HomeMy WebLinkAbout2011-12-01 - Agendas - FinalParks & Recreation Staff Connie Edmonston, Director Chase Gipson, Recreation Superintendent Byron Humphry, Maintenance Superintendent Alison Jumper, Park Planning Superintendent Carole Jones, Park Planner Melanie Thomas, Senior Secretary aeevte A 14 Parks & Recreation Advisory Board Brian Bailey Jennifer Hazelrigs Michael Lindsey Riley Mason Jim Meinecke - Chair Steve Meldrum Quin Thompson Bill Waite, Jr. Phillip Watson Special Parks and Recreation Advisory Board Meeting December 1, 2011 at 12:00 p.m. Parks and Recreation Office 1455 S. Happy Hollow Road Fayetteville, AR **We will meet at the Parks and Recreation Office and travel to the proposed park location to tour the site. Please wear appropriate clothing.** AGENDA: 1. Park Land Dedication: Alison Jumper, Park Planning Superintendent Quarry Trace Commons Milholland Engineering Tim Brisiel North of Hwy. 16 E, west of Lake Sequoyah SE 114 Single Family 35 acres 2.74 acres $109, 440 None within t/z mile, Lake Sequoyah, Baryyari Park and Rodney Ryan Park are within one mile Dedicate approximately 2.8 acres Dedicate approximately 2.8 acres and designate as a natural area. Development Name: Engineer: Owner: Location: Park Quadrant: Units: Total Acres: Land Dedication Requirement: Money in Lieu Requirement Existing Parks: Developer's Request: Staff Recommendation: Developer's Comments: Justification: Annual Maintenance Cost: No public park land exists within %Z mile as recommended by the Parks and Recreation 10 Year Master Plan. Park will be designated as a natural area and will not be developed therefore requiring little maintenance. Park & Recreation Staff Recommendation: To accept 2.8 acres as a natural area. PRAB Motion: 2. Adjournment: Attachments: Agenda Items listed below: 1. Quarry Trace Park Land Dedication December 1, 2011 PRAB Agenda 1 LEGACY VENTURES, LLC P.O. BOX 8216 FAYETEVILLE, AR 72703 11/20/2011 Parks and Recreation City of Fayetteville 1445 S. Happy Hollow Road Fayetteville, Arkansas 72701 ATTN: Alison Jumper RE: Park Land Dedication I Waterbrook Subdivision Dear Alison, Please accept this letter as a written request to dedicate the 2.804 acres of proposed parkland associated with the Waterbrook subdivision. We are working hard to finish this bank owned subdivision so that it becomes a viable part of the City of Fayetteville rather than an overgrown, eye sore residents pass traveling home on Highway 16. Although this subdivision is almost complete, "finishing" the project will entail taking the subdivision through the complete planning process including preliminary and final plat approval. Accepting this park land dedication and a recommendation of approval from the PRAB is the first, and critical, step in this process. This development originally went through the planning process in 2005 and received preliminary plat approval; however, was never final platted. As part of that process it went through the PRAB at that time. On July 11, 2005, the Parks and Recreation Advisory Board recommended accepting this land dedication to meet the park land requirements of this subdivision. We are seeking the same recommendation from the PRAB, as we are proposing exactly the same as what was previously presented in regards to the land mass, location and layout. Most of the work is complete in regards to the subdivision so changes at this point would be cost prohibitive. However, we are planning improvements wherever possible to make this development a quality and desirable place to call home. One such improvement is to create our own "park area" around the detention pond. This existing quarry pond can be a beautiful focal point of the entire subdivision. We will clean up there area and install picnic tables, landscaping, barbeque grills, bird nesting boxes, a walking trail around the quarry pond, and an overlook area. This area will be owned and maintained by the POA. It is worth mentioning because it might be beneficial to provide a connection between the walking trail around the quarry pond and through the proposed park area. We appreciate your time and hope that you will give this proposal careful consideration and make findings similar to what was recommended in 2005. We are looking forward to completing this subdivision and together leaving our Lejiacv one Venture at a time. LEGACY,ES 0 3 F m dull Illllm� Illlo�l L-1_1 uowwLuo a,bu J-110(10, akilerS &,�s'! tali GL Ziitar-20 PtCatillit cif Plate TALLGRASS ED EDWARDS RD DEERFl\ELLDD \\\\ \\ MALLY WAGNON BALDWIN AVE LAKE SEOUOYAH DRIVE engem ewe pal LW MY AT IDE Of RKS DESCRIPTION.' 7uruiRini - rn w• �ir r'v• �• [Welt 01E4 me • .01 AH YAW, etas TREE PRESERVATION DESCRIPTION anew ovallt 70.20 A anner NY PM Sol-aler 77.21 rimy 'WO 1111.4 Sr SAS IT 0 /ACE SAT NOPPLIP MO o 0 PEEP POWER POP ITIPMAPPLO PECK PAP LAMP SPEW PACT I row werow Anna, rt®xm wen c..m 1 OCT 19-2011 PENDING RESUBMITTAL TO CITY FOR APPROVAL FINAL PLAT awRRY RACE COMMONS PROPISSIOZILI KNGINEMIS SUAVEIDIC SPECIALISTS