Loading...
HomeMy WebLinkAbout2005-05-09 - Agendas - FinalARKANSAS TILE CITY OF FAYETTEVILLE, ARKANSAS 125 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 AGENDA FOR A MEETING OF THE PLANNING COMMISION Monday, May 9, 2005, 5:30 p.m. Room 219, City Administration Building The following items will be considered: Approval of Minutes from the April 25, 2005 meeting Consent Agenda: 1. ADM 05-1506: (Wal-Mart Optical PZD): Submitted by Todd Jacobs of CEI Engineering Associates, Inc. on behalf of Wal-Mart Stores, Inc. for property located at 2314 W 6th Street. The property is zoned I-PZD, INDUSTRIAL PLANNED ZONING DISTRICT, and is in the DESIGN OVERLAY DISTRICT. The request is to extend the approval of the Planned Zoning District for a period of one year. Planner: JEREMY PATE 2. ADM 05-1507: (Stonewood Gardens PZD): Submitted by Chris Brackett of Jorgensen & Associates on behalf of Stonewood Gardens for property located at the 4900 block of Crossover Road, N of Stonewood Subdivision. The property is zoned R-PZD, RESIDENTIAL PLANNED ZONING DISTRICT. The request is to extend the approval of the Planned Zoning District for a period of one year. Planner. JEREMY PATE 3. FPL 05-1477: Final Plat (RIVER HILLS, 569): Submitted by DAVE JORGENSEN for property located at E HWY 16, S OF THE DAVID LYLE S/D. The property is zoned R -O, RESIDENTIAL OFFICE and contains approximately 6.91 acres. The request is to approve the Final Plat of a residential subdivision with 18 single family lots proposed. Planner: JEREMY PATE New Business: 4. ADM 05-1497: Administrative Item: Outdoor Lighting Ordinance (formerly AD 01-15): Submitted by Long Range Planning as a proposal to add an Outdoor Lighting Ordinance to the Unified Development Code. Planner: LEIF OLSON 5. ADM 05-1505: Administrative Item: Botanical Gardens of the Ozarks: The request is for a major modification to the approved Large Scale Development (LSD 04-1078) for the Botanical Gardens. Planner: SUZANNE MORGAN 6. ADM 05-1503: Administrative Item: Rupple Road R -O -W: A request to modify the conditions of approval for the subject project regarding right-of-way dedication. Planner: JEREMY PATE 7. PPL 05-1408: Preliminary Plat (CHERRY HILLS STD, 282/243): Submitted by MCCLELLAND CONSULTING ENGINEERS for property located at THE W SIDE OF HUGHMOUNT RD., N TO LIERLY LANE. The property is in the Planning Area and contains approximately 75.85 acres. The request is to approve the preliminary plat for a residential subdivision with 195 single family lots proposed. Property Owner: JOHN & JEANNIE ARMSTRONG Submitted on behalf of: RIC GRAY Planner: SUZANNE MORGAN 8. CUP 05-1474: Conditional Use Permit (ZAXBY'S, 521): Submitted by WILLIAM RUDASILL for property located at NE CORNER 6TH ST. AND LEWIS. The property is zoned C-2, THOROUGHFARE COMMERCIAL & R -O, RESIDENTIAL OFFICE and contains approximately 1.15 acres. The request is to permit a restaurant within the R -O Zoning District. Property Owner: GLOBE CEO, LLC Planner: JEREMY PATE 9. CUP 05-1475: Conditional Use Permit (CHRISTIAN LIFE CATHEDRAL, 213): Submitted by DAVE JORGENSEN for property located at 1147 E MILLSAP RD. The property is zoned R -O, RESIDENTIAL OFFICE and contains approximately 0.90 acres. The request is to allow a church in an R -O Zoning District. Planner: SUZANNE MORGAN 10. RZN 05-1479: Rezoning (WIMBERLY, 368): Submitted by DAVID & SALLY WIMBERLY for property located at 155 E ELM STREET. The property is zoned RSF-4, SINGLE FAMILY - 4 UNITS/ACRE and contains approximately 0.26 acres. The request is to rezone the subject property to R -O, Residential Office. Property Owner: TIM BRISIEL Planner: SUZANNE MORGAN 11. ANX 05-1451: (LANE, 571): Submitted by MEL MILHOLLAND for property located at THE END OF COUNTRY RIDGE ROAD, N OF HWY 16E, W OF DEERFIELD WAY. The property is in the Planning Area and contains approximately 24.191 acres. The request is to annex the subject property into the City of Fayetteville. Property Owner: FORREST & MODYNE LANE Planner: SUZANNE MORGAN 12. RZN 05-1452: (LANE, 571): Submitted by MEL MILHOLLAND for property located at THE END OF COUNTRY RIDGE, N OF 16E AND W OF DEERFIELD WAY. The property is zoned R -A, Residential Agricultural, and C-1, Neighborhood Commercial and contains approximately 30.872 acres. The request is to rezone the subject property to RSF-4, Residential Single Family, 4 units per acre. Property Owner: FORREST & MODYNE LANE Planner: SUZANNE MORGAN 13. ANX 05-1470: Annexation (PHILLIPS/BAGGETT, 571): Submitted by MICHELE, A HARRINGTON for property located at 5150 AND 5270 E HUNTSVILLE RD. The property is in the Planning Area and contains approximately 29.59 acres. The request is to annex the subject property into the City of Fayetteville. Planner: SUZANNE MORGAN 14. RZN 05-1471: Rezoning (PHILLIPS/BAGGETT, 571): Submitted by MICHELE, A HARRINGTON for property located at 5150 AND 5279 E HUNTSVILLE RD. The property is zoned R -A, RESIDENTIAL - AGRICULTURAL and contains approximately 36.99 acres. The request is to rezone the subject property to RSF-4, Residential Single-family, 4 units per acre. Planner: SUZANNE MORGAN 15. ADM 05-1504: Administrative Item: PZD Ordinance Revision Planner: JEREMY PATE All interested parties may appear and be heard at the public hearings. A copy of the proposed amendments and other pertinent data are open and available for inspection in the office of City Planning (575-8267), 125 West Mountain Street, Fayetteville, Arkansas. All interested parties are invited to review the petitions. Interpreters or TDD for hearing impaired are available for all public hearings; 72 hour notice is required. For further information or to request an interpreter, please call 575-8330. ORDER OF PLANNING COMMISSION MEETING A. Introduction of agenda item — Chairman B. Presentation of Staff Report C. Presentation of request — Applicant D. Public Comment E. Response by Applicant/Questions & Answer with Commission F. Action of Planning Commission (Discussion & Vote) NOTE TO MEMBERS OF THE AUDIENCE If you wish to address the Planning Commission on an agenda item raise your hand when the Chairman asks for public comment He will do this after he has given Planning Commission members the opportunity to speak and before a final vote is taken. Public comment will only be permitted during this part of the hearing for each item. Once the Chairman recognizes you, go to the podium at the front of the room and give your name and address. Address your comments to the Chairman, who is the presiding officer. He will direct them to the appropriate appointed official, staff member or others for response. Please keep your comments brief, to the point, and relevant to the agenda item being considered so that everyone has a chance to speak. Please, as a matter of courtesy, refrain from applauding or booing any speakers or actions of the Planning Commission. 2005 Planning Commissioners Nancy Allen Jill Anthes Candy Clark James Graves Christine Myres Alan Ostner Audy Lack Sean Trumbo Christian Vaught Celle ARKA N5 A'5 THE CITY OF FAYETTEVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE TO: Fayetteville Planning Commission FROM: Jeremy Pate, Director of Current Planning DATE: May 03, 2005 PC Meeting of May 09, 2005 125 W. Mountain Si Fayetteville, AR 72701 Telephone: (479) 575-8267 ADM 05-1506: (Wal-Mart Optical PZD): Submitted by Todd Jacobs of CEI Engineering Associates, Inc. on behalf of Wal-Mart Stores, Inc. for property located at 2314 W 6th Street. The property is zoned I-PZD, INDUSTRIAL PLANNED ZONING DISTRICT, and is in the DESIGN OVERLAY DISTRICT. The request is to extend the approval of the Planned Zoning District for a period of one year. Planner: JEREMY PATE BACKGROUND Project Description: The subject property is located on 6th Street, east of I-540 within the Design Overlay District, and consists of Wal-Mart Optical Lab, Tractor Supply and the Arkansas State Unemployment Center. It is a fully developed site, constructed many years ago, prior to many of the city's current ordinance requirements. Background: The property was approved for a rezoning and large scale development approval as I-PZD 04-05.00 by ordinance 4507 on May 04, 2004. The City Council unanimously passed the ordinance to redesign the existing parking lot to gain parking spaces, bring the property up to code with regard to landscaping and greenspace within the Design Overlay District, right-of-way dedication per the Master Street Plan and construction of a six-foot sidewalk along 6th Street. The applicant subsequently submitted construction plans for building permit review. However, in the process of estimating construction costs, specifically with regard to retrofitting the existing light poles to meet Design Overlay District requirements, the developers realized that replacing the poles is more cost-effective. In doing so, the parking lot could be redesigned and striped even more in accordance with city codes, complying with typical drive aisle widths, circulation routes and space sizes. Before, the existing poles in large part determined the location of aisles and parking spaces. The applicant subsequently requested and gained approval to revise the approved I-PZD development plans to replace the existing poles with new ones and increase the parking spaces from 285 to 307 through a more efficient code -compliant design. The Subdivision Committee approved this modification unanimously on February 17, 2005. The applicant has submitted all required construction plans, cost estimates and draft warranty deeds to obtain building permit approvals for construction for the subject property. However, permits were not able to obtained prior to the deadline of May 04, 2005. As mentioned in the submitted letter, the scope of the project has been altered in the last year, additional costs K:IReports120051PCReports105-09-051ADM 05-1506 (Wal-Mart Optical PZD Extension).doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.1 required approvals from Wal-Mart and additional review by city staff. To date, there are three outstanding items to gain approval of the required permits: finalized warranty deeds for adjacent rights-of-way, performance bonds for all public improvements (landscaping and sidewalks), and a pre -construction meeting with city staff prior to construction. Proposal: The applicant requests to extend the approval of the Planned Zoning District development plans for one year, to expire on May 04, 2006. All permits to begin construction are required to be obtained prior to the one-year deadline, measured from the date of final approval. If this is not possible, the Unified Development Code allows for a one-time extension request to be made to the Planning Commission, if submitted prior to this deadline. Should this extension be granted, all permits are required to be issued before the one-year extended deadline. RECOMMENDATION Planning Staff recommends approval of ADM 05-1506, the requested extension to the I-PZD 04- 05.00, with the following conditions: 1. The applicant shall be allowed until May 04, 2006 to receive all required permits to begin construction. If, at this time, all permits required have not been issued, appropriate actions to revoke the Planned Zoning District approvals shall be taken. 2. All other conditions of approval for the project shall remain applicable. DISCUSSION The Unified Development Code gives the Planning Commission authority to extend approval of a planned zoning district one additional year if the applicant requests the extention prior to the one year time limit and shows good cause why the tasks could not reasonably be completed within the normal one year. It is within this time that the applicant shall receive all permits and approvals as required by City, State, and Federal regulations to start construction of the development or project. The applicant's representative states in the attached letter that due to the change in scope and additional costs associated with the change of plans, all permits have not been obtained within the one-year time frame. No ordinance amendments that would potentially affect this project have been passed since the City Council approval of the subject I-PZD 04-05.00. The UDC allows a three year period from the date of issuance of a permit to the receipt of a final Certificate of Occupancy for completion of the project. IC IReports120051PC Reports105-09-051ADM 05-1506 (Wal -Man Optical PZD Extension).doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.2 CHAPTER 166: 166.20 Expiration Of Approved Plans And Permits (A) Applicability. The provisions of this section apply to all of the following plans and permits: (1) Preliminary plats; 27n; se di R0:int (3) (4) (5) (6) (7) Conditional uses; Large-scale developments; Lot splits; Physical alteration of land permits; Storm water, drainage, and erosion control permits; (8) Tree preservation plans; (9) Sign permits; and, (10) Floodplain development permits. (B) One-year time limit. (1) Tasks to be completed. All of the above - enumerated plans and permits are conditioned upon the applicant accomplishing the following tasks within one (1) year from the date of approval: (a) For any renovation or new construction, receive a building permit; and/or, (b) For a lot split, record a deed or survey at the Washington, County Circuit Clerk's Office, stamped for recordation by the City Planning Division; and/or, Receive a Certificate of Zoning Compliance; and/or, Receive all permits and approvals required by City, State, and Federal regulations to start construction of the development or project. (c) (d) DEVELOPMENT be completed within the normal one (1) year limit. Expiration: If the required task(s) are not completed within one (1) year from the date of approval or during an allowed extension period, all of the above - enumerated plans and permits shall be rendered null and void. (C) Three-year time limit. (1) Tasks to be complete. All of the above - enumerated plans and permits are also conditioned upon the applicant completing the project and receiving final inspection approval and/or a final Certificate of Occupancy permit within three (3) years from the date of issuance of a Building Permit. (2) Extensions. Prior to the expiration of the three (3) year time limit, an applicant may request the Planning Commission to extend the three (3) year period to complete the project by up to two (2) additional years. The applicant has the burden to show good cause why the project could not reasonably be completed within the three (3) year time limit. (3) Expiration. If the applicant fails to meet the requirements of subsection (C)(1) within three (3) years from the date of issuance of a Building Permit or during an allowed extension period, all of the above - enumerated plans and permits; shall be rendered null and void. (2) Extensions. Prior to the expiration of the one (1) year time limit, an applicant may request the Planning Commission to extend the period to accomplish the tasks by up to one (1) additional year. The applicant has the burden to show good cause why the tasks could not reasonably K:1Reports120051PC Reports105-09-051ADM 05-1506 (Wal-Mart Optical PZD Extension).doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.3 I Jeremy Pate-PermitExtenslon pdt _ Page 1 = �® CEI Engineering Associates, Inc. 3317 SW "1" Street • P.O. Box 1408 • Bentonville, AR 72712-1408 • (479) 273-9472 • (479) 273-0844 May 4, 2005 City of Fayetteville Office of City Planning Division 125 West Mountain Street Fayetteville, Arkansas 72701 Attn: Jeremy Pate Director of Planning Ref.: Wal-Mart Optical Center/Lab 2314 S.W. 6" Street Fayetteville, Arkansas Dear Mr Pate: This letter is to request an extension for the Wal-Mart Optical Lab of the official approval date of May 4, 2004 . We are unable to meet the deadline due to a number of reasons. 1) The scope of this project as changed several times during the past year. CEI has revised plans to reflect a new site layout, which require additional city approvals and second submittal for Building Permit review. 2) The revised construction plans did incur additional cost which had not been anticipated and required approved by Wal-Mart. 3) The revised construction plans increased the amount of landscaping which required a new cost estimate be submitted to the city for approval. There are three outstanding items left to complete. 1.. Warranty Deed's. - Wal-Mart will have these completed and signed by the end of the week. 2. Performance Bond — Wal-Mart is currently having the bonds processed and will be ready the first week of May 9, 2005. 3. Pre -construction meeting with city officials. All parties involved have spent a great amount of time on this project. We hope the extension is granted in order to start summer construction of the site improvements. Respec y bmitt Todd Jacobs Project Man CALIFORNIA • TEXAS • ARKANSAS • TENNESSEE • MINNESOTA • PENNSYLVANIA • GEORGIA • FLORIDA May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.4 THE CITY OF FAYETTEVILLE, ARKANSAS ADM 05-1402 Page 1 SC Meeting of February 17, 2005 PLANNING DIVISION CORRESPONDENCE TO: Subdivision Committee Members FROM: Jeremy Pate, Director of Current Planning DATE: February 15, 2005 125 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 ADM 05-1402: Administrative Item (I-PZD 04-05.00: Wal-Mart Optical Lab/Hwy 62W, pp 559): Submitted by Todd Jacobs of CEI Engineering Associates, Inc. on behalf of Wal-Mart Stores, Inc. for property located at 2314 W 6th Street. The property is zoned I-PZD, INDUSTRIAL PLANNED ZONING DISTRICT, and is in the DESIGN OVERLAY DISTRICT. The request is for a Major Modification to the approved site development plan for a realignment of parking spaces and landscaping in order to gain more net spaces. Planner: JEREMY PATE BACKGROUND Project Description: The subject property is located on 6th Street, east of I-540 within the Design Overlay District, and consists.of Wal-Mart Optical Lab, Tractor Supply and the Arkansas State Unemployment Center. It is a fullydeveloped site, constructed many years ago, prior to many of the city's current ordinance requirements: Background: The property was approved for a rezoning and large scale development approval as I-PZD 05-05.00 by ordinance 4507 on May 04, 2004. The City Council unanimously passed the ordinance to redesign the existing parking lot to gain parking spaces, bring the property up to code with regard to landscaping and greenspace within the Design Overlay District, right-of-way dedication per the Master Street Plan and construction of a six-foot sidewalk along 6th Street. The applicant subsequently submitted construction plans for building permit review. However, in the process of estimating construction costs, specifically with regard to retrofitting the existing light poles to meet Design Overlay District requirements, the developers realized that replacing the poles is more cost-effective. In doing so, the parking lot could be redesigned and striped even more in accordance with city codes, complying with typical drive aisle widths, circulation routes and space sizes. Before, the existing poles in large part determined the location of aisles and parking spaces. Proposal: The applicant requests to revise the approved I-PZD development plan with the following modifications: 1. Replace the existing poles with new poles that meet Design Overlay District requirements, with a maximum height of 35 feet, utilizing full cut-off fixtures of high pressure sodium or energy equivalent. 2. Increase, through more efficient design and more code -compliant configuration, the K.Vteports1200511C Reports102-17-054IDM05-1402 (Wal -Man Opticall-PZDJ.doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.5 ADM 05-1402 Page 2 allowed parking spaces from 285 total to 307 total parking spaces. DISCUSSION The proposed modifications to the approved Industrial Planned Zoning District large scale development plans have been determined as a major modification. In the event that a developer wishes to make major modifications to an approved development, such modifications shall be submitted to the Subdivisions Committee for approval or denial. At the time of Planning Commission recommendation to City Council (7-0) and City Council approval (7-0), no discussion was made regarding the parking ratio or number of parking spaces. Staff is comfortable with the ratio proposed, as a net loss of impervious surface is being achieved with a more efficient and code -compliant project. The net increase of parking spaces is 22, increasing the approved amount from 285 to 307. RECOMMENDATION Planning Staff recommends approval of the Major Modification with the following conditions: Conditions of Approval: 1. Submitted building permits shall be resubmitted with the proposed changes in order to continue the building permit review process. 2. The applicant shall comply with all conditions of approval of I-PZD 04-05.00. 3. The Planned Zoning District approval is valid for one year from the date of original approval, May 04, 2004. 4. Additional conditions: a. b. c. Subdivision Committee Action: Approval 0 Forwarded to P.C. Meeting Date: February 16, 2005 Comments: 3-0-o The "Conditions of Approval" listed in the report above are accepted in total without exception by the entity requesting approval of this development item. Signature K kRepornt20051SC Repons102-17-05WDM05-1402 (Wal -Man Optical-PZDJ.doc Date May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.6 ADM 05-1402 Page 3 CHAPTER 166: DEVELOPMENT 166.05 Large Scale Development (LSD) (F) Modifications. (1) Minor modifications. The Zoning and Development Administrator may authorize minor modifications in an approved Large scale development. Minor modifications shall include, but not be limited to, substitutions of one approved structural type for another or minor variations in placement of buildings in such a way that the overall limits of approved floor area, open space or rooms per acre are not increased. (2) Major modifications. In the event that a developer wishes to make major modifications to an approved development, such modifications shall be submitted to the Subdivisions Committee in a form which compares the approved submission with the desired changes. After submission, the Subdivision Committee shall approve or disapprove the requested modifications at its next meeting. K:lReports120051SC Reports102-17-0514DM 05-1402 (Wal -Man Optical 1-PZDJ.doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.7 _. IS a _ MIN aa - YaINII SI IS SYS SI —1 CEI Engineering Associates, Inc. 3317 SW "l" Street • P.O. Box 1408 • Bentonville, AR 72712-1408 • (479) 273-9472 • (479),273-0844 February 10, 2005 City of Fayetteville Office of City Planning Division 125 West Mountain Street Fayetteville, Arkansas 72701 Attn.: Jeremy Pate Ref.: Wal-Mart Optical Center 2314 S.W. 6th Street Fayetteville, Arkansas Dear Mr Pate: This letter accompanies our submittal of a revised Site Plan for proposed modifications to the above referenced facility. First, CEI originally designed the parking lot around the existing light poles to prevent the removal of said poles. However, to keep the poles and update them to current code would be more expensive - than removing them in exchange for new light poles. Thus, we propose the addition of new light poles. Second, the city has previously approved 285 parking spaces. This new proposed layout would increase the parking to 307 spaces, with a gain of 22 spaces. The proposed site layout modifications are represented on the Site Plan, which is submitted herein for your review and approval. Respectful 7i submitted, Todd Jacobs Project Manger May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.8 CALIFORNIA • TEXAS • ARKANSAS • TENNESSEE • MINNESOTA • PENNSYLVANIA • GEORGIA • FLORIDA FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE PC Meeting of April 12, 2004 113 W. Mountain St Fayetteville, AR 72701 Telephone: 501-575-8264 TO: Fayetteville Planning Commission FROM: Jeremy Pate, Associate Planner Matt Casey, Staff Engineer THRU: Dawn Warrick, A.I.C.P., Zoning & Development Administrator DATE: April 07, 2004 I-PZD 04-05.00: Industrial Planned Zoning District (Wal-Mart Optical.Lab/Hwy 62W, pp 559) was submitted by Todd Jacobs of CEI Engineering Associates, Inc. on behalf of Wal-Mart Stores, Inc. for property located at 2314 W 6th Street The property is zoned C-2, Thoroughfare Commercial, and is in the Design Overlay District. The request is to rezone the subject property to an I-PZD, Industrial Planned Zoning District, to allow a 979 sq.ft. addition to the Optical Lab building and revise the on-site parking. Planner: Jeremy Pate Background:: The applicant originally submitted a Large Scale Development to expand the existing Wal-Mart Optical Center, a manufacturer of lenses for glasses, located north of 6th Street, just east of I-540, within the Design Overlay District. The site was formerly a Wal-Mart retail store and has operated as the Wal-Mart Optical Center, with Tractor Supply Company and the Arkansas State Unemployment Center as accompanying uses, since the early 1990's. In subsequent meetings with city staff, it was determined that the most appropriate process to approve an expansion of this particular use, which is not allowed by right in the C-2, Thoroughfare Commercial zoning district, would be the Industrial Planned Zoning District. The existing building formerly housed the Wal-Mart retail store, a use that is permitted within the C-2 zoning district. The Wal-Mart retail store eventually relocated and in subsequent years permits were issued to remodel the structure for use as the Wal-Mart Optical Lab. Under current zoning ordinances, this use is only permitted in an industrial zoning district, such as I-1 or I-2. Therefore an expansion of said use requires a rezoning. However, the Future Land Use Plan identifies this site as a.Regional Commercial area. Furthermore, the applicant leases office and commercial/retail space at the present time, uses which are permitted by right in the current zoning district. Based on the variety of office, commercial and lab uses and the low -impact, commercially compatible nature of the Optical Lab use, staff recommended the applicant process an I-PZD, to expand the existing structure by 979 SF which will accommodate a new processing machine and to revise the parking lot layout. Rezoning to an I-PZD more appropriately fits the current use of the site to its zoning district. The applicant has indicated that a mixture of the current manufacturing/lab use, commercial uses and office space are to be allowed with the I- PZD. K:W.eports120041PC Reparts104-12-041f-PZD 04-05.00 (WalMart Optica[).doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.9 Proposal: The applicant requests to expand the existing Wal-Mart Optical Center by 979 square feet, and re -stripe the existing parking lot to more efficiently park employee and customer vehicles. The ratio of parking spaces that currently exist was originally determined by the retail use of the Wal-Mart store. With the addition of islands and greenspace net parking spaces actually decrease, however become more usable and efficient. The existing parking lot is nonconforming, in that it contains no landscape islands or other designated greenspaces The applicant has provided landscape islands throughout the site, to comply with the Parking Lot landscaping ordinance. Additionally, site improvements and added landscaping along the rights- of-way have brought the site into compliance with the 25% greenspace requirement and 25 feet of greenspace adjacent to 6th street right-of-way as required by the Design Overlay District. Parking lot lights are to be retrofitted to meet Design Overlay District requirements for full cut- off fixtures, shielded and directed downward away from adjacent properties, as well. The request is to approve a rezoning from C-2 to I-PZD 04-05.00, along with the associated development plans. Proposed Development: I-PZD, Industrial Planned Zoning District — Wal-Mart Optical Center *Approximately 110 employees per shift. * The applicant proposes 284 parking spaces, which is 70 spaces (33%) above the maximum number allowed by ordinance. However, the existing parking spaces number 323; with the reorganization of spaces to accommodate greenspace requirements, landscape islands, etc., the total number is actually decreased by 39 spaces. Proposed Uses: The applicant proposes to retain several use units within the I-PZD, including office, studio, neighborhood shopping goods, professional office, eating places, hotel and motel facilities, and manufacturing. Access: With the restriping of parking spaces and building expansion, the applicant is not proposing to change any points of access. Current access to the site includes curb cuts onto 6th Street, Old Farmington Road and Futrall Drive. The curb cut along Hwy 62 (6th Street) is to be modified and upgraded to comply with the maximum width of 39 feet allowed by ordinance. Existing Development: The site is currently comprised of three uses, the Wal-Mart Optical Center, Tractor Supply Company, and the Arkansas State Unemployment Office, along with associated parking for employees and customers, and display space. K: Repom120041PC Reportsl04-12-0411-PZD 04-0100 (Wahl/tart Optim¢doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.10 Land Use Square Feet Employee tis Parking Existing Parking Required Parking Requested Optical Center Manufacturing 44,387 SF *511 125 37 (1:1200 SF) Tractor Supply Commercial/Retail 24,465 SF 6-10 141 98 (1:250 SF) Employment Center Office 8,574 SF 6-10 57 29 (1:300 SF) Totals Mixed Use 77,426 SF 523-531 Spaces 164 Spaces (214 allowed w/30% overage) Spaces *Approximately 110 employees per shift. * The applicant proposes 284 parking spaces, which is 70 spaces (33%) above the maximum number allowed by ordinance. However, the existing parking spaces number 323; with the reorganization of spaces to accommodate greenspace requirements, landscape islands, etc., the total number is actually decreased by 39 spaces. Proposed Uses: The applicant proposes to retain several use units within the I-PZD, including office, studio, neighborhood shopping goods, professional office, eating places, hotel and motel facilities, and manufacturing. Access: With the restriping of parking spaces and building expansion, the applicant is not proposing to change any points of access. Current access to the site includes curb cuts onto 6th Street, Old Farmington Road and Futrall Drive. The curb cut along Hwy 62 (6th Street) is to be modified and upgraded to comply with the maximum width of 39 feet allowed by ordinance. Existing Development: The site is currently comprised of three uses, the Wal-Mart Optical Center, Tractor Supply Company, and the Arkansas State Unemployment Office, along with associated parking for employees and customers, and display space. K: Repom120041PC Reportsl04-12-0411-PZD 04-0100 (Wahl/tart Optim¢doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.10 Surrounding Land Use/Zoning: Direction Land Use Zoning North Fayetteville Schools P-1, Institutional South 6th Street (Hwy 62), Bank C-2, Thoroughfare Commercial East Blockbuster Video C-2, Thoroughfare Commercial West Futrall Drive, I-540 C-2, Thoroughfare Commercial Water & Sewer: Water and sewer lines are available to the site. Street Improvements Proposed: An existing curb cut is proposed to be modified to comply with the maximum 39 -foot width along 6th Street. Six-foot sidewalks are to be constructed along 6th Street, at the Master Street Plan right-of-way line. The Sidewalk Administrator has determined that sidewalks are not feasible and thus not recommended along Futrall Drive and Old Farmington Road. Adjacent Master Street Plan Streets: Futrall Drive (Collector), minimum of 35 feet from centerline; Old Farmington Road (Local), minimum of 25 feet from centerline, 6a' Street (Principal Arterial), minimum of 55 feet from centerline (dedication by warranty deed) Tree Preservation: All existing on-site trees are to be preserved. Design Overlay District: • Greenspace: The applicant has complied with the 25'greenspace requirement along 6th Street. Due to existing structures and required access drives for emergency vehicle access, staff is recommending all other street frontages remain as they currently exist, with the exception of the recommended trees along Old Farmington and Futrall Drive, per the Landscape Administrator's recommendation. • Signage: The applicant is not proposing additional signage. • Curb Cuts: The applicant is not proposing additional curb cuts. The applicant has provided curbs to contain greenspace along 6th street, and extended this off-site to the east, as well as the sidewalk, to connect to existing drives. Lighting: The applicant is indicating that all existing light poles will be retrofitted to comply with the requirements for full cut-off lighting fixtures that are shielded and directed downward to the parking lot and light spread not to reflect into the adjacent properties. Exterior appearance: Elevations havebeen submitted for all four sides of the building. The applicant is not proposing to modify the existing structure in any way, with the exception of the 979 SF expansion to the northwest of the site. The expansion is proposed to match the existing building. K.'IRepon812004IPC Reportsl04-12-0411--PZD 04-05.00 (Wa(Mart Optica/J.doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.11 • Building Material: The expansion is proposed to utilize the same materials as the existing structure, a painted CMU block with accessory trim. • Site Coverage: The existing site contains 19% greenspace. The applicant has provided 23,137 SF of additional greenspace to meet the minimum 25% greenspace requirement. • Fencing: Additional fencing is not proposed with this development. • Outdoor Storage: Outdoor display of merchandise for sale is allowed by right without screening. Any outdoor storage of materials that are not for sale requires appropriate screening. • Access: Pedestrian access is being provided with new 6 -foot sidewalks along 6th Street. The applicant is extending the sidewalk off-site to the east to provide a pedestrian connection to existing sidewalks, as well. Six bicycle racks are being provided within the development. Meetings: The applicant and/or representative has met with city staff on several occasions to discuss recommendations regarding site improvements and the development review process. The proposal was heard at Technical Plat Review on February 11, 2004, and at the Subdivision Committee meeting on March 11, 2004. Discussion centered around the location of landscape islands, providing additional uses within the I-PZD for future commercial development on this site and the decreased parking. Recommendation: Staff recommends I-PZD 04-05.00 be forwarded to the City Council with a recommendation for approval of the requested rezoning. Planning Commission approval of the proposed large scale development in association. with I-PZD 04-05.00 subject to the following conditions: Conditions of Approval: 1. Planning Commission recommendation to the City Council regarding the rezoning of the subject property to the unique district I-PZD 04-05.00 with all conditions of approval as determined by the Planning Commission. 2. Planning Commission determination of Commercial Design Standards for the building expansion. K:IReports120041PC Reparts104-12-04V-PZD 04-05.00 (WalMart Optica[).doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.12 All future additions, remodels and new construction for existing and proposed buildings shall comply with Commercial Design Standards and Design Overlay District requirements. - A minimum of 51% of the gross leasable floor area on the site shall be of industrial use, per the I-PZD ordinance requirements. Any less shall constitute a rezoning request. 5. All setbacks, protective easements, and designated uses are binding with the approval of the I-PZD. 6 Building permits and/or parking lot permits shall be issued for the construction of said plans within one (1) year of final approval, or revocation of the I-PZD approval, pursuant to City Code, shall be pursued. 7. The existing, illegal access to Futrall Drive shall be permanently closed and removed from public access. 8. An AHTD permit is required for any work done within the Highway Department right-of- way. 9. A six-foot sidewalk shall be constructed along 641 Street, Located at the right-of-way line, pursuant to the submitted and approved site plans. 10. Right-of-way shall be dedicated to meet Master Street Plan requirements, including that along 6th Street (55 feet from centerline), along Futral Drive (existing, minimum of 35 • feet from centerline) and along Old Farmington Road (25 feet from centerline). 11. All existing and future trash enclosures shall be screened with access not visible from the street, with materials compatible with and complimentary to those of the associated building. 12. All parking lot lights are to be shielded, directed downward and away from adjacent properties utilizing full cut-off sodium lighting fixtures. Standard Conditions of approval: 13. All mechanical/utility equipment shall be screened using materials that are compatible with and incorporated into the structure. 14. Plat Review and Subdivision comments (to include written staff comments provided to the applicant or his representative, and all comments from utility representatives - AR Western Gas, SWBT, Ozarks, SWEPCO, Cox Communications) 15. Staff approval of final detailed plans, specifications and calculations (where applicable) for grading, drainage, water, sewer, fire protection, streets (public and private), sidewalks, K IReports120041PC Reports104-12-04V-PZD 04-0500 (Wo[A4art Optical).doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.13 parking lot(s) and tree preservation. The information submitted for the plat review process was reviewed for general concept only. All public improvements are subject to additional review and approval. All improvements shall comply with City's current requirements. 16. Large scale development shall be valid for one calendar year. 17. Prior to the issuance of a building permit the following is required: a. Grading and drainage permits b. An on-site inspection by the Landscape Administrator of all tree protection measures prior to any land disturbance. c. Separate easement plat for this project that shall include the tree preservation area and all utility easements. d. Project Disk with all final revisions e. One copy of final construction drawings showing tree preservation and protection plans and detailed landscape plans submitted to the Landscape Administrator for approval. f Completion of all required improvements or the placement of a surety with the City (letter of credit, bond,escrow) as required by §158.01 "Guarantees in Lieu of Installed Improvements" to guarantee all incomplete improvements. Further, all improvements necessary to serve the site and protect public safety must be completed,not just guaranteed, prior to the issuance of a Certificate of Occupancy. a. Additional conditions: PLANNING COMMISSION ACTION: yes Required ✓ Approved Denied Date Apri112, 2004 fi-0-1 -4uvts mismwso The "CONDITIONS OF APPROVAL", beginning on page one of this report, are accepted in total without exception by the entity requesting approval of this development item. By Title Date KVtepom120041PC Reportsl04-12-0411-PZD 04-05.00 (WalMarnOpfical).doc May 09, 2005 Planning Commission ADM 05-1506 (Wal-Mart Optical PZD) Page 1.14 WAL-MART OPTICAL sSiocigiik Overview Legend ® 000a$ Overly DisIria Master Street Plan Master Street Plan Freeway/Expressway atom Pnnapal Medal — FLOODWAY i Mow Medal — IOO YEAR 1 Collector.. 500 YEAR • • • • tdslaic Collector --- LIMIT OF STUDY 17:1Gtytimils Outside C — — - Baseline Profile J 1-PZD04-05.00 0 125 250 750 1.000 Feet M 05 - May 09, 2005 Planning Commission 506 (Wal-Mart Optical PZD) Page 1.15 PRIVATE DR Legend Subject Property I-PZD04-05.00 Streets r Evstng jj Planed Boundary Planning Area 0 00043 0000000 Oveday District L _ _i City Limits Itta Outside City 0 0.1 02 OA Master Street Plan Freeway/Expressway 'Principal Mesal Minor Mere) Is, ♦Colletor •••• Historic Collector ADM 05- 0.6 0.8 Miles May 09, 2005 Planning Commission 506 (Wal-Mart Optical PZD) Page 1.16 11- m. Fano Regional Commercial:, ea, n2 k egional Commercial L Regi anal Commercial Overview Legend Boundary h_.. Planning Area �000� 000000_Overlay District L _ _I City Limits I I Outside City Subject Property l-PZD04-05.00 Streets Existing ."*" \ Planned 125 250 500 Master Street Plan Freeway/Expressway Principal Arterial Minor Arterial e •,. Collector •'•.. Historic CoH*UM 05-1 750 1.000 Feet . Nei0bbamood Cam %I jtegiopaf_Cgmrpeta Mix lc4NaC . _ . . 11n EsiV : May 09, 2005 Planning Commission 06 (Wal-Mart Optical PZD) Page 1.17 ev 4. e AR KA N 5 A5 THE CITY OF FAYETTEVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE TO: Fayetteville Planning Commission FROM: Jeremy Pate, Director of Current Planning DATE: May 03, 2005 PC Meeting of May 09, 2005 125 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8267 ADM 05-1507: (Stonewood Gardens PZD): Submitted by Chris Brackett of Jorgensen & Associates on behalf of Stonewood Gardens for property located at the 4900 block of Crossover Road, N of Stonewood Subdivision. The property is zoned R-PZD, RESIDENTIAL PLANNED ZONING DISTRICT. The request is to extend the approval of the Planned Zoning District for a period of one year. Planner: JEREMY PATE BACKGROUND Project Description: The subject property is located on Crossover Road, south of Albright Road, adjacent and to the north of Stonewood Subdivision. It contains 3.36 acres and is zoned R-PZD. Background: The property was approved for a rezoning and preliminary plat approval as R-PZD 04-04.00 by ordinance 4564 on May 04, 2004. The City Council passed the ordinance to rezone the property an allow for the development of 14 lots with 12 single family dwellings proposed. The applicant has submitted construction plans for review, received comments, and is currently undergoing the second review by the Engineering Division. Arkansas Health Department review and approval follows, and subsequently a pre -construction meeting with city officials before beginning construction. However, all permits to begin construction were not able to be obtained prior to the deadline of May 04, 2005. As noted in the attached letter, the construction review process is well under way and approvals from the city are expected within the next two weeks. Proposal: The applicant requests to extend the approval of the Planned Zoning District development plans for one year, to expire on May 04, 2006. All permits to begin construction are required to be obtained prior to the one-year deadline, measured from the date of final approval. If this is not possible, the Unified Development Code allows for a one-time extension request to be made to the Planning Commission, if submitted prior to this deadline. Should this extension be granted, all permits are required to be issued before the one-year extended deadline. RECOMMENDATION Planning Staff recommends approval of ADM 05-1507, the requested extension to the R-PZD 04-045.00, with the following conditions: 1. The applicant shall be allowed until May 04, 2006 to receive all required permits to begin K:IReports120051PC Reportsl05-09-051.1DM 05-1507 (Stonewood Gardens PZD Extension).doc May 09, 2005 Planning Commission ADM 05-1507 (Stonewood Gardens PZD) Page 2.1 construction. If, at this time, all permits required have not been issued, appropriate actions to revoke the Planned Zoning District approvals shall be taken. 2. All other conditions of approval for the project shall remain applicable. DISCUSSION The Unified Development Code gives the Planning Commission authority to extend approval of a planned zoning district one additional year if the applicant requests the extention prior to the one year time limit and shows good cause why the tasks could not reasonably be completed within the normal one year. It is within this time that the applicant shall receive all permits and approvals as required by City, State, and Federal regulations to start construction of the development or project. The applicant's representative states in the attached letter that due to the change in scope and additional costs associated with the change of plans, all permits have not been obtained within the one-year time frame. No ordinance amendments that would potentially affect this project have been passed since the City Council approval of the subject R-PZD 04-04.00. The UDC allows a three year period from the date of issuance of a permit to the receipt of a final Certificate of Occupancy for completion of the project. K:IReports120051PC Reports105-09-051ADM 05-1507 (Stonewood Gardens PZD Extension).doc May 09, 2005 Planning Commission ADM 05-1507 (Stonewood Gardens PZD) Page 2.2 CHAPTER 166: DEVELOPMENT be completed within the normal one (1) year limit. _ 166.20 Expiration Of Approved Plans And Permits (A) Applicability. The provisions of this section apply to all of the following plans and permits: (1) Preliminary plats; Si) .0 4LCt-(CG`SPS. (3) Conditional uses; (4) Large-scale developments; (5) Lot splits; (6) Physical alteration of land permits; (7) Storm water, drainage, and erosion control permits; (8) Tree preservation plans; (9) Sign permits; and, (10) Floodplain development permits. (B) One-year time limit. (1) Tasks to be completed. All of the above - enumerated plans and permits are conditioned upon the applicant accomplishing the following tasks within one (1) year from the date of approval: (a) For any renovation or new construction, receive a building permit; and/or, For a lot split, record a deed or survey at the Washington County Circuit Clerk's Office, stamped for recordation by the City Planning Division; and/or, (c) Receive a Certificate of Zoning Compliance; and/or, (d) Receive all permits and approvals required by City, State, and Federal regulations to start construction of the development or project. (2) Extensions. Prior to the expiration of the one (1) year time limit, an applicant may request the Planning Commission to extend the period to accomplish the tasks by up to one (1) additional year. The applicant has the burden to show good cause why the tasks could not reasonably K:IReports120051PC Reports105-09-05UDM 05-1507 (Stonewood Gardens PZD Extension).doc (b) Expiration. If the required task(s) are not completed within one (1) year from the date of approval or during an allowed extension period, all of the above - enumerated plans and permits shall be rendered null and void. (C) Three-year time limit. (i) Tasks to be complete. All of the above - enumerated plans and permits are also conditioned upon the applicant completing the project and receiving fmal inspection approval and/or a final Certificate of Occupancy permit within three (3) years from the date of issuance of a Building Permit. (2) Extensions. Prior to the expiration of the three (3) year time limit, an applicant may request the Planning Commission to extend the three (3) year period to complete the project by up to two (2) additional years. The applicant has the burden to show good cause why the project could not reasonably be completed within the three (3) year time limit. (3) Expiration. If the applicant fails to meet the requirements of subsection (C)(1) within three (3) years from the date of issuance of a Building Permit or during an allowed extension period, all of the above - enumerated plans and permits shall be rendered null and void. May 09, 2005 Planning Commission ADM 05-1507 (Stonewood Gardens PZD) Page 2.3 05/03/2004 08:31 FAX 47958247`7 JORGENSEN & ASSOC 1\ FAY PLAN/ENGR It?1002 JORGENSEN & ASSOCIATES CIVIL ENGINEERS • SURVEYORS 124 WEST SIINBRIDGE, SUITE 5 • FAYE11 hVILLE, ARKANSAS 72703 • (479) 442-9127 • FAX (479) 582-4807 DAVID L JORGENSEN, RE., RLS May 4, 2005 CHRISTOPHER B_ BRACKETT, P.E. City of Fayetteville 113 W. Mountain Street Fayetteville, AR 72701 Attn: Planning Department Re: Stonewood Gardens PZD On behalf of the owner of the above mentioned project, we would like to ask for an extension of the approval of this project. Construction documents have been prepared and they are currently being reviewed by the City Engineering Department. We expect to begin construction as soon has we are given approval from the City which we expect within the next couple weeks. Please call concerning any questions you may have. Thank you. Sincerely; Christopher B. Brackett, P.E. May 09, 2005 Planning Commission ADM 05-1507 (Stonewood Gardens PZD) Page 2.4 • STRUCTURAL DESIGN • LAND DEVELOPMENT • WATER SYSTEMS • WASTEWATER SYSTEMS • LAND SURVEYING • ORDINANCE NO. 4564 AN ORDINANCE ESTABLISHING A RESIDENTIAL PLANNED ZONING DISTRICT .TITLED R-PZD 04-04.00 LOCATED SOUTH OF ALBRIGHT ROAD AND NORTH OF THE STONEWOOD SUBDIVISION CONTAINING 3.36 ACRES MORE OR LESS; AMENDING THE OFFICIAL ZONING MAP OF THE CITY OF FAYETTEVILLE; AND ADOPTING THE ASSOCIATED RESIDENTIAL DEVELOPMENT PLAN AS APPROVED BY THE PLANNING COMMISSION BE IT ORDAINED BY THE CITY COUNCIL OF TILE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the zone classification of the following described property is hereby changed as follows: From R -O, Residential Office to R-PZD 04-04.00 as shown in Exhibit "A" attached hereto and made a part hereof Section2: That the change in zoning classification is based upon the approved master development plan and development standards as shown on the plat and approved by the Planning Conunission on March 22, 2004. Section 3: That this ordinance shall take affect and be in full force at such time as all of the requirements of the development plan have been met. Section 4: That the official zoning map of the City of Fayetteville, Arkansas, is hereby amended to reflect the zoning change provided in Section 1 above. PASSED and APPROVED this 4th day of May, 2004. By:if By: fiduiginge & SON ity Clerk c ;FAYE IEVILLE: E 'IsygRXANSQ=0J i,NCTOt,,,,,,,' APP °COVED: IAN COODY, Mayor May 09, 2005 Planning Commission ADM 05-1507 (Stonewood Gardens P D) EXHIBIT "A" RPZD 04-04:00 PART OF THE SE 3/4 OF THE SW '/a OF SECTION 18, T17N, R29W IN WASHINGTON COUNTY, ARKANSAS ANI) BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT THE NW CORNER OF SAID SE 1/4 , SW t/a THENCE S00°26'02"E 110.00 FEET TO THE P.O.B., THENCE N89°33'58"E 122.33 FEET, THENCE S32°50'29"E 37817 FEET, THENCE S00°26'02"E 231.35 FEET, THENCE S89°40'40"W 325.00 FEET, THENCE N00°26'02"W 54999 FEET TO THE P.O.B.; CONTAINING 3.36 ACRES MORE OR LESS SUBJECT TO EASEMENTS AND RIGHT OF WAY OF RECORD. May 09, 2005 Planning Commission ADM 05-1507 (Stonewood Gardens PZD) Page 2.6 FAYETTEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS PLANNING DIVISION CORRESPONDENCE PC MeetingofMarch 22, 2004 113 W. Mountain St. Fayetteville, AR 72701 Telephone: 501-575-8264 TO: Fayetteville Planning Commission FROM: Jeremy Pate, Associate Planner Matt Casey, Staff Engineer THRU: Dawn Warrick, A.I.C.P., Zoning & Development Administrator DATE: March 17, 2009 Revised 03-24-04 R-PZD 04-04.00: Residential Planned Zoning District (Stonewood Gardens, pp 60) was submitted by David Gilbert of Jorgensen & Associates on behalf of Mark Foster for property located on Crossover Road, immediately north of the Stonewood subdivision. The property is zoned R -O, Residential Office and contains approximately 3.36 acres. The request is to rezone the property to an R-PZD to allow the development of 14 lots with 12 single-family dwelling units proposed. Planner: Jeremy Pate Findings: Proposal: The applicant requests a rezoning and preliminary plat approval for a residential development within an R-PZD zoning district. The proposed use of the site is for 12 single- family residential dwelling units, accessed from Crossover Road by way of a private drive. Twelve dwelling units on the 3.36 -acre site are proposed, therefore the proposed density for the R-PZD is 3.4 DU/acre. The project site is currently zoned R -O, Residential -Office. The vacant site is located in north Fayetteville, east of Lake Fayetteville, near the intersection of Crossover Road and Albright Road. Immediate surrounding properties are primarily single family residential (including Stonewood Subdivision) and agricultural in nature, including the nearby future Botanic Gardens. Proposed Development: R-. Access: The development is proposed to have one point of vehicular access, from Crossover Road. The applicant proposes a private street (Stonewood Court) that utilizes a controlled access point (privacy gate for the subdivision). The remainder of the subdivision is proposed to be within the perimeter of a wrought iron and brick fence in the rear and a 6 -foot brick wall along the front, similar to that of Stonewood Subdivision to the south. A six-foot public sidewalk is to be constructed along Crossover for the length of the property. The applicant is requestingto not IC IReports120041PC Reports103-22-0418-PZD 04-04.00 (Stonewood Gardens).doc May 09, 2005 Planning Commission ADM 05-1507 (Stonewood Gardens PZD) Page 2.7 Land Use -. Lots 1-12 Single Family Residential Lot 13 Detention Pond Lot 14 Common Area, Private Street, drive, utilities Access: The development is proposed to have one point of vehicular access, from Crossover Road. The applicant proposes a private street (Stonewood Court) that utilizes a controlled access point (privacy gate for the subdivision). The remainder of the subdivision is proposed to be within the perimeter of a wrought iron and brick fence in the rear and a 6 -foot brick wall along the front, similar to that of Stonewood Subdivision to the south. A six-foot public sidewalk is to be constructed along Crossover for the length of the property. The applicant is requestingto not IC IReports120041PC Reports103-22-0418-PZD 04-04.00 (Stonewood Gardens).doc May 09, 2005 Planning Commission ADM 05-1507 (Stonewood Gardens PZD) Page 2.7 construct sidewalks within the development. A draft of protective covenants, as well as the applicant's response to the Planned Zoning District requirements and description of the project, have been submitted and are included in the staff report. Existing Development: The site is currently vacant. Surrounding Land Use/Zoning: Direction North Land Use South East Single family homes Single family homes West Single family homes Lake Fayetteville, Crossover Road Zoning RSF-4, Single Family Res. 4 DU/Acre R -O, Residential Office RSF-4, Single Family Res. 4 DU/Acre R -A, Residential Agricultural Water & Sewer: Water and sewer lines will be extended from Crossover Road. Street Improvements Proposed: Six-foot sidewalks are required to be constructed along Crossover Road. The interior street is proposed to be a private street, 24 -feet in width. Vehicular access to the each lot is restricted to access from the rear, by way of a 14 -foot wide one-way drive/alley. Adjacent Master Street Plan Streets: Crossover Road (Hwy 265), Principal Arterial Tree Preservation: Existing canopy: Preserved canopy: Required canopy: Mitigation: 9.1 % 6.6 % 9.1% 16 mitigation trees (see condition of approval) Background- This proposal was heard at the Technical Plat Review meeting of January 14, 2004 and at the Subdivision Committee on March 11, 2004. Points of discussion include sidewalks along the interior street, the "gated community" and emergency/delivery access, utilization of the rear drive for access, the proposed wall within utility easements, and a turn -around at the entry gate. Recommendation: Forward to the City Council with a recommendation for approval of the requested rezoning. Planning Commission approval of the proposed preliminary plat subject to the following conditions: Conditions of Approval: 1. Planning Commission recommendation to the City Council regarding the rezoning of the subject property to the unique district for R-PZD 04-04.00 with all conditions of approval KiReports120041PC Reporu103-22-0418-PZD 04-04.00 (Stonewood Gardens).doc May 09, 2005 Planning Commission ADM 05-1507 (Stonewood Gardens PZD) Page 2.8