LS00-7: Yogi & BooBoo, pp175
PP00-2: Quail Creek, Ph II, pp250
LS00-6: Wellington Place, pp401
MEMBERS PRESENT
Johney Boles, Arkansas Western Gas
Michael Campbell, SWEPCO
Bob Falk, Southwestern Bell
Kevin Lefler, Cox Communications
STAFF PRESENT
Tim Conklin
Sara Edwards
Ron Petrie
Kim Hesse
Chuck Rutherford
Eric Schuldt
Perry Franklin
ACTION TAKEN
Forward to SC
Forward to SC
Forward to SC
MEMBERS ABSENT
STAFF ABSENT
Plat Review Minutes
March 15, 2000
Page 2
LS00-7: LOT SPLIT
YOGI & BOOBOO PROPERTIES, PP175
This item was submitted by Phil Bronson for property located on east Joyce in Vantage Square.
The property is zoned C-1, Neighborhood Commercial and contains approximately 2 acres. The
request is to split the property into three tracts containing 0.936 acres and 0.665 acres
Phil Bronson was present on behalf of the request.
Staff Reports
Kim Hesse, Landscape Administrator
No comment
Chuck Rutherford, Sidewalk & Trails Coordinator
Sidewalks, driveway approaches and access ramps shall be constructed to Ordinance 4005. An
inspection is required prior to the concrete pour. Driveway approaches shall be constructed of
Portland Cement Concrete. The 10 foot wide trail needs to be shown in the legend and on the
drawing. The curb and gutter lines need to be removed through the trail at the driveway
approach.
Perry Franklin, Traffic Superintendent
No comment
Sara Edwards, Development Coordinator
Submittal requirements were adequate. Regarding plat requirements, add the adjacent zoning
and property owners to the plat. Add plat page 175. Include a flood plain reference. Provide a
separate legal description for the original parcel and the newly created parcels. Dimension the
right of way from the centerline of the street. Include easement dimensions.
Conklin: Are you going to hire a surveyor?
Bronson. Yes. There are a total of three lots. There is one lot in the back with two
buildings and two more lots. I have three banks that are going to be mortgaging
property and they want to be able to sell it if I go under. We have a mutual access
easement already prepared for the whole property.
•
•
Plat Review Minutes
March 15, 2000
Page 3
Street requirements were adequate. Parking requirements were adequate. Lot requirements were
adequate.
Large scale development approval is required on each lot if they are developed independently.
Conklin: I have spoken to Roger Trotter and I don't have any problem permitting if these
match the building footprint and you have the parking. A year from now, if you
don't start construction you will have to come back through.
In order for this project to continue in the current review cycle, all requested revisions must be
added to the plat and 37 revised copies submitted to the Planning Division no later than 10 a.m.
on Wednesday, March 22, 2000.
Ron Petrie, Engineering
In general, all designs are subject to the City's latest design criteria. Review for plat approval is
not approval of public improvements and all proposed improvements are subject to further
review at the time construction plans are submitted. The comments and conditions from all
previous meetings for this large scale development are still applicable.
Regarding water and sewer, from previous review letters, the proposed sanitary sewer is required
to be a minimum distance of 10 feet from the easement line. Therefore, revise the plan to meet
this previous requirement or provide an additional offsite utility easement to meet this
requirement. Extend the sewer to the proposed southern lot line approximately 10 feet. Extend
the waterline and fire hydrant approximately 10 feet to the north to prevent service lines from
crossing through adjacent lots.
Petrie: They were suppose to have resubmitted their drawing and I don't have that.
Eric Schuldt, Parks Development Coordinator
No comment
Utility Comments
Kevin Lefler, Cox Communications
Will this come back through?
• Conklin: The large scale has been through the process.
•
Plat Review Minutes
March 15, 2000
Page 4
Lefler: I need one 2 inch conduit from each building out to this green space.
Bob Falk, Southwestern Bell Telephone
I need to get with you to determine if you want our service.
Bronson: I have received a letter from you for a project that I am doing in Bentonville.
Falk:
If you want our service, I need two conduits in case somebody wants another
service later on. The easements on the east side, are they general utility
easements?
Bronson. Yes, sir.
Falk: Note those as utility easements. I can not locate in a water easement.
Johney Boles, Arkansas Western Gas
• I don't know what is going on in the eastern utility easement.
Petrie: It will probably end up being 10 feet from that water line.
Boles: I'd like to see something easier to understand and showing those easements more
clearly. Will the easement be in green space or a parking lot?
Conklin: Part of it will be in the parking lot and part of it won't.
Boles: What is immediately east of this lot?
Bronson: Butterfield Trail Professional Park. I'm between the post office and the
professional park.
Boles: How many proposed tenants for each of these buildings?
Bronson: I don't know yet. The buildings are 6,500 square feet each. The first one has 3
tenants. The second one has one tenant. The last two, I don't know about yet.
•
•
Plat Review Minutes
March 15, 2000
Page 5
PP00-2: PRELIMINARY PLAT
QUAIL CREEK, PHASE III, PP250
This item was submitted by Dave Jorgensen of Jorgensen & Associates on behalf of Sam Mathis
& Bleaux Barnes for property located west of Quail Creek Drive. The property is zoned R-1.5,
Moderate Density Residential and contains approximately 6.65 acres with 13 lots proposed.
Staff Reports
Kim Hesse, Landscape Administrator
Some tree replacement will be required for the percentage of existing canopy lost. Additional
tree protection fencing will be required for the construction of the proposed drainage
improvements along lot 13. Please indicate fencing along the north and south boundary of the
proposed drainage. No utilities shall be installed within the front setback of the lot due to tree
preservation. Water and sewer services for lot 9 shall be located along the north boundary of the
lot and along the south boundary of lot 8 due to tree preservation.
• Chuck Rutherford, Sidewalk & Trails Coordinator
Sidewalks, driveway approaches, and access ramps shall be constructed to Ordinance 4005 An
inspection is required prior to the concrete pour. Driveway approaches shall be constructed of
Portland Cement Concrete. The sidewalk on the south side of Ripple Creek Drive needs to be
shown extending to the northeast property line of lot 2. The sidewalk on the west side of
Dorchester Drive needs to be shown extending to the southeast corner of lot 6.
Perry Franklin, Traffic Superintendent
Check the street light location between lots 3 and 4 with street locations in phase II. A street
light is required every 300 feet.
Sara Edwards, Development Coordinator
Submittal requirements were adequate. Plat requirements were adequate. Street requirements
were adequate. Parking requirements were adequate. Lot requirements were adequate. All new
utilities are to be placed underground.
Eric Schuldt, Parks Development Coordinator
• The parks and Recreation Advisory Board approved money in lieu of land on March 6, 2000 for
Quail Creek Subdivision Phase III. At the current rate with 13 lots, the amount due is $6,110.00.
•
•
•
Plat Review Minutes
March 15, 2000
Page 6
These fees are based upon the present park land formula in accordance with U.D.O. 166.03 K,
166.03 K6, 16604.49 A9, and 166.05 C7. Also, Ordinance 4068 requires the formula base to be
updated every two years to the current average market price. Therefore, the actual park fee will
be determined on the date of Planning Commission approval, unless it is approved at the Final
Subdivision Committee level
In order for this project to continue in the current review cycle, all requested revisions and
additional information must be added to the plat and 37 revised copies submitted to the Planning
Division no later than 10 a.m. on Wednesday, March 22, 2000.
Developers of preliminary plats are required by ordinance to provide notification to all adjoining
property owners of the upcoming public hearings of the Subdivision Committee and Planning
Commission and proof of said notification is required to be submitted with revisions.
Ron Petrie, Engineering
In general, all designs are subject to the City's latest design criteria. Review for plat approval is
not approval of public improvements and all proposed improvements are subject to further
review at the time construction plans are submitted. All corrections and/or additional
information are required to be provided no later than March 22 in order to continue in this cycle.
Regarding water, the minimum easement widths for water lines shall be 20 feet. Wider easement
shall be required if the easement contains any other utility. The proposed waterline along Ripple
Creek Drive can be reduced to 6 inches in diameter. Fire protection and fire hydrant locations
shall meet the more stringent of the published water standards or the Fire Chiefs request. Steel
encasement will be required under box culverts and wing walls.
Petrie: We discussed the water line on Ripple Creek.
Regarding sanitary sewer, increase the easements along the south sides of lots 5 and 6 to be 10
feet from the sewer line. A note should be added to the plat that no fences will be allowed to be
constructed across the 25 foot utility easement on lots 6 through 13. Should the proposed sewer
line end between lots 3 and 4 instead of between lots 4 and 5? Steel encasement will be required
under box culverts and wing walls. "Raincatchers" are required for all new sewer manholes.
Regarding grading, the preliminary grading plan is acceptable. A final grading plan is required
to be submitted and approved prior to beginning construction.
Regarding drainage, all pipes, open swales and channels outside of the street right of way are
private and will be privately maintained. The preliminary drainage report was reviewed for
general compliance and is acceptable as a preliminary report. A final drainage report is required
•
•
Plat Review Minutes
March 15, 2000
Page 7
to be submitted and approved.
Utility Reports
Michael Campbell, SWEPCO
We have underground power tied through a portion of this development from phase two. We're
going to tie the underground loop together. On lot number one, show a 10 foot utility easement
on the north. Also on lot 13, you show a drainage easement. Change that to a utility easement.
Brackett: Actually, we would like to show a 15 foot on the north side We switched the
pipe from the south side to the north side of the creek. We'll make a 15 foot UE
on lot nine.
Conklin: Okay. That will do. Okay.
Campbell: We'll need a crossing between lots 1 and 13 and also between lots 8 and 9 and 3
and 4.
Brackett: Okay. We'll do a 15 foot easement between lots 8 and 9 and lots 3 and 4.
Conklin: There is a 48 inch oak tree at the crossing.
Campbell: You can put it down on lot 8. We have to get back over to tie in to a transform
over between 2, 3, and 4 to tie this loop together.
Brackett: Could we go between 9 and 10? It's more of an angle. Is that too much?
Campbell: We can do that. The developer will have to pay for the extension cost and the cost
of the one street light.
Kevin Lefler, Cox Communications
We'll follow the electric in the same easements and crossings.
Bob Falk, Southwestern Bell
Will Appleby Estates constructed first?
• Brackett: Yes. We are working on the construction plans for Appleby.
•
•
•
Plat Review Minutes
March 15, 2000
Page 8
Falk: To feed these lots, I'm going to have to come through Appleby.
Johney Boles, Arkansas Western Gas
The easements shown are fine. There is a drainage line running east and west on the north side
of lot 13, can you tell me how much cover is going to be over the top of that?
Brackett: I haven't worked it out. We're shooting the profile today.
Boles: If there isn't adequate coverage, I'll need casing across that. I need to be at least
30 inches deep at the rear lot line in the 25 foot utility easement.
Plat Review Minutes
March 15, 2000
Page 9
LS00-6: LOT SPLIT
WEDINGTON PLACE LOT 3R, PP401
This item was submitted by Robert Brown of Development Consultants on behalf of Clary
Development Corporation for property located at Wedington Place. The property is zoned C-2,
Thoroughfare Commercial and contains approximately 7.15 acres. The request is to split the
property into two tracts containing 5.9 acres and 1.25 acres.
Robert Brown was present on behalf of the request.
Staff Reports
Kim Hesse, Landscape Administrator
No comment
Chuck Rutherford, Sidewalk & Trails Coordinator
Sidewalks, driveway approaches and access ramps shall be constructed to Ordinance 4005. An
inspection is required prior to the concrete pour. Driveway approaches shall be constructed of
Portland Cement Concrete. The minimum 6 foot sidewalk will be required on Colorado Drive
and Steamboat Drive at the time of development.
Perry Franklin, Traffic Superintendent
I recommend that you do not name Tahoe Drive since it is not public right of way.
Sara Edwards, Development Coordinator
Submittal requirements were adequate. Regarding plat requirements, we will not require a new
site plan; however, with regard to the easement plat, include plat page 401 and add a flood plain
reference. Street requirements were adequate. Parking requirements were adequate. Lot
requirements were adequate. Provide a shared parking agreement and an access easement.
Conklin: How do you propose to do parking?
Brown: Mr. Clary did Spring Creek and he will have a master document that covers all
these people on these three lots. I will get you a copy of that. Is that satisfactory?
Conklin: Yes. That will work.
Plat Review Minutes
March 15, 2000
Page 10
Ron Petrie, Engineering_
In general, all designs are subject to the City's latest design criteria. Review for plat approval is
not approval of public improvements and all proposed improvements are subject to further
review at the time construction plans are submitted. The comments and conditions from all
previous meetings are still applicable.
Regarding water and sewer, because of the lot split, the waterline on the north side of the
proposed buildings will have to be extended to Lot 3RB The service line and fire protection
lines are required to be on the lot and not crossing adjacent lots. Contact Don Osburn (575-8384)
for preferred meter locations. There may need to be a separate line from the main for both the
fire line and domestic service. The sanitary sewer service line is also required to be completely
on the lot on which it is serving.
Eric Schulds, Parks Development Coordinator
No comment.
Utility Comments
Michael Campbell, SWEPCO
No comment.
Kevin Lefler, Cox Communications
Easements are fine as shown.
Bob Falk, Southwestern Bell
Do we know what's going in here?
Brown: Clary Development and Consumer's Thrift Way will be developing properties.
We'll develop the grocery store in the first phase
Falk: I'll need to have contact with them if they need Southwestern Bell service. If they
want us to service each customer, do I need to send a letter to Mr. Clary?
Brown: I will have him or his construction manager, Jeff Maxwell, contact you.
Falk: 442-3170. If we are going to serve it, I'll need two 4 inch conduits to each
•
•
to
•
Plat Review Minutes
March 15, 2000
Page 11
demarche location. I'll have to have a signed letter from him.
Johney Boles, Arkansas Western Gas
The easements shown are fine. No other comment.
Meeting adjourned at 10:05 a.m..