective, it is to the long-term benefit of all customers, and the wastewater systems themselves,that they be designed, installed, operated, and maintained as a single entity, rather than as separate entities with multiple physical and ownership points of connection. As a result, the recently negotiated Fayetteville-Farmington Wastewater Services Agreement contains a provision for the future ownership transfer to Fayetteville. In order to take ownership of the Greenland system, Fayetteville staff recommends that the Greenland system be "whole,"meaning that it is a good state of repair, meets all current regulatory requirements,has a reasonable allowance for future growth, and that there either(1) is no debt or(2)all Greenland associated debt would be borne by Greenland residents. The following must be accomplished in order to meet these requirements: (1) SSES and resulting rehabilitation be completed(the SSES is being considered at the 20 May 2008 Fayetteville City Council meeting)using the cost share model developed in the Fayetteville-Farmington arbitration agreement; (2) infiltration and inflow(UI) must be reduced through the sewer rehabilitation, and post-rehabilitation flows projected in order to determine current capacity; (3) Greenland's Wastewater Master Plan must be updated and identify projected growth requirements; (4) pipes and pump stations must have adequate capacity to meet an established growth projection; (5) backup power generators must be installed at both lift stations; and (6) funding framework must be established, to include impact fees,to ensure neither Fayetteville nor Greenland residents bear costs for work that purely benefits the other City. BUDGETIMPACT None at this time. Fayetteville-Greenland Wastewater SvcsStatus I OMayO8 WSCmIy Memo 09/19/2005 06:05 4795217780 CITY OF GREENLAND .PAGE 01 POM-W Fax Nola 7671 "0 • pq 11 1. From .[r „,;to —..- nA,„��t c/,P�, 0.4RECEIVED f ld,� 76 t PMne a,... PAOne a t� FaYq - ' c SEP 19 2005 CITY OF FAYETTEVILLE CITY CLERK'S OFFICE RESOLUTION NO. -",5 WHEREAS,the City of Greenland does not operate a municipal sewer system or a municipal water system. WHEREAS,the City of Fayetteville owns and operates the water system within the City and provides wastewater collection and treatment for residents of the City. WHEREAS,rapid projected development will very quickly increase the demand for sewage collection and treatment infrastructure which the City cannot undertake at this time. WHEREAS,the City owns its existing sewage collection right-of-ways and system._ WHEREAS,the City of Fayetteville has expressed interest in acquiring the Greenland sewage collection and treatment infrastructure and operating same in conjunction with their City department/system. BE IT THEREFORE RESOLVED BY THE CITY COUNCIL OF GREENLAND, ARKANSAS,that: Section l: The Greenland City Council strongly supports the concept of selling to the City of Fayetteville the entire Greenland sewage collection system,including right-of-ways, piping,lift-stations,etc. Section 2: The Greenland City Council hereby authorizes and directs the Mayor and Recorder-Treasurer along with all City officials,employees,staff and agents to cooperate with the City of Fayetteville in collecting information and conducting further investigation consistent with a transfer by the City of Greenland to the City of Fayetteville of Greenland's sewage collection system. Section 3: TheMayor shall preparea monthly oral report on the various steps taken 09/19/2005 08:05 4795217780 CITY OF GREENLAND PAGE 02 for the immediate past month and the prospective steps to be taken in the corning month at each Council meeting. Section 4_: Recognizing that the acquisition by Fayetteville of the City sewage system will also require theapplication-of Impact Fees to-land developed-and sold for,use in Greenland the City Council pledges its support of those fees and authorizes and directs the Mayor,the Recorder-Treasurer and all City officials,employees,staff and agents to cooperate in investigation and pm-implementation procedures in this regard as well. __ PASSED AND APPROVED this_�74y of September,2005. WILLIAM YOES,Mayf ATTEST: .:Lrn i�vf C� vL K`c DONNA CHEEVERS,Recorder-Treasurer FAYETTEVILLE WSIP MAJOR CONSTRUCTION CONTRACTSUMMARY 13,W,08 Contract Construction Cast- Estimated Contract 'fentalive Bid Construction Period(days) Construction Substantial Final Number Description Bi,UAwarded Work 4=Mtian Cost Conlin encu Dote Substantial Final Start Data Com detion Cam letion EP-2 Noland WWTP Renovmion $14,836.631 $100,248 15-Feb-05 ]89 879 16-Ma-05 14-Ju1-07 12-Oct-07 WP-3 West Side WWTP $611,672,456 $1722254 29-5,. -05 939 1019 4-Nov-05 31-Ma-08 19-Au•-08 WP-3 Elm Electric Line Relocation.Broyles Road $299,961 29-5 -05 939 1019 4-Nov-05 31-Ma-08 19-Ac,08 WL-5 Force Mains.Harncstrin•to West Plant S4 752,287 PROJECT COMPLETE 3-Nov-05 250 310 8-Feb-06 15-Nov-06 15-Dec-06 WL-3 Porter to Hmnestrin• $7186.957 $107991 27-Jan-06 330 365 I-Ma-06 27-Mar-07 I-Ma-07 WL4 ore"to Hamestrin• $1097021 $4904 31-J:m-06 624 684 5-Jun-06 19-Feb-08 19-Apt-08 WI-I Old Wire to Gregg Mv•cd with WL-3 Connected with WL-3 27-1an-06 330 365 LM.-06 27-Mar-07 I-Ma-O] WL-2 Nonh to Portz to Van Asche $4433.82 24-Oct-06 300 330 3-Jan-07 30-Qt-07 29-Nov-07 WL-6 Ha nestrin•Station $7,099.3961 $63.561 29-Jun-06 500 530 6-Aug-06 19-Dec-07 18-1an-08 WL.7 Great,Lift Station $152700 $7600 8-Ma-07 210 250 I-An•-07 27-Fe6-08 7-Ar-08 WL-S Uvl C,wk LS and Force Main $1200.00 $12000 Nov-08 300 330 J.,-09 26-Nov-09 26-Dm.09 WP-Ib Bro les Rood 3-Ma-07 360 420 II-Jun-07 5-Jun-08 4-Au•-08 Wp-I. Bro les Road Winer Line Contacted what P.3 SUBPROJECT COMPLETE 29-Sep-05 939 1019 4-Nov-05 31-Ma-08 19-Au•-08 \VP-2b Wetlands Mitigation On WWTP Site 92970 10 21-Sep-06 700 720 Nov-06 Oct-08 /Jct-08 WP-2. Wetlands Mitigation Earth Work&Boma Connected Mth WP-3 29-Se 05 939 1019 4-Nov-05 31Na-08 19-Au•-08 EP-1 Noland Wet Weather Basin 1336886 $55908 5-Apr-07 180 210 23-Jul-07 19-1,v,-08 I8-Feb-08 EP4 Noland Oxygenation Inection 56646 PROJECT COMPLETE 8-M.-07 105 135 19-1un-07 2-Ot-07 I-Nov-O] WP3,WL-6 BP West WWTP,I iamestring Backe Power 81,98689] $40000 27-Feb-07 180 210 21-Mar-07 17-Sm-07 V-Oct-07 EL-I Mall Wa,non1 ftSmtion&Force Main $139388 $110. 31-Jul-07 180 210 15-Qt-07 I2-Ar-08 12-Ma-08 EL-2 Line 7-Ha Hollow to Noland 10464082 5697913.13 31-Jul-07 335 365 15-Oct-O] 14-Se-08 14-Oct-08 EL-al Lift Stations 13,14.16 $460.36 10000 9-Ar-07 180 210 7-Aug-07 3-Feb-O8 4-Mar-08 EL-5 Line 15.South Mm to Industrial Park 557200 $2288 Ma'-08 350 390 Au•-08 Au•-09 Se-09 EL-3 Line 4-Tome Branch to Ha Hollow 015.00 524060 Ma08 360 390 Au•-08 Au•-09 Se 09 EP-3 Noland Effluent Pum Stat.Aeration Basin $1646.90 $65876 Ma-08 270 300 Au,-08 Ma-09 tun-09 WL-9 CmomrDet.OMI comma amend $6500 143500 $60650 Jan-OB 120 2]0 Ma'-08 Sop-09 Feb-09 B\VD-I Beaver Lake Wmershed A aeemetlt L Jnl-07 355 365 24-Aug-07 23-Aug-08 23-Aug-08 IVP-PFE \Vat lV\VIP Furniture, tri mmnt 9085 108111 S1.0001 Ma-08 130 180 Apr-08 Oct-OS Oct-OB Sludge Haul Sledge Hauling Tractor and Trailer 510674 ACTION CONVLETE 22-Sm-06.— Frei Met Pro'ect Marra gement Team i72 Ma 46 Ma-09 Spare Paris S stem Wide S vers mid Maint E ui ment Aug-08 120 120 Sep-08 ine-09 tan-09 Mise Ex uses&Cant n•rne • MA Subtotal ConstlectioNPurchrses S132,175,489 S11,850,59d 59,277,94 153,304.027 DesigNConslructlon Supervision Contracts, Easements EP Black&Vetch-Noland Plant Conti EL Garver-Fast Lima&Lift Stations WE NE(hodwin-(Vest Plan,Broyles Road "llv, WL RJN-\Vest Lines&Lift Stations All ECO.Wetland.Environmental Iwi All CF12M Hill 0 All Bums McDonnell (l$•V .tom, Easeinents Easoneng t Costs includin Counsel Svcs .2 g " i' .2 ' 7 Subtotal Enineerin &Easements 524,79103 5160,28. $19397 Fayetteville Area Project Totals: $156,966,524 $12.010,07t $9,471,92 173.449.324 Fayetteville Area Project Total: $178,449,324 West Fa yetteville-Farmin ton Are. Fn gr Fa $ RRk-Fa et-Panning Area Engineering Enr Fmm$ RJN-Foul-gamin•Arca Enginemin• S480.0001 WLIO Fa S Fa-Fain A.G.Line Loeer Section 16-Jan-08 120 150 12-Ma'-08 10-Jul-08 9-Au•-08 WE-10(Fare S) Fa-Fain Arca G.Line Lower Section S269.67111 $13.484116-Jan-OS 120 150 12-Mar-OB 10-M418 9-Au•-08 WL-10a Fa S Fa-Fart.Arra Gmv LineU err Section Dec-08 270 300 Feb-09 23-Nov-09 23-Dec-09 \4L-IOU FannS Fa-Farm Area Gmv Line U rSection 747 $112374 Dec-08 270 300 Feb-09 23-Nor-09 23-Dec-09 WE-I I Fn $ Force main doe LS 12 Farrington West) I6-Jan-08 330 360 17-Mar-08 10-Feb-09 12-Mer-09 \VL-II FannS Force main Som LS 12 Emaington\Vest 948425 7421 16-tan-08 330 360 17-Mar-08 10-Feb-09 12-Mar-09 WL-12 Fn S Lift Station 12 Farrington West) 8-A r48 240 285 27-Ma-08 22-1an-09 8-Mar-09 \VL-12 Fannb Lift Statioul2 Farmin•ton West 1215802 079 8-A r-08 NO 285 27-Ma-08 22-Jan-09 8-Mar-09 \VL(Fav5 Mi.,Value En•imon.g WL rarn$I Value En•inecring 39844 Estualaffenn$1 EoscrnSg and General Comingenc 1632 Subtotal West Fa eltevillnFermin ton Area 54493468 $3232640 539]82] 3.123.935 Wast Fayetteville-Farmington Project Total: $8,123,935 All Areas Project Totals: 1 $161,459,991 $15,243.511 $9,869,751 186,573.260 Grand Total: $186,573,260 Net Fayetteville Cost Including West Fey-Farm Area: 5180,683,701 Cost Breaktlown b W31P Component: West Lina Conal Talal 0110223 NoleM(VMO 10100908 1 01 -x.194 E..ILina Coral Tulal 10800222 Wxl Plum 010001 M I M Faeemertls -171061 OVA Creak LS,FM Ind In N991 the tostaft 1 $1.3M0)() F Fa,mF 0 9 Grant Totel: 5188523200 rk I Esat S e tl Plan W 6, 1823 W 1 •8 222 18108909 Untler Wa W 7 1 1 088163 West Lin Work Summa $37.028.1171 263500 45310 $40116223 n rWe E Ine Warks mm 1121a181311 Al 81 9 19986]22 U der Wa _; 1. .. F I 7A B 6 9 ws,rco,,.,co„e:ts.g.,,.gru,ror