Loading...
HomeMy WebLinkAbout2007-08-02 - Agendas - Final 71170� A. r,' m ns WATEMEWER COMMITTEE AGENDA Meeting Date of August 2, 2007 COMMITTEE: Chairman Kyle Cook; Alderman: Lioneld Jordan, Bobby Ferrell, Adella Gray COPY TO: Mayor Dan Coody, Sondra Smith, Gary Dumas, Paul Becker, Susan Thomas, Tim Conklin, Jeremy Pate, Ron Petrie, hp on Jones, Tom Hubbard, Peggy Bell, Lynn Hyke, OMI FROM: David Jurgens, Water and Wastewater Director A meeting of the Fayetteville Water and Sewer Committee is pla d fo August 2, 2007, at 4:30 PM, in Room 326, Fayetteville City Hall. Proposed topics elude: 1. Approve Minutes of the July 10 and 26, 2007 Water/Sewer Committee Meetings. 2. Beaver Water District Discussion. A representative of BWD will be present to discuss master planning, capacity, and BWD rate issues. 3. WSIP U date. Contract Description Contractor Cost %Complete WL-1 Porter— Hamestring & Old Wire—Gregg Oscar Renda $ 7,186,957 100% WL-2 North St—Poplar—Gregg Gravity Line T-G Excavating $ 4,413,664 79% WL-3 Porter— Hamestring & Old Wire—Gregg Combined contract with WL-1 99% WL-4 Gregg Ave— Hamestring LS Gravity Line Oscar Renda $ 10,441,319 68% WL-5 Force mains Hamestring—West Plant Gamey Const $ 4,752,287 99% WL-6 Hamestring Lift Station Brasfield & Gorrie $ 6,133,546 79% WL-7 GreggAve Lift Station Crossland Heavy $ 1,527,000 0.00% EP-1 Noland Wet Weather Improvements Wilson Brothers $ 1,327,794 0.00% EL-1 FM Mally Wa non Lift Station and Force Main Garney Const $ 1,393,880 Bid 31Jul07 EL-2 Happy Hollow—Noland WWTP 42" Gravity Rosetta Const $ 10,431,995 Bid 31Jul07 EP-2 Noland WWTP Renovation Archer Western $ 14,818,644 94.63% EP-4 Noland WWTP Oxygen Injection BluelnGreen $ 66,460 15.00% WP-1 b Broyles Road Construction Crowder Const $ 3,737,965 0.00% BWD-1 Geos ntec Consulting Geos ntec $ 199,883 0.00% WP-2b Wetlands Mitigation, WWTP Site Green Scaping $ 145,200 5.00% WP&L BP West Side (WL-6 &WP-3) Backup Power PowerSecure $ 1,986,897 14.21% WP-3 West Side WWTP Construction Brasfield & Gorrie $ 59,994,710 63.55% This percentage reflects only this particular contract. The overall completion percentage for the wetland mitigation site, including berms, water control structures, etc., is 75%. a. WSIP Farmington Area Work. Design and easement acquisition are under way. b. WSIP Easement Update. An updated matrix will be distributed at the meeting. c. Subproject EL-1 LS, Mally Wagnon Lift Station and Force Main replacement. The new station will pump up to 2.6 mgd through 4,000' of 16"force main pipe to the 36 and 42" sewer lines EL-2. The City received seven bids on July 31, 2007 for this project, shown below. Bidders could bid on either one or both of the components; Garvey was the low bidder for both. Staff requests this item be forwarded to the full City Council for approval. W&S commiUee agenda 2Aug07 backup BIDt)ER =EL-1Lift . , . EL-1 Force . Total Station Main Basic Construction Co., Inc. $1,319,400.00 $939,950.00 $2,259,350.00 C-2 Projects, LLC No Bid $774,540.00 Construction & Engineering Solutions, LLC No Bid $851,548.75 Garney Companies, Inc. $715,150.00 $678,730.00 $1,393,880.00 Mobley Contractors, Inc. $1,076,701.87 $778,639.18 $1,855,341.05 Redford Construction, Inc. No Bid $848,312.00 S &J Construction Co., Inc. No Bid $775,071.76 d. Subproject EL-2 LS, 42" Gravity Line from Happy Hollow to the Noland WWTP involves 25,0000' of 42" gravity sewer pipe, 1,240' of 18" — 36" gravity sewer, 70 manholes, 170 concrete piers, and related items. Six bids were received on July 31. Staff requests this item be forwarded to the full City Council for approval. Rosetta Construction $10,431,995.00 (low bid) Garvey Companies, Inc. $10,949,390.00 Redford Construction $12,349,485.00 S. J. Louis $13,781,007.00 Kraus Construction $14,166,410.00 Sweetser Construction $16,903,825.00 Engineer's Estimate $14,546,590.00 e. Wetlands Mitigation Update. Bruce Shackelford, ECO, will be present to discuss alternatives with the wetlands mitigation site. f. Contract Legal Review- West Plant Construction Contract. The selection process is underway; the decision will be made in late August. g. WSIP Construction Schedule and Cost Update will be distributed at the meeting. 4. Sanitary Sewer Rehabilitation Project Update. a. Basins 1-5, 18 & 19 Sewer Rehab. T-G Excavating, $2,514,292, including Change Orders 1 and 2. Construction underway at Doc Murdoc's. b. Farmington Area. The Farmington Sewer Rehabilitation Project Notice to Proceed will be issued on July loth. Work will commence within the next month. 5. Water and Sewer Rate Study Schedule. Several issues need to be decided upon based on the HDR Water/Sewer Rate Study presentation. 6. 24" Water Line- Custer and Morningside. The 1,400' section of 24" main on Custer is complete; Crossland Heavy is moving to complete the 3,700' section on the Morningside Drive. Work should be completed in sixty days. 7. Scheduling the Next Water/Sewer Committee Meeting. Staff recommends the next W/S Committee meeting be scheduled Tuesday September 11, 2007, 5:15 (following the Agenda Session), in room 326. Attachments (to be distributed at the meeting): WSIP Easement Matrix EL-1 Information Packet EL-2 Information Packet WSIP Construction Schedule and Cost Update W&S committee agenda 2AugO7 backup