HomeMy WebLinkAbout1994-01-20 - MinutesMINUTES OF A SPECIAL SUBDIVISION COMMI'1^1'hE MEETING
• A special meeting of the Fayetteville Subdivision Committee was
held on Thursday, January 20, 1994 at 4:30 p.m. in Room 111 of
the City Administration Building, 113 West Mountain Street,
Fayetteville, Arkansas.
•
MEMBERS PRESENT:
OTHERS PRESENT;
Jerry Allred, Ken Pummill, Bob
Reynolds
Don Bunn, Tim Conklin, John
Redfern, Kurt Jones, Daran Johnson
LARGE SCALE DEVELOPMENT - DUPLEXES
DARAN JOHNSON - N. OF DOCKERY, E. OF RAY
The only item on the agenda was a large scale development for
duplexes presented by Kurt Jones, Northwest Engineers, on behalf
of Daran Johnson for property located north of Dockery Lane, east
of Ray Street. The property is zoned R-2, Medium Density
Residential, and contains 1.40 acres with 6 proposed units.
Mr. Conklin explained a meeting between Planning staff and the
developer and engineer of the large scale development had
occurred on Thursday, January 20, 1994 - noting Ms. Little had
agreed with 40, rather than 50, feet of off-site right-of-way but
requested access to the east. He stated he and Mr. Bunn, City
Engineer, confirmed for the Subdivision Committee that the road,
because it was a private drive, would not be extended at a future
time to the north. Mr. Conklin noted Ms. Little, however, did
feel the road could be extended east to Cherry Street.
Mr. Johnson suggested the best way to provide access for future
developments in the area was to connect to the end of Ray Street.
In answer to a question from Mr. Bunn, he explained the necessary
right-of-way would result in the loss of one duplex.
Mr. Conklin it was possible to loop Cherry Street to facilitate
the necessary connection.
In response to a question from Mr. Conklin, Mr. Jones explained
Ms. Little suggested, in order to provide the subject access,
providing a zero setback between units.
Mr. Johnson confirmed obtaining right-of-way from the school was
not feasible.
Mr. Allred confirmed the area near the Mhoon Beef site was
currently vacant.
• Mr. Bunn remarked the units could be repositioned to provide the
subject access.
In response to a remark from Mr. Pummill, Mr. Conklin advised the
staff had recommended waiving the 50 foot right-of-way
requirement and approved 40 feet of right-of-way subject to
access being provided to the east.
In response to a question from Mr, Reynolds, Mr. Johnson stated
he was unsure if a sidewalk was required - adding his concern was
that - the sidewalk being constructed on his property and not
public right-of-way - liability. He explained, in response to a
question from Mr. Bunn, the required specifications for the
street had not been determined - adding the street would be 24
feet in width, which is wider than the current street. Mr.
Johnson remarked Ms. Little had suggested a Bill of Assurance on
improvements to the street.
Mr. Bunn explained a Bill of Assurance had no specific time
whereas an Escrow account had a time limit of five years.
Mr. Allred expressed concern that required improvements for
Cherry Street developments had not been waived.
Mr. Johnson stated Ms. Little advised she would agreed to a 40
foot right-of-way if he would construct a sidewalk. In answer to
a question from Mr. Bunn, he remarked the requirements for
construction of the street would be the same as for the private
drive - double chip -and -seal.
limit
other
Mr. Bunn suggested constructing the subject street to
standards - 24 feet wide with 2 inches of asphalt and
base - without curb and guttering - adding this would
developer from his obligation to a Bill of Assurance.
remarked the City could then }mprove the street - i.e.
curb and guttering - at a future time.
street
6 inches of
free the
Mr. Bunn
adding
Mr. Jones confirmed the distance of the subject street would be
220 feet.
Mr. Allred confirmed the maintenance of the subject street would
be public and therefore the responsibility of the City.
Mr. Bunn explained a
acceptable and would
Mr. Johnson remarked
developer.
double chip -and -seal private drive would be
be the responsibility of the developer.
he felt that was fair to him as the
Mr. Allred expressed doubt that the area would develop to the
extent that the requested access to the east would be necessary.
Mr. Pummill remarked the City had not built a street in a number
of years and any access would be required of future developers.
Mr. Bunn advised the Planning Commission could chose to require
or not require the subject access as a recommendation of the
•
•
•
Special Subdivision Committee Meeting
January 20, 1994
Page 3
staff.
In response to a request from Mr. Conklin, Mr. Johnson stated he
agreed to a 40 foot right-of-way street, sidewalk and required
improvements to the subject street from the end of Dockery Lane
to the site - adding he would prefer double chip -and -seal but
would agree to 6 and 2 asphalt as required by Mr. Bunn in lieu of
a Bill of Assurance. He explained the sidewalk would extend 650
from the end of Dockery Lane to the north property line.
Mr. Bunn remarked an easement for the sidewalk could be granted
to insure the developer's liability would not exceed liability
for a sidewalk constructed in public right-of-way. He stated the
developer would still responsible for the maintenance of the
sidewalk - adding the easement would be exclusively for a
sidewalk.
Mr. Pummill confirmed the Subdivision Committee could recommend
the Planning Commission accept the sidewalk easement.
There was a discussion to determine the width of the necessary
sidewalk easement.
Mr. Reynolds expressed concern that an easement be provided for
future development to the northeast and northwest of the site.
Mr. Allred remarked if the Planning Commission chose not to
require the subject access, potential development to the east
would not be limited.
Mr. Conklin confirmed the item would be removed from the consent
agenda.
Mr. Bunn pointed out one of the staff comments would be a request
that the subject access to the east be required.
MOTION
Mr. Pummill moved to forward the plat to the Planning Commission
with the Subdivision Committee recommendation that the Commission
accept the plat with the 24 foot wide, 240 foot long portion of
the subject street be improved to meet city standards without
curb and guttering, the sidewalk easement, and 40 foot of right-
of-way subject to staff comments.
Mr. Reynolds seconded the motion.
The meeting adjourned at 5:10 a.m.