HomeMy WebLinkAbout2004-07-14 - MinutesMINUTES OF A MEETING OF THE
TECHNICAL PLAT REVIEW COMMITTEE
A MAJORITY OF THIS MEETING IS INAUDIBLE.
PLEASE REFER TO THE TECHNICAL PLAT REVIEW STAFF
COMMENTS UNDER THE REPORT SECTION OF THE
RESPECTIVE FILES FOR INFORMATION REGARDING
TECHNICAL PLAT REVIEW COMMITTEE COMMENTS.
Renee Thomas—Senior Secretary, City of Fayetteville Planning Division
A regular meeting of the Technical Plat Review Committee was held on July 14, 2004 at 9:00
a.m. in room 111 in the City Administration Building, 113 W. Mountain, Fayetteville, Arkansas.
PPL 04-1141: (Schlegel Subdivision, 207)
Page 2
PPL 04-1143: (Estates At Salem Hills Ph. II, 205)
Page
LSD 04-1128: (Theta Tau House, 443)
Page
LSD 04-1142: (Lazenby Warehouses, 520)
Page
STAFF PRESENT
Jeremy Pate
Suzanne Morgan
Renee Thomas
Rebecca Ohman
Matt Casey
UTILITIES PRESENT
Mike Phipps, Ozark Electric Coop.
Sue Clouser, Southwestern Bell
Jim Sargent, AEP/ SWEPCO
Ron Berstrom, AEP/SWEPCO
Larry Gibson, Cox Communications
Johney Boles, Arkansas Western Gas
ACTION TAKEN
Forwarded
Forwarded
Not Heard
Withdrawn
STAFF ABSENT
Danny Farrar
Travis Dotson
Perry Franklin
UTILITIES ABSENT
Technical Plat Review
July 14, 2004
Page 2
PPL 04-1141: Preliminary Plat (SCHLEGEL SUBDIVISION, 207): Submitted by
MEL MILHOLLAND for property located at THE SW CORNER OF DEANE
SOLOMON AND SALEM. The property is zoned RSF-4, SINGLE FAMILY - 4
UNITS/ACRE and contains approximately 33.41 acres. The request is to approve a
residential subdivision with 173 single family lots proposed.
Pate: Welcome to the Technical Plat Review Committee meeting of July 14,
2004. We have four items on our agenda this morning. The first item is
PPL 04-1101 for Schlegel Subdivision containing approximately 33 acres
with 173 single family lots proposed. Include adjacent property zoning.
Change the title block to reflect the RSF-4 zoning district. The primary
comment that I have is the Master Street Plan calls for Gypsum Drive as a
collector street across this property east and west. Crystal Springs has
constructed a portion of this street which is shown on the Master Street
Plan to connect east to Deane Solomon Road. To amend that it would
take a Master Street Plan amendment to the City Council. I don't believe,
in speaking with other staff, that we would recommend approval of that.
What we will need to look at is what kind of connection we can get here
from the west to the east. This stub out really doesn't accomplish that
because it is so meandering that it does not function as a collector street
whatsoever. That is probably the biggest issue on this development.
Jefcoat: I guess that is a major issue because while the Master Street Plan may
show that going through Wilson Springs it is not going through Wilson
Springs.
Pate: Correct. That has actually gone to Council and been amended.
Jefcoat: We are providing a future project that we know of which is the 120 acre
property that does connect up to Salem Road that does give us that
collector street. I thought we had gone over this during the planning
process of how that is going to occur. I know that it is on the Master
Street Plan but we need to get it removed. I guess we'll just have to
resolve that somehow.
Pate: We can sit down and talk about that. The Wilson Springs project to the
east of here had the same Master Street Plan, it was called Truckers Drive
on the east and they went to Council and got that removed due to wetlands
and preservation area. That was amended but this portion is still on the
Master Street Plan. Council would have to approve that amendment to not
have the connection that this development could provide.
Jefcoat During the preliminary planning process we actually thought that this gave
us the connectivity so that that could be amended.
Technical Plat Review
July 14, 2004
Page 3
Pate: That would actually be required regardless to handle some of the traffic.
The collector street though is more of a through street, much like Crystal
Springs that has constructed Gypsum Drive already and stubbed it out.
That provides a through street in the future.
Jefcoat: Right. During the preliminary planning stage, that stub out was the one
that lines up with the stub out for Crystal Springs I. During the annexation
and planning approval talking to the Zaccanti's about their property
development they don't want that collector there. That's been discussed a
whole lot with them so we'll have to work it out.
Pate: That's appropriate to do that. There are a couple of notes to add on the
plat and that's about all that Planning has. Matt?
Matt Casey — Staff Engineer
Casey: Tom, you are showing a detention area in this proposed roundabout and
that will not be allowed. Also, the roundabout will have to meet all current
design criteria.
Jefcoat: We were hoping to come up with a nice feature.
Casey: I understand that. We also need to ensure that it is designed properly. We
will have to work with you about the location.
Jefcoat: That stub out there is lined up to feed into the Wilson springs
development. They are in agreement with that location to connect to their
location. If we go anymore we are at the curve.
Casey: We will have to work out those details. We need to remove the island
between 19 and 20.
Jefcoat: There again, when we were working with Tim Conklin in Crystal Springs
III the use of that island was very desirable at the Planning Commission
level and we talked with Tim as far as the transition coming into this
subdivision and flow of traffic with a straight shot through to Crystal
Springs. Yes, we can eliminate that, that's fine. It was a desirable
entrance point and was asked for almost at that point in time.
Casey: I'll have to look into that. I don't know if lot 111 will have enough room
to access a driveway if entering from the north.
Jefcoat: We have worked with driveway entrances with common shared drives.
We can still cut that down and change it so it will be more desirable for a
driveway. Check the profile grade for the street at lots 158 and 160, there
seems to be a long distance between contours.
Technical Plat Review
July 14, 2004
Page 4
Casey: All local streets will need to have a 4' sidewalk on both sides located at
the right of way. The park area you are not shown any sidewalks, you will
need to make sure those are shown.
Jefcoat: In the park area?
Casey: Yes.
Jefcoat: I can tell you just what Tracy said and I can tell you just the way Tracy
feels and he is not willing to, he has donated that land to parks.
Casey: Irregardless of how he feels, we will need a 6' sidewalk in there.
Jefcoat I'm telling you that is going to be a point of contention.
Casey: That's fine. They need to be there. The collector street will need to have
a 6' sidewalk located at the right of way. We are recommending
improvements for Salem 14' from centerline with curb and gutter on the
south side. The north side will be brought up to county standards. That is
the same as our recommendation at the time of rezoning and annexation.
West Salem Road will need to be widened to a minimum of 20' of
pavement from the project to the intersection with Deane Solomon.
Jefcoat: Right of way issues for the property to the south there are in the city
limits?
Casey: Yes. Sanitary sewer services can only enter the manholes if the manhole
is at the end of the line. The sewer line will need to be extended to serve
lots 133 and 51. Sanitary sewer will also need to be extended to the north
project boundary for future extension. We will need to get with RJN
about where the sanitary sewer easements may need to run through this
property for our new wastewater treatment plant.
Jefcoat: Are there easements along the south of Crystal Springs III?
Casey: There may be additional required.
Pate: Parks?
Allison Brady — Parks Department
Brady: We will need to work with you with the lot number change and the
parkland dedication.
Technical Plat Review
July 14, 2004
Page 5
Jefcoat: I don't know if you were privy to the conversation that occurred yesterday
or not but I did call Rebecca and Connie and brought some letters today.
The 120 acres to the east is a project we are looking at. For that
development we are looking at doing some reverse land banking. That
park may not be there at the time of final plat.
Mike Phipps — Ozark Electric Coop,
Phipps: Tom, any relocation of existing facilities will be at the developer's
expense. We will need 20' UE's and all utility crossings will need to be
six 4". This is a drawing you can have to put those in. Things may
change if that street goes through.
Pate: The last item is trees. Based on this calculation there is 2.5% existing and
1.7% preserved. Are you looking at doing some onsite mitigation?
Jefcoat: Probably what we will do is the island in the middle we'll do our tree
mitigation in there.
Pate: Ok, so you would prefer to do onsite mitigation instead of paying into the
tree fund?
Jefcoat: Yes, and we will probably plant in those island areas.
Pate: We'll need to show the canopy on there.
Jefcoat There are no important trees, they are just all fence line shrub trees.
Pate: Ok, just show the areas that have existing canopy and in a table. The
revisions are due on the 21st by 10:00 a.m.