HomeMy WebLinkAbout2006-10-23 - Agendas - FinalTayelteyi;le
113 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 575-8267
AGENDA FOR A MEETING OF THE
PLANNING COMMISSION
Monday, October 23, 2006, 5:30 p.m.
Room 219, City Administration Building
ORDER OF PLANNING COMMISSION MEETING
A. Introduction of agenda item—Chairman
B. Presentation of Staff Report
C. Public Comment
D. Presentation of request — Applicant
E. Questions & Answer with Commission
F. Action of Planning Commission (Discussion & Vote)
NOTE TO MEMBERS OF THE AUDIENCE
If you wish to address the Planning Commission on an agenda item please queue behind the podium when
the Chairman asks for public comment. He will do this after the Planning Staff has presented the
application. Public comment will only be permitted during this part of the hearing for each item.
Once the Chairman recognizes you, go to the podium at the front of the room and give your name and
address. Address your comments to the Chairman, who is the presiding officer. He will direct them to the
appropriate appointed official, staff member or others for response. Open dialogue will not be permitted:
please ask any questions and answers will be provided once public comment has been closed. Please keep
your comments brief, to the point, and relevant to the agenda item being considered so that everyone
has a chance to speak.
Please, as a matter of courtesy, refrain from applauding or booing any speakers or actions of the Planning
Commission.
2006 Planning Commissioners
Jill Anthes
Lois Bryant
Candy Clark
James Graves
Hilary Harris
Audy Lack
Christine Myres
Alan Ostner
Sean Trumbo
aye evi;le
ARKANSAS
TENTATIVE AGENDA
113 W. Mountain SI.
Fayetteville, AR 72701
Telephone: (479) 575-8267
AGENDA FOR A MEETING OF THE
PLANNING COMMISSION
Monday, October 23, 2006, 5:30 p.m.
Room 219, City Administration Building
The following items will be considered:
Consent:
1. Approval of the minutes from the September 11, 2006 meeting.
2. ADM 06-2321 (Vantage Center PZD) Submitted by Jerry Kelso requesting an approval extension of
the mixed-use Planned Zoning District for a period of one year. Planner: Andrew Gamer
3. FPL 06-2192: Final Plat (ROCKHAVEN, 245): Submitted by STEADFAST, INC. for property
located east of SALEM RD., north of Crystal Springs Phase I. The property is zoned RSF-4, SINGLE
FAMILY - 4 UNITS/ACRE and contains approximately 10.00 acres. The request is for approval of a final
plat for a residential subdivision with 31 single family dwelling units. Planner: Suzanne Morgan
4. FPL 06-2260: Final Plat (STONEBRIDGE PHASE 5): Submitted by H2 ENGINEERING for
property located at GOFF FARM RD., E OF CRESCENT LAKE S/D. The request is to approve the final
plat of a residential subdivision with 70 single family lots. Planner: Jesse Fulcher
5. PPL 06-2280: Preliminary Plat (STEELE BUSINESS PARK, 173): Submitted by MCCLELLAND
CONSULTING ENGINEERS for property located at THE NE CORNER OF STEELE BOULDEVARD
AND VAN ASCHE DRIVE. The property is zoned C-2, THOROUGHFARE COMMERCIAL and
contains approximately 22.75 acres. The request is for 5 commercial lots ranging in size from 1.7 to 7.35
acres. Planner: Andrew Garner
6. VAC 06-2290: (GRUBBS, 248): Submitted by RICHARD L. GRUBBS for property located at LOT 6,
BLOCK 1 OF THE NORTHPOINT S/D ON POINT CIRCLE. The property is zoned C-2,
THOROUGHFARE COMMERCIAL. The request is to vacate a portion of a utility easement on the
subject property. Planner: Jesse Fulcher
Old Business:
7. LSD 06-2265: Large Scale Development (MAYNARD, 717): Submitted by MILHOLLAND COMPANY for
property located at SE WILLOUGHBY AND MCCOLLUM. The property is zoned 1-1, HEAVY
COMMERCIAL/LIGHT INDUST and contains approximately 2.95 acres. The request is for extended development,
grading and entrance paving for an existing industrial use structure. Planner: Suzanne Morgan
THE APPLICANT HAS REQUESTED THIS ITEM BE TABLED INDEFINITELY
8. R-PZD 06-2196: Planned Zoning District (WEST FORK PLACE, 565/566): Submitted by
PROJECT DESIGN CONSULTANTS, INC for property located at THE END OF RAY AVENUE, S OF
HUNTSVILLE ROAD. The property is zoned RSF-4, SINGLE FAMILY - 4 UNITS/ACRE and contains
approximately 13.92 acres. The request is for a Master Development Plan of a Residential Planned Zoning
District with 59 single-family dwellings: 30 attached and 29 detached. Planner: Jesse Fulcher
New Business:
9. ADM 06-2322: (North Street ROW Dedication Variance): Submitted by Josh and Eloise Pettit for
property located at 1104 N. COLLEGE AVENUE requesting a variance of the Master Street Plan right-of-
way for North Street in the manner indicated to allow the existing building footprint to remain within the
right-of-way and additions to the building which will further encroach within the Master Street Plan right-
of-way. Planner: Suzanne Morgan
10. VAC 06-2289: (ARCHER, 442): Submitted by CRAFTON TULL & ASSOCIATES for property
located at THE W END OF MARKHAM, W OF SANG. The property is zoned C-PZD, COMMERCIAL
PLANNED ZONING DISTRICT. The request is to vacate a portion of a right-of-way on the subject
property. Planner: Andrew Gamer
11. R-PZD 06-1884: Planned Zoning District (WESTSIDE VILLAGE, 439): Submitted by TODD
JACOBS, CRITICAL PATH DESIGN for property located at SOUTH OF WEDINGTON, EAST OF
RUPPLE ROAD. The property is zoned RMF -24, MULTI FAMILY - 24 UNITS/ACRE and contains
approximately 21.91 acres. The request is for a rezoning and large scale development approval for a
Residential Planned Zoning District with 352 attached dwelling units and 74,255 square feet of non-
residential and mixed use space. Planner: Andrew Garner
12. R-PZD 06-2107: Planned Zoning District (CHAMPION'S CLUB CONDOS, 599): Submitted by
CRAFTON, TULL & ASSOCIATES for property located at SW CORNER OF RAZORBACK RD. AND
15TH STREET, E OF THE CROWNE APTS. The property is zoned I-1, HEAVY COMMERCIAL/
LIGHT INDUSTRIAL, and contains approximately 4.20 acres. The request is for Master Development
Plan rezoning and land use approval for a Residential Planned Zoning District 4 -story condominium
building with 144 residential units. Planner: Andrew Gamer
13. CUP 06-2284: (CALYPSO PROPERTIES, 595): Submitted by CALYPSO PROPERTIES for
property located at 4170 W. SIXTH STREET. The property is zoned R -O, RESIDENTIAL OFFICE and
contains approximately 2.95 acres. The request is for a restaurant in the R -O, Residential Office, Zoning
District. Planner: Suzanne Morgan
14. RZN 06-2291: (HWY 16 ANIMAL HOSPITAL, 567): Submitted by JORGENSEN &
ASSOCIATES for property located at 2805 E. HUNTSVILLE RD. The property is zoned RSF-1,
Residential Single-family - 1 unit/acre, R -A, Residential Agricultural, and C-1, Neighborhood Commercial,
and contains approximately 3.46 acres. The request is to rezone the subject property to C-1,
Neighborhood Commercial. Planner Suzanne Morgan
15. ADM 06-2252 (Future Land Use Map): Discussion of the Future Land Use Map for the City of
Fayetteville. Planner: Karen Minkel
16. ADM 06-2323 (Urban Residential Design Standards): Discussion of Urban Residential Design
standards for staff to prepare an ordinance regarding the same. Planner: Karen Minkel
All interested parties may appear and be heard at the public hearings. A copy of the proposed amendments and other pertinent data
are open and available for inspection in the office of City Planning (575-8267), 125 West Mountain Street, Fayetteville, Arkansas. All
interested parties are invited to review the petitions. Interpreters or TDD for hearing impaired are available for all public hearings; 72
hour notice is required. For further information or to request an interpreter, please call 575-8330.
ARKANSAS
THE CITY OF FAYETTEVILLE, ARKANSAS
PLANNING DIVISION CORRESPONDENCE
TO: Fayetteville Planning Commission
FROM: Andrew Garner, Senior Planner
THRU: Jeremy Pate, Director of Current Planning
DATE: October 19, 2006
PC Meeting of October 23, 2006
125 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 575-8267
ADM 06-2321 (Vantage Center PZD) Submitted by Jerry Kelso requesting an approval extension
of the mixed-use Residential Planned Zoning District development (R-PZD 05-1543) for aperiod of
one year.
Property Owner: VANTAGE CENTER, LLC
Planner: ANDREW GARNER
BACKGROUND
Project Description: The project site contains approximately 4.68 acres located at the end of
Shepard Lane in northern Fayetteville between Frontage Road and Stearn Street. The approved
Residential Planning Zoning District/Large Scale Development for this site consists of the
construction of four mixed use buildings containing 26,932 square feet of commercial retail and 76.
multi -family units.
Background: The original Residential Planned Zoning District/Large Scale Development for the
project was approved on October 4, 2005. The owner's representative has stated that construction of
the project has been delayed in order for the owner to wait and determine how successful the
Southern View Phase II project will be. The Southern View Phase II project is an almost identical
project under the same ownership on the other side of Fayetteville. It is on schedule to be completed
within the next several months. After completion of that project the owner will be able to determine
whether or not to move forward with the Vantage Center PZD.
Proposal: The applicant requests to extend the approval of the development approval ofR-PZD 05-
1543 for one year, to expire on October 4, 2007. Should this extension be granted, all permits are
required to be issued before the one-year extended deadline. If the permits are not issued prior to
October 4 2007, all of the approved development plans for the project shall be rendered null and
void.
K:1Reports120061PC Reports110-23-061ADM06-2321 (Vantage Center PZD).doc
October 23, 2006
Planning Commission
ADM 06-2321 Vantage Center PZD
Agenda Item 2
Page 1 of 6
RECOMMENDATION
Planning Staff recommends approval of ADM 06-2277, the requested extension for the development
approval of R-PZD 05-1543, with the following conditions:
1. The applicant shall be allowed until October 4, 2007 to receive all required building permits.
If all permits have not been received by this time, the Large Scale Development approval
shall be revoked.
2. All other conditions of approval for the project shall remain applicable.
DISCUSSION
The City of Fayetteville Unified Development Code (UDC) Section 166.20(b) gives the Planning
Commission authority to extend approval of a planned zoning district one additional year from the
original approval. In order to extend this approval, the applicant must: (1) request the extention prior
to the one year time limit, and (2) show good cause why the tasks could not reasonably be completed
within the normal one year. If the one year extension is granted, it is within this time that the
applicant shall receive all permits and approvals as required by City, State, and Federal regulations to
start construction of the development or project.
(1) The applicant has submitted the extension request to the Planning Division on October 2,
2006, prior to the one year time limit ending on October 4, 2006.
(2) The applicant has stated that market conditions and project feasibility have delayed this
project for now, but that they plan to be able to fully evaluate the decision to move forward
in the following year.
KkReportsl20061PC Reports110-23-061ADM06-2321 (Vantage Center PZD).doc
October 23, 2006
Planning Commission
ADM 06-2321 Vantage Center PZD
Agenda Item 2
Page 2 of 6
CHAPTER 166: DEVELOPMENT
166.20 Expiration Of Approved Plans
And Permits
(A) Applicability. The provisions of this
section apply to all of the following plans
and permits:
(1) Preliminary plats;
(2) Planned zoning district developments;
(3) Conditional uses;
(4) Large-scale developments;
(5) Lot splits;
(6) Physical alteration of land permits;
(7) Storm water, drainage, and erosion control
permits;
(8) Tree preservation plans;
(9) Sign permits; and,
(10) Floodplain development permits.
(B) One-year time limit.
(1) Tasks to be completed. All of the above -
enumerated plans and permits are
conditioned upon the applicant
accomplishing the following tasks within
one (1) year from the date of approval:
(a) For any renovation or new
construction, receive a building
permit; and/or,
(b) For a lot split, record a deed or
survey at the Washington County
Circuit Clerk's Office,
stamped for recordation by the City
Planning Division; and/or,
(c) Receive a Certificate of Zoning
Compliance; and/or,
(d) Receive all permits and approvals
required by City, State, and Federal
regulations to start construction of
the development or project.
(2) Extensions. Prior to the expiration of the
one (1) year time limit, an applicant may
request the Planning Commission to
extend the period to accomplish the tasks
by up to one (1) additional year. The
applicant has the burden to show good
cause why the tasks could not reasonably
be completed within the normal one (1)
year limit.
Expiration. If the required task(s) are not
completed within one (1) year from the
date of approval or during an allowed
extension period, all of the above -
enumerated plans and permits shall be
rendered null and void.
(C) Three-year time limit.
K:IReports120061PC Reports110-23-06IADM06-2321 (Vantage Center PZD).dac
(1) Tasks to be complete. All of the above -
enumerated plans and permits are also
conditioned upon the applicant completing
the project and receiving final inspection
approval and/or a final Certificate of
Occupancy permit within three (3) years
from the date of issuance of a Building
Permit.
(2) Extensions. Prior to the expiration of the
three (3) year time limit, an applicant may
request the Planning Commission to
extend the three (3) year period to
complete the project by up to two (2)
additional years. The applicant has the
burden to show good cause why the
project could not reasonably be completed
within the three (3) year time limit.
(3)
Expiration. If the applicant fails to meet
the requirements of subsection (C)(1)
within three (3) years from the date of
issuance of a Building Permit or during an
allowed extension period, all of the above -
enumerated plans and permits, shall be.
rendered null and void.
October 23, 2006
Planning Commission
ADM 06-2321 Vantage Center PZD
Agenda Item 2
Page 3 of 6
4:1‘ 44) Crafton, TuII & Associates, Inc.
engineers & surveyors
October 2nd, 2006
Mr. Jeremy Pate
City of Fayetteville
113 W. Mountain St.
Fayetteville, AR 72701
RE: Sterns Street PZDNantage Center PZD
LSDP Extension
CTA Job No. 021131-01
Dear Jeremy:
historical preservation II
government •
public works M
healthcare ■
residential •
education IN
parks, sports & recreation .
transportation •
industrial
commercial Ng
On behalf of Lindsey Management Company, we are requesting a 1 -year
time extension of the Large Scale Development Plan/PZD for the project. The
PZD was approved on October 4, 2005. As you are aware Southern View Phase
II is the same type development and it is under construction.
The intent is to get that project built, and determine how successful this
product will perform. Sometime next year Lindsey Management company should
be able to determine that, and feel good about moving forward with Sterns Street
PZD.
Please let me know if you have any questions or need any additional information.
Very Truly Yours,
Grafton, Tull & Associates, Inc.
erry Kelso, P.E.
Vice President
ZZL sesue
October 23, 2 txu
Planningm
�Commis, a
www .49M f"aY*f d iqn� toXgend Item 2�
Page 4 of 6
FORD OIL_
Legend
MEER RPZD05-1543 °-°,T,OsxrlaYOlsmn— FLOODWAY ----- 500 YEAR
— 100 YEAR — — LIMIT OF STUDY
— — - BaseLiae ProMe
D Fayetteville
1 -I oaelaecry
0 75 150 300 450 600
Feet
October 23, 200€
Planning Commissior
ADM 06-2321 Vantage Center PZC
Agenda Item
RPZD05-1543
One Mile View
VANTAGE CENTER
IAKeVIEW OR_
iLAKE FAFAYYEETTEVILLE
SUBJECT PROPERTY
RMF -12
i1�F��
c
11 \ \ �"� /
�
'�,_ � �.T2ELE L�U
' \'D -e 4115 D0. - RIvgTE9247 ° ti
Wi
P %
C-2
yr. Cyta,.
'^4
ioyeE_: w4 C1 G2 .
IeYC B vo-
-24
-24
R-0
24 _,. \ R-tl : I
RSF4_
RSF-4
Overview
Legend
Subject Property
RPZ005-1543
R-0:-RSE4_
Boundary
Planning Area
soggy,
ce.cc o Overlay District
Outside City
Legend
0 0.129.25 0.5 0.75 1
M
ile,$M
October 23, 2006
Planning Commission
06-2321 Vantage Center ?ZD
A3roci^ 4r m 2
Page 6 of 6
ARKANSA
C1TY OF FAYETTEVILLE, ARKANSAS
PLANNING DIVISION CORRESPONDENCE
TO: Fayetteville Planning Commission
FROM: Suzanne Morgan, Current Planner
Matt Casey, Assistant City Engineer
THRU: Jeremy Pate, Director of Current Planning
DATE: October 17, 2006
PC Meeting of October 23, 2006
125 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 575-8267
FPL 06-2192: Final Plat (ROCKHAVEN, 245): Submitted by STEADFAST, INC. for
property located east of SALEM RD., north of Crystal Springs Phase I. The property is zoned
RSF-4, SINGLE FAMILY - 4 UNITS/ACRE and contains approximately 10.00 acres. The
request is for approval of a final plat for a residential subdivision with 31 single family dwelling
units. Planner: Suzanne Morgan
Findings:
Property & Proposal: The subject property contains approximately 10 acres located east of
Salem Road. The property is zoned RSF-4 and is located north of Crystal Springs, Phase 1. ,The
applicant requests approval of a final plat for a 31 single family lot subdivision.
Surrounding Land Use and Zoning•
Direction from Site
Land Use
Zoning
North
Single Family Subdivision
Planning Area
South
Single Family Subdivision
RSF-4
East
Vacant
Planning Area
West
Single Family Residential
Planning Area
Water and Sewer System: Water and sewer have been extended to serve the development.
Adjacent Master Street Plan Streets: West — Salem Road (Collector) — existing;r. r:
Right-of-way to be dedicated: The applicant shall dedicate 35' right-of-way from centerline for
Salem Road and a total 70' right-of-way for a collector street through this property.
Street Improvements: The applicant was required to widen Salem Road 14' from centerline with
a 6' sidewalk at the right-of-way line with all other improvements to comply with Master Street
Plan requirements.
Connectivity: The applicant has indicated street connections to Salem Road. The Collector
street through the property will connect with the infrastructure to be installed within Cobblestone
Subdivision.
K:IReparts120061PC Reports110-23-061FPL 06-2192 (Rockhaven).doc
October 23, 2006
Planning Commission
FPL 06-2192 Rockhaven
Agenda Item 3
Page 1 of 8
Parks:
• PRAB recommended accepting money in lieu of land for 35 single family units on April
4, 2005 due to its proximity to the future Salem Meadows Park.
• Since that time, the number of units has decreased to 31 single family, therefore, fees are
due in the amount of $17,205 prior to signing final plat.
• Please update the signature block to read "...complies with section 166.03 (K)...."
Tree Preservation: Existing: 3.42%
Preserved: 3.42%
Required: 3.42%
Mitigation: All trees have been preserved with the development of this
subdivision. No mitigation is required.
Recommendation: Staff recommends approval of FPL 06-2192 with the following conditions:
Conditions of Approval:
1. Planning Commission approval for a waiver of installation of sewer service. A change
was made in the construction plans that would allow this subdivision to connect to the.
proposed sanitary sewer system in the Cobblestone Subdivision. This connection would
be a much better setup for the City of Fayetteville to maintain than the original plan.
Plans are complete and the off-site sewer work is scheduled to begin construction after
approval from the Arkansas Department of Health. An easement for this work will need
to be filed and a bond for 150% of the construction cost will need to be submitted prior to
filing the final plat. No Certificate of Occupancy shall be issued and no meter shall be
set for any dwelling unit within the subdivision until sewer has been constructed and
accepted by the city Engineering Division.
The Subdivision Committee recommended approval of a waiver for installation of
sewer service: -
Sidewalks along Salem Road and the detention lot (#16) shall be constructed (not
guaranteed) prior to recordation of the final plat. All other required sidewalks shall be
installed or guaranteed prior to recordation of the final plat.
3. The lot reserved for detention shall be an unbuildable lot and owned and maintained by
the P.O.A.
4. Payment of $17,205 for 31 additional single family units in lieu of dedication of parkland
shall be contributed by the developer prior to final plat.
5. Subdivision area signage shall be permitted in accordance with applicable city codes.
6. Street lights (a total of 5 lights) shall be installed or guaranteed with a maximum
separation of 300 feet along all streets prior to final plat recordation.
7. The applicant shall submit for final plat review comments by Planning and Engineering
Staff from the City prior to application of signatures. The revisions to be addressed prior
K:IReports12006 PC Reports110-23-061FPL 06-2192 (Rockbaven).dac
October 23, 2006
Planning Commission
FPL 06-2192 Rockhaven
Agenda Item 3
Page 2 of 8
to signatures include the following:
a. Coordinate with staff to remove ancillary notes from the plat in order to provide
additional clarity.
b. Add addresses to the plat: The applicant shall coordinate and receive approval by the
911 coordinator for all street names and addresses.
c. Please update the signature block to read "...complies with section 166.03 (K)..."
d. Include a note that all retaining walls shall be set back a minimum of 2 feet from the
right of way or sidewalk. All retaining wall construction shall be on the building
permit and have the approval of the City Engineer.
e. Move "Kenwood Hills Subdivision" from within the signature blocks to just above
the north property line of the subdivision.
f. Remove the street lines intersecting the signature blocks for water and sewer, etc. and
the shaded improvement area on Salem Road (it could be mistaken for a sidewalk).
g. Modify the city limit line within the vicinity map.
h. Add the following note to the plat: No Certificate of Occupancy shall be issued and
no meter shall be set for any dwelling unit within the subdivision until sewer has been
constructed and accepted by the city Engineering Division.
Standard Conditions of Approval:
8. Plat Review and Subdivision comments (to include written staff comments provided to
the applicant or his representative, and all comments from utility representatives - AR
Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications).
Staff approval of final detailed plans, specifications and calculations (where applicable)
for grading, drainage, water, sewer, fire protection, streets (public and private),
sidewalks, parking lot(s) and tree preservation. The information submitted for the plat
review process was reviewed for general concept only. All public improvements are
subject to additional review and approval. All improvements shall comply with City's
current requirements.
10.,, All overhead electric lines under 12Kv shall be relocated underground. All proposed
utilities shall be located underground.
11.
Submit a digital copy of the approved final plat on CD to the Planning Division.
Additional conditions:
Planning Commission Action: O Approval O Denied El Tabled
Meeting Date: October 23, 2006
Comments:
The "Conditions of Approval" listed in the report above are accepted in total without exception
by the entity requesting approval of this development item.
Signature Date
K:IReports120061PC Reports110-23-061FPL 06-2192 (Rockhaven).doc
October 23, 2006
Planning Commission
FPL 06-2192 Rockhaven
Agenda Item 3
Page 3 of 8
PC Meeting of October 23, 2006
THE CITY OF FAYETTEVILLE. ARKANSAS
TREE PRESERVATION and PROTECTION REPORT
To: Fayetteville Subdivision Committee
From: Sarah K. Patterson, Urban Forester
Date: October 17, 2006
113 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 444-3470
ITEM #: PPL 05-1740: Preliminary Plat (Rockhaven)
Requirements Submitted:
Canopy Measurements:
acres
10
square feet
435,600
acres
0.34
square feet
14,879
percent of site area
3.42%
acres
0.34
square feet
14,879
percent of total site area
3.42%
3.42%
All trees have been preserved with the development of this subdivision. No
mitigation is required.
October 23, 2006
Planning Commission
FPL 06-2192 Rockhaven
Agenda Item 3
Page 4 of 8
Initial Review with the Landscape Administrator
T
Site Analysis Map Submitted
T
Site Analysis Written Report Submitted
T
Complete Tree Preservation Plan Submitted
Canopy Measurements:
acres
10
square feet
435,600
acres
0.34
square feet
14,879
percent of site area
3.42%
acres
0.34
square feet
14,879
percent of total site area
3.42%
3.42%
All trees have been preserved with the development of this subdivision. No
mitigation is required.
October 23, 2006
Planning Commission
FPL 06-2192 Rockhaven
Agenda Item 3
Page 4 of 8
TT
V
ARKANSAS
THE CITY OF FAYETTEVILLE, AR
SAS
113 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 444-3469
TO: Suzanne Morgan, Associate Planner
FROM: Alison Jumper, Park Planner
DATE: October 10, 2006
SUBJECT: Parks & Recreation. Subdivision Committee Review Comments
************************
Meeting Date: October 12, 2006
Item: FPL 06-2192 (Rockhaven, 245)
Park District: NW
Zoned: RSF-4
Billing Name & Address: Olika Investments P.O. Box 4427 Fayetteville, AR 72702
Land Dedication Requirement
Single Family @ .024 acre per unit =
Multi Family @ .017 acre per unit =
Mobile Home _@ .024 acre per unit =
Lot Split
COMMENTS:
acres
acres
acres
Money in Lieu
35 @ $555 per unit = $19,425
@ $393 per unit = $
@ $555 per unit = $
@ $555 per unit = $
• PRAB recommended accepting money in lieu of land for 35 single family units on April
4, 2005 due to its proximity to the future Salem Meadows Park.
■ Since that time, the number of units has decreased to 31 single family, therefore, fees are
due in the amount of $17,205 prior to signing final plat.
• Please update the signature block to read "...complies with section 166.03 (K)...."
FPL 06-2192
October 23, 2006
Planning Commission
FPL 06-2192 Rockhaven
Agenda Item 3
Page 5 of 8
FPL06-2192
Close Up View
ROCKHAVEN
SUBJECT PROPERTY
GYPSUMR .—.—"-------� GYPSUMDR'
Overview
Legend
®000 ° Overlay District — FLOODWAY --- 500 YEAR
— 100 YEAR --- LIMIT OF STUDY
— — - BaseLine Profile
O Fayetteville
I Outside City
Eas FPL06-2192
vectorGDB.Footprint2004
® Hillside-Hiliop Overlay District
0 125 250
500 750 - 1,000
Feet
October 23, 2006
Planning Commission
FPL 06-2192 Rockhaven
A.enda Item 3
age . o •
' L_. d� lI� {''7iSF2'-P=ty
WI z' i —.
SF -4h 11 r t i - '.PTI
-RSF) I-._� r. __ __ _
-te-ital. -tft - RSF-1
Overview
Legend
Subject Property
FPL06-2192
Boundary
Planning Area
000000 Overlay District
Outside City
0 0.25 0.5
Legend
Hillside -Hilltop Ch
1
erlay District
iles
October 23, '4"
Planning Commissio006
FPL 06-2192 Rockhavenn
rigeriva nem 3
Page 7 of 8
October 23, 2006
Planning Commission
FPL 06-2192 Rockhaven
Agenda Item 3
Page 8 of 8
aynevile
ARKANSAS
THE CITY OF FAYETTEVILLE, ARKANSAS
PLANNING DIVISION CORRESPONDENCE
PC Meeting of October 23, 2006
125 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 575-8267
TO: Fayetteville Planning Commission
FROM: Jesse Fulcher, Current Planner
Matt Casey, Assistant City Engineer
THRU: Jeremy Pate, Director of Current Planning
DATE: October 16, 2006
FPL 06-2260: Final Plat (STONEBRIDGE MEADOWS PHASE V, 607): Submitted by H2
ENGINEERING for property located at GOFF FARM RD., E OF CRESCENT LAKE S/D. The
property is zoned RSF-4, SINGLE FAMILY - 4 UNITS/ACRE and contains approximately
87.86 acres. The request is to approve the final plat of a residential subdivision with 70 single-
family lots.
Planner: Jesse Fulcher
Findings:
Background: On August 8, 2005, the Planning Commission approved the preliminary plat for
Stonebridge Meadows Phase V with 70 single-family lots and one (1) R -A lot containing a
portion of the golf course. As approved, an assessment was due for street improvements along
Lot 71 which is a part of the Stonebridge Meadows Golf Course, prior to signing the final plat
document. On October 9, 2006 the applicant brought forward a request to the Planning
Commission to modify the condition of approval requiring the street improvement assessment.
Subsequently, the Planning Commission approved the modification based on the
recommendation of the City Engineering Division; finding that the requirement for curb and
gutter, storm drainage and sidewalks would not meet the rough proportionality for the demand on
infrastructure placed by this phase of the project. Rather, a 24' road section is to be provided
along Lot 71 for safe vehicular travel on Goff Farm Rd.
Proposal: The applicant requests approval of a final plat for Phase V of Stonebridge Meadows
containing 70 single-family lots, with Lot 71 to remain as the golf course.
Subdivision Committee October 12, 2006: The applicant requested that the item be forwarded to
the full Planning Commission, so that a waiver of Chapter 158.01, Guarantees In -lieu of Installed
Improvements could be reviewed. This would allow continued processing and approval for the
final plat and would require the developer to bond for any incomplete improvements (including
the improvements to Goff Farm Road), at 150% of the cost approved by the City Engineering
Division.
K:\Reporis)2006\PC Reports\ 0-23-06\FPL 06-2260 (Stonebridge Ph V).doc
October 23, 2006
Planning Commission
FPL 06-2260 Stonebridge Meadows PhV
Agenda Item 4
Page 1 of 14
Surrounding Zoning and Uses:
Direction
Land Use
Zoning
North
Golf Course
R -A
South
Single Family (Stonebridge Meadows)
RSF-4
East
Golf Course
R -A
West
Crescent Lake Subdivision
RSF-4
Water & Sewer: Water and sanitary sewer have been extended to serve this development.
Right-of-way being dedicated: 50' of right-of-way for Spy Glass Hill, 40' of right-of-way for
Pebble Beach Drive and Spanish Bay Place, 35' from centerline for Goff Farm Road.
Park land: The Parks and Recreation Advisory Board accepted park land dedication of 1.68
acres for 70 single-family lots. A warranty deed for parkland dedication is required prior to
signing the final plat document.
Tree Preservation: 321 (2) inch caliper large species trees will be required to be planted on-
site and a bond, letter or credit, or check in the amount of $ 80,250 deposited with the City of
Fayetteville before signature of Final Plat. This monetary amount will be held for a 3 year period
which at the end the Urban Forester will inspect the 321 trees. Finding 90% or better healthy, the
amount is released.
Recommendation: Staff recommends approval of FPL 06-2260 with the following conditions:
Conditions of Approval:
1. Planning Commission determination of a waiver request of Chapter 158.01 Guarantees
In -lieu of Installed Improvements, to allow the applicant to bond for the street widening
of Goff Farm Road to a 24' section and full improvements including curb and gutter,
storm drainage and sidewalks to a portion of Lot 71 located between Lot 70 of
Stonebridge Phase V and Lot 33 of Stonebridge Phase I. Said improvements shall be
installed and inspected prior to issuance of a building permit, with the bond/guarantee of
150% of the approved cost due prior to signing the final plat.
All required improvements along Lots 1, 30-36 and 70 shall be installed, not guaranteed,
prior to signing of the final plat. Sidewalks shall be installed or guaranteed for all other
lots, prior to recordation of the final plat.
An assessment in the amount of $36,668.92 shall be required for the Deadhorse Mountain
Road bridge assessment area prior to signing the final plat.
3. 321 (2) inch caliper large species trees will be required to be planted on-site and a bond,
letter or credit, or check in the amount of $ 80,250 deposited with the City of Fayetteville
before signature of Final Plat. This monetary amount will be held for a 3 year period
which at the end the Urban Forester will inspect the 321 trees. Finding 90% or better
healthy, the amount is release&
K:\Reports\2006\PC Reports\I0-23-06\FPL 06-2260 (Stonebridge Ph V)-doc
October 23, 2006
Planning Commission
FPL 06-2260 Stonebridge Meadows PhV
Agenda Item 4
Page of 14
4. Subdivision area signage shall be permitted in accordance with applicable city codes.
Right-of-way shall be dedicated by this plat as follows:
a. 50' for Spy Glass Hill
b. 40' for Pebble Beach Drive and Spanish Bay Place
c. 35' from centerline for Goff Farm Road
6. Lot 72 shall be deeded to the City of Fayetteville prior to signing the final plat.
Streetlights shall be installed or guaranteed with a maximum separation of 300 feet along all
street rights-of-way prior to final plat. Provide a receipt from the electric company indicating
proof of payment for these lights to Planning staff prior to signing the final plat.
8. A deed for the park land dedication of 1.68 acres for this subdivision must be received by the
Parks and Recreation Division prior to signing the final plat.
The applicant shall submit for final plat review comments by Planning and Engineering Staff
prior to application of signatures.
a. Indicate the centerline of Goff Farm Road and dimension the right-of-way for all
streets on both pages.
b. Provide drainage easements a minimum of 10' from the center of the drainage pipes
on Lots 31, 47, 57 and 58.
Standard Conditions of Approval:
10. Plat Review and Subdivision comments (to include written staff comments provided to
the applicant or his representative, and all comments from utility representatives - AR
Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications)
11. Staff approval of final detailed plans, specifications and calculations (where applicable)
for grading, drainage, water, sewer, fire protection, streets (public and private), sidewalks,
parking lot(s) and tree preservation. The information submitted for the plat review
process was reviewed for general concept only. All public improvements are subject to
additional review and approval. All improvements shall comply with City's current
requirements.
12. Submit a digital copy of the approved final plat on CD to the Planning Division.
13. All street names and addresses shall be approved by the 9-1-1 Coordinator.
14. All overhead electric lines under 12Kv shall be relocated underground. All proposed
utilities shall be located underground.
Planning Commission Action: ❑ Approved ❑ Tabled ❑ Denied
K:\Reports\2006\PC Reports\I 0-23-06WPL 06-2260 (Stonebridge Ph V).doc
October 23, 2006
Planning Commission
FPL 06-2260 Stonebridge Meadows PhV
Agenda Item 4
Page 3 of 14
Motion:
Second:
Vote:
Date: October 23, 2006
The "CONDITIONS OF APPROVAL", stated in this report, are accepted in total without
exception by the entity requesting approval of this development item.
By
Title
Date
K:\Reports\2006\PC Reports \10-23-06\FPL 06-2260 (Stonebridge Ph V).doc
October 23, 2006
Planning Commission
FPL 06-2260 Stonebridge Meadows PhV
Agenda Item 4
Page 4 of 14
THE CITY OF FAYETTEVILLE, ARKANSAS
PC Meeting of October 23, 2006
TREE PRESERVATION and PROTECTION REPORT
113 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 444-3470
To: Fayetteville Planning Commission
From: Sarah K. Patterson, Urban Forester
Date: October 17, 2006
ITEM #: FPL 06-2260: Final Plat (Stonebridge Meadows Phase V)
Requirements Submitted:
Canopy Measurements:
Initial Review with the Landscape Administrator
T
Site Analysis Map Submitted
T
Site Analysis Written Report Submitted
T
Complete Tree Preservation Plan Submitted
Canopy Measurements:
1. With the original approval of this preliminary plat the applicant was required to
plant 401 (2) inch caliper large species trees on-site for mitigation
purposes. Since this time the applicant has requested to utilize the on-site
October 23, 2006.
Planning Commission
FPL 06-2260 Stonebridge Meadows PhV
Agenda Item 4
Page 5 of 14
acres
87.86
square feet
3,827,18
8.94
{2
acres
square feet
389,473
percent of site area
1o%
acres
6.722
square feet
292,852
percent of total site area
8
erc�m1-a®w ®
e
io%
1. With the original approval of this preliminary plat the applicant was required to
plant 401 (2) inch caliper large species trees on-site for mitigation
purposes. Since this time the applicant has requested to utilize the on-site
October 23, 2006.
Planning Commission
FPL 06-2260 Stonebridge Meadows PhV
Agenda Item 4
Page 5 of 14
mitigation incentive and lower the requirement by 20%. The Urban Forester has
approved this option due to the size constraints and trees required.
2. 321 (2) inch caliper large species trees will be required to be planted on-site
and a bond, letter or credit, or check in the amount of $ 80,250 deposited with
the City of Fayetteville before signature of Final Plat. This monetary amount will
be held for a 3 year period which at the end the Urban Forester will inspect the
321 trees. Finding 90% or better healthy, the amount is released.
October 23, 2006
Planning Commission
FPL 06-2260 Stonebridge Meadows PhV
Agenda Item 4
Page 6 of 14
THE CITY OF FAYETTEVILLE, ARKANSAS
113 W. Mountain St.
Fayetteville, AR 72701
Telephone: (479) 444-3469
TO:
FROM:
DATE:
SUBJECT:
Suzanne Morgan, Associate Planner
Alison Jumper, Park Planner
October 10, 2006
Parks & Recreation Subdivision Committee Review Comments
**************************:****************************************************
Meeting Date:
Item:
Park District:
Zoned: RSF-4
Billing Name & Address: Meadows Enterprises
October 12, 2006
FPL 06-2260 Stonebridge Meadows Phase V
SE
Land Dedication Requirement
Single Family 70@ .024 acre per unit = 1.68 acres
Multi Family @ .017 acre per unit = acres
Mobile Horne @ .024 acre per unit = acres
Lot Split
COMMENTS:
Money in Lieu
@ $555 per unit = $
@ $393 per unit = $
@$555 per unit =$
@ $555 per unit = $
■ PRAB recommended accepting a land dedication to meet the requirements of this
development. This land will be adjacent to Eagle park, expanding its overall acreage to
approximately 7.27 acres.
• A deed for the land has been received but must be re-recorded with the final plat of
Stonebridge Meadows Phase 4. The deed encompasses the land requirement for both
Phases 4 and 5.
FPL06---3
October 23, 2006
Planning Commission
FPL 06-2260 Stonebridge Meadows PhV
Agenda Item 4
Page 7 of 14
Jesse Futcher Stonebridge 5
From: Matt Casey
To: Fulcher, Jesse
Date: 10/11/06 8:12AM
Subject: Stonebridge 5
Jesse,
Can you add the following to the conditions of approval for this project?
Lot 72 will need to be deeded to the City of Fayetteville for the lift station.
Provide drainage easements a minimum of 10' from the center of the drainage pipes on lots 30,
21,22,20,19,31,47,57,58,9 and 10.
Thanks,
Matt
Page 1 i
October 23, 2006
Planning Commission
FPL 06-2260 Stonebridge Meadows PhV
Agenda Item 4
Page 8 of 14
ENGINEERING, INC.
October 2, 2006
City of Fayetteville
Planning Department
113 West Mountain Street
STONEBRIDGE MEADOWS PHASE 5
GOFF FARM ROAD IMPROVEMENTS APPEAL
Dear Staff:
Please consider this correspondence as an official appeal to the Planning Commission, to
reconsider the condition of approval for Stonebridge Meadows Phase 5 Preliminary Plat
regarding the improvements to Goff Farm Road along lot 71 and the related assessment for the
cost of curb and gutter, storm drain, and sidewalk. The condition states that Goff Farm Road be
widened to 16 feet from centerline, along lot 71. We are requesting that this widening be
modified to reflect that Goff Farm Road be widened to 24 feet total width. This is the standard
driving width for the other improvements along Goff Fami Road excluding curb and gutter. The
current width of the road along lot 71 is 22 feet. The total length of the improved width along lot
71 is estimated to be 1500 feet.
We are also requesting that the assessment for curb, gutter, storm drain and sidewalk be
eliminated entirely. The condition of approval regarding the assessed amount was left open
ended and the minutes of the meeting infer that the need for, and the amount of, the assessment
be left entirely up to the City Engineer. Based on a conversation I had with the City Engineer the
afternoon of the Planning Commission meeting, I was under the impression that staff's
recommendation was that curb, gutter, storm drain, and sidewalk would not required at this time,
and as long as the adjacent golf course was in use would not be required at all. If the golf course
were to ever close and the property was to develop that those improvements would be required
by the developer at the time of development.
Additionally, we are requesting that we be allowed to bond for whatever improvements
are required. This would allow for the fmal plat to be approved and recorded while the
improvements are being done.
Thank you for your consideration in this matter.
Sincerely,
Thomas A. Hennelly,_P.E.
President
October 23, 2006
2758 Millennium Drive Suite 1 Fayetteville, Arkansas 72703 Phone: 479.582.4234 Fax: 479u5 2 92i n
FPL 06-2260 Stonebridge ea ow_s rnV
Agenda Item 4
Page 9of14
ENQINEERINQ. INC.
ENGINEER'S ESTIMATE
Stonebridge Meadows, Phase V
Goff Farm Road 2' Widening
2758 Millennium Drive, Fayetteville, AR 72703
Phone 479-582-4234 Fax 479-582-9254
Date: 2 -Oct -06
Item
No.
Unit
Description of Item
Planned
Quantity
Unit
Price
Extended
Amount
1
LS
Mobilization
1
$ 5,000.00
$ 5,000.00
2
LS
Clear & Grub / Demo of Ex St
1
$ 5,500.00
$ 5,500.00
3
LF
Saw -Cut Edge of Ex. Pavement
1,500
$ 2.50
$ 3,750.00
4
CY
Undercut & Haul Off
333
$ 9.00
$ 2,997.00
5
SY
Streets(a1.8"/3"
333
$ 27.50
$ 9,157.50
6
LF
Replace 6" AC W.L. w/ 8" P.V.C.
0
$ 60.00
$
7
LF
Curb and Gutter (Includes Goff Farm Rd)
1,500
$ 9.50
$ 14,250.00
8
CY
Select Fill (Red Hillside)
333
$ 13.50
$ 4,495.50
9
EA
Flared End Sections
2
$ . 150.00
$ 300.00
10
EA
Inlet Boxes
5
$ 2,500.00
$ 12,500.00
11
EA
4' Extensions
15
$ 450.00
$ 6,750.00
12
LF
18" CMP
800
$ 32.00
$ 25,600.00
13
LF
18" RCP
28
$ 45.00
$ 1,260.00
14
LF
24" CMP
400
$ 35.00
$ 14,000.00
15
EA
Bond / Insurance
1
$ 8,000.00
$ 8,000.00
16
LF
Silt Fence
2,488
$ 3.00
$ 7,464.00
17
EA •
Hay Bales
50
$ 7.00
$ 350.00
18
LF
Tree Preservation Fencing
300
$ 2.50
$ 750.00
19
LF
6' Sidewalk
1,500
$ 17.00
$ 25,500.00
20
CY
Rock - Storm Drainage
200
$ 150.00
$ 30,000.00
21
LS
Clean Up/ Final Grade
1
$ 5,000.00
$ 5,000.00
22
LS
Testing
1
$ 7,500.00
$ 7,500.00
SUBTOTAL
$ 190,124.00
CONTINGENCY
10.00%
$ 19,012A0
TOTAL
$ 209,136.40
Constructed Amount (as requested w/ this appeal 10-2-06)
Assessed Amount (Per P.C. Condition of Approval 8-2-05)
qq 71 R�py�q 3, 2006
n
FPL 06-2141131 fL� tigg a MeadowswisPhV
D ge PhV
Agenda Item 4
Page 10 of 14
ENOINEER/NC. INC.
ENGINEER'S ESTIMATE
Stonebridge Meadows, Phase V
Goff Farm Road 14' from CL
between Ph V & PH 1
2758 Millennium Drive, Fayetteville, AR 72703
Phone 479-582-4234 Fax 479-582-9254
Date: 17 -Oct -06
Item
No.
Unit
Description of Item
Planned
Quantity
Unit
Price
Extended
Amount
1
LS
Clear & Grub / Demo of Ex St
1
$ 3,000.00
$ 3,000.00
2
LF
Saw -Cut Edge of Ex. Pavement
170
$ 2.50
$ 425.00
3
CY
Undercut & Haul Off
55
$ 9.00
$ 495.00
4
SY
Streetse.8"/3"
60
$ 27.50
$ 1,650.00
5
LF
Curb and Gutter (Includes Goff Farm Rd)
170
$ 9.50
$ 1,615.00
6
CY
Select Fill (Red Hillside)
55
$ 13.50
$ 742.50
7
EA
Bond / Insurance
1
$ 2,000.00
$ 2,000.00
8
LF
Silt Fence
170
$ 3.00
$ 510.00
9
LF
6' Sidewalk
170
$ 17.00
$ 2,890.00
10
LS
Clean Up/ Final Grade
1
$ 2,000.00
$ 2,000.00
11
LS
Testing
1
$ 1,500.00
$ 1,500.00
SUBTOTAL
$ 16,827.50
CONTINGENCY
10.00%
$ 1,64225
$ 18,510.25
TOTAL
October 23, 2006
Planning Commission
FPL 06-2260 Stonebridge Meadows PhV
Agenda Item 4
Page 11 of 14
Legend
po=- 0 en yD' tri 1 ROODWAY — 500 YEAR PPL05-160TH- _ — 100 YEAR --- UNIT OF STUDY
– – - BaseLine Profile
O Fayetteville
1-1 Oubide City
1 1 Wash Co ParnIs (Fayetteville)
0100200 400 600 800
—��–�'— Feet
October 23, 2006
Planning Commission
FPL 76-2260 Stonebridge Meadows PhV
Agpnrin Ifnm n
Page 12 of 14