HomeMy WebLinkAbout1996-10-08 - Minutes• • • • MINUTES OF A MEETING OF TECHNICAL PLAT REVIEW A meeting of the Technical Plat Review Committee was held on Tuesday, October 8, 1996 at 9:00 a.m. in room 111 of the City Administration Building, 113 W. Mountain, Fayetteville, Arkansas. UTILITY REPRESENTATIVES PRESENT: Dennis Burrack, Mike Phipps, and Johney Boles. STAFF PRESENT: Alett Little, Rich Lane, Dawn Warrick, Beth Sandeen, Cheryl Zotti, Nancy Dugwyler, Chuch Rutherford, Randy Allen and Heather Woodruff. LS96-43.00: LOT SPLIT KARYN BROPHY- N. OF E. HUNTSVILLE RD. AND W. OF HAPPY HOLLOW RD. The first item on the agenda was submitted by Karyn Brophy for property located north of E Huntsville Road and west of Happy Hollow Road. The property is zoned R -O, residential - office, and contains approximately 0.98 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson(575-8380) Solid Waste Division- Cheryl Zotti(443-3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: Comments: No objection or comments Landscape Administrator- Beth Sandeen(575-8308) Tree Preservation &/or Replacement: Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: X35 • • Technical Plat Review October 8,1996 Page: 2 • Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: A 5' sidewalk will be required at 1700 Huntsville Road, where the existing office is located and a 5' sidewalk will be required on the undeveloped lot at the time of development. Trails: Location of Utilities, Easements, ROW: Comments: Traffic- Perry Franklin (575-8228) Street Names: N/A Street Lights: One street light is required if none are located within 300' of the property. Comments: Mr. Russell Brophy commented there was a street light across the street within 300' Parks- Nancy Dugwyler (444-3472) Land Dedication Requirement: Money in Lieu: Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning- Dawn Warrick (575-8264) Plat Information: Add plat page 565 to title block, a vicinity map, and show zoning of adjacent property. Proposed & Existing Street rights of way and easements: Required 45' from centerline of Huntsville Road. Subdivision of Land. Site Specific Information: Other requirements: Fire- Mickey Jackson (575-8364) Fire Hydrant Spacing: Fire Hydrant locations: Water Main Sizing. Water Main Looping: Water Main Location: General Street Design: Comments: Engineering- Jim Beavers (444-3418) • Water -Preliminary: Sewer -Preliminary: • Technical Plat Review October 8,1996 Page: 3 Preliminary Grading: Preliminary Drainage: Street -Preliminary: Comments: no comments UTILITIES Ozark Electric Cooperatives- Mike Phipps (521-2900) Requested a 15' utility easement. The easement should be centered down the proposed new property line 7.5' on each side. SW Bell- Andy Calloway (442-3170) Absent TCA Cable- Kevin Leflar (521-7730) Written- no comment • Arkansas Western Gas-Johney Boles (521-1141) No comment • The item was forwarded to Subdivision Committe for approval. \3') • • • Technical Plat Review October 8,1996 Page: 4 LS96-41.00: LOT SPLIT FOR US POST OFFICE STEVE WARD- NORTH OF HWY 156 AND EAST OF CITY LAKE ROAD The next item on the agenda was submitted by Steve Ward for property located north of Hwy 156 and east of City Lake Road. The property is zoned I-1, Heavy Commercial and Light Industrial, and I-2, General Industrial, and contains approximately 10.7 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) Solid Waste Division- Cheryl Zotti (443-3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: Comments: no comments Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement: Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: A 5' sidewalk will be required along City Lake Road at the time of development. Trails: Location of Utilities, Easements, ROW: The railroad right-of-way is not part of this property. Comments: Traffic -Perry Franklin (575-8228) Street Names. N/A Street Lights: Street lights every 300' along City Lake Road if none are in place Comments: Parks -Nancy Dugwyler (444-3472) • • • Technical Plat Review October 8,1996 Page: 5 Land Dedication Requirement: Money in Lieu: Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: Add plat page 642 to title block, show zoning of adjacent property Proposed & Existing Street rights of way and easements: Show right-of-way on City Lake Road from centerline; 35' is required. Label widths of all easements. Subdivision of Land: Provide (on plat) legal description for parent tract and newly created tracts. Delineate where split is occurring. Site Specific Information: Setbacks: Other requirements: Fire- Mickey Jackson (575-8364) • Fire Hydrant Spacing: Fire Hydrant locations: Water Main Sizing: Water Main Looping: Water Main Location: General Street Design: Comments: • Engineering- Jim Beavers (444-3418) Water -Preliminary: Water and sewer plans previously approved (design by McClelland) Sewer -Preliminary: Preliminary Grading: Preliminary Drainage: Since the development for the US Post office does not have to go through the LSD, the drainage will not be reviewed. The designers are cautioned to use sound engineering for the drainage design. Street -Preliminary: Comments: UTILITIES SWEPCO- Dennis Burrack (973-2308) There would be no changes if the building site did not change. Mr. Franklin needs to contact Mr. Burrack to discuss street lights. • • • • • Technical Plat Review October 8,1996 Page: 6 SW Bell- Andy Calloway (442-3170) Absent TCA Cable- Kevin Lefler (521-7730) Written- no comment Arkansas Western Gas-Johney Boles (521-1141) No comments \LXO • • Technical Plat Review October 8,1996 Page: 7 PLA96-20.00: PROPERTY LINE ADJUSTMENT RICHARD ALEXANDER -S. OF CATO SPRINGS RD. AND W. OF CLOVER DR. The next item on the agenda was submitted by Richard Alexander for property located south of Cato Springs Road and west of Clover Drive. The property is zoned R-1, Low Density Residential, and contains approximately 4.17 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) Solid Waste Division- Cheryl Zotti (443-3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement: Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: Trails: Location of Utilities, Easements, ROW: Comments: Sidewalks are not required for property line adjustments Traffic- Perry Franklin (575-8228) Street Names: Street Lights: Comments: • Parks- Nancy Dugwyler (444-3472) Land Dedication Requirement: ,ao • Technical Plat Review October 8,1996 Page: 8 • • Money in Lieu: Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: A surveyors certification or seal is needed. Proposed & Existing Street rights of way and easements: Show existing easements for Clover Creek Subdivision. Subdivision of Land: Site Specific Information: Other requirements: Approval is subject to no further approval, tandem lots or splits. Fire- Mickey Jackson (575-8364) Fire Hydrant Spacing: Fire Hydrant locations: Water Main Sizing: Water Main Looping: Water Main Location: General Street Design: Comments: Engineering- Jim Beavers (444-3418) Water -Preliminary: Sewer -Preliminary: Preliminary Grading: Preliminary Drainage: Street -Preliminary: Comments: UTILITIES SWEPCO- Dennis Burrack (973-2308) Stated they had existing underground running through property. He added the easements would have to remain in place. The easements in the Clover Creek Addition were not shown and needed to be on the plat. There was existing service to this area SW Bell- Andy Calloway (442-3170) Absent TCA Cable- Kevin Lefler- (521-7730) • Technical Plat Review October 8,1996 Page: 9 • • Written - no comments Arkansas Western Gas- Johney Boles (521-1141) Stated there was an existing 2" plastic line, they needed to show the 15' easement on the plat. The item would be forwarded to Subdivision. • • • Technical Plat Review October 8,1996 Page: 10 LS96-44.00: LOT SPLIT PHIL EZELL- S. OF WEDINGTON DR. AND W. OF BETTY JO DR. The next item on the agenda was submitted by Phil Ezell for property located south of Wedington Drive and west of Betty Jo Drive. The property is zoned RA, Residential Acre, and contains approximately 3.64 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) Solid Waste Division- Cheryl Zotti (443 3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement: Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: A 5' sidewalk will be required along Wedington Drive to connect to the sidewalk at the east side of the property Trails: Location of Utilities, Easements, ROW: Comments: The sidewalk will be a condition of approval and will have to be built before the lots could become legal. Traffic -Perry Franklin (575-8228) Street Names: N/A Street Lights: One street Tight is required if none are located within 300' of the property. Comments: • • • • Technical Plat Review October 8,1996 Page: 11 Parks -Nancy Dugwyler (444-3472) Land Dedication Requirement: Money in Lieu: Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: Add plat page 440 to title block Proposed & Existing Street rights of way and easements: 25' public access will be required on the west property line of both lots A 55' right-of-way is required from the centerline on Hwy 16. Subdivision of Land: Site Specific Information: Water and sewer are not currently available onsite. The developer will be responsible for extending both. Other Comments: Mr. Lynn Farrell stated they had moved the south property line of tract A to allow for more parking room so the trees would not have to be disturbed. A revised plat refecting this change was distrubuted to staff. Ms Little stated they would need at 25' public access along the west side to help provide for future circulation. There is a subout on the east side which can connect with Jewel Street to the south. They would make the right -of -way available in the future in case the surrounding area was developed. Mr. Farrell described the property and informed them that the potential buyers did not plan to develop for several years. Fire- Mickey Jackson (575-8364) Fire Hydrant Spacing: Fire Hydrant locations: Water Main Sizing: Water Main Looping: Water Main Location: General Street Design. Comments: Engineering- Jim Beavers (444-3418) Water -Preliminary: Sewer -Preliminary: Preliminary Grading: ias • Technical Plat Review October 8,1996 Page: 12 Preliminary Drainage: The drainage will be addressed as part of a LSD. Street -Preliminary: Comments: The presence of official "wetlands" needs to be checked. UTILITIES Ozark Electric Cooperatives- Mike Phipps (521-2900) no comment SW Bell- Andy Calloway (442-3170) Absent TCA Cable- Kevin Lefler (521-7730) Written- no comment • Arkansas Western Gas-Johney Boles (521-1141) no comment. • The item would be forwarded to Subdivision. • Technical Plat Review October 8,1996 Page: 13 LS96-45.00: LOT SPLIT MELANIE STAFFORD- N. OF HWY 16 W. AND W. OF 59TH ST. The next item on the agenda was submitted by Melanie Stafford for property located north of Hwy 16 West and west of 59th Ave. The property is zoned A-1, Agricultural, and R-1, Low - Density Residential, and contains approximately 3.64 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) Solid Waste Division- Cheryl Zotti (443 3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement: Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: A 5' sidewalk will be required along Wedington Drive on Tract 2 for the lot split. Tract 1 will require a 5' sidewalk at the time of development. Trails: Location of Utilities, Easements, ROW: Comments: Ms. Little stated the sidewalk was a condition of the lot split, it would not be stamped and filed at the court house until the walk was complete. Traffic- Perry Franklin (575-8228) Street Names: Street Lights: Street lights are required every 300' on Wedington Drive along N. 59th Street and at the comer of Wedington Drive and north 59th street if none are in place. Comments: From discussion it was determined there were street lights along Wedington. ILO • Technical Plat Review October 8,1996 Page: 14 Parks- Nancy Dugwyler (444-3472) Land Dedication Requirement: Money in Lieu: $300 per unit Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: Add plat page 397 to title block. Proposed & Existing Street rights of way and easements: 55' right-of-way is required from centerline of Hwy 16 W, plus addtional as needed to cover gas line easement and dedicate 30' public right-of-way sas shown on N. 59th street. Subdivision of Land: Site Specific Information: Other requirements: Fire- Mickey Jackson (575-8364) • Fire Hydrant Spacing: Fire Hydrant locations: Water Main Sizing. Water Main Looping: Water Main Location: General Street Design: Comments: Engineering- Jim Beavers (444-3418) Water -Preliminary: Sewer -Preliminary: Preliminary Grading: Preliminary Drainage: Street -Preliminary: Comments UTILITIES Ozark Electric Cooperatives- Mike Phipps (521-2900) requested a 15' utility easement, 7.5 each side of property line between tracts 1 and 2. SW Bell- Andy Calloway (442-3170) • Absent • Technical Plat Review October 8,1996 Page: 15 TCA Cable- Kevin Lefler (521-7730) Written- no commnet Arkansas Western Gas- Johney Boles (521-1141) There was a 2" high pressure steel line on the north side of Wedington Drive. They would have to locate the line and would require a 30' easement to over the line. The line would have to be centered in the easement. The line would have to be located before the easement was surveyed. Location of this line causes ROW dedication to be an additional 15' from edge of current AHTD Hwy 16WROW. • • Technical Plat Review October 8,1996 Page: 16 • • LS96 40 00: LOT SPLIT FOR CANTERBURY PLACE CUSTOM BUILDING PRODUCTS- N. OF JOYCE BLVD & W OF HWY 265 The next item on the agenda was submitted by Custom Building Products for property located north of Joyce Blvd. And west of Hwy 265. The property is zoned A-1, Agricultural, and R-1, Low -Density Residential, and contains approximately 20.19 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) Solid Waste Division- Cheryl Zotti (443-3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement: Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: Trails. This lies within the Joyce Blvd. Improvement project where an 8' trail is going to be built on the north side of Joyce Blvd. Location of Utilities, Easements, ROW: Comments: Traffic -Perry Franklin (575-8228) Street Names. Street Lights: One street light is required if none are located within 300' of the property. Comments: Parks -Nancy Dugwyler (444-3472) ) 50 • • Technical Plat Review October 8,1996 Page: 17 Land Dedication Requirement: Money in Lieu: Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: Add plat page 176 to title block, dimension Joyce from centerline, and show the zoning of adjacent property. Need revised legal description. Proposed & Existing Street rights of way and easements: Subdivision of Land: Site Specific Information: They were planning on widening Joyce. Other requirements: Fire- Mickey Jackson (575-8364) Fire Hydrant Spacing: Fire Hydrant locations: • Water Main Sizing: Water Main Looping: Water Main Location: General Street Design: Comments: Engineering- Jim Beavers (444-3418) Water -Preliminary: Water and sewer main extensions will be required. Service lines will not be allowed across property lines, they will have to relocate irrigation line. Sewer -Preliminary: Preliminary Grading: Preliminary Drainage: A letter report addressing the drainage is required by ordinance This letter should state the effects or new effects created by the lot split. This will be required prior to the deadline for corrections prior to subdivision committee. The property owner to the west has official wetlands and thus drainage to the west must be checked for water quality, erosion and sediment. Street -Preliminary: Access drive may need to be public street to serve the NE portion of the total property. Comments: Mr. Kurt Jones stated the rest of the property will be subdivided and the access drive would not be necessary. The private drive will be eliminated in the subdivision All public improvements, streets, water, sewer, drainage will be subject to additional review. • UTILITIES )51 • • • Technical Plat Review October 8,1996 Page: 18 Ozark Electric Cooperatives- Mike Phipps (521-2900) stated they would address easements when the project came back for subdivision. SW Bell- Andy Calloway (442-3170) Absent Arkansas Western Gas- Johney Boles (521-1141) No comment �S� • • • Technical Plat Review October 8,1996 Page: 19 LS96-46.00: LOT SPLIT PRESTON FERGUSON- N. OF HUNTSVILLE RD. AND E The next item on the agenda was submitted by Preston Ferguson Huntsville Road and east of Stone Bridge Road. The property is Commercial, and contains approximately 1.45 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) Solid Waste Division- Cheryl Zotti (443-3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement: Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: . OF STONE BRIDGE RD. for property located north of zoned C-2, Thoroughfare Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: A 5' sidewalk will be required for Tract 1 for the lot split. A 5' sidewalk for Tract 2 and Tract 3 will be required at the time of development. Trails: Location of Utilities, Easements, ROW: Comments: Sidewalks need to be added to the legend. Traffic- Perry Franklin (575-8228) Street Names. Street Lights: Street lights required every 300' along Huntsville road if none are in place. One street light required at NW corner of lot 3 if none are located within 300' of the property corner. Comments: \53 • • • Technical Plat Review October 8,1996 Page: 20 Parks- Nancy Dugwyler (444-3472) Land Dedication Requirement: Money in Lieu: Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: Add plat page 528 to title block Proposed & Existing Street rights of way and easements: Label required setback on Tract 3. A 55' right-of-way is required from centerline on Hwy 16. Subdivision of Land: Tracts 2 and 3 will be required to go through the large scale development process; note on plat. Site Specific Information: Delineate where split is occurring Other requirements: The lot split is subject to each lot coming back through the large scale process. • Fire- Mickey Jackson (575-8364) Fire Hydrant Spacing: Fire Hydrant locations: Water Main Sizing: Water Main Looping: Water Main Location: General Street Design: Comments: • Engineering- Jim Beavers (444-3418) Water -Preliminary: Sewer -Preliminary: Preliminary Grading: Preliminary Drainage: A letter report addressing the drainage is required by ordinance. This letter should stated the effects or no new effects created by the lot split. The grading and drainage for the existing ditch should be discussed or it should be stated that the drainage will be addressed as part of LSD. Street -Preliminary: Improvements to Stone bridge will be requested. Ms. Little requested a estimate on bring Stonebridge up to a city street for the 311 feet including curb, guttering and paving. The amount of the improvement would have to be shared by all three tracts of land and the City would need a letter of credit for 150% of the amount or a cash deposit of 150%. 25' right-of-way would be fine. Comments: All public improvements, street, water, sewer, drainage will be subject to additional • • • Technical Plat Review October 8,1996 Page: 21 review. UTILITIES Ozark Electric Cooperatives- Mike Phipps (521-2900) no comment SW Bell- Andy Calloway (442-3170) Absent TCA Cable- Kevin Lefler (521-7730) Written- no comment Arkansas Western Gas- Johney Boles (521-1141) No comment The item was forwarded to Subdivision. 4 • • • Technical Plat Review October 8,1996 Page: 22 LS96-47.00 & LSD96-33.00 FOR WRMC DIALYSIS CENTER NW ENGINEERS -S. OF MONTE PAINTER DR. & E. OF NORTH HILLS BLVD. The next tow items on the agenda were submitted by Northwest Engineers for property located south of Monte Painter Drive and east of North Hills Blvd. The property is zoned R -O, Residential -Office, and contains approximately 15.53 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) Solid Waste Division- Cheryl Zotti (443-3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement. Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks. A 5' sidewalk with a 4' green space along Monte Painter Dr. Trails: Location of Utilities, Easements, ROW: Comments: Discussion on reducing the amount of green space due to the steep slope. Mr. Rutherford felt the 4' green space would work. Traffic -Perry Franklin (575-8228) Street Names. Street Lights: Street lights are too close together. They are required every 300' on Monte Painter Drive. Comments: At Least one van accessible space is required. ( requires an 8' aisle and can be shared by another standard size space. • Technical Plat Review October 8,1996 Page: 23 Parks- Nancy Dugwyler (444-3472) Land Dedication Requirement: Money in Lieu: Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: Add plat page 251 to title block, show property zoning Proposed & Existing Street rights of way and easements: Subdivision of Land: Site Specific Information: Front setback for R -O is 30', if parking between building and row front setback is 50'. Other requirements: 5' sidewalk along Monte Painter Dr.; add to legend. Waiver required for parking over 31 spaces. Fire- Mickey Jackson (575-8364) • Fire Hydrant Spacing: Fire Hydrant locations. An additional hydrant should be installed between the north entry and the NE parking area. Water Main Sizing: Water Main Looping: Water Main Location: General Street Design: Comments: The building will be required to be sprinkled to meet building code. • Engineering- Jim Beavers (444-3418) Water -Preliminary: Sewer -Preliminary: Preliminary Grading: Preliminary Drainage: Street -Preliminary: Comments: Mr. Beavers questioned if they were going to provide detention now or when the whole site was developed. Mr. Gray stated they would provide drainage for this site either on site or adjacent to it. Waiver of Parking Spaces has been requested. 26 required, 83 requested. UTILITIES SWEPCO- Dennis Burrack (973-2308) • • • Technical Plat Review October 8,1996 Page: 24 There was an existing underground loop near by. They would have to have their electrical engineer contact him. SW Bell- Andy Calloway (442-3170) Absent TCA Cable- Kevin Lefler (521-7730) If cable is requested they need to contact Kevin Lefler Arkansas Western Gas- Johney Boles- 521-1141 They would need a 20' easement parallel and adjacent to the south property line of the Rehab. Hospital. and a 20' easement parallel to the west property line. The item was forwarded to the Subdivision Committee. 15 • • • • • Technical Plat Review October 8,1996 Page: 25 LSD96-34.00: LARGE SCALE FOR UNITARIAN UNIVERSALIST FELLOWSHIP ENGINEERING DESIGN ASSOC: S OF CLEVELAND ST & W. OF STORER ST. The next item on the agenda was submitted by Engineering Design Associates for property located south of Cleveland Street and west of Storer Street. The property is zoned R-3, High Density Residential, and contains approximately 1.11 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) Solid Waste Division- Cheryl Zotti (443-3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement: Rare Trees ID'd or Statement: Coordination of approval of "rare tree" removal is required Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: Interior parking lot landscaping is required. Ms. Hesse commented they would have to take out existing trees to fulfill the landscaping requirements. Ms. Little stated they should work with Beth Sandeen to develop a plan. Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: 4' sidewalk are shown on Oakland Ave and Storer Street. The sidewalks shall be continuous through the driveways with a maximum 2% cross slope. The master sidewalk plan calls for a sidewalk parallel to Cleveland street, however, a sidewalk will not work close to Cleveland because of the topography. Trails: Location of Utilities, Easements, ROW: Comments: Traffic- Perry Franklin (575-8228) 1") • • Technical Plat Review October 8,1996 Page: 26 • • Street Names: Street Lights: Street lights required at NW and NE corner of this property if none are in place at these intersections. Comments: 1. If parking spaces in the south parking lot are 45, then the 13.5' aisle width for one-way traffic is adequate (please show all parking space dimensions). 2. The driveway on the south west corner of the property should be narrowed down to a one lane drive to prevent a fifth car from parking over the sidewalk. 3. The 90 parking in the north parking lot requires a 24' aisle. This will eliminate the four spaces on the south side of the lot. 4. Mr. Franklin will check the adjacent streets to see if any on -street parking is available. Ms. Hesse expressed concern about moving the parking that it would run into the slop and the drip line of some of the trees. Parks- Nancy Dugwyler (444-3472) Land Dedication Requirement: Money in Lieu: Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: Add plat page 444 to title block, add sidewalk, hydrant, street light, to legend. Show property owners and adjacent zoning, check scale. Proposed & Existing Street rights of way and easements: 5' additional right-of-way required on Cleveland, Storer, and Oakland. Show this dimension from centerline. Dimension from B.O.0 to centerline of Storer needs to be Changed to 14' Subdivision of Land: Site Specific Information: Need to add ordinance numbers on plat that vacated alleys. Other requirements: Interior parking lot landscaping requirements, 1 tree per 10 spaces; exterior, 1 tree + three shrubs per 40' parking lot frontage. Improvements may be required to Cleveland Fire- Mickey Jackson (575-8364) Fire Hydrant Spacing: Fire Hydrant locations: Water Main Sizing. Water Main Looping: Water Main Location: General Street Design: Comments: iuo • • • Technical Plat Review October 8,1996 Page: 27 • • • Engineering- Jim Beavers (444-3418) Water -Preliminary: Sewer -Preliminary: Preliminary Grading: Preliminary Drainage: Street -Preliminary: Comments: All public improvements (water, sewer, grading, drainage...) Must meet City requirements and are subject to additional review. Improvements to the south half of Cleveland are requested ( storm drainage curb, gutter, pavement). UTILITIES SWEPCO- Dennis Burrack (973-2308) This will have to be served underground. They had service on three sides Cleveland, Oakland, and Stores. It could come from any of these sides. Mr. Rantis stated it would probably be off Oakland Mr. Burrack recommended, with the size of the building expansion and the existing building he recommended they bring the primary conductor in and place a transformer and pad. They would have to agree on a location. They would be obligated to provide SWEPCO with conduit and transformer pad. Have electrical contractor contract him. SW Bell- Andy Calloway (442-3170) TCA Cable- Kevin Lefler- (521-7730) need to contact Kevin Lefler Arkansas Western Gas- Johney Boles (521-1141) Requested a 20' easement on the west side of Storer street. Forwarded to Subdivision Committee. Approval of LSD contingent upon action by Tree and Lanscape Advisory Committee. • • • • Technical Plat Review October 8,1996 Page: 28 LSD96-35 00: LARGE SCALE FOR ARBY'S FLINTCO. INC: S. OF W. 6TH ST. AND E. OF RAZORBACK RD. The next item on the agenda was submitted by Flintco, Inc For property located south of W. 6th Street and east of Razorback Rd. The property is zoned C-2, Thoroughfare Commercial, and contains 1.09 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) Solid Waste Division- Cheryl Zotti (443-3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: The solid waste division will not open gates. It will be their responsibility to have them open when we arrive. Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement: Trees proposed along Hwy 62 should be relocated approximately 20' north of their current location due to sewer line and water line; additionally, any trees planted along 62 must be small -medium growing species Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: Ms. Little stated they were required to have a 15' setback on the parking width, the requirement could be reduced to 5' with landscaping. They are required to have internal landscaping. They needed to coordinate with Beth Sandeen. Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: The asphalt sidewalk will be replaced with 5' concrete sidewalks and access ramps as shown on plat Trails: Location of Utilities, Easements, ROW: Comments: Traffic- Perry Franklin (575-8228) • • • • Technical Plat Review October 8,1996 Page: 29 Street Names: Street Lights: Street light required on 6th street if none located within 300'. Comments: Parks- Nancy Dugwyler (444-3472) Land Dedication Requirement: Money in Lieu: Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: Add plat page 521 to title block, add street light, hydrants, sidewalks, etc to legend. Show property owner to the north. Proposed & Existing Street rights of way and easements: Show right-of-way from centerline of Hwy 62; 55' is required. Show all easement widths. Subdivision of Land: Site Specific Information: Recommended that building be moved closer to street with parking in the rear. Parking requirements are 1 space per table (4 occupants) + 1 per employee; adjust parking accordingly. Other requirements: Tree preservation plan and fee required and preliminary drainage report and fee required before project can proceed through development process. Ms. Little commented they were paving most of their site. She suggested narrowing the distance between parking to 24' instead of 40'. At the back of the site there was room for movability of cars and a drive through. They should aim for 30' between the parking lot and the back space. Ms. Little discussed the idea of an outlet across the rail road tracts to service the neighborhood, adding that Fayetteville, had a policy of connectivity. Fire- Mickey Jackson (575-8364) Fire Hydrant Spacing: Fire Hydrant locations: An additional hydrant is required at the south side of 6th street at the east entrance to the property. Water Main Sizing: Water Main Looping: Water Main Location: General Street Design: Comments: Ms. Little commented there was a fire hydrant on the west side of the other building., she suggested he contact Mr. Jackson to verify the request. • • • Technical Plat Review October 8,1996 Page: 30 Engineering- Jim Beavers- 444-3418 Water -Preliminary: Sewer -Preliminary: Preliminary Grading: The grading and drainage plan must be supplemented with erosion control details and resubmitted with a permit application prior to any construction. Preliminary Drainage: A preliminary drainage report is required by ordinance and would be due by Monday. Street -Preliminary: Comments: Mr Beavers commented, water and fire protection must be addressed. Engineering records indicate that the existing line will not support a fire hydrant for this development. A water main extension may be required. Fire protection must be provided to the Fire Chief s satisfaction. All public improvements (water, sewer, grading, drainage..) Must meet City requirements and are subject to additional review. Ms. Little questioned the previous use of the site, expressing concerns about low, sinking areas on the property. She cautioned that they should do thorough soil testing. Mr. Erickson stated they had done soil testing and they would have to excavate a large amount of soil because of the wet soil. UTILITIES SWEPCO- Dennis Burrack (973-2308) Underground service will be required. They had existing overhead on the south side of Indian Trails. They had crossed over the railroad tracts in a couple of places and have existing crossing there. He would try and get to this piece of property from one of the existing crossings. The details would have to be worked out. There was possibilities of boring underneath the tracts through to the other side. He questioned the load that would be required by the facility. He though they might need a three phase pad on a transformer setting and he did not know where they would place it unless it was by the cooler. The pad would have to maintain national standards and would be approximately 8' X 9'. He questioned if they had reached the railroad right -of way, adding he would need to cross the tracts to the west and on their permit they had sent in had informed them there was a 100' right of way. The lighting will have to be discussed with Mr. Franklin. They would ask for a donation of $595.00 per light. Have the electrical engineer call him as soon as he is selected. SW Bell- Andy Calloway (442-3170) Need to contact Mr. Calloway. • TCA Cable- Kevin Lefler (521-7730) • • 24 • • • Technical Plat Review October 8,1996 Page: 31 Arkansas Western Gas-Johney Boles (521-1141) the proposed meter location is fine. They needed to be notified before construction. Ms. Little informed if they had to substantially change the site because of the railroad right-of- way they would have to come through the process again and the project would not go forward. uC • • • • • Technical Plat Review October 8,1996 Page: 32 LSD96-36.00: LARGE SCALE FOR CHAMBERLAND SQUARE APARTMENTS TIM RISLEY & ASSOC.-S. OF WEDINGTON DR. & W. OF SHILOH DR. The next item on the agenda was submitted by Tim A. Risley and Associates for property located south of Wedington Drive and west of Shiloh Drive. The property is zoned R-2, Medium - Density Residential, and contains approximately 8.02 acres. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) Solid Waste Division- Cheryl Zotti (443-3400) Cul-de-sac Street Width: Container Location: Container Pad: Screening: Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement: avoid planting trees within the water and sewer easement. Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: A 4' sidewalk with a 4' green space between the curb and sidewalk is required along Shiloh Drive. This also needs to be shown on the plans and in the legend. Trails: Location of Utilities, Easements, ROW: Comments: Traffic- Perry Franklin (575-8228) Street Names. Street Lights: Comments: Parks- Nancy Dugwyler (444-3472) \UU el • • Technical Plat Review October 8,1996 Page: 33 Land Dedication Requirement: Money in Lieu: $23,040 Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: Add plat page 440 to title block, add sidewalk to the legend. Add streetlight to the legend. Proposed & Existing Street rights of way and easements: Dimension Shiloh Road from the centerline; 30' of right-of-way is required from this centerline. Need to connect to Jewell Road on the west. Subdivision of Land: May need lot split or subdivision prior to large scale development. Site Specific Information: Need 1 ADA accessible parking space for each building group. Need a name for the entry drive. Other requirements: A 4' sidewalk is required along Shiloh Drive Ms. Little stated the City had a requirement for the connect to the street stubout to the west, Jewell, they created that in 1978 with a view on extending the street to Shiloh. • Mr. Abernathy, Mr. Risley, and Ms. Little discussed the necessity for the street. Ms. Little stated the street was not negotiable it would have to be built and a City Street. The project will come out of process until it redesigned. • Fire- Mickey Jackson (575-8364) Fire Hydrant Spacing: Fire Hydrant locations: Move hydrants shown at southwest corner of building 1 to island at northwest corner of building 1. Move hydrant shown at southwest of building 7 to island southeast of building 7, east approximately 75'. Add a hydrant between building 9 and 10. Water Main Sizing: All water mains suppling hydrants need to be 8". Water Main Looping: Water Main Location: General Street Design: Comments: Engineering- Jim Beavers (444-3418) Water -Preliminary: Final design subject o additional review. Must be designed by a P.E. The applicant must decide between a private 8" loop with a master meter or a 6/8" line extending to the existing water line at the intersection of Jewell and Betty Joe. Fire protection to meet the Fire Chiefs request Taps to the 36" CPP will not be allowed. The 8" ductile iron pipe between the fire hydrant and the 36" CPP may be tapped. Minimum easement widths shall be 20'. • • • Technical Plat Review October 8,1996 Page: 34 Sewer -Preliminary: Final design subject to additional review. Must be designed by a P.E. Minimum easement widths shall be 20'. The elevations shown do not match our as - builds. Check the discrepancy. Additionally, there was a subdivision approved for this same property in March 1984 and the elevations for this approved design more closely match our as -builds. Bends in sewer mains, as shown, will not be allowed. Sewer lines will not be allowed in detention ponds. Preliminary Grading The contours do not match our topography. Preliminary Drainage: The Stormwater ordinance requires a preliminary drainage report, by a P.E. to accompany the application. This was not furnished, therefore the item must be pulled from the process until the preliminary drainage report is furnished. The Stormwater Ordinance requires the detention unless proven otherwise. The proposed swale at the north end of the property may not be adequate. It is Mr. Beavers initial judgement that detention shall be required and provided on site. Street -Preliminary: They are required to connect to the stubout to Jewel Street. Comments: There was discussion about the northeast corner of the property not being shown on the plat. The whole piece of land would have to be shown on the plat. UTILITIES SWEPCO- Dennis Burrack (973-2308) The underground electric was shown in a non-standard SWEPCO form. They had two transformers serving one existing structure. He questioned if they were fire walled. He sketched a typical layout for him and added they tryed to keep the secondary runs down to a minimum. They would have low voltage, if they used the proposed layout. He suggested setting them internal and close so the secondary runs would not be very long. He would not request easements now, would wait for the changes. SW Bell- Andy Calloway -442-3170 Absent TCA Cable- Kevin Lefler- 521-7730 Written, no comment Arkansas Western Gas- Johney Boles (521-1141) Will request easements later, adding they would need to assist in the design of lines. They would have to have a 20' easement for any line around perimeter. Any line going to a building they would have to 15'. • The item was pulled from the process. �4� • • • Technical Plat Review October 8,1996 Page: 35 PP96-6.20: PRELIMINARY PLAT FOR CHARLESTON PLACE GREG HOUSE- N. OF MISSION AND E. OF AMBER. The last item on the agenda was submitted by Greg House for property located north of Mission and east of Amber. The property is zoned R-1, Low Density Residential, and contains approximately 12.84 acres with 69 lots proposed. Comments from the following were presented: STAFF: 911 Coordinator -Jim Johnson (575-8380) The main street thru this project should have only one name. Amber Drive should be used and would change to Hackberry at Overcrest. The names Charleston and Woodridge should not be used, because the names are already being used. Solid Waste Division- Cheryl Zotti (443-3400) Cul-de-sac: Street Width: Container Location: Container Pad: Screening: Landscape Administrator- Beth Sandeen (575-8308) Tree Preservation &/or Replacement: Need revised tree preservation plan reflecting changes made on plan of former "Ambercrest court" to "Charleston Place" Rare Trees ID'd or Statement: Location of Utilities, Easements, ROW: Location for Storage, Cement Wash-out, etc.: Tree Protection Specifications: Other Landscaping Requirements: Sidewalk and Trails Coordinator- Chuck Rutherford (575-8291) Sidewalks: Trails: Location of Utilities, Easements, ROW: Comments: sidewalks are shown as required. Traffic -Perry Franklin (575-8228) • Street Names: Woodridge already exist and must be renamed. Street Lights: A street light is required at the corner of Moss Lane and Hackberry Drive. A street • • • • • Technical Plat Review October 8,1996 Page: 36 light is required at the corner of Hackberry Drive and Woodridge Drive. A street light is required between lot 23 and 26 and at the east end of Hackberry if none are located within 300'. Comments: Parks -Nancy Dugwyler (444-3472) Land Dedication Requirement: Money in Lieu:$20,700 Vehicle access to Park Land: Pedestrian Access Easements: Drainage through Park: Planning -Dawn Warrick (575-8267) Plat Information: Add plat page 370 to title block, add street lights and hydrants to legend. Proposed & Existing Street rights of way and easements: Each private street shall be designated as such on the plat. Subdivision of Land: Site Specific Information: Provide a copy of protective covenants Other requirements: Will be required to apply for easement vacation for existing 12" Sanitary Sewer line. Fire- Mickey Jackson (575-8364) Fire Hydrant Spacing: Fire Hydrant locations: Hydrant shown on lot 54 needs to be moved to lot 51 for property distance coverage for lots 62 and 63. A hydrant needs to be added placed on lot 17 at intersection of streets. Water Main Sizing: Water Main Looping: Water Main Location: General Street Design: Comments: Engineering- Jim Beavers (444-3418) Water -Preliminary: Final design subject to additional review, line size may be 8" fire protection to meet the Fire Chief's request. Minimum easement widths shall be 20' Sewer -Preliminary: Final design subject to additional review. Minimum easement widths (or combination of easements and ROW) shall be 20' and wider for sewer lines over 10' in depth. Sewer lines will not be allowed in detention ponds. Existing line cannot be vacated until the new line is in service. Preliminary Grading: Preliminary Drainage: Based upon recent experiences the requirements for preliminary drainage \rib • • • Technical Plat Review October 8,1996 Page: 37 are revised such that it, and when, detention is proposed or required the detention pond shall be designed and the design submitted as part of the preliminary report. The design of these two detention ponds shall be required pnor to the deadline for changes to proceed to subdivision committee. Show existing swales and how these will leave the property. Street -Preliminary: The proposed "round -a -bout" and connecting streets are a concern. Does the engineer have any sight distance, traffic flow and safety information to provide? Show all street dimensions. Label private streets. Comments: Neighbor, Mr. Chalfant had expressed concern about the trees between his property and the proposed detention pond. He wants the trees to remain. Drainage facilities will be private restrictive covenants must provide for maintenance. Mr. Beavers questioned if there would be adequate sight distance in the round -a -bout. Mr. House explained it would be one way. Adding the sight distance problem would not be with the round -a -bout but with the island. Mr. Beavers stated he would need to be able to discuss the issue at Subdivision. UTILITIES SWEPCO- Dennis Burrack (973-2308) on 33, 34, 35, they needed to have easement on the corners. 50 and 51 he would need an easement touching them, 10'. SW Bell- Andy Calloway (442-3170) Absent TCA Cable- Kevin Lefler (521-7730) Arkansas Western Gas- Johney Boles (521-1141) Need 15' easement to continue across lots 8 and 9. They would need casings NW corner between lot 63 and 64 and lot 58 and 59, crossing Charleston Glen a 4" casing would be required. Between lot 67 and 68 crossing Charleston Glenn down to property line on lot 56, between lot 11 and 12 and 20 and 21 crossing Woodridge Drive. Lot 7 and 8, lots 28 and 29 crossing Woodridge Drive. North to lots 46 and 47 crossing Charleston Glen to lot 50 and 51. Between lots 39 and 40 crossing to lot 34. Mr. Beavers added the ponds would have to maintained by the property owners association. Mr. House questioned why PUD would have to maintain the detention ponds if they had been • Technical Plat Review October 8,1996 Page: 38 • • dedicated to the City. \) 2