HomeMy WebLinkAbout1995-02-09 - Minutes•
•
•
MINUTES OF PLAT REVIEW MEETING
A meeting of the Fayetteville Plat Review Committee was held on
Thursday, February 9, 1995 at 9:00 a.m. in Room 111 of the City
Administration Building, 113 West Mountain Street, Fayetteville,
Arkansas.
UTILITY REPRESENTATIVE: Rick Evans, Dennis Burrack, Andy
Calloway, Tim Johnson, and Allen Combs
CITY REPRESENTATIVES: Tim Conklin and Lisa Cox
OTHERS PRESENT: Al Harris, Kurt Jones, Greg Bone, and
Ted Pitman
LARGE SCALE DEVELOPMENT - HOLLINGSHEAD/LINTON
KURT JONES - S. OF WILLOUGHBY, W OF MCCOLLUM
The first item was a large scale development presented by Kurt
Jones of Northwest Engineers.
DENNIS BURRACK - SWEPCO
Mr. Burrack stated that the plat contained an accurate
representation of the power lines. Further, he stated that only
single phase lines were available on Willoughby. He stated that
three phase lines would be available off McCollum and they could
use the easement on the back.
Mr. Jones offered to dedicate the back easement as general
utility.
Mr. Burrack inquired if the 30'access easement could be
designated as a utility/access easement.
TIM JOHNSON - WARNER CABLE
Warner Cable has no facilities there.
ANDY CALLOWAY - SOUTHWESTERN BELL
Mr. Calloway requested that the easement parallel to Hwy 156 and
down McCollum Road at the southeast corner be a 15 feet utility
easement.
Mr. Jones stated that would be granted.
Mr. Calloway stated they would require two conduits from each
building out to the north easement.
•
•
•
•
Plat Review Committee
February 9, 1995
Page 2
The owner inquired if Southwestern Bell would be able to provide
a few T-1 stands and D -Trunks. Further he inquired as to what he
would need to do in order to have that service. Mr. Calloway
requested that he receive a forecast of his exact requirements as
soon as possible. Further he stated that they would need a large
conduit to provide that service. Mr. Jones inquired if they
would need conduit from the easement to the building.
Mr. Conklin inquired as to the nature of his business and the
proprietor responded that he operated a computer consulting
business. Mr. Jones added that the other business would be a
type of glass blowing studio.
RICK EVANS - ARKANSAS WESTERN GAS
Mr. Evans stated he had gas on the north side of Hwy. 156 and
service could be extended across with no problems. Further he
requested a 4 inch casing under the drive along the 15 feet
easement.
Mr. Jones agreed.
Further Mr. Jones stated that the studio would require an upper
limit of gas capacity of 1.5 inches with 5 pounds for the glass
blowing operation. Mr. Jones inquired as to the size of the line
on the north and Mr. Evans stated that to be 2 inches.
TIM CONKLIN - CITY PLANNING
Mr. Conklin requested that the drive be approved by the Arkansas
Highway Department. Further he stated the improvements for this
tract would be determined at Large Scale Development.
Mr. Jones stated that he submitted applications for a lot split
and a lot line adjustment per the advice of Ms. Little.
Mr. Conklin stated that Mr. Allen had a question about water flow
and requested the Mr. Jones contact him to resolve that issue.
Mr. Conklin stated that Mr. Jackson had a question about the
location of fire hydrants and requested that Mr. Jones contact
him to resolve that issue.
Mr. Conklin inquired if the lines as drawn were part of the lot
split. Discussion ensued. Further Mr. Conklin expressed concern
with the easements and the lot split as requested today. Mr.
Jones stated he would do an easement plat.
•
•
•
Plat Review Committee
February 9, 1995
Page 3
Mr. Conklin requested that a Tree Preservation Plan and a Grading
Plan be completed.
Mr. Conklin stated they were indicating that their parking and
drive were SB -2 and require asphalt or concrete paving and
inquired if they had requested that the Planning Commission waive
this requirement. Mr. Jones responded he would do same and
further stated that Ms. Little had stated that City Planning
would support it with a Bill of Assurance that it would be paved
at a later date. Further he stated he would work out the details
regarding that.
Mr. Jones further stated that post drawing and submission of this
plat, the owners decided that they would prefer the structures
closer to the back property line.
Mr. Conklin inquired about sanitation service and Mr. Jones
responded they are showing dumpsters. Further Mr. Conklin
requested that those locations meet the gravel parking standards
and be approved by Ms. Zotti.
Mr. Jones inquired about the water line on the back side of the
property and Mr. Conklin responded that he should contact Mr.
Bunn.
•
•
•
Plat Review Committee
February 9, 1995
Page 4
LARGE SCALE DEVELOPMENT - NORTHWEST VILLAGE
GREG BONE - E OF HWY 71B, S OF SHEPHERD
FINAL PLAT - NORTHWEST VILLAGE
GREG BONE - E OF HWY 71B, S OF SHEPHERD
The next items, large scale development and final plat of
Northwest Village located east of Hwy. 71B and south of Shepherd
Lane were presented by Greg Bone of DCI. Mr. Conklin requested
that these be considered together.
TIM JOHNSON - WARNER CABLE
Mr. Johnson stated the utility easements look fine but inquired
about special services and requested conduits to the restaurant
locations.
ALLEN COMBS - OZARKS ELECTRIC COOPERATIVE
Mr. Combs requested that he be notified as soon as possible as to
the location of the transformers.
ANDY CALLOWAY - SOUTHWESTERN BELL TELEPHONE
In reference to the large scale development plat Mr. Calloway
expressed concern regarding the building locations and easement
locations not being shown on the plat.
Mr. Conklin requested that those be included on the large scale
development plat.
Further Mr. Calloway was concerned that the utility easement
would be paved over. He explained the impact of paving the
easement would be that he would need conduit underneath the
parking area. He stated their minimum requirement, based on
demand, would be two conduits from each building to the easement.
RICK EVANS - ARKANSAS WESTERN GAS
Mr. Evans stated that there was a problem with the existing line
running down the existing road. Further he stated that they
would have to relocate their lines to feed the new lines.
Discussion with the engineer and developer ensued as to conduit
locations, building locations, and meter locations.
•
•
•
Plat Review Committee
February 9, 1995
Page 5
TIM CONKLIN - CITY PLANNING
Mr. Conklin stated the placement of easements looked pretty good.
He further stated they will have to vacate the existing easements
traversing the property which will have to be approved by the
City Council. He advised that the vacation process needed to be
started.
Mr. Conklin inquired from Ms. Cox if she had been contacted
regarding dedication of Lot 5 as park land. She responded that
they had not been notified and Mr. Conklin stated that would need
to be done.
Mr. Conklin requested a tree preservation plan.
Mr. Conklin stated he would discuss a formal variance for a 25
feet set back with Ms. Little.
Mr. Conklin inquired if the throat length of the drive would be
adequate for the anticipated stacking of the cars. Discussion
ensued.
Mr. Conklin inquired about the property to the east which is
zoned residential. Further he stated that there is a screening
requirement. Discussion ensued. He required that a vegetative
screen or wood fence be erected and shown on the tree
preservation plan. Mr. Pitman stated they would provide a berm,
fence, and additional landscaping.
In reference to the large scale development plan, Mr. Conklin
required that it remain in two separate plats with subdivision
lines, easements, and adjacent property owners shown.
In response to the proposed additional landscaping at the back of
the building, Mr. Calloway requested that they keep in mind that
the utilities might be faced with tearing out landscaping to work
and repair in the utility easement. Discussion ensued.
Mr. Calloway further stated that he wished to go on record that
if the landscaping on this development was finished prior to
telephone lines being put in they would not provide replacement
of landscaping. Mr. Conklin suggested that the landscaping be
coordinated with utility work. Discussion ensued. Mr. Calloway
suggested that conduit be laid throughout. Discussion ensued
regarding the parking ordinance, landscaping in other large scale
developments, replacement costs to utilities, and liability of
the property owner providing landscaping. Mr. Conklin suggested
that in the future the utility easement might be increased from
15 feet to 25 feet. Discussion ensued regarding cleared
Plat Review Committee
February 9, 1995
Page 6
easements, utilities' policy for service and repair work, and
city ordinance requirements for landscaping.
Mr. Johnson of Warner Cable inquired if any of the businesses in
the development would require television cable. None indicated
that they did.
•
•
•
Plat Review
February 9,
Page 7
PRELIMINARY
JORGENSEN &
Mr. Conklin
PRELIMINARY
JORGENSEN &
Mr. Conklin
Committee
1995
PLAT - WILLOW SPRINGS, PHASE III
ASSOC.
stated that this item was tabled.
PLAT - EMERALD SUBDIVISION, PHASE III
ASSOC.
stated that this item was also tabled.
Mb-
•
•
•
Plat Review Committee
February 9, 1995
Page 8
FINAL PLAT - FIELDSTONE, PHASE III
NORTHWEST ENGINEERS
The next item was Final Plat on Fieldstone, Phase III, presented
by Kurt Jones for Northwest Engineers.
ALLEN COMBS - OZARKS ELECTRIC
Mr. Combs requested a crossing between Lots 146 and 159, and Lots
141 and 84, and then north and south where Lots 146, 125, and 140
come together, and another one across Ponca at 84 and 85, and one
more across Prescott between 132 and 133 over to 95 and 96.
ANDY CALLOWAY - SOUTHWESTERN BELL
Mr. Calloway requested three crossings: north and south across
Prescott; north and south across Ponca between 125 and 140; and,
north and south on the west side of Ponca between 84 and 85.
Further he stated they would probably all go in the 20 feet
easement between 95 and 96.
RICK EVANS - ARKANSAS WESTERN GAS
Mr. Evans requested the same easements as Bell Telephone with 4
inch conduits. Further he requested the 10' off site easement
from 98 to 106 to be shown. Discussion ensued regarding whether
or not the crossing should be shown on finals.
Discussion ensued regarding location and orientation of the
development.
LISA COX - PARKS
Ms. Cox stated that there were options regarding whether they
would donate land or money. Further she stated that they would
have an on-site meeting on Monday, February 13, 1995 at 4:00.
TIM JOHNSON - WARNER CABLE
Mr. Johnson requested a crossing along the back side of 59;
crossing across Cato; crossing across Genoa; and he further
stated that he was out of signal and would need at least 10 feet
either off site or on Lots 159, 146, 141, and 84 for a trunk to
feed this development.
Discussion ensued regarding the concept map.
•
•
•
Plat Review Committee
February 9, 1995
Page 9
TIM CONKLIN - CITY PLANNING
Mr. Conklin requested a more accurate vicinity map showing the
phases of the development.
Mr. Conklin also stated that he shows that Genoa is Boxley and
requested that to be verified.
•
•
•
•
Plat Review Committee
February 9, 1995
Page 10
FINAL PLAT - NORTHWEST ACRES, PHASE V
NORTHWEST ENGINEERS
The next item was the final plat on Northwest Acres, Phase V,
presented by Northwest Engineers.
TIM JOHNSON - WARNER CABLE
Mr. Johnson stated he had existing facilities and further
requested the off-site easements to be shown.
Discussion ensued regarding easements.
Mr. Conklin requested a revised vicinity map to be shown on the
plat.
Mr. Conklin also requested that the perimeter easements be
reduced to 10'.
ANDY CALLOWAY - SOUTHWESTERN BELL
Mr. Calloway approved of the easement reduction.
RICK EVANS - ARKANSAS WESTERN GAS COMPANY
Mr. Evans requested that the streets be named.
Mr. Conklin requested that the street names be shown by the
revisions which are due Monday, February 13, 1995.
TIM CONKLIN - CITY PLANNING
Mr. Conklin requested modification of property use to duplex.
Mr. Conklin also stated the Mr. Jackson required a hydrant within
400 feet of each lot.
LISA COX - PARKS
Ms. Cox requested payment of Park fees in the amount of $6720.
Discussion ensued regarding the new ordinance.
•
•
•
Plat Review Committee
February 9, 1995
Page 11
FINAL PLAT - ROLLIN BARNES SUBDIVISION
NORTHWEST ENGINEERS
The next item was the final plat for Rollin Barnes Subdivision
presented by Northwest Engineers.
ALLEN COMBS - OZARKS ELECTRIC
Mr. Combs requested a 15' easement on the south side of Lot 3 and
15' easement on the west side of Lot 1. Further he requested
that the off site input easement on the north side be shown on
the plat.
Mr. Conklin requested an easement plat on the large scale
development.
ANDY CALLOWAY - SOUTHWESTERN BELL
Mr. Calloway stated they would request the same easements.
RICK EVANS - ARKANSAS WESTERN GAS
Mr. Evans stated they would also request the same easements.
LISA COX - PARKS
Ms. Cox requested payment of parks fees in the amount of $1,440
on the three lots shown on the duplexes.
Mr. Conklin stated that additional money will be due on the large
scale development.
TIM CONKLIN - CITY PLANNING
Mr. Conklin requested the extension of the sidewalk south.
The meeting adjourned at 11:10 a.m.