HomeMy WebLinkAbout2008-05-08 - Agendas - Final aee;lile
ARKANSAS
ENGINEERING DIVISION CORRESPONDENCE
For further information contact: Ron Petrie, 575-8206
STREET COMMITTEE MEETING AGENDA
The City of Fayetteville Street Committee will be meeting in Room 219 of City
Hall at 4 :30 P.M. on Thursday, May 8, 2008 . The following topics proposed for
discussion at the committee meeting include:
1 . Call Meeting to Order by Chairman Lioneld Jordan
2. Approval of the minutes from the February 28 and March 10, 2008 Street Committee
meetings.
3 . WEDINGTON DRIVE: Discussion of a reimbursement to the Arkansas Highway &
Transportation Department in the amount of $30,889. 11 for revisions to the project plans.
4. ACCESS MANAGEMENT ORDINANCE: Discussion of a proposed Access
Management Ordinance to replace UDO Chapter 166.08, Design Standards for public
streets. This item was tabled at the December 10, 2007 meeting.
5 . Discussion of a request to vacate a portion of a platted alley located between Park Avenue
and Highland Avenue and to the north of Prospect Street as requested by Chip Dickenson.
This item was tabled at the February 28, 2008 meeting.
6. STEELE BOULEVARD MEDIAN CUT: Presentation of a proposed median cut on
Steele Boulevard located north of Van Asche Boulevard and south of Mud Creek.
7. Presentation of the proposed Scull Creek Trail crossing of North Street.
8. RAZORBACK ROAD(HWY. 112) WIDENING PROJECT: Discussion of the status of
the Razorback Road widening project between 61h Street and Garland Avenue
1
TRANSPORTATION BOND PROGRAM ITEMS:
9. GARLAND AVENUE (NORTH OF FULBRIGHT EXPRESSWAY): Continued
discussion of a proposal from the owner of the Park West Development property to
relocate Garland Avenue between the Fulbright Expressway and Howard Nickell Road.
10. FAYETTEVILLE EXPRESSWAY ECONOMIC DEVELOPMENT CORRIDOR
PROJECT: Discussion of Amendment No. 1 to the Engineering Contract with Carter &
Burgess in the amount of $700,215 .31 for the design of the Flyover Project and the
improvements to the Fulbright access ramps at North Hills Boulevard including the
Enviromental Assessment services, Geotechnical services, surveying, bridge design, and
bidding services.
11 . GARLAND AVENUE (NORTH STREET TO MELMAR): Presentation of preliminary
plans and cost estimates provided by the Arkansas Highway & Transportation
Department.
12. General Update of the Transportation Bond Program.
13 . Scheduling of the next Street Committee Meeting.
14. Adjourn
UPCOMING TOPICS:
1 . Policy discussion of streets in the annexed area.
2. Results of the 2007 Traffic Calming Studies.
2