Loading...
HomeMy WebLinkAbout2008-05-12 - Agendas - FinalTayelteyi;le 113 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 AGENDA FOR A MEETING OF THE PLANNING COMMISSION Monday, May 12, 2008, 5:30 p.m. Room 219, City Administration Building ORDER OF PLANNING COMMISSION MEETING A. Introduction of agenda item — Chair B. Presentation of Staff Report C. Presentation of request — Applicant D. Public Comment E. Questions & Answer with Commission F. Action of Planning Commission (Discussion & Vote) NOTE TO MEMBERS OF THE AUDIENCE It' you wish to address the Planning Commission on an agenda item please queue behind the podium when the Chair asks for public comment. Public comment occurs after the Planning Staff has presented the application and will only be permitted during this part of the hearing for each item. Members of the public are permitted a maximum of 10 minutes to speak; representatives of a neighborhood group will be allowed 20 minutes. The applicant/representative of an application before the Planning Commission for consideration will be permitted a maximum of 20 minutes for presentation. Once the Chair recognizes you, go to the podium at the front of the room and give your name and address. Address your comments to the Chair, who is the presiding officer. He/She will direct them to the appropriate appointed official, staff member or others for response. Open dialogue will not be permitted: please ask any questions, and answers will be provided once public comment has been closed. Please keep your comments brief, to the point, and relevant to the agenda item being considered so that everyone has a chance to speak. Please, as a matter of courtesy, refrain from applauding or booing any speakers or actions of the Planning Commission. 2008 Planning Commissioners Sean Trumbo Lois Bryant Matthew Cabe James Graves Porter Winston Audy Lack Christine Myres Jeremy Kennedy Jill Anthes 1• a e ne 1'�TARKANSAS a TENTATIVE 113 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 AGENDA FOR A MEETING OF THE PLANNING COMMISSION Monday, May 12, 2008, 5:30 p.m. Room 219, City Administration Building The following items will be considered: ConsentA.enda: 1. Approval of the minutes from the April 28, 2008 meeting. 2. CCP 08-2973: (LAKEWOOD S/D LOTS 77-96, 137): Submitted by H2 ENGINEERING, INC. for property located at N OF ZION RD., W OF RANDALL PL. The property is zoned R-PZD, RESIDENT. PLANNED ZONING DIST. and contains approximately 1.53 acres. The request is to re -plat lots 77-96 of the approved Residential Planned Zoning District, R-PZD 05-1599. Planner: Andrew Garner 3. ADM 08-3000: (BUNGALOWS AT CATO SPRINGS, 600): Submitted by BURKE LARKIN for property located N OF CATO SPRINGS RD., W OF CLINE AVE. The property is zoned R-PZD, RESIDENTIAL PLANNED ZONING DISTRICT and contains approximately 5.52 acres. The request is for a reduction of the required street improvement assessment. Planner: Andrew Gamer Unfinished Business: 4. RZN 08-2971: (WALKER PARK NEIGHBORHOOD): Submitted by THE CITY OF FAYETTEVILLE THE SUBJECT PROPERTIES ARE ROUGHLY BOUNDED BY ARCHIBALD YELL BLVD., HUNTSVILLE ROAD, MORNINGSIDE DRIVE, 15TH STREET AND S. SCHOOL AVENUE. The properties are zoned RMF -24, MULTI FAMILY - 24 UNITS/ACRE, C-2, THOROUGHFARE COMMERCIAL AND P-1, INSTITUTIONAL and contain approximately 303.45 acres. The request is to rezone the various properties within the boundaries of the Walker Park Neighborhood to NC, Neighborhood Commercial (128.19 acres), DG, Downtown General (107.41 acres), and MSC, Main Street Center (19.94 acres.) Planner: Karen Minkel New Business: None All interested parties may appear and be heard at the public hearings. A copy of the proposed amendments and other pertinent data are open and available for inspection in the office of City Planning (575-8267), 125 West Mountain Street, Fayetteville, Arkansas. All interested parties are invited to review the petitions. Interpreters or TDD for hearing impaired are available for all public hearings; 72 hour notice is required. For further information or to request an interpreter, please call 575-8330. ay revile ARKANSAS THE CITY OF FAYETTEVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE TO: Fayetteville Planning Commission FROM: Andrew Garner, Senior Planner Matt Casey, Assistant City Engineer THRU: Jeremy Pate, Director of Current Planning DATE: May 6, 2008 PC Meeting of May 12, 2008 125 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 CCP 08-2973: Concurrent Plat (LAKEWOOD S/D LOTS 77-96, 137): Submitted by H2 ENGINEERING, INC. for property located at N OF ZION RD., W OF RANDALL PL. The property is zoned R-PZD, RESIDENT. PLANNED ZONING DIST. and, contains approximately 1.53 acres. The request is to re -plat lots 77-96 of the approved Residential Planned Zoning District, R-PZD 05-1599. Planner: Andrew Garner Findings: Property & Proposal: The subject property consists of approximately 1.53 acres located in the southeast comer of the Lakewood Gardens Subdivision, which is west of Crossover Road and immediately northwest of the intersection of Randal Place and Zion Road. The Fayetteville City Council approved R-PZD 05-1599 (Lakewood Subdivision) on September 20, 2005 for zoning and preliminary plat approval of a residential development with 95 residential lots. The final plat approval for the subdivision was recorded on January 17, 2007. The applicant now requests approval of a concurrent plat to re -plat lots 77-96 into lots 77-90. This re -plat slightly increases the size of the lots resulting in an overall reduction in six residential lots from the subdivision. Surrounding Land Use/Zoning Direction Land Use Zoning North Pasture; single family residential R -A South Woodbury Subdivision R-PZD 06-2190 East Undeveloped lot; Fayetteville Athletic Club RMF -24; R -O; C-1 West Open pasture R -A Right-of-way dedication: Sufficient right-of-way was dedicated with the final plat — no additional dedication needed. Water/Sewer/Street Improvements: This subdivision does not affect the public original water, sewer, and street improvements. Several of the existing meters serving the individual lots will need to be removed or relocated. Access: Public streets serve the subject development with direct access to Randall Place and K: IReports120081PC Reports109-May 121CCP 08-2973 (Lakewood Sub Lots 77-96).doc May 12, 2008 Planning Commission CCP 08-2973 Lakewood S/D Lots 77-96 Agenda Item 2 Page 1 of 8 Zion Road. Parkland Dedication: Fees in -lieu of parkland dedication in the amount of $52,725 for 95 single family lots have been paid prior to recordation of the final plat. The concurrent plat will reduce the number of residential lots by six, for a total of 89 lots in the subdivision. Recommendation: Staff recommends approval of CCP 08-2973 with the following conditions: Standard Conditions of Approval: 1. All conditions of approval and zoning criteria associated with R-PZD 05-1599, except that modified by the Fayetteville City Council, shall remain in force. 2. All existing meters required to be moved shall occur prior to recording the concurrent plat. 3. All construction shall meet Building Code criteria, including minimum separation from building walls. 4. Provide three updated copies of the PZD plats and booklets with the zoning criteria and plats updated to reflect the revised lot configuration from the concurrent plat. 5. Plat Review and Subdivision comments (to include written staff comments provided to the applicant or his representative, and all comments from utility representatives - AR Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications). Additional Conditions: Planning Commission Action: ❑ Approved ❑ Denied ❑ Forwarded Motion: Second: Vote: Meeting Date: Comments: The "Conditions of Approval" listed in the report above are accepted in total without exception by the entity requesting approval of this development item. Signature Date K: IReports120081PC Reports109-May 121CCP 08-2973 (Lakewood Sub Lots 77-96).doc May 12, 2008 Planning Commission CCP 08-2973 Lakewood S/D Lots 77-96 Agenda Item 2 Page 2 of 8 �a�/y/7 laeville / AF:K&N.5A5 THE CITY OF FAYETTEVILLE, ARKANSAS PC Meeting of May 12, 2008 TREE PRESERVATION and PROTECTION REPORT 113 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 444-3472 To: Fayetteville Planning Commission From: Carole Jones, Interim Urban Forester Date: May 6, 2008 ITEM # CCP 08-2973: Concurrent Plat (Lakewood S/D Lots 77-96) Requirements Submitted: FINDINGS: This site was originally reviewed with the R-PZD of Zion Gardens. This concurrent plat will subdivide Lots 77 — 95 (19 lots) into Lots 77 — 89 (13 lots). On-site mitigation was required with the original development. Several of the mitigation trees are to be located around these lots and along Zion Road and Randall Place. All mitigation trees required from the previous development will still be required. Conditions of Approval: 1. All on-site mitigation trees required from previous reviews shall be planted, inspected and bonded before the certificate of occupancy will be granted for these lots. Mitigation trees cannot be located within any utility easements. May 12, 2008 Planning Commission CCP 08-2973 Lakewood S/D Lots 77-96 Agenda Item 2 Page 3 of 8 Initial Review with the Urban Forester Y Site Analysis Map Submitted Y Site Analysis Written Report Submitted Y Complete Tree Preservation Plan Submitted FINDINGS: This site was originally reviewed with the R-PZD of Zion Gardens. This concurrent plat will subdivide Lots 77 — 95 (19 lots) into Lots 77 — 89 (13 lots). On-site mitigation was required with the original development. Several of the mitigation trees are to be located around these lots and along Zion Road and Randall Place. All mitigation trees required from the previous development will still be required. Conditions of Approval: 1. All on-site mitigation trees required from previous reviews shall be planted, inspected and bonded before the certificate of occupancy will be granted for these lots. Mitigation trees cannot be located within any utility easements. May 12, 2008 Planning Commission CCP 08-2973 Lakewood S/D Lots 77-96 Agenda Item 2 Page 3 of 8 aye eve le ARKANSAS THE CITY OF FAYETTEVILLE, ARKANSAS 113 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 444-3469 TO: FROM: DATE: SUBJECT: Andrew Garner, Associate Planner Alison Jumper, Park Planner April 30, 2008 Parks & Recreation Subdivision Committee Review Comments ****************************************************************************** Meeting Date: May 1 , 2008 Item: CCP 08-2973, (Lakewood S/D lots 77-96, 137) Park District: NE Zoned: R-PZD Billing Name & Address: Zion Place, LLC P.O. Box 4034 Fayetteville, AR 72702 Land Dedication Requirement Single Family @ .024 acre per unit = acres Multi Family @ .017 acre per unit = acres Mobile Home @ .024 acre per unit = acres Lot Split COMMENTS: Money in Lieu 95 @ $555 per unit = $52,725 �@ $393 per unit = $ @ $555 per unit = $ @ $555 per unit = $ • PRAB recommended accepting money in lieu of land for 95 single family units on June 6, 2005. This decision was based on the project's proximity to Lake Fayetteville. • Fees in the amount of $52,725 for 95 single family lots have been paid for this development. CCP08--1 May 12, 2008 Planning Commission CCP 08-2973 Lakewood S/D Lots 77-96 Agenda Item 2 Page 4 of 8 cN2 ENGINEERING, INC. April 3, 2008 City of Fayetteville Planning Division 113 West Mountain St. Fayetteville, AR 72701 RE: LAKEWOOD — CONCURRENT PLAT REPLAT OF COF PROJECT # FPL 06-2261 LOTS 77-96 To Whom It May Concern: Please accept this letter as our official request for Concurrent Plat approval for the proposed replat of Lots 77-96 of Lakewood Subdivision. The intent of this application is to reduce the number of platted lots by 6 lots thereby providing the opportunity to enlarge the remaining lots. This proposed change is a result of market demand for a larger residential unit than what was initially proposed for this area. Lots 77-96 origianlly represented 19 residential lots and 1 common area lot. The revised plat reflects a total of 13 residential lots and 1 common area lot. No additional infrastructure improvements are needed to serve the revised parcels. Respectfully, Kipp Hearne, P.E. H2 Engineering, Inc. May 12, 2008 Planning Commission CCP 08-2973 Lakewood S/D Lots 77-96 Agenda Item 2 Page 5 of 8 CCP08-2973 Close Up View LAKEWOOD S/D LOTS 77-96 Overview 0 75 150 300 450 600 Feet CC Planni P 08-2973 May 12, 2008 ng Commission Lakewood: /D Lots 77-6 Agenda item 2 Page 6 of 8 LAKEWOOD S/D LOTS 77-96 CREEKKR 03= Overview Legend Subject Property IAA CCP08-2973 Boundary Planning Area 0 rg Overlay District onoo L J Outside City 0 0.25 0.5 Legend Hillside -Hilltop Ot 1 May 12, 2006 p pCp,(1$, Planning Commission IVI ICJ2973 Lakewood AgendD Lots a Item 2 Page 7 of erlay District 3 May 12, 2008 Planning Commission CCP 08-2973 Lakewood S/D Lots 77-96 Agenda Item 2 Page 8 of 8 Tirekev A RICAN 5A5e THE CITY OF FAYET I EVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE TO: Fayetteville Planning Commission FROM: Andrew Garner, Senior Planner Glenn Newman, Staff Engineer THRU: Jeremy Pate, Director of Current Planning DATE: May 6, 2008 PC Meeting of May 12, 2008 125 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 ADM 08-3000: (BUNGALOWS AT CATO SPRINGS, 600): Submitted by BURKE LARKIN for property located N OF CATO SPRINGS RD., W OF CLINE AVE. The property is zoned R-PZD, RESIDENTIAL PLANNED ZONING DISTRICT and contains approximately 5.52 acres. The request is for a reduction of the required street improvement assessment. Planner: Andrew Gamer Findings: Background: On August 30, 2007, the Planning Commission approved Final Plat 07-2678 for development of the Bungalows at Cato Springs Subdivision consisting of 31 single family residential lots on 5.52 acres. The property is zoned R-PZD 05-1797 (Bungalows at Cato Springs) and is located on the north side of Cato Springs Road, west of Cline Avenue and east of Cato Springs Branch. Proposal: The applicant requests approval to amend condition of approval No. 1 from FPL 07-2678 to reduce the amount of assessment required to be paid for improvements to Cato Springs Road from $46,337.50 to $41,999.00, a reduction of $4,338.50. Discussion: Condition of approval for FPL 07-2678 currently reads as follows: "Payment of an assessment to the City for the cost of widening Cato Springs Road to 14' from centerline including storm drains, curb and gutter, pavement and sidewalks in the amount of $46.337.50. " The dollar amount for the assessment amount was derived by City Engineering staff at the time of preliminary plat, in the absence of a cost estimate from the applicant, and was based on a standard cost per linear foot for road construction. This dollar amount was carried forward and included in the conditions for the final plat approval. The applicant has now provided staff with a detailed cost estimate for the cost of the road improvements which is $4,338.50 less than the original number. As shown in the attached memo, City Engineering staff has reviewed the cost estimate and finds it acceptable to cover the required improvements to Cato Springs Road along the property frontage. K: I REPORT8120081 PC REPORTS109-MAY 721 ADM 08-3000 B UNGALOWSSTREETASSESSR ED UCTION.DOC May 12, 2008 Planning Commission ADM 08-3000 Bungalows at Cato Springs Agenda Item 3 Page 1 of 12 Recommendation: Staff recommends approval of ADM 08-3000 to change condition of approval No. 1 from FPL 07-2678 to read as follows: "Payment of an assessment to the City for the cost of widening Cato Springs Road to 14' from centerline including storm drains, curb and gutter, pavement and sidewalks in the amount of $16,337.50. $41,999 00 " PLANNING COMMISSION ACTION: ves Required Approved Denied Date: May 12, 2008 Comments: The "CONDITIONS OF APPROVAL", stated in this report, are accepted in total without exception by the entity requesting approval of this development item. By Title Date K IREPORTS120081PCREPORTSI09-MAY I11ADM 08-3000 BUNGALOWSSTREETASSESSREDUC[ION.DOC May 12, 2008 Planning Commission ADM 08-3000 Bungalows at Cato Springs Agenda Item 3 Page 2 of 12 FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS 113 W. Mountain St. Fayetteville, AR 72701 Telephone: 479-575-8206 ENGINEERING DIVISION CORRESPONDENCE TO: FROM: DATE: SUBJECT: Planning Commission Members Glenn E. Newman, Jr., P.E., Staff Engineer May 6, 2008 The Bungalows at Cato Springs — Cato Springs Assessment At the May 8, 2006 Planning Commission Meeting, PPL 06-2011 Preliminary Plat (Bungalows at Cato Springs) was approved with the Planning Commission determination of $46,337.50 of street improvements on Cato Springs Road. At this time the applicant had not presented a cost estimate as requested by engineering and subsequently the engineering department prepared the above referenced assessment based on our standard at the time of $110 per linear foot of improvements for the property frontage. At the August 30, 2007 Subdivision Committee Meeting, FPL 07-2678 Final Plat (Bungalows at Cato Springs) was approved with the Planning Commission determination of $46,337.50 of street improvements on Cato Springs Road. The applicant has presented a unit price breakdown of the proposed street improvements in the amount of $41,999 that has been reviewed and approved by the Engineering Department. (Please see the attached breakdown) The Engineering department recommends acceptance of the revised street assessment total in the amount of $41,999 for The Bungalows at Cato Springs. May 12, 2008 Planning Commission ADM 08-3000 Bungalows at Cato Springs Agenda Item 3 Page 3 of 12 Dm CO 03 (0 -1 zm c) --10) =DD my CO CO Ao 0o mz z to oz > z 1 G) (m 0x z Z G) T0 z o Z Om o0 D40 m mo fns A ---I to A Z 0 m mm c 01 m 0 c CCDO > -I zD r c c m A Z D 50 1 to ob Cn O m 11 z G) Cn T1 n A W N> 10 co CO V O (TI A co N-, CD 3 STORM DRAINAGE FLARED END SECTION FINAL DRESS UP AND SEEDING INLET TEMPORARY TRAFFIC CONTROL 6 FT SIDEWALK 12' CURB & GUTTER ISAWCUT (INCLUDES TAPERS) OFFSITE TAPERS (30 mph) Hillside (OFFSITE TAPERS (30 mph) Pavement (2/3/4) 12" TYPE!! HMAC 3" BINDER I4" BLACK BASE ASPHALT UNDERCUT & INSTALL HILLSIDE (2') Description A 01-s--s>s ro N (T O a ('PTI (T VOl00(CO CDD A 189 0 c 0) c rmm m>>cc rr mm SF J r m CY LF Co �-C Cn 0) -I -<Z C z r: EA co o $ 250.00 1 $ 100.00 $ 2,000.00 EA 01 o 0 $ 3.00 Efl C O 0 Ef) EA N O 0 0 $ 24.75 1 EA Co 0 EH EA O O 0 0 E!9 O 0 Unit Price 1 CD N V 0 O o 6 250.00 N O 0 0 OO O O 6 500.00 V W 01 O o 3,277.50 N_ O O 0 800.00 6 1,485.00 N? O 0 -+a -CO V 0 (TI O 0 0 4J V 0 O 0 0 --I O= Nm me cnz -10 f l r m< m V) 73 73 0> v0 -N .o 23 -o xi Oz 0m m z D r 0 z 0 0 -o it1 z co 73 0 v May 12, 2008 Planning Commission ADM 08-3000 Bungalows at Cato Springs Agenda It Pag of 12 05/05/2008 16:15 FAX 479 964 2075 1310 West Main Street Russellville, AR 72801 May 5, 2008 REAL PRACTICES INC Mr. Andrew Garner Senior Planner 125 West Mountain City of Fayetteville, AR 72701 RE: Fees for Cato Springs Road Improvements Andrew, IJJ001 (4619.)7-m07C x_ (j1) Pr-8zoz: This is my request to appear before the Fayetteville Planning Commission, May 12, 2008, in reference to item, PPL 06-2011, regarding the ability to lower the Road Impact fee from $46,337.50 to the calculated/bid number of $41,999.00. The cost of development can be extremely high, and every dollar counts. We are ready to bring new construction, for sale, affordable housing to the City of Fayetteville, through the Bungalows at Cato Springs. I believe the Engineering Department is in agreement with lower amount. The higher amount was calculated using a number derived from a calculation, rather than a bid or a contractor's estimate. Please accept this letter as my request for an appearance at the May 12th Planning Commission,meeting. M. Burke Larkin Developer -Bungalows at Cato Springs 479.968.2001 (P) 479.9642008 (F) www.realdevelopmentinc.com May 12, 2008 Planning Commission ADM 08-3000 Bungalows at Cato Springs Agenda Item 3 Page 5 of 12 ayeen. le ARKANSAS THE CITY OF FAYETTEVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE TO: Fayetteville Subdivision Committee FROM: Andrew Garner, Senior Planner Matt Casey, Assistant City Engineer THRU: Jeremy Pate, Director of Current Planning DATE: August 28, 2007 Updated August 30, 2007 SC Meeting of August 30, 2007 125 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 FPL 07-2678: (BUNGALOWS @ CATO SPRINGS, 600): Submitted by MCCLELLAND CONSULTING ENGINEERS for property located at N OF CATO SPRINGS RD., W OF CLINE AVENUE. The property is zoned R-PZD 05-1979 BUNGALOWS AT CATO SPRINGS and contains approximately 5.52 acres. The request is for final plat approval of a Residential Planned Zoning District with 31 residential lots. Property Owners: Bungalows at Cato Springs, LLC Planner: Andrew Garner Findings: Background: This property was rezoned from RSF-4, Single -Family Four Units Per Acre to Residential Planned Zoning District (R-PZD) 05-1797, Bungalows at Cato Springs on December 20, 2005. The R-PZD zoning criteria allows for single family development in two residential planning areas with a variety of bulk and area regulations. The Preliminary Plat (PPL 06-2011) was approved by the Planning Commission on April 24, 2004. Properly: The subject property contains part of two tracts totaling 5.52 acres. The property is located on the north side of Cato Springs Road, west of Cline Avenue. The property has been developed with streets and infrastructure for the Bungalows at Cato Springs Subdivision. The Cato Springs Branch Creek and wooded area traverses north -south near the western edge of the property and an old railroad spur is to the north. The site is zoned R-PZD 05-1797 (Bungalows at Cato Springs) and as shown in Table 1 is immediately surrounded by single-family residential and undeveloped land, with a variety of zoning. Table 1 Surrounding Land Uses and Zoning Direction From Site Land Use Zoning North Undeveloped; Single -Family Residential 1-1 South Single -Family Residential RSF-4 East Single -Family Residential RSF-4 West Undeveloped (Cato Springs Branch and associated floodplain) RSF-4; 1-1 RSF-4, Residential Single -Family Four Units Per Acre RMF -24, Residential Multi -Family 24 Units Per Acre 1-1, Heavy Commercial and Light Industrial K:IReporls120071SC Reports108-30-071FPL 07-2678 (Bungalows Q Cato Springs).doc May 12, 2008 Planning Commission ADM 08-3000 Bungalows at Cato Springs Agenda Item 3 Page 6 of 12 Proposal: The applicant request final plat approval for the Bungalows at Cato Springs Residential Planned Zoning District with 31 residential lots. Water and Sewer: Water and sewer lines have been installed to provide adequate service to the proposed development. Adjacent Master Street Plan Streets: Cato Springs Road (minor arterial). Right-of-way to be dedicated: 45' from centerline right-of-way along the project's Cato Springs Road frontage, 50' for the proposed South Florida Way, and 24' for the proposed alleys. Street Improvements: As approved as part of the Preliminary Plat, required street improvements include payment of an assessment to the City for the cost of widening Cato Springs Road to 14' from centerline including storm drains, curb and gutter, pavement and sidewalks in the amount of $46 337.50. This assessment for the delayed street improvement is planned to be utilized with the City's improvements of the larger Cato Springs Road improvement project currently being designed. Tree Preservation: Existing: 7.4% Preserved: 1.8% Required: 7.4% Mitigation: Required; 31 two-inch caliper trees to be planted on-site as street streets. Recommendation: Staff recommends approval of FPL 07-2678 with the following conditions: Conditions of Approval: 1. Payment of an assessment to the City for the cost of widening Cato Springs Road to 14' from centerline including storm drains, curb and gutter, pavement and sidewalks in the amount of $46,337.50. 2. Payment of an assessment in the amount of $3,686.50 to the City for the cost of constructing South Florida Way from where it stubs -out, to the north property line (approximately 10'). Add Note No. 15 to state that, "The property owners to the east, Lots 8-14 in the . McClinton's Subdivision, have public alley access to their property off of Eastern Loop, by dedication of right-of-way to the property line. Should they desire to construct access to their property from the public alley, the fence and vegetation along the Bungalows at Cato Springs eastern property line may be removed to allow access and the remaining fence and vegetation shall be repaired at the expense of the owner/developer constructing the access." 4. The required fence along the eastern property line shall be constructed and inspected prior to the City signing the final plat. The vegetative plantings must be planted before the first home in the development received a final Certificate of Occupancy. K: IReports120071SC Reports108-30-071FPL 07-2678 (Bungalows @ Cato Springs).doc May 12, 2008 Planning Commission ADM 08-3000 Bungalows at Cato Springs Agenda Item 3 Page 7 of 12 5. Dedication of right-of-way in the amount of 45' from centerline along the project's Cato Springs Road frontage, 50' for the proposed South Florida Way, and 24' for the proposed alleys. 6. Access for all lots is allowed only off of alleys. 7. Interior sidewalks shall be constructed or guaranteed prior to final plat. 8. Street lights shall be installed or guaranteed with a maximum separation of 300 feet and at intersections along Cato Springs Road and the interior streets. Receipts from the electric company indicating installation of these street lights shall be submitted prior to the City signing the final plat. Prior to signing the final plat signs shall be installed and approved at the northern street stub -out indicating future extension of public right-of-way. 10. Payment of $16.650 for 30 new single-family units in lieu of dedication of parkland, prior to final plat. 11. The location, height and placement of any landscaped entry feature shall be reviewed by City staff for compliance with ordinance regulations and maintained by the Property Owner's Association. 12. Building permits for homes will be reviewed (plan and elevation) to confirm general compliance with the approved PZD design standards. 13. All existing structures and driveways on the property not incorporated into the subdivision shall be removed and the areas re -vegetated prior to recordation of the final plat. 14. The plat should be revised as follows: a. Zoning Criteria. PA -1. Purpose. Change PA -2 to PA -1 b. Zoning Criteria. PA -3. Purpose. Change RSF-3 to PA -3. c. Lot 32. Add a note that this lot is an un -buildable lot limited to parkland and tree preservation uses. d: Change the Setback Requirements table to be titled "Planning Areas", delete the front side, and rear columns in the table, and add a row under PA -2 listing that PA -3 is lot 32. e. The plat should be revised to have two points in Arkansas State Plane Coordinates. f. Include a note on the plat that all residential driveways shall have a maximum width of 24 feet measured at the right-of-way. 15. Submit a revised copy of the plat to Planning Staff for review prior to obtaining signatures. K: IReports12007LSC Reports108-30-071FPL 07-2678 (Bungalows @ Cato Springs).doc May 12, 2008 Planning Commission ADM 08-3000 Bungalows at Cato Springs Agenda Item 3 Page 8 of 12 16. Impact fees for water, sewer, police, and fire shall be paid in accordance with City ordinance. Tree Preservation and Landscape Plan Conditions: 17. Mitigation will be required in the amount of 31(2) inch caliper large species trees. These trees will be planted on-site as street trees. A Tree Mitigation Planting Plan has been submitted to the Urban Forester for approval. 18. Before signature of Final Plat, a bond, letter of credit, or check in the amount of $7,750 shall be submitted to the City of Fayetteville. These trees will be planted with development of the single family homes and must be inspected by the Urban Forester before a certificate of occupancy will be granted. The amount is held for 3 -years to ensure the maintenance of the mitigated trees. If after the 3 years, 90% are found to be healthy, the amount is released in full 19. A vegetative buffer is required along the eastern property line. This landscape must be planted before the first home in the development receives a final certificate of occupancy. Please contact the Urban Forester for an inspection. Standard Conditions of Approval: 20. Plat Review and Subdivision comments (to include written staff comments provided to the applicant or his representative, and all comments from utility representatives - AR Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications) 21. Staff approval of final detailed plans, specifications and calculations (where applicable) for grading, drainage, water, sewer, fire protection, streets (public and private), sidewalks, parking lot(s) and tree preservation. The information submitted for the plat review process was reviewed for general concept only. All public improvements are subject to additional review and approval. All improvements shall comply with City's current requirements. 22. Submit a digital copy of the approved final plat on CD to the Planning Division. 23. All street names and addresses shall be approved by the 9-1-1 Coordinator. 24. All overhead electric lines under 12Kv shall be relocated underground. All proposed utilities shall be located underground. K. IReports[20071SC Reports108-30-071FPL 07-2678 (Bungalows Q Cato Springs).doc May 12, 2008 Planning Commission ADM 08-3000 Bungalows at Cato Springs Agenda Item 3 Page 9 of 12 Additional conditions: a. b. c. Subdivision Committee Action: X Approval 9 Forwarded to P.C. 9 Tabled Motion: Ostner Second: Cabe Vote: 3-0-0 Meeting Date: August 30, 2007 Comments: The "Conditions of Approval" listed in the report above are accepted in total without exception by the entity requesting approval of this development item. Signature Date K.'IReports120071SC Reparts108-30-071FPL 07-2678 (Bungalows @ Cato Springs).doc May 12, 2008 Planning Commission ADM 08-3000 Bungalows at Cato Springs Agenda Item 3 Page 10 of 12 FPL07-2678 Close Up View BUNGALOWS @ CATO SPRINGS PErrIGRGW. ;PATO SPRING R --- CATO SPRINGS RD,.-. Overview esE May 12, 2008 Planning Commission 08-3000 Bungalows at Cato Springs Agenda Item 3 Page 11 of 12 Overview Legend Subject Property FPL07-2678 Boundary Planning Area Overlay District Ii Outside City 0 0.25 0.5 Legend SI Hillside -Hilltop Overlay District 1 M May 12, 20d8 Planning Commission Ltdt000 Bungalows at Cato Springs 'IGJ Agenda Item 3 o.,Qg ^2,ar 2 Tare evile THE CITY OF FAYETTEVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE PC Meeting of May 12, 2008 125 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 TO: Fayetteville Planning Commission FROM: Karen Minkel, Senior Long Range Planner THRU: Jeremy Pate, Director of Current Planning Tim Conklin, Planning and Development Management Director DATE: May 7, 2008 (Update) RZN 08-2971: (WALKER PARK NEIGHBORHOOD): Submitted by THE CITY OF FAYETTEVILLE. THE SUBJECT PROPERTIES ARE ROUGHLY BOUNDED BY ARCHIBALD YELL BLVD., HUNTSVILLE RD., MORNINGSIDE DR., 15TH STREET AND S. SCHOOL AVENUE. The properties are zoned RMF -24, MULTI FAMILY - 24 UNITS/ACRE, C- 2, THOROUGHFARE COMMERCIAL AND P-1, INSTITUTIONAL and contain approximately 303.45 acres. The request is to rezone the various properties within the boundaries of the Walker Park Neighborhood to NC, Neighborhood Commercial (128.19 acres), DG, Downtown General (107.41 acres), and MSC, Main Street Center (19.94 acres.) Planner: Karen Minkel BACKGROUND: Staff first presented the proposed rezoning of the Walker Park Neighborhood to the Planning Commission on April 28, 2008. The Commission tabled the rezoning and scheduled a work session to address areas of concern expressed by commissioners and members of the public. The work session was held on May 6, 2008, and Commissioners Trumbo, Anthes and Kennedy attended. Several broad concepts were discussed during the work session. Jefferson Square was one of the ideas that stakeholders expressed the most excitement about during the charrette. Limiting Downtown General zoning districts to nodes on 6th Street rather than extending the zoning along the entire length of 6th Street is one way to encourage the development of the Square concept. This priority served as a key criterion when discussing specific areas identified in the table below. Commissioners also discussed how the Illustrative Plan is used when determining appropriate zoning. Staff conveyed that the Illustrative Plan is a loose guide that is conceptual only. The Illustrative Plan is not tied to specific parcels, so some infill development shown on the Plan was not appropriate or feasible to reflect in the zoning. Specific areas and questions were also discussed as follows: NC=Neighborhood Center DG=Downtown General MSC=Main Street Center Area of Concern Question(s) Proposal K: (Reports 120081PC Reports109-May 121RZN 08-2971 (Walker Park Neighhorhood).doc May 12, 2008 Planning Commission RZN 08-2971 Walker Park Neighborhood Agenda Item 4 Page 1 of 16 K: (Reports 120081PC Reports109-May 121RZN 08-2971 (Walker Park Neighborhood).doc May 12, 2008 Planning Commission RZN 08-2971 Walker Park Neighborhood Agenda Item 4 Page 2 of 16 Discussed Morningside Drive Is the DG (blue) zoning too big or too small? Commissioners proposed keeping the NC block because it reflects the existing uses as well as the Illustrative Plan. The NW corner of Morningside and 15th Street was changed from DG to MSC (teal) in order to encourage a predominantly commercial node along a major corridor. The DG area extending south from Huntsville Road along Morningside Drive was left as originally proposed. Huntsville Road and 6th Street Would it be appropriate to change from NC (green) to DG in order to create another node? This area was discussed as the gateway to the neighborhood from the east, and the Illustrative Plan showed greater density at this intersection. The NE and SE corners were changed from NC to DG. In order to emphasize the significance of Jefferson Square, the NW and SW corners were left as NC. Willow Avenue between 6th Street and 7th Street Should this block change from NC to DG to complete Jefferson Square? Changing this block from NC to DG was determined to be appropriate in order to enhance the sense of enclosure on both sides of Willow Avenue and complete the Square. 4th Street and Washington Avenue Should this area change from NC to DG in order to reflect the Illustrative Plan? While this area may later be appropriate for more dense and intense development, NC was determined as being appropriate at this time; NC reflects the existing uses within this area. 11th Street and Willow Avenue Is the mix of DG and NC appropriate at this intersection? This area was left as proposed. The Illustrative Plan shows row houses as part of the large parcel north of the Housing Authority property. However, the zoning is tied to parcels and changing this large parcel to DG would be incompatible with the single-family dwellings across the street. Commissioners decided not change the DG to NC at the SE corner, since the DG reflects an existing use. Block of Locust between 5th Street and 6th Street Should the area change from DG to NC? The proposed zoning was left as originally proposed because the DG serves as a transition area between the MSC (existing zoning) and NC zones. South School Avenue Should the proposal show a greater area of The commissioners supported the original proposal, which concentrates more dense and K: (Reports 120081PC Reports109-May 121RZN 08-2971 (Walker Park Neighborhood).doc May 12, 2008 Planning Commission RZN 08-2971 Walker Park Neighborhood Agenda Item 4 Page 2 of 16 K: (Reports 120081PC Reports109-May 121RZN 08-2971 (Walker Park Neighborhood).doc May 12, 2008 Planning Commission RZN 08-2971 Walker Park Neighborhood Agenda Item 4 Page 3 of 16 MSC? intense development at the intersection of 15th Street and South School Avenue rather than dispersing it over a larger area. Trey Morrison: 2 parcels at the SE corner of Church Avenue and 6th Street Should the property owner's parcels change from NC to DG? The commissioners proposed changing these two parcels and the parcel at the NE corner of 7th Street and Church Avenue from NC to DG because the Illustrative Plan showed the vacant parking lot developing with more density than what is allowed in NC and changing these parcels would provide for greater compatibility between both sides of Church Avenue. Mark Sugg: 3 parcels on 7th Street between Wood Avenue and Willow Avenue Should the property owner's parcels change from NC to DG? In order to highlight Jefferson Square, the commissioners proposed to limit the DG area to the Square area and key intersections along 6th Street. Dorothy Ashworth: 1 parcel on the NE corner of 7th Street and Wood Avenue Should the property owner's parcel change from NC to DG? This parcel was included in the discussion about the intersection of 6th Street and Wood Avenue. The commissioners decided to limit the DG are to the two parcels at the NE and SE corners of the intersection. Marc Crandall: 1 parcel on Wood Avenue between 7th Street and 15th Street Should the property owner's parcel change from NC to DG? The property owner has an existing multi -family dwelling on the parcel with 7 units. Zoning the property DG would be a form of spot zoning, which is discouraged in the City's Unified Development Code. The commissioners decided to keep the parcel NC. K: (Reports 120081PC Reports109-May 121RZN 08-2971 (Walker Park Neighborhood).doc May 12, 2008 Planning Commission RZN 08-2971 Walker Park Neighborhood Agenda Item 4 Page 3 of 16 Tare eville ARKANSAS THE CITY OF FAYETTEVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE PC Meeting of April 28, 2008 125 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 TO: Fayetteville Planning Commission FROM: Karen Minkel, Senior Long Range Planner THRU: Jeremy Pate, Director of Current Planning Tim Conklin, Planning and Development Management Director DATE: April 18, 2008 RZN 08-2971: (WALKER PARK NEIGHBORHOOD): Submitted by THE CITY OF FAYETTEVILLE. THE SUBJECT PROPERTIES ARE ROUGHLY BOUNDED BY ARCHIBALD YELL BLVD., HUNTSVILLE RD., MORNINGSIDE DR., 15TH STREET AND S. SCHOOL AVENUE. The properties are zoned RMF -24, MULTI FAMILY - 24 UNITS/ACRE, C- 2, THOROUGHFARE COMMERCIAL AND P-1, INSTITUTIONAL and contain approximately 303.45 acres. The request is to rezone the various properties within the boundaries of the Walker Park Neighborhood to NC, Neighborhood Commercial (128.19 acres), DG, Downtown General (107.41 acres), and MSC, Main Street Center (19.94 acres.) Planner: Karen Minkel BACKGROUND: Property Description: The subject property is roughly bounded by the southern boundary of the Downtown Master Plan area, Huntsville Road, Morningside Drive, 15th Street and South School Avenue (See attached maps.). The property consists of multiple zoning districts. Surrounding land use and zoning for each section is depicted in the following table. TABLE 1: SURROUNDING LAND USE AND ZONING: Direction Land Use Zoning North Single-family dwellings, Commercial, Multi- family dwellings MSC, NC, DG, R -O, RMF -24, RSF-8 South Industrial, Multi -family dwellings I-1, RMF -24, R -A East Open pasture/agricultural RSF-4 West Single-family dwellings, Industrial I-1, RMF -24 Proposal: As discussed within the adoption of the Walker Park Neighborhood Master Plan by the City Council, the City of Fayetteville proposes to change the zoning of the property identified above in order to accurately reflect existing uses as well as maintain a sustainable balance of commercial, residential and institutional uses within the neighborhood. The proposed zoning draft was included in the Walker Park Neighborhood Plan adopted by the City Council on February 5, 2008. Public Comment and Participation: The Walker Park Neighborhood charrette was held September K: (Reports 120081PC Reports109-May 121RZN 08-2971 (Walker Park Neighhorhood).doc May 12, 2008 Planning Commission RZN 08-2971 Walker Park Neighborhood Agenda Item 4 Page 4 of 16 21 to 27 in the fall of 2007. Close to 200 stakeholders participated during the process and 97 percent of the surveyed participants at the Work -in -Progress session, where the proposed zoning was first viewed, said they believed the Plan was on the right track. Of those respondents, 9 percent believed that encouraging higher density was a top priority and another 7 percent believed that mixed income housing was a top priority. Some of the comments in response to what was valued in the Plan included, "Creation of high-density mixed-use and townhouses" and "Encouraging higher density (as we are so near to the heart of town) and the mixed uses and amenities that go along with density." The survey also asked if there were elements missing from the Plan. Six comments addressed zoning specifically: • We need to know specifically what is allowed/encouraged in the proposed zoning and what incentives will catalyze development. I am concerned that single-family homes, which are not a sustainable development pattern, are being promoted proximate to downtown. • It is important to remember the neighborhood's proximity to downtown and the need for density, commercial and mixed used. • I don't support the creation of and preservation of single-family homes. They are inefficient and unaffordable. • The neighborhood preservation concept seems to inhibit positive development of my neighborhood. • Allowing zoning to allow lots to be divided for roads and alleys where there is none isn't good for the existing neighborhoods. Sticking with no dividing existing lots or land holdings keeps integrity of community and keeps out developers. • Too much greenspace being changed into homes. Planning Staff mailed postcard notices about the rezoning to all property owners within the Walker Park Neighborhood as well as to adjacent property owners. In addition, Planning Staff held an open house with the proposed zoning from April 14 through April 22. During that period, several residents dropped by to ask questions. Staff also received several phone calls and one written comment from Mark Sugg and one in-person visit from Trey Morrison, both property owners in the area. Mr. Sugg would like to see several of the lots east of Willow Avenue between 6th and 7t1 Streets zoned to Downtown General rather than Neighborhood Conservation. Mr. Morrison would like two parcels east of Church Avenue between 6th and 7th Streets also zoned Downtown General. INFRASTRUCTURE: Streets: Street improvements will be evaluated as developments are proposed. Water and Sewer: The Engineering Division evaluated the neighborhood in preparation for the charrette. The neighborhood has a good backbone of large diameter lines (12" or greater) for both the water and sewer system which provides sufficient sewer capacity and water pressure for the area. The one weak area in respect to water is the southwest corner of the boundary. This area, which is near the intersection of S. School Avenue and 15th Street, will need to have additional lines placed to create loops across S. School to compensate for the lack of large diameter mains. K: (Reports 120081PC Reports109-May 121RZN 08-2971 (Walker Park Neighborhood). dor May 12, 2008 Planning Commission RZN 08-2971 Walker Park Neighborhood Agenda Item 4 Page 5 of 16 While there is a good backbone of large diameter pipe in the area, there are also many lines that do not meet the current minimum sizes. There are numerous 1.5" to 4" diameter water lines that are serving the existing structures as well as 6" diameter sewer mains. There are also fire hydrants that are connected to 4" mains which do not provide adequate fire flow. With redevelopment of the neighborhood, each of these water and sewer lines will need to be replaced with a minimum of 8" diameter mains and water loops will need to be created where possible to provide adequate flow to each lot. Each individual development in this area will have to be evaluated on a case by case basis to determine the extent of improvements necessary. Drainage: Standard improvements and requirements for drainage will be required as development is proposed. Fire: The fire department does not anticipate any additional calls for service or reduced response times based on the proposed rezoning. Police: It is the opinion of the Fayetteville Police Department that this rezoning will not substantially alter the population density, create an undesirable increase in load on police services, or create an undesirable increase in traffic danger and congestion. CITY PLAN 2025 FUTURE LAND USE PLAN: City Plan 2025 Future Land Use Plan designates this site as a City Neighborhood Area. Rezoning this property as proposed would allow for a more traditional form of residential development with narrower lots and buildings closer to the street, consistent with the City Plan 2025 Goal 1 for infill development. RECOMMENDATION: Staff recommends approval of the rezoning based on findings stated herein. The new zoning brings most of the nonconforming structures into compliance and reflects the traditional layout and mix of uses within the neighborhood. Further, the zoning creates a natural extension of the Downtown zoning and promotes a City Neighborhood area, which is what is shown on the Future Land Use map. The rezoning will become the first step in realizing the vision generated by the stakeholders within the neighborhood during the charrette process. PLANNING COMMISSION ACTION: Required YES Approved Forwarded Denied Motion: Second: _Vote: Date: April 28, 2008 CITY COUNCIL ACTION: Date: Required YES Approved Denied May 12, 2008 Planning Commission RZN 08-2971 Walker Park Neighborhood Agenda Item 4 Page 6 of 16