Loading...
HomeMy WebLinkAbout2003-11-10 - Agendas - Final FAYETTEVILLE THE CITY OF FAYETTEVILLE,ARKANSAS 125Mountain St. Fayetteville,AR 72701 Telephone: (479)575-8267 PLANNING DIVISION CORRESPONDENCE AGENDA FOR A REGULAR MEETING OF THE PLANNING COMMISSION A meeting of the Fayetteville Planning Commission will be held Monday November 10, 2003 at 5:30 p.m. in the City Administration Building, 113 West Mountain Street, Room 219,Fayetteville, Arkansas. Roll Call The following items will be considered: Consent Agenda: Approval of minutes from the October 27,2003 meeting. New Business: 1. CUP 03-30.00: Conditional Use (Jernigan,pp 524) was submitted by James P. Jernigan for property located at 604 Blair Avenue. The property is zoned RMF-24, Residential Multi-family, 24 units per acre. The request is for an approval of a tandem lot. Planner: Suzanne Morgan 2. ADM 03-29.00: Administrative Item (Cliffs Blvd. Eastern Extension)Master Street Plan Amendment. 3. PPL 02-13.10: Preliminary Plat (Stone Mountain, pp. 488/489)was submitted by Jorgensen and Assoc. on behalf of Bill Conner for property located South of Hyland Park and east of Crossover Rd. The property is zoned RSF-4, Residential Single-family and contains 82.74 acres. The request is for a residential subdivision with 115 lots proposed. Planner: Suzanne Morgan All interested parties may appear and be heard at the public hearings. A copy of the proposed amendments and other pertinent data are open and available for inspection in the Office of City Planning(575-8267), 125 West Mountain Street,Fayetteville,Arkansas. All interested parties are invited to review the petitions. Interpreters or TDD for hearing impaired are available for all public meetings. 72 hour notice is required. For further information or to request an interpreter,please call 575-8330. FAYETTEVILLE PC Meeting of November 10, 2003 - THE CITY OF FAYETTEVILLE,ARKANSAS 125 W. Mountain St. Fayetteville,AR 72701 Telephone:(479)575-8267 PLANNING DIVISION CORRESPONDENCE TO: Fayetteville Planning Commission FROM: Suzanne Morgan,Associate Planner THRU: Dawn Warrick, AICP,Zoning&Development Coordinator DATE: November 4,2003 CUP 03-30.00: Conditional Use (Jernigan, pp 524)was submitted by James P. Jernigan for property located at 604 Blair Avenue. The property is zoned RMF-24, Residential Multi-family, 24 units per acre. The request is for an approval of a tandem lot. Planner: Suzanne Morgan RECOMMENDED MOTION: Staff recommends approval of the conditional use subject to the following conditions: 1. The only principle structure permitted on this tandem lot shall be one single-family home. 2. -A new access drive shall be paved a minimum of 25 feet in length from the intersection of the drive and the paved portion of Blair Avenue and a minimum of 20 feet in width in order to meet Fire Code requirements. 3. No vehicles shall be parked at any time on that portion of a tandem lot utilized as a private drive. 4. Complete building plans shall be submitted to the City to secure a building permit. 5. Payment of$630 in lieu of sidewalk construction. Mn Rutherford,Sidewalk Coordinator, has recommended money in lieu of a sidewalk due to the lack of roadway and that a sidewalk at this location would not generate pedestrian traffic(see attached memo). Staff is in support of this recommendation. 6. Prior to issuance of a Certificate of Occupancy the applicant shall coordinate with the Solid Waste Division for appropriate solid waste disposal. Any solid waste containers shall be stored in a screened location except on collection days. Staff recommends the use of a residential cart that may be wheeled to an appropriate location on collection day only. 7. Minimum building setbacks shall be 20 feet from all property lines and 25 feet from all street right-of-way lines. K.IREPORM1003TC REPORTSIII-IOICUP 03-30.00 JERNIGANDOC _ November 10,2003 Planning Commission CUP 03-30.00(Jernigan) Page 1.1 8. Water and sewer shall be extended to serve the property prior to issuance of Certification of Occupancy. PLANNING COMMISSION ACTION: Required YES .Date:November 10, 2003 O Approved O Denied Comments: The "CONDITIONS OF APPROVAL" listed in this report are accepted in total without exception by the entity requesting approval of this conditional use. Name: Date: BACKGROUND: Property description: The subject property is located at 604 Blair Avenue which is just north of Blair Avenue along Lucien Street, an undeveloped street. The site is an existing non-conforming lot with no existing structures and is zoned RMF-24, Residential Multi-family, 24 units per acre. Surrounding land use is single-family in nature. The property has approximately 20.6 feet of street frontage on Blair Avenue. A single-family home on this lot is required to have 60 feet of frontage. As such, this lot may be approved as a tandem lot, defined in the Unified Development Code as: A lot which does not have required frontage on a public street and which is located behind a lot or a portion of a lot which does have frontage on a public street. Proposal: The applicant proposes to construct a single-family residence of no more than 1800 sq. ft. on this lot with two off-street parking spaces. A letter from the applicant stating the intentions for this property has been attached. Request: The request is to allow for the creation of a tandem lot so that access can be created for the development of a single-family residence on the subject property. Recommendation: Staff is in support of the creation of a tandem lot at the north end of Blair Street. The result of this action will be that this property will be developed in harmony with the surrounding single-family neighborhood. K:IREPORTSI2 OMC REPORTSIII-IOICUP 03-30.00JEWGAN.DOC November 10,2003 Planning Commission CUP 03-30.00(Jernigan)- Page 1.2 SURROUNDING LAND USE AND ZONING Direction Land Use Zoning North Single-family residential RMF-24,Residential Multi-family—24 units per acre South Single-family residential RMF-24, Residential Multi-family—24 units per acre East Single-family residential RMF-24,Residential Multi-family—24 units er acre West Single-family residential RMF-24, Residential Multi-family—24 units er acre GENERAL PLAN DESIGNATION § 163.02. AUTHORITY; CONDITIONS; PROCEDURES. B. Authority; Conditions. The Planning Commission shall: 1. Hear and decide only such special exemptions as it is specifically authorized to pass on by the terms of this chapter. 2. Decide such questions as are involved in determining whether a conditional use should be granted; and, 3. Grant a conditional use with such conditions and safeguards as are appropriate under this chapter; or 4. Deny a conditional use when not in harmony with the purpose and intent of this chapter. C. A conditional use shall not be granted by the Planning Commission unless and until: 1. A written application for a conditional use is submitted indicating the section of this chapter under which the conditional use is sought and stating the grounds on which it is requested: Finding: The applicant has submitted a written application requesting a conditional use permit for a tandem lot on property zoned RMF-24. K.IREPORTSI OOPC REPORTSI71-10rUP 03-30.00JERWGANDOC November 10,2003 Planning Commission CUP 03-30.00(Jernigan) Page 1.3 2. The applicant shall pay a filing fee as required under Chapter 159 to cover the cost of expenses incurred in connection with processing such application. Finding: The applicant has paid the required filing fee. 3. The Planning Commission shall make the following written findings before a conditional use shall be issued: (a.) That it is empowered under the section of this chapter described in the application to grant the conditional use; and Finding: The Planning Commission is empowered under § 163.13 (see attached)to grant the requested conditional use permit. (b.) That the granting of the conditional use will not adversely affect the public interest. Finding: Granting the requested conditional use will not adversely affect the public interest. This action will allow the subject property to be developed in harmony with surrounding properties. The amount of traffic and noise proposed with this request will not significantly increase the total amount of traffic along Blair Street. (c.) The Planning Commission shall certify: (1.) Compliance with the specific rules governing individual conditional uses; and Finding: The applicant has complied with specific rules governing this individual conditional use request. (2.) That satisfactory provisions and arrangements have been made concerning the following, where applicable: (a.) Ingress and egress to property and proposed structures thereon with particular reference to automotive and pedestrian safety and convenience, traffic flow and control and access in case of fire or catastrophe; Finding: There is an existing turn-around at the north end of Blair Avenue. The applicant proposes to construct a 25' wide drive extending north from the existing turn-around. K''REPORr81 OO PCREPORM11-101CUP 03-30.00JERNIGANDOC November 10,2003 Planning Commission CUP 03-30.00(Jernigan)- Page 1.4 (b.) Off-street parking and loading areas where required, with particular attention to ingress and egress, economic, noise, glare, or odor effects of the special exception on adjoining properties and properties generally in the district; Finding: The constructed drive will serve the single family dwelling on this property with a required minimum of two off-street parking spaces. (c.) Refuse and service areas, with particular reference, to ingress and egress, and off-street parking and loading, Finding: Applicant shall coordinate with the Solid Waste division for appropriate solid waste disposal. Any solid waste container shall be screened in accordance with the City Ordinance. CHAPTER 163: USE CONDITIONS 163.13 Tandem Lot Development Certificate of occupancy. Before a certificate of occupancy is issued for a dwelling located on a tandem lot,the property owner shall: (1) Construct a 30-foot by 40-foot hard surface vehicular turnaround equivalent to SB-2 base or better at the end of the private drive and shall execute a written agreement granting the city permission to enter upon the private drive and turn around with sanitation vehicles; or (2) Shall construct a masonry garbage can holder, with screening,for each garbage can to be used,which garbage can holder shall be constructed alongside the street onto which the private drive leads. (d.) Utilities, with reference to locations, availability, and compatibility; Finding: There is an existing sewer line tap located adjacent to the southwest corner of the property. Mr.David Jurgens,Water and Sewer Maintenance Superintendent, has approved a water meter for this lot to be included in the Accelerated Waterline Replacement project for Lucien Street. The water meter will be located fifteen feet east of the existing sewer tap. The Accelerated Waterline project for Lucien Street is scheduled to be started as early as this summer(according to information supplied by the applicant). (See attached letter.) K.IREPORTSI200MCREPORTSVI-I01CUP 03-30.00JERNIGAKDOC November 10,2003 Planning Commission CUP 03-30.00(Jernigan) Page 1.5 (e.) Screening and buffering with reference to type, dimensions, and character; Finding: N/A (f.) Signs, if any, and proposed exterior lighting with reference to glare,traffic safety, economic effect, and compatibility and harmony with properties in the district; Finding: No signage is being proposed at this time. (g.) Required yards and other open space; and Finding: Applicant meets all setbacks for a single family unit on a tandem lot. (h.) General compatibility with adjacent properties and other property in the district. Finding: The adjacent properties consist of single-family residential dwelling units. The proposal to utilize this lot for the development of a single-family dwelling will make this property compatible with adjoining properties and enhance the neighborhood. K:IREPORTSI20031PC REPORTS111-]OICUP 03-30.00.ERMGANDOC November 10,2003 Planning Commission CUP 03-30.00(Jernigan) Page 1.6 CHAPTER 163:USE CONDITIONS 163.13 Tandem Lot Development FI"' (A) ll1W The development of one tandem lot (4) The safety zone between the behind another tandem lot shall be private drive of a tandem lot and prohibited. any adjacent driveway will not be less than the minimum (B) Requirements. Before any conditional distance between curb cuts in use for tandem lot development shall be the standards for street design of granted,the Planning Commission shall Development, Chapter 166, for determine that: streets having a use designation higher than collector,the (1) Tandem lot development will standards for collector streets not significantly reduce property shall apply. values in the neighborhood. In determining whether property (5) The tandem lot, excluding the values will be significantly 25-foot private drive,will reduced, the Planning conform to the minimum lot Commission shall consider the width and lot area requirements size of nearby lots in comparison of the zoning district in which it with the proposed tandem lot or is located. Lot area calculations lots. to determine whether a tandem lot meets minimum lot area (2) The terrain of the area in which requirements shall not include the tandem lot is proposed is any portion of the lot having less such that subdivision of said than the required minimum area into a standard block in width. No structure shall be accordance with Development, placed on any portion of a Chapter 166 is not feasible. tandem lot having less than the required minimum width. (3) (C) Setback. (D) Vehicle/private drive. No vehicles shall be parked at any time on that portion of a tandem lot utilized as a private drive or on the vehicular turnaround required by subsection(E)below. The dwelling structure on a tandem lot shall not be K.V2EPORTS120031PCREPORTS111-10CUP 03-30.00JERNIGANDOC November 10,2003 - Planning Commission CUP 03-30.00(Jernigan) Page 1.7 located more than 200 feet from the end of the private drive nearest the structure. (E) Certificate of occupancy. Before a certificate of occupancy is issued for a dwelling located on a tandem lot,the property owner shall: (1) Construct a 30-foot by 40-foot hard surface vehicular turnaround equivalent to SB-2 base or better at the end of the private drive and shall execute a written agreement granting the city permission to enter upon the private drive and turn around- with sanitation vehicles;or (2) Shall construct a masonry garbage can holder,with screening,for each garbage can to be used,which garbage can holder shall be constructed alongside the street onto which the private drive leads. K:IREPORTSp0031PCREPOR7S111-101CUP 03-21.00ff"IGAN.DOC November 10,2003 _ Planning Commission CUP 03-30.00(Jernigan)' Page 1.8 Description of Application for Conditional Use. is for the condittoal usg ofzQ4 Blain Avenue, Fayetteville Arkansas. It is a de 'dee empy Lot 4 Blocc�rarxdd>fl ?n. The assesor's parcel number is Thot is dassrfied andin�jot since aft}libiygh it has developed street access, it lacks the required frontage on a developed street: Blair Avenue providesaccess at its north end,and Lucien Street, undeveloped, formsthe south border to the lot. James P. and Julia M. Jernigan, applicants, propose to build a single family residence of no more than 1800 sq.ft.on the lot, with two off-street parking spaces required and to be provided. There are no existing structures on the property. An existing sewer line tap is located adjacent to the southwest corner of the property, and David Jergens at the Fayetteville Water and Sewer Department has approved a water meter for this lot to be included in the Accelerated Waterline Replacement project for Lucien Street. The water meter will`be located fifteen feet east of the existing sewer tap. The Accelerated Waterline project for Lucien Street is scheduled to be started as early as this summer. A turnaround currently used by sanitation, emergency, and service vehicles is located at the north end of Blair Avenue, adjacent to the property in question. The site map included with this application has been overlaid on the current GIS aerial topographic map obtained from the Fayetteville City Engineering Office. The real world relation between property boundaries and streets, existing structures and other landmarks depicted on this map,together with the very ample dimensions of this lot assure compliance with requirements for safety zones and setbacks from rights of way. Moreover, the recent survey performed by the Garver Engineering firm of Fayetteville for the preparation of design drawings for the Accelerated Waterline Replacement project shows no disagreement with the GIS map. The applicants therefore have substantial assurance that identified property boundaries with respell to Fayetteville rights of way are correct. November 10,2003 Planning Commission James P. and Julia M. Jernigan CUP 03-30.00(Jernigan) Page 1.9 FA V THE pTT OF FAftInTUX,ARKANSAS Date: October 6,2903 To: Dawn Warrick, Zoning& Development Administrator Fayetteville Planning Commission From: Chuck Rutherford, Sidewalk Administrator Subject: Conditional Use Permit ( 604 Blair Ave.-Parcel#05268) I would recommend money in lieu instead of constructing a sidewalk at this location. This lot is at the north end of Blair Ave. where the street ends. Lucien St.does not exist and there is an existing sidewalk on the east side of Blau Ave. A sidewalk at this location would not generate pedestrian traffic. Encls: November 10,2003 Planning Commission CUP 03-30.00(Jernigan) Page 1.10 119 WEST MOUNTAIN 72701 501 521.7700 FAX 501.6755267 _ WILVIN4 a, -(>3^6F 1.4N r ay 22l S zs LAJC IW StFW fs-aw s pc,.A4 l3 /l1f ,Nt1f, GOIIDi'fIOh1ALr USl; Lcrr.4, &WGK 5, rAIjz L A►JI9'AbpWIOW November 10,2003 Planning Commission CUP 03-30.00(Jernigan). - — age 1.11 CUView.wo ClosseeUUpp wJERNIGAN _ 77, i i � I 1 RW-24 - SUBJECT PROPERTY SMF-24 \ I i 0 RSF-4 Pi I \ I I L fir i 1 I r Overview Legend -Boundary �-Tsa Subject Property Planning Area Master Street Plan CUP03-30.00 r000a �v- o00o Overlay District V Freeway/Expressway 4eik t ^ l r Streets L_ City Limits Principal Arterial uj 2 n y2�T. gOutside City Minor Arterial Existing November� — � yid Planned �+� Collector Nb10 r 2003 I� *., Planning Commission �� Historic Collector - ? ! CUP 03-30.00(Jernigan) o �s tso aoo aso so Feet Page 1.12 CUP03-30.00 J E RN I GA N . One Mile View t�.rr Zt}AF"f, b '� If ;RSF�141 RSFd II RSFd p :.. - SF 4 f . + III 7t. r �'I'_at.+yVy'4yi.i r-`RSF-0 RSFd��J ! 1 - tRSF7- RSF-0as�r�!as��I._'I!Il it ,1 X11- � 1•�.�4j11'�d• I..!�sl,'�/•+#,i is{a+tl '_ __! ! I of r HMFI24y(�. li_d � lbr + 12 RSF-0f 1 t Ir— IIAF 1�1'lil> I- - J f 71 I ��tlr HSF 1II 4�4y I �- -Ilo-' lF 17-0II y- 4♦ t Pi_ . 1 ql# n'QRl S1F-0lf�•Pi 1 9HQi ► •RfI 4R6y1•RiIArlIN-.IeI�J!N {IrPlIIRR�S$�FFd�IRM�'{N-2�fdbgtf_dIYY'txintMS-0Fd TA SFJ771 - IRS , F- 15 RMr eljCY- � pd1I - I - $F-{rRPZt} R5F 6' R$�l RSF.4 4RYSF-0 li- 1 y • !. r '*rl a-0 6z zi3 I IIRte- ' 1• !' !i +L,_�-li `T tf•RSFI�; c^- s w 11 a r_ • C ••it relllsll y I f '-+# i - _Jr rG9{- � `f43�`G3« 1 y01- 'C 1 ROl li IRMF 2d��I�1�SF-0�fl��•t11./_ -._- � i I 4 r y 1111 �1 ( rr i �� !- '- - )3ntz��asi 4 I� 1 t i if '_I {- / R+[3 Ri� 'Gi9±17'ICSJ' � ' _ I. 11- F it III "� P 1P 1\ RSFd if F-0i II r` -1 C 111 s _ 1 # I _ L r C3 �fMF24 RMF 2a MF-2N j h i 11 IL Icc.e.a,,l�LFr f 4 I ♦LyryH.RSGIKSL`F11j1 JR,ORC1K 7 JSTI 1I JIdP \ �tYlL 1 . s- \ I I�.F. d -_,pN. 0.T�F jT 1114 sz � I RSF _II ..I ...._ Vl'M,4 /f-F1M 6t I"12�ttM zap 3 SUBJECT PROPERTY -, -Y1 ICeF 2—'I -t-tk ,v�";t/.I69TM'24"�'.'�MF z91 ___ `¢) GZ NF1. �I IF�24` M� I F-24, pt1(FtI 'aqqI„1I'}MF 2 i`,1-,�-F�A-�2d_�1jy��NlRC�-1•.�\•,t.'.��`'•",•,}Py”�A.IVi4 ! RfMF �! R �I -R�MF 2441 I F - j5 SII -L TI l W,24- II ` Ilr RSFd RSF k RSF-1 RSF JMf 2 1 if ! LO' fl I ' RSF x P 1 RMP-24 �2 RMF-12 + 41 I # F , P.1._.I� RMF 24 1 -+ �— NCRMF`?Y L �RfMF�� F20 i" �. �i# M4 RSFd �I f� o L I l� MF 3d I1 I-I I RMF 2d R-0 RSP IGL 1. RSF4 I 'RMF-261 k IS i�j II f�'RSFd M Fla I� _"�sTzran - -, _R X71 -ca ♦ 1_ ^`, 10 _ -._ ,rl-nMF�a�.11.�� �I z4 IIY III I X11 1 - P 24 3TH PL RMF 2 RIAF 24...... B RLf.1F 2 .. rk I. 'P_ I ir- _ 1�- P ATE e 1 I C2 GP 21 d 2 - 1 RMF 2d - RIII 1 ME2ii�'I I If \ C 1 c z , R.A f 11 41 IIS MF-24 I F-24 I I G2 z -RMF 24 :RMF 2, RSFdI 1 ~ RA RA 1S- T13Tti4PRIVAT_G6 L c2 G1 - A __-- �_ - 0 1 RMF-24 RT-02 - —_ Overview Legend Subject Property Boundary - Master Street Plan x Y CUP03-30.00 "%, Planning Area 6:�Fmeway/Expressway ! 0 000% 4 Prppa lnl Arienal r'S Overlay District"u 1� Streets 000000° II`-}I''-,N Minortvtenal ` ' .Existing L_ I City Limits ���Collector 4} Planned L Outside cy •• November 10 2003 •• Histone Colledar -1 Planning Commission 1 0 0.1 0.2 0.4 0.6 0.8 CUP 03-30.00(Jernigan) Miles Page 1.13 FAYE TTE VILLE PC Meeting of November 10,2003 THE CITY OF FAYETTEVILLE,ARKANSAS 125 W. Mountain St. Fayetteville,AR 72701 Telephone:479-575-8267 PLANNING DIVISION CORRESPONDENCE TO`. Fayetteville Planning Commission FROM: Suzanne Morgan,Associate Planner THRU: Dawn T. Warrick,AICP,Zoning& Development Admin. DATE: November 10, 2003 SUBJECT: ADM 03-29.00: Amendment of adopted Master Street Plan to relocate and change designation of Cliffs Boulevard eastern extension(a proposed minor arterial connecting Crossover Rd. and Starr Dr.) RECOMMENDATION Planning Staff recommends approval of a resolution amending the Master Street Plan to eliminate Cliffs Boulevard eastern extention, aproposed minor arterial, from this policy document. This request will be heard by the Planning Commission November 10, 2003 as a part of the proposed Stone Mountain Subdivision preliminary plat. The plat identifies the road in question as Stone Mountain Rd. BACKGROUND Cliffs Blvd., a proposed connection between Crossover Rd. and Starr Dr., has been identified on the City's Master Street Plan for many years. Staff recommends removal of this eastern extention of Cliffs Blvd. based on findings from the City of Fayetteville's traffic analysis performed by Bucher, Willis and Ratliff and their-recommendations regarding the Master Street Plan. Approval of a preliminary plat is currently being sought to begin the development process of an 82.74 acre tract which includes 8.19 acres of park land and 112 residential lots, DISCUSSION The attached documents include a memo from the project representative for the proposed development and a section from the traffic study conducted by Bucher,Willis and Ratliff addressing the Master Street Plan. K..Wpo,l M03TC REPORTSVI-10W,03-29_Sbne Mounmin_msp ammdment.doc November 10,2003 Planning Commission ADM 03-29.00(Cliffs Blvd.Eastern Extension) Page 2.1 JORGENSEN & ASSOCIATES CIVIL ENGINEERS SURVEYORS 124 WEST SUNBRIDGE,SUITE 5 FAYETTEVILLE,ARKANSAS 72703 (479) 442-9127 • FAX (479)582=4807 DAVID L.JORGENSEN,P.E., P.L.S. October 22,2003 - CHRISTOPHER B.BRACKETT, P.E. City of Fayetteville 113 W. Mountain Street Fayetteville, AR 72701 Attn: Planning Department Re: Stone Mountain Subdivision Phase I—MSP Amendment On behalf of the owner of the above mentioned project, we are also requesting an amendment to the Master Street Plan for the minor arterial that is shown crossing this property. We are proposing to change this street classification from a minor arterial with a 90' Right-of-way to a collector with a 70' Right-of-way. We are also proposing to move the street to the north and build it with this development. It would be very difficult for this street to function as a minor arterial due to the steep grades coming from Highway 265 and the extremely steep grades east of this project. These steep grades would limit the capacity of this road. It is our option that this road would never function as a minor arterial whether or not the Right-of-way was dedicated. Please call concerning any questions you may have. Thank you: Sincerely; Christopher B. Brackett, P.E. November 10,2003 Planning Commission ADM 03-29.00(Cliffs Blvd.Eastern Extension) - Page 2.2 • STRUCTURAL DESIGN LAND DEVELOPMENT-• WATER SYSTEMS WASTEWATER SYSTEMS . LAND SURVEYING City of Fayetteville,Arkansas Traffic and Transportation Study - - Chapter 1—Master Street Plan 2. MASTER STREET PLAN Key Findings: This chapter of the report describes the proposed Master Street Plan for the City of Fayetteville. Development of the Master Street Plan considers the function of each street (mobility and/or access) and uses this functional assignment to create a functional hierarchy. Defining a functional hierarchy is paramount in attaining a balance between arterial, collector, and local streets,which is essential to maintaining the quality of life within the City as it grows. Based on the functional assignment and functional hierarchy of Fayetteville's city streets, the proposed Master Street Plan recommends the following typical sections for arterial, collector, and local access streets: • Principal arterial streets should generally provide two to three moving lanes in each direction, plus auxiliary turn lanes. Four typical sections have been prepared for principal arterial streets: (1) Principal Arterial typical section(150 feet right of way)with a trail on one side and sidewalk on the other,(2) Principal Arterial typical section(150 feet right of way)with on-street bike lanes on both sides and sidewalk on the both sides, (3) Constrained Principal Arterial typical section (110 feet right of way) with a trail on one side and sidewalk on the other, and.(4)Constrained Principal Arterial typical section (I 10 feet right of way) with on-street bike lanes on both sides and sidewalk on the both sides. • The typical sections for a minor arterial street lie within a 90 feet right of way width. • This width would allow for(1)one moving traffic lane in each direction,a bicycle lane in each direction, sidewalks on each side, room for utilities and green space, and sufficient room to provide a center auxiliary turn lane,(2)one moving traffic lane in each direction, a bicycle lane in each direction, sidewalks on each side, room for utilities and green space,and sufficient room to provide a center landscaped median, (3)two moving traffic lanes in each direction,sidewalks on each side, and room for utilities and green space. • The collector street typical section would lie within a 70 feet right of way and would provide for (1) one lane of moving traffic in.each direction and sufficient room for a center tum lane with sidewalks on each side, and room for utilities and green space,(2) one 15 feet lane of moving traffic in each direction and sufficient room for a center landscaped median, with sidewalks on each side, and room for utilities and green space, (3) one lane of moving traffic in each direction, on-street bike lanes in each direction, with sidewalks on each side, and room for utilities and green space. • The historic collector includes two 16 feet Janes and sidewalk on each side, within a 50 feet right of way. • Several typical sections for local streets have been developed to meet the special demands for a variety of subdivision designs. Most local streets lie within a 50 feet right of way width.Four typical sections have been provided to accommodate local streets:(1) 50 feet of right of way to include 24 'feet of pavement with sidewalks and green space each side, (2)50 feet of right of way to include 34 feet of pavement to include bike lanes each side, with sidewalks and green space each side, (3) anew urbanism section with 50 feet of right of way, to include 30 feet of pavement for parking lanes each side, with landscaped sidewalks each side (4) a new urbanism section with 60 feet of right of way, • 'biove ber 10,2003 Bucher, Willis&Ratliff CorpaQprta' q M9?00?-359WooVtepon\IOUSA3 Final Repon.doc -YIaIIIIIIlg Commission ADM 03-29.00(Cliffs Blvd.Eastern Extension) Page 2.3 City of Fayetleville,Arkansas Traffic and Transportation Study Chapter 1—Master street Plan to include 40 feet of pavement for parking lanes and bike lanes each side, with landscaped sidewalks each side. • The typical section for residential streets is set in a 40 feet right of way, and includes 22 feet of pavement with sidewalks on each side. • 20 feet of right of way should be dedicated for alleys. It is vital that the City protects the function,of the major street system. Therefore, the study recommends that the City adopts the Access Management Policies described in Chapter 7 to preserve the function of the major street system. INTRODUCTION Public roadways have two primary purposes. They are intended to provide access to properties within a community, and to carry traffic between properties within a community or between two communities. These two functions are in competition with each other when provided on the same roadway. An increase in the number of access points onto a roadway causes a corresponding decrease in vehicle mobility and safety.As a result,a well managed street system must include: ❑ Local streets, whose primary purpose is to provide access. ❑ Arterial streets, whose primary purpose is to provide mobility. ❑ Collector streets, whose primary purpose is to collect traffic from local streets and feed it • to arterial streets. In reality, the street systems in most communities do not reflect this distinction clearly. Frequently, what are intended to be arterial streets degenerate into providing direct access to properties, reducing both mobility and safety. At the other end of the continuum, streets that are intended to provide direct property access sometimes end up carrying volumes of through traffic for lack of an adequate arterial street to fulfill that function, resulting in a decrease of safety through neighborhoods. The key to protecting emerging neighborhoods from future encroachment of through traffic is to plan the transportation system to include local, collector, and arterial streets, and to protect the intended function of each through adhering to design guidelines. These roadway design guidelines are most effective when implemented and maintained on new construction. FUNCTIONAL ASSIGNMENT The street system functions best when the intended purposes of arterial, collector, and local streets are protected, and when the overall street system includes the proper proportion of each type of street. Too few arterial streets will result in excessive through traffic using collector and. local streets to pass through neighborhoods. In contrast direct access onto arterial streets will result in degradation of the arterial's function to move traffic, again causing diversion of through traffic onto collector and local streets and through neighborhoods. Bucher, Willis&Ratliff ra600 mer 10,2003 M'Q002-359Wa Wepon%10.05.03 Final Repon.doc - anrnng tommission ADM 03-29.00(Cliffs Blvd.Eastern Extension) Page 2.4 City of Fayetteville,Arkansas Traffic and Transportation Study ... - Citapter 1—Master Street.Plan • Since many existing streets in Fayetteville do not have a pure function of mobility only,or access only,classification of the streets as a principal arterial, minor arterial, collector,or local street is somewhat subjective. Several factors may be considered in determining the actual existing function of each street. " ❑ . Greater existing traffic volumes on a street indicate a draw from a larger area within the community,.and thus an arterial function. ❑ As the continuous length of a street increases, its potential to carry traffic through the community also increases,and thus an arterial function. ❑ Streets that provide interchanges with the freeway system will more often carry through traffic, and thus function as an arterial. ❑ Streets that access major commercial developments, industrial areas, or a university will generally carry traffic originating elsewhere in the community, thus functioning as an arterial. General traffic volume guidelines assumed in assigning functions to the existing streets in Fayetteville as part of this Master Street Plan include: ❑ Residential streets carry less than 300 vehicles per day. u Local streets carry less than 2000 vehicles per day. ❑ Collector streets 2000 to 7000 vehicles per day. ❑ Minor arterial streets carry 7000 to 14,000 vehicles per day. • ❑ Principal arterial streets carry greater than 14,000 vehicles per day. It should be emphasized that these traffic volume ranges do not describe the capacity of the street to carry traffic, but only provide a general range of the magnitude of traffic volumes that might be expected on a class of street. For instance, a minor arterial street, collector street, and local street might physically carry the same traffic volume. Furthermore, traffic volume alone does not determine or necessarily indicate the function of a street. Whereas the traffic volume guidelines may be useful in classifying streets according to their existing function, traffic volumes alone are insufficient to address the long range function of currently undeveloped streets. It is important that arterial and collector corridors be designated to service future development of land beyond the urban fringe, even though significant traffic volumes may not be present for many years. The future function of these corridors will be influenced by the continuous length of each corridor,and their access to the freeway system. The master street plan also designates a number of streets as historic collector streets. These are streets that carry greater traffic volumes than might be expected on a typical local street, but lack sufficient right of way to be widened and/or are constrained by historic development. While the function of these streets may be a collector function, it is impractical to consider reconstructing them to the collector street typical section. Rather,as historic collector streets are considered for improvement,it should be recognized that each historic collector street in Fayetteville has its own unique characteristics and any improvement project should be carried out in the spirit of context sensitive design, consistent with the smart growth policy of identifying the unique demands for neighborhood preservation. Consequently, a special typical section for historic collector has not been recommended. • er10,2003 Bucher Willis&Ratliff CorNpveroon M:@00b35Mdo,TR .V0.05-03 Final Rep doc nmg commission ADM 03-29.00(Cliffs Blvd.Eastern Extension) Page 2.5 City of Fayetteville,Arkansas Traffic and Transportation Study Chapter 2—Master Street Plan • Figure 2-1 depicts the proposed Master Street Plan for the year 2023. The plan designates the future street network for major arterial,minor arterial,collector, and historic collector streets.It is important that as the City expands,the intent of the plan be followed, so that an adequate balance of arterial and collector streets with local streets is maintained. • • vb Bucher Willis&Ratli�Cor anmon Nove m:eoozase�duan<pomio-os-03 Fm�R<poaau< �amng er 10,2003 Commission ADM 03-29.00(Cliffs Blvd.Eastern Extension) Page 2.6 PPL 02-13.10 Page I FAYETTEVILLE PC Meeting of November 10, 2003 THE CITY OF FAYETTEVILLE,ARKANSAS 113 W. Mountain St` Fayetteville,AR 72701 Telephone:501-5758264. PLANNING DIVISION CORRESPONDENCE TO: Fayetteville Planning Commission FROM: Suzanne Morgan, Associate Planner Matt Casey, Staff Engineer THRU: Dawn Warrick,A.I.C.P.,Zoning&Development Administrator DATE: November 5,2003 PPL 02-13.10: Preliminary Plat(Stone Mountain,pp.488/489)was submitted by Jorgensen and Assoc.on behalf of Bill Conner for property located South of Hyland Park and east of Crossover Rd. The property is zoned RSF-4, Residential Single-family and contains 82.74 acres. The request is for a residential subdivision with 115 lots proposed. Planner: Suzanne Morgan Findings: Proposal: The applicant is requesting to create a residential subdivision of 115 lots on 82.74 acres. Two lots are to be used for detention and one 8.19 acre lot is proposed for park land dedication. The location of the proposed subdivision extends east off of Crossover Rd to the border of the City and Planning Area and is zoned RSF-4,Residential Single-family with 4 units per acre. Surrounding Land Use: Land to the north, south, and west is zoned RSF-4 with Planning Area to the east. All land is single-family residential in nature. Water&Sewer: Water and sewer will be extended to serve this development. Right-of-way being dedicated.• The applicant requests an amendment to the Master Street Plan for the minor arterial (90')bisecting the property. The request is to relocate this planned road further south as Stone Mountain Drive at a lesser dedication of 70', a collector road. (see attached map) The following streets are being proposed with 50' rights-of-way: Crestline Place, Pebblestone Drive,Flagstone Circle, Limestone Drive, Fossil Drive, Sandstone Place, and Stone Bridge Road. Connectivity will be provided to Crossover on the west, Stone Bridge Road to the south, and in two locations to the east for future street connections. Adjacent Master Street Plan Streets: Crossover Road(Collector) K:VZEPOR7SL'0031PCREPOR7SVl-101PPL 01-13.10 SYONE MOUNTAINDOC November 10,2003 Planning Commission PPL 02-13.10(Stone Mountain) Page 3.1 PPL 02-13.10 Page 2 Tree Preservation: Existing canopy: 33.94% Required canopy: 25.0% Preserved canopy: 24.88% Mitigation required: $3,150 to the Tree Escrow Account Parks: The Parks and Recreation Advisory Board accepted a land dedication on January 15, 2002. PRAB accepted a banking credit of excess park land dedicated. The park land dedication for 112 single family lots is 2.68 acres. The owners have proposed to dedicate 8.19 acres,leaving a banking credit of 5.51 acres for the southeast park district. Background: Stone Mountain Phase I was heard at Technical Plat Review on May 15,2002. It was tabled due to concerns regarding water pressure problems in the vicinity. The project was heard again at Technical Plat Review on September 30, 2003 and at Subdivision Committee on October 30, 2003 at which time the Subdivision Committee forwarded the project to the Planning Commission. Discussion for this project included the request for a Master Street Plan amendment. Recommendation: Staff recommends approval of PPL 02-13.10 with the following conditions: Conditions of Approval: 1. Add a note to the plat stating the existing private drive shall be removed prior to Final Plat approval. 2. Payment into the Tree Escrow Account in the amount of$3,150. 3. All street names shall be approved by the 9-1-1 Coordinator. 4. Any outstanding issues with the legal description shall be resolved prior to final plat approval. 5. Necessary property line adjustments to the east of the project boundary and to lot 51 shall be approved prior to development of infrastructure. 6. If any water pressure problems arise that might impact this proposed subdivision or the adjacent residents preventative actions shall be addressed and resolved through an approved water system design. 7. Planning Commission determination of waiver request for Stone Mountain Drive to be constructed at a 14% grade for approximately 1400 feet. City street standards allow for a 10%grade with an allowance up to 15%for 300 feet. Staff is in support of this request due to the connectivity Stone Mountain Drive provides to the east on Crossover Road. K..IREPORYS12003WREPORTSIII-IMPPL 02-13.10 STONE MOUNTAIKDOC - November 10,2003 Planning Commission PPL 02-13.10(Stone Mountain) Page 3.2 PPL 02-13.10 Page 3 8. Planning Commission determination of the proposed Master Street Plan Amendment to relocate the planned minor arterial Cliffs Boulevard to the proposed location of Stone Mountain Drive and to reduce the street classification from a minor arterial to a collector street. 5taffrecommends removal of the Cliffs Boulevard eastern extension. The proposed revision to the Master Street Plan based on the recent traffic study performed by Bucher, Willis and Ratliff does not include the construction of the minor arterial in this location due to unsuitable topography. 9 The developer shall comply with all conditions of the Parks and Recreation Board. All conditions as noted in the attached Memo dated October 29, 2003 are applicable and shall be considered,by reference, as part of the official Conditions of Approval. Standard Conditions of Approval: 10. Plat Review and Subdivision comments (to include written staff comments provided to the applicant or his representative, and all comments from utility representatives -AR Western Gas, SWBT,,Ozarks, SWEPCO, Cox Communications) 11. Staff approval of final detailed plans, specifications and calculations (where applicable) for grading; drainage,water, sewer, fire protection, streets (public and private), sidewalks, parking lot(s) and tree preservation. The information submitted for the plat review process was reviewed for general concept only. All public improvements are subject to additional review and approval. All improvements shall comply with City's current requirements. 12. All overhead electric lines 12kv and under shall be relocated underground. All proposed utilities shall be located underground. 13. Sidewalk construction in accordance with current standards to include a minimum four foot sidewalk and a minimum of six feet of green space on all interior roads and a six foot sidewalk with a minimum of ten feet of green space along Stone Mountain Drive. Sidewalks shall be installed or guaranteed in accordance with Ch. 158.01 prior to final plat approval. 14. Preliminary Plat approval shall be valid for one calendar year. 15. Additional conditions: a. - b. C. K.IREPOR7SI20031PCREPOR7SUI-IOIPPL 02-13.10 S70NE MOUNTAINDOC. - - November 10,2003 Planning Commission PPL 02-13.10(Stone Mountain) Page 3.3 PPL 02-13.10 Page 4 PLANNING COMMISSION ACTION: yes Required Approved Denied Date: November 10, 2003 Comments: The "CONDITIONS OF APPROVAL",beginning on page two of this report, are accepted in total without exception by the entity requesting approval of this development item. By Title Date K:IREPOR7Y20031PCREPOR7S111-101PPL 02-13.10 S70ME MOUNTAM.DOC November 10,2003 Planning Commission PPL 02-13.10(Stone Mountain) Page 3.4 City of Fayetteville Tree Preservation Plan Review Form Project: Stone Mountain Phase I Developer: Bill Conners Location: S. of Hyland Park/E. of Crossover Engineer: Jorgensen and Associates This form shall stand as a: ✓Initial Review/Letter of Confirmation ✓Recommendation to Planning Commission or City Council O Final Administrative Determination* Requirements Submitted: ✓Initial Review /Site Analysis ✓Analysis Report */Tree Preservation Plan Canopy Measurements: %Tree Canopy Required to be Preserved Total Area of Existing Tree Canopy Land Use RSF-4 Acres 25.2 %To be Preserved 25 Square Feet 1,102,045 %of Total Site Area 33.94 Total Area of Site Acres 82_74 Existing Tree Canopy Preserved Square Feet 3,604,154 Acres 3,247,491 (less Parkland) Square Feet 807,928 %of Total Site Area 24.88. Mitigation/Off Site Alternatives Requested: /Yes ONo OOn-Site Mitigation OOff--Site Preservation OOff--Site Reforestation /Tree Fund Tree Preservation Criteria Met: ✓Yes ONo (See back for criteria list and comments) Applicant's Plan: ✓Approved O Denied OConditionally Approved Conditions for Approval: Signed: The Landscape Administrator Date: November 10,2003 Planning Commission PPL 02-13.10(Stone Mountain) Page 3.5 Criteria used by the Landscape Administrator to evaluate Tree Preservation Plans 1.The desirability of preserving a tree or group of trees by reason of age,location,size or species. Comments: Groves of significant trees are being preserved. 2.Whether the design incorporates the required Tree Preservation Priorities. Comments:Yes, priority groupings have been preserved. 3.The extent to which the area would be subject to environmental degradation due to removal of the tree or group of trees. Comments: Minimal disturbance to tree canopy is proposed. 4.The impact of the reduction in tree cover on adjacent properties,the surrounding neighborhood and the property on which the tree or group of trees is located. Comments: The preserved perimeter trees provide a buffer between properties. 5. Whether alternative construction methods have been proposed to reduce the impact of development on existing trees. Comments: Trees preserved are outside of areas to be developed. 6. Whether the size or shape of the lot reduces the flexibility of the design. Comments:N/A. 7.The general health and condition of the tree or group of trees, or the presence of any disease,injury or hazard. Comments: Trees on the site are in moderate to good condition. 8. The placement of the tree or group of trees in relation to utilities, structures, and use of the property. Comments: Utilities have been sited for least impacts to trees. 9. The need to remove the tree or group of trees for the purpose of installing,repairing,replacing,or maintaining essential public utilities. Comments: Utilities have been routed to avoid large groups of existing trees. 10. Whether roads and utilities are designed in relation to the existing topography,and routed,where possible,to avoid damage to existing canopy. Comments: Yes 11. Construction requirements for On-Site and Off-Site Alternatives. Comments:None 12.The effects of proposed On-Site Mitigation or Off-Site Alternatives, Comments: Payment is requested into the City's Tree Escrow Account. 13. The effect other chapters of the UDO,and departmental regulations have on the development design. Comments:None 14. The extent to which development of the site and the enforcement of this chapter are impacted by state and federal regulations. Comments:N/A 15.The impact a substantial modification or rejection of the application would have on the Applicant. Comments: Approval is recommended. *An appeal may be filed against a Final Administrative Determination in accordance with Chapter 5 oo lYe ber 10,2003 Unified Development Ordinance. City Landscape Administrator determinations/decisioa an ���Co Vfiemission person aggrieved to the Planning Commission within 10 business days. Recommendations gods a�g t t�7TCann o�ntain) Commission,thus no formal appeal is necessary for recommendations. lage 3.6 City of Fayetteville Tree Mitigation Form Project: Stone Mountain Phase I Developer: Bill Conners Location: S. of Hyland Park/E. of Crossover Engineer: Jorgensen and Associates Canopy Measurements: %Tree Canonv Total Area of Existing Tree Canopy: Land UseRSF-4 Acres 25.2 Required to be Preserved 25 Square Feet 1.102.045 %of Total Site Area 33.94 Total Area of Site Acres 82.74 Existing Tree Canopy Preserved: Square Feet 3,247.491 Acres Square Feet 807.928 . Amount of Preservation Requirement % of Total Site Area 24.88 Requested for Mitigation: Acres Square Feet 3.945 % of Total Site 0.12 _ Type of Mitigation Pursued: OOn Site Mitigation QOff Site Preservation OOff Site Reforestation /Tree Fund List Mitigation Species,Caliper, and Quantity of trees to be planted in the space below. Refer to table and on back for figuring quantity and caliper sizes. �- Species Caliper Qty. Amount proposed to be deposited in the City of Fayetteville Tree Fund: $ 3,150.00 Mitigation Proposal: /Approved ODisapproved November 10,2003 Signed: , Landscape Administrator Plan Commission F t;-924-- b-(Stone Mountain) Page 3.7 ,Suzanne Morgan -Subdivision Comments W. ,.. From: Rebecca Ohman To: Morgan, Suzanne; Pate, Jeremy Date: 1 A/29/03 11:47AM Subject: Subdivision Comments LSP 03-56.00 Parks and Recreation fees are assessed in the amount of$555 for one additional single family lot. Fees are due prior to issuance of a building permit. PPL 03-16.00 On December 9, 2002,PRAB voted to accept a combination.of money and land to meet the Park Land Dedication requirements. City Council approved a combination of money and land at the January 7, 2003 meeting in Resolution 01-03,waiving Ordinance 166.03K. The developer has agreed to provide 1.84 acres of land and $14,568.75 for 103 Single family lots. A deed representing the park land and the remaining parks fees are due prior to issuance of the final plat. Parks and Recreation requests the developer erect park boundary signs. Signs are available at the Parks and Recreation offices located on Happy Hollow Road. POA should exclude the park land dedication from the covenants. Construction debris or dumping shall not be permitted on park property. PPL 02-13.10 The Parks and Recreation Advisory Board accepted a land dedication on January 15, 2002. PRAB accepted a banking credit of excess park land dedicated. The park land dedication for 112 single family lots is 2.68 acres. The owners have dedicated 8.19 acres, leaving a banking credit of 5.51 acres for the southeast park district. Please label the park land with a lot number. Parks Staff requests a review of the proposed concrete weir on Lot 114 for potential flow on Park Property prior to construction. A deed for the park land dedication must be received by the Parks and Recreation Division priorto issuance of the final plat. Parks and Recreation requests the developer erect park boundary signs. Signs are available at the Parks and Recreation offices located on Happy Hollow Road. POA should exclude the park land dedication from the covenants. Construction debris or dumping shall not be permitted on park property. RPZD 03-7.00 The Parks and Recreation Advisory Board reviewed this project on July 7, 2003 and recommended money in lieu of land for 50 Multi-Family units. Parks fees are due in the amount of$19,650 before issuance of a final plat. November 10,2003 Planning Commission PPL 02-13.10(Stone Mountain) Page 3.8