Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2013-11-13 - Agendas - FinalFAYETTEVILLE PUBLIC LIBRARY
Kim Agee, President
Elizabeth Jordan, Vice President
Maylon Rice, Treasurer
We inspire imagination and foster learning.
1. Call to order
Board of Trustees Special Meeting
November 13, 2013, 4 pm
AGENDA
Ann Henry Board Room
Brenda Boudreaux, Secretary
Suzanne Clark
11. New business
A. Health Insurance Decision
B. Master Plan Phase 11
C. Possible partial/full dosing December 15
D. Board Retreat
E. Budget 2014
111. Adjournment
Susan Graham
Charles Adams
FAYETTEVILLE PUBLIC J I RARY
Memo
To: Fayetteville Public Library Board of Trustees
Through: David Johnson, Executive Director
From: Stephen Davis, Accounting & HR Manager
CC: Fayetteville Public Library Management Staff
Date: 11/12/2013
Re: 2014 Preliminary Draft Budget
Summary
Fayetteville Public Library's (FPL) draft budget is attached for Board review. This budget continues the
migration toward a departmental budget presentation perspective. This budget development method will
provide departmental managers with more comprehensive financial information and is a continuation of the
budget/financial management changes initiated during 2012.
The 2014 Budget presents a number of financial challenges that will need to be addressed in a financially
sustainable manner. The key impacts on the Library's budget are:
• Continuing to provide high quality library materials and programming services that are responsive to
our library patrons;
• Addressing the needs identified in the 2013 Master Plan process;
• Maintaining state-of-the-art technology tools that meet the needs of the community;
• Providing resources that complement instructional programs through the Fayetteville School District
and other K-12 schools within Fayetteville; and,
• Assimilating the City Hospital property into the FPL annual budget.
Revenue
FPL's revenues for 2014 are predicted to be $4,007,801. The table below compares Library revenues from
2012 through 2014.
Revenue/Year
2012 Budget
2013 Budget
2014 Budget
O•eratin• Revenue
372,576
416,565
428,400
Transfers
3,405,918
3,585,701
3,579,401
Total
3,778,494
4,002,266
4,007,801
1
The primary change in operating revenue has been the FINRA Grant that was awarded in late 2012 and is to
be completed by the 2nd quarter 2015. This grant has had a corresponding increase in materials and
programming services for this same period.
Transfers change from 2012 through 2014 is from increasing the transfer from the Foundation for NEH
programming and reducing the Unrestricted Transfer for Library Operations. This reduction was necessary
because the Foundation has agreed to transfer $2.0 million from Unrestricted Capital Campaign Funds to FPL
to purchase the City Hospital property. This unrestricted transfer will be suspended for the next several years.
FPL has sufficient operations & maintenance reserves that can be accessed to offset this transfer reduction.
During 2013, the Foundation transferred $117,536 from Unrestricted Capital Campaign investments to FPL for
operations expenses.
The overall conclusion is that operating revenues for the Library have been relatively flat for the past several
years while program attendance and materials circulation has grown significantly.
Expenses
The following table provides an overview of FPL's operating expenses from 2012 through 2014.
Expense Category/Year
2012 Budget
2013 Budget
2014 Budget
Personnel Services
2,392,468
2,556,370
2,573,670
Library Services
594,926
701,362
853,426
Information Technology
249,000
260,743
142,900
Administrative Supplies
69,200
68,900
33,575
Administrative Services & Charges
335,249
342,125
465,221
Building, Landscape & Equipment
Maintenance
203,270
188,500
167,700
Capital & Depreciation
68,655
66,500
21,500
Internal Transfers
0
-79,500
-158,000
Original Budget
3,912,768
4,105,000
4,099,992
One -Time Expenses:
Master Plan Update
110,500
0
Financial & Donor Software
111,000
0
IT Purchases from 2012
40,946
0
Youth Services Copier
7,000
0
3D copiers
10,000
0
Sound System Upgrade
6,000
0
Marketing Canopy
1,000
0
Land
36,400
0
IT Capital
0
183,000
Facilities Capital
0
40,000
City Hospital Security &
Utilities
0
0
58,385
Revised Expense Budget
3,912,768
4,427,846
4,381,377
The able above illustrates that as that the Library nears the ten (10) year anniversary, building assets
purchased over the past few years are nearing the end of the planned and useful lives and require
replacement and/or greater maintenance expenses.
In 2010/2011 Library prepaid service contracts and database subscriptions all of which have cycled around for
renewal. The 2014 budget contains the annual cost for carpet cleaning, conveyor inspection and generator
inspection for an increased cost of approximately $45,000.
• Page 2
Revenue and Expense Comparison
Year
2012 Budget
2013 Budget
2014 Budget
Revenue
3,778,494
4,002,266
4,007,801
Expenses after Internal
Transfers
-3,912,768
-4,427,846
-4,381,377
Total
-134,274
-425,580
-373,576
Conclusion
This proposed budget is submitted for Board consideration and discussion. FPL's budget does not
have to be adopted until December so there is time for discussion.
® Page 3
October 29, 2013
Amendment #2
Contract Between
Fayetteville Public Library and Meyer, Scherer & Rockcastle, Ltd.
Dated February 21, 2013
for Master Plan of Library Services
The Fayetteville Public Library (Owner) and Meyer, Scherer & Rockcastle, Ltd. (Consultant) agree to
the following additions to the scope of work as defined in the Contract.
I . Concept Design
Prepare a concept design for the Fayetteville Public Library expansion as proposed in the Master
Plan, completed as part of the Contract, and approved by the Fayetteville Public Library Board of
Directors on October 28, 2013. This concept design will include:
.1. Exterior site development including access to and exiting from the site.
.2. Development of the parking requirements.
.3. Integration with the city planning recommendations for this district including the proposed arts
district along School Street.
.4. Recommendations for locations of all departments in the building.
.5. Recommendations for adjustments to existing functional arrangements as a result of the
proposed expansion.
.6. Concept design alternatives for the exterior that is integrated into the design of the existing
library.
.7. Refinement of the design based on public input.
.8. Preparation of a Statement of Probable Construction Costs that includes the concept
development for:
1.8.1. Mechanical, electrical, plumbing, heating and ventilations engineering systems
1.8.2. Structural systems
1.8.3. Architectural design
1.8.4. Furnishing, Fixtures and Equipment
2. Public Process
The Owner and the Consultant agree that it is in the best interest of the citizens of Fayetteville that
the design process be fully vetted, discussed and debated publicly.To this end, the Consultant will:
2.1. Prepare a preliminary set of alternatives for all work defined in Article 1.1-1.6 of Amendment
#2.
2.2. Conduct a five (5) public meetings. These meetings will be conducted to present, discuss and
refine the alternative design strategies.These public meetings will include a discussion of design
options and the related costs associated with these options.The purpose of this cost discussion
is to ensure the public are fully aware of the choices for the expansion and their associated
construction and operational costs.
2.3. Conduct two (2) public meetings to present the recommended design and the related
Statement of Probable Construction Costs.
Ar: hi tc:.'.:;.r:_
3. Deliverables
The Consultant will deliver to the Owner the following:
3.1. Statement of Probable Construction Costs
3.2. Statement of Probable Costs for Furnishings, Fixture and Equipment
3.3. Concept design, reflecting the public process, including site plan, elevations, plans (diagrammatic
without furnishings illustrated), sections, roof plan and two (2) fully rendered exterior views and
one (1) fully rendered interior perspective view.
4. Schedule
The Owner and the Consultant will cooperate to ensure a timely delivery of all deliverables in this
Amendment. Based on a preliminary understanding of the Owner's stated intentions regarding the
schedule, the Consultant has outlined below the estimated time required to complete the work. It
is noted that these steps may overlap; therefore the total completion time will not equal the sum of
all steps. The Owner reserves the right, however, to schedule these tasks non -sequentially as
necessary for the public process:
4.1. Step I: Concept Design Alternatives (Articles 1.1- I.6)
Twelve Weeks
4.2. Step 2: Public Process to Solicit Input (Articles Article 2.2)
Twelve Weeks
4.3. Step 3: Final Design and Statement of Probable Costs (Articles 1.7-1.8)
Twelve Weeks
4.4. Step 4: Public Process to Describe Recommendations and Budget (Article 2.3)
Eight Weeks
4.5. Step 5: Complete Documents (Article 3.1-3.3)
4 Weeks
5. Compensation
5.1. The Owner and the Consultant agree that the estimated costs for the professional work, as
defined in Articles 1 and 2 above are as shown in Exhibit A attached to this Amendment.
5.2. The Owner and the Consultant agree that this compensation will be paid on an hourly basis
with a cost not to exceed Two -Hundred and Fifty Thousand dollars and no cents ($250,000.00.)
5.3. Should the Owner require any additional duties associated with the detailed requirements of
the land acquisition, the Owner and the Consultant will discuss beforehand to reach a fair and
reasonable cost for professional services. An Amendment to the Agreement will be executed
before any additional work is commenced.
5.4. Reimbursable expenses will be invoiced at costs and are estimated to not exceed Fifteen
Thousand dollars and no cents ($15,000.00) . See Exhibit A for estimated expenses.
5.5. The hourly rates used to determined the compensation in Exhibit A are based on the
Consultant's billable rates for 2014.These rates will be adjusted annually on October 1, 2014 by
an increase of five (5) percent . Should the Owner wish to extend the schedule beyond
October I, 2014, the contract will be amended to include this increase for that portion of
hours that occur within the 2015 fiscal year (October 1, 2014 through September 30, 2015.)
V
Architecni-.
Interfax r...�
Urban uen:;n
esicn. cot
This AMENDMENT is entered into on the twenty-ninth day of October, 29 2013
On behalf of the OWNER
David Johnson, Director Fayetteville Public library
Jeffi-ey A Scherer, FAIA, Founding Principal, Meyer, Scherer & Rockcastle, Ltd.
Inte
Amendment #2 ExhibitA Schedule of Compensation
Task Person
Concept Design Principal 200 $205.00 $41,000.00
Designer 180 $126.00 $22,680.00
Principal 120 $174.00 $20,880.00
Interior 200 $90.00 $ 18,000.00
Intern (documentation) Intern 400 $88.00 $35,200.00
Public Meetings (7) Principal 168 $205.00 $34,440.00
Local Architect Liaison with City and consultants Architect 250 $115.00 $28,750.00
Mechanical, Electrical, Plumbing, Heating and Ventilation Engineering concept and narrative $10,000.00
Structural Engineering concept and narrative $7,500.00
Civil Engineering concept and narrative $5,000.00
Statement of Probable costs for construction $ 12,500.00
Statement of Probable costs for furnishings, fixtures and equipment $2,500.00
Professional Renderings (2 exterior and I interior) 3 $4,000.00 $12,000.00
Estimated total professional services $250,450.00
Agreed cost -not -to -exceed $250,000.00
Estimated Reimbursable Expenses # trips # Rate Total
Hotel for Scherer 7 3 $149.00 $3,129.00
Hotel for Larsen and Lesneski 2 4 $149.00 $1,192.00
Car Rental 7 3 $50.00 $1,050.00
Scherer Airfare MSP>XNA>MSP 7 1 $700.00 $4,900.00
Lesneski and Larsen Airfare MSP>XNA>MSP 2 2 $700.00 $2,800.00
Meals per Diem (Larsen, Lesneski) 4 2 $25.00 $200.00
Meals per Diem (Scherer) 7 3 $25.00 $525.00
Miscellaneous $1,200.00
Total $14,996.00
Hrs
Fee
Interior Design and Principal -in -charge
Hr<I'u teaJre
Inte,lo re; and
Urban oeagn
>r,