MINUTES OF A SUBDIVISION COMMITTEE MEETING
The Subdivision Committee of the Planning Commission met at 3:30 p.m.,
Tuesday, December 15, 1964, in the Office of City Planning in the City
Administration Building.
PRESEffr:.. Lighton, Chairman
ConsultantBryan Walker
Ja A. Vizzier, Planning
permitThe first item discussed was the question on whether or not the
creation of more than one lot out of an wdsting parcel would interfere
with future subdivision of property east of Highway 71 South and south
of Twenty Second Street or surrounding properties, I
Paul E. Sullins had requested a .. property which .:
not been subdivided. The subdivision regulations permit the building
inspector to decide if the creation of one lot will interfere with
future development. (This decision had been made by Harold E. Lieberenz,
City Building Inspector, when building permit No. 5388 was issued
Februar7 3. 1964). However, if more than one lot is involved, the
Planning Commission is to determine if the proposed lots will interimm
fare with future subdivisions and development.
After briefly discussing the request of Mr. Paul E. Sullins, the
Committee was _ .y to recommend to the Planning Commission
Sullins not be required to file the preliminary plat and follow the
procedure required by the Subdivision Regulations as there would be no
new street created or improvements installed, The Committee further
rec.de nded thatSullins be issuedbuilding Permit*
The Committee discussed the final subdivision plat of Virginia Hills.
James R. Hale ..:. shown .. his final:urn. of the
-
PlanningCommission noted • . the preliminary plat au. as recorded
in the Committee's report of October 12, 1964, and the Planning
Commission n r - of • therefore nn
recommended that the final.. plat of Virginia
approved and that the secretary be authorized to sv. the plat for
recording after the engineering on the streets has been worked out
•. niu .y •. .unu' •:
0 During the Committee's discussion, it was noted that several items had
I
m
not been corrected.
• 1. Lots 303 31 and 32 have double street frontage which is not
desirable.
2. The proposed streets in the subdivision are not named.
3. All of Letson Clark's property should be shown on the preliminary
plat and has not been shown.
4. The 20 feet in the northeast corner which Letson Clark has
dedicated for street purposes is not ihown on the plat.
However, the following items were in compliance:
le The streets located south and east of existing Clark Street
and the proposed now street, running more or less parallel to
said Clark Street and said proposed street, have been extended
to the boundary of the adjoinin property.
2o The lot line between lot 8 and lot 14 should be extended in a
southwesterly direction to the street line.
3. The error in contour lines on topography map has been
4o Remarks from utility companies had been made and were noted on
the Plato
5. Three high pressure gas mains located in the Tomlyn Valley View
Addition were shown on the revised preliminary plate
Additional problems we" created by the location of the n a pressure
mainsgas
and the extension of the eastrowest streets to the boundary of
the adjoining property*
1. Several lots would be unusable because of the easements required
by the gas company on the high pressure gas mains. The remain-
:..
shouldgiven lot number.
2o Street line and gas main easement
descriptionsproperty do not become complicated*
The Committee's
the Committee
Planning Commission after the public hearing at w•
The meeting adjourned at ww Pomo