MINUTES OF A SUBDIVISION COMMITTEE MEETING
A meeting of the Fayetteville Subdivision Committee was held on Thursday, March
3, 1994 at 10:30 a.m., in Room 111 of the City Administration Building, 113 West
Mountain Street, Fayetteville, Arkansas.
MEMBERS PRESENT: Jerry Allred, Ken Pummill and Bob Reynolds
OTHERS PRESENT:
Tim Conklin, Alett Little, Jerry Kelso, F.
Gabbard, Tom Hopper, Laleh Aminorez, Dave
Porter and Sharon Langley
LARGE SCALE DEVELOPMENT - CITIZENS BANK
CITIZENS BANK OF NWA - W OF CROSSOVER, N OF MISSION
The first item to be heard was a large scale development for Citizens Bank of
Northwest Arkansas submitted by Jerry Kelso, Crafton Tull & Associates, for
property located on the west side of Crossover, north of Mission. The property
contains 1.92 acres.
Mr. Conklin stated the applicant was proposing a 60 -foot right-of-way with a 30 -foot
back to back private drive curving to the south, giving access to Highway 45. He
also noted the applicant planned to plant 10 trees in order to meet the tree ordinance
requirements.
MOTION
• Mr. Pummill moved to forward the plat to the full Planning Commission.
Mr. Reynolds seconded the motion.
•
Subdivision Committee
March 3, 1994
Page 2
• LARGE SCALE DEVELOPMENT - HAMPTON INN HOTEL
NARRY KRUSHIKER - SW CORNER OF OLD FARMINGTON & SHILOH DRIVE
The next item was a large scale development for Hampton Inn Hotel presented by
Steve Jordan and Harry Gray on behalf of Narry Krushiker for property located at
the southwest corner of Old Farmington Road and Shiloh Drive.
Mr. Conklin advised the project was a 70 -unit hotel. He stated the applicant had
proposed working with the owner of the adjoining shopping center for access into the
shopping center parking lot. He also noted the applicant had agreed to provide a
connection of the hotel parking lot at the rear of the building. He advised the
applicant did need a variance for the covered drive-through since it extended into
the 50 -foot setback.
•
•
He stated staff had required a sidewalk along Shiloh but the applicant was asking
that the sidewalk be waived since neither adjoining property had a sidewalk.
Mr. Pummill pointed out the applicant was offering a Bill of Assurance for the
sidewalk and advised he saw no problem with accepting the Bill of Assurance.
Ms. Little explained the City was now either placing a lien on the property or
requiring money in an escrow account.
Mr. Gray advised the applicant would not object to a lien however, he did not believe
he would want to place money in escrow. He pointed out his client did want to tie
into the adjacent shopping center; but, if a sidewalk was installed at this time, it
would dead end into a gully.
The Committee discussed a possible tie-in to the shopping center, stating they
believed it would be a good idea to have an access.
Ms. Little explained this project adjoined Old Farmington Road and it was customary
to require the developer to pay for one-half of the improvements to the adjacent
road, if improvements were needed. She advised that, when Regency 7 Motel had
been approved, the applicant had not been required to improve his portion of Old
Farmington Road. She stated this developer did not feel it was fair to require him
to upgrade the street when the adjoining property owner had not been required -to
do so. She further stated staff was still recommending this applicant pay for one-
half of the improvements to that portion of Old Farmington Road which adjoined the
subject property.
In response to a question from Mr. Pummill, Mr. Gray advised he believed it would
cost between $6,000 and $7,000.
After discussion, it was determined this matter should be forwarded to the full
Planning Commission for decision.
MOTION
Mr. Pummill moved to forward the large scale development.
Mr. Reynolds seconded the motion.
Subdivision Committee
III March 3, 1994
Page 3
•
•
FINAL PLAT - WILLOW SPRINGS, PHASE I
RALPH WALKER - N OF WEDINGTON, W OF RUPPLE RD.
The next item was a final plat for Willow Springs Subdivision, Phase I, presented by
Dave Jorgensen on behalf of Ralph Walker for property located on the north side of
Wedington Road, est of Rupple Road. The property is zoned R-1.5, Moderate
Density Residential, and R-2, Medium Density Residential, and contains 15.25 acres
with 68 proposed lots.
Mr. Conklin advised this subdivision would eventually tie into Northwest Acres,
Phase IV. He also noted the next item was Phase II of Willow Springs which tied into
Carriage Way to the south.
In response to a question from Mr. Pummill, Mr. Conklin stated the lots measured
approximately 6,000 square feet. He pointed out the property was zoned R-1.5 and
R-2 but only single family homes were being constructed.
MOTION
Mr. Pummill moved to forward the plat to the Planning Commission.
Mr. Reynolds seconded the motion.
•
•
•
Subdivision Committee
March 3, 1994
Page 4
PRELIMINARY PLAT - WILLOW SPRINGS, PHASE II
RALPH WALKER - OFF CARRIAGE WAY, N OF WEDINGTON DR.
The next item was a preliminary plat for Willow Springs, Phase II, submitted by Dave
Jorgensen on behalf of Ralph Walker for property located off Carriage Way, north
of Wedington Drive. The property is zoned R-1.5, Moderate Density Residential,
contains 12.17 acres with 55 lots proposed.
Mr. Conklin showed the Committee how this subdivision would fit in with adjoining
subdivisions and requested verification the sidewalk along Patrick lined up with the
sidewalk in Phase IV of Northwest Acres.
MOTION
Mr. Reynolds moved to forward the plat to the Planning Commission.
Mr. Pummill seconded the motion.
•
Subdivision Committee
March 3, 1994
Page 5
PRELIMINARY PLAT - THE MEADOWLANDS, PHASES I & II
HAYDON McILROY - S OF WEDINGTON, E OF 46TH AVE.
The next item was a preliminary plat for The Meadowlands, Phase I, presented by
Dave Jorgensen on behalf of Haydon Mcllroy for property located ont he south side
of Wedington, east of 46th Avenue. The property is proposed to be zoned R-1, Low
Density Residential, R-1.5, Moderate Density Residential, and R -O, Residential -
Office, and contains 40 acres with 104 lots proposed.
Ms. Little pointed out the main street of this subdivision would line up with the main
street in Willow Springs. She also noted it would eventually intersect with Rupple
Road. She showed the Committee an aerial photograph of the property, pointing out
there was vacant property between the existing Luttrell Subdivision and the
proposed Meadowlands. She advised staff had requested an access to the west so
there could be a connection made at some time in the future.
Mr. Jorgensen advised there would be R-1 zoning on the west of the main street, and
R-1.5 property to the east side of the main street and lots 1 and 2 would be R -O.
Ms. Little pointed out there would be a good buffer area.
MOTION
• Mr. Reynolds moved to forward the plat to the Planning Commission.
Mr. Pummill seconded the motion.
•
Subdivision Committee
March 3, 1994
Page 6
• LARGE SCALE DEVELOPMENT - CARPENTER MINI -STORAGE
CARL CARPENTER - S OF 15TH, E OF S. SCHOOL
The next item was a large scale development for Carpenter Mini -Storage submitted
by Kurt Jones, Northwest Engineers, on behalf of Carl Carpenter for property
located south of 15th Street, east of South School. The property contains 14.98
acres.
•
•
Ms. Little advised the only issue related to requiring 50 feet of right-of-way. She
pointed out the applicant had discussed constructing a separate building for an
office which might be relocated.
Mr. Jones stated the owner was still not certain where he wanted the office to be
located.
Mr. Allred advised he believed all details should be worked out prior to this item
going to the full Planning Commission.
Ms. Little explained the entire tract contained almost 15 acres but this development
covered only 4 acres.
Mr. Jones advised that, if the office was constructed on this site, they could move
the building over enough to have 50 feet of right-of-way.
Ms. Little also stated the developer would need a parking waiver. She explained
staff was recommending the waiver so the interior of the site could be gravel but the
perimeter would be paved.
Mr. Jones advised the owner wanted to use chip and seal on the perimeter.
Ms. Little stated chip and seal was not acceptable for the perimeter. She advised
staff was agreeable to not paving the overflow storage area for permeability. She
noted there was a screening requirement.
Mr. Jones advised the owner had agreed to provide screening but was hesitate to
screen too much. He stated they wanted visibility in order to deter break ins.
Ms Little pointed out that, while the property was zoned industrial, it was across
the street from Walker Park. She informed Mr. Jones she would allow chain link
fence but there would have to be screening or a view obscuring fence.
Mr. Conklin advised landscaping would be required in order to reduce the front
building setback.
Mr. Allred suggested presenting the matter to the full Planning Commission.
MOTION
Mr. Pummill moved to forward the plat to the Planning Commission.
Mr. Reynolds seconded the motion.
Subdivision Committee
March 3, 1994
Page 7
• FINAL PLAT - MOSIER ADDITION
CLIFF MOSIER - SW CORNER OF WEDINGTON AND 54TH
The next item was a final plat for Mosier Addition submitted by Alan Reid on behalf
of Cliff Mosier for property located ont eh southwest corner of Wedington and 54th
Street. The property is zoned R-1, Low Density Residential, and contains 2.07
acres with 2 lots.
•
•
Mr. Conklin explained this would have normally been a lot split rather than a
subdivision but the property had already been split three times (the maximum).
MOTION
Mr. Reynolds moved to forward the plat to the Planning Commission.
Mr. Pummill seconded the motion.
Subdivision Committee
March 3, 1994
Page 8
• LARGE SCALE DEVELOPMENT - ELEMENTARY SCHOOL
FAYETTEVILLE SCHOOL DISTRICT - N OF HWY 45, E OF HWY 265
The last item was a large scale development for an elementary school submitted by
Laleh Aminorez of Hailey & Associates, Architects, for property located on the north
side of Highway 45, east of Highway 265. The property is zoned P-1, Institutional,
and contains 60.07 acres.
•
•
Mr. Bunn pointed out the main access to the school was proposed to be off of
Highway 265 after the extension of Township. He further advised the city had
agreed to extend Township up to the property line of this site.
Ms. Little advised the park shown on the plat was owned by the school but leased to
the city.
Mr. Bunn stated that, until Township was extended, the school had planned a
temporary access from Highway 45. He further stated staff believed a permanent
access from Highway 45 would be a good idea, pointing out many of the students
could be coming from the south and east of the site. He advised they had asked the
school to carefully consider making the Highway 45 access a permanent one. He
noted there were some sight distance problems along Highway 45 but he and Perry
Franklin, Traffic Department, had completed some rough measurements along the
highway. He advised there was one location on Highway 45 which would met the
sight distance requirements. He also stated a pedestrian access across Highway 45
had been suggested.
Ms. Little advised she would like the school district to furnish the school boundaries
to the Planning Commission, stating the boundary lines were important as far as
streets, trails, etc.
Mr. Allred pointed out the second access should also alleviate some of the traffic
congestion which would occur on Highway 265.
Mr. Conklin stated Mickey Jackson, Fire Chief, had also favored two accesses to the
school .
Mr. Allred asked if it was possible for the southern access to line up with
Whippoorwill.
Ms . Little advised she and Tim Conklin had driven the area and had not found a good
access point on Highway 45. She noted a light at Whippoorwill, since it was at the
bottom of the hill, could create additional problems.
Mr. Conklin pointed out that, when the junior high school was constructed on this
site, the access would have to be off of Highway 45.
Mr. Allred requested that Mr. Franklin review this site and recommended preferred
accesses prior to the Planning Commission meeting
Ms Harold Burton, 2096 Box, expressed concern regarding any connections on Box
Avenue. She also advised there was already a drainage problem in the area.
Mr. Allred explained there would be no connection to Box Street. He further stated
a drainage study had to be submitted by the developer and approved by the city
engineer prior to construction of the school.
•
•
•
Subdivision Committee
March 3, 1994
Page 9
Mr. V. B . Runnels asked why Highway 265 would be the main access to the school
rather than Highway 45.
Mr. Allred explained that, at some point. Highway 265 would be a 4 -lane road with
signalization at Township.
In response to a question from Mr. Runnels, Mr. Bunn explained the city would
extend Township (2 lanes) to the school property with a sidewalk on the south side
of the street.
Ms. Fountain, an area resident, complained about people dumping trash behind her
house which was adjacent to the site. She asked if the school would be putting up
a fence.
Ms. Little explained the city could not require the school to put up a fence.
Ms. Burton asked if the ball courts and tennis courts would be open to the public at
night. She also wanted to know when the school would be completed.
Mr. Bunn stated the school usually allowed public use but it was doubtful the courts
would be lighted.
Ms. Aminorez stated scheduled completion was the Fall of 1995.
Mr. Bunn noted the school was also required to comply with the tree preservation
ordinance.
Ms. Aminorez advised there would be minimal clearing.
Mr. Runnels stated the extension of Township would remove a number of large trees.
Mr. Bunn also stated the trees within the utility easements would probably be
cleared.
MOTION
Mr. Pummill moved to forward the plat to the Planning Commission
Mr. Reynolds seconded the motion.
The meeting adjourned at 11:35 a.m.