Loading...
HomeMy WebLinkAbout1991-07-03 Minutes• • MINUTES OF A PLAT REVIEW MEETING A meeting of the Fayetteville Plat Review Committee was held on Wednesday, July 3, 1991 in Room 111 of the City Administration Building, 113 West Mountain Street, Fayetteville, Arkansas. UTILITY REPRESENTATIVES: CITY REPRESENTATIVES: OTHERS PRESENT: Rick Evans, Ken Raider, and David Tucker Jim Beaver, Don Bunn, Perry Franklin, and Sharon Langley Rick Collins LARGE SCALE DEVELOPMENT - THE SPORTS PARK RICK COLLINS - W OF BETTY JO, S OF WEDINGTON DR. The only item on the agenda was a request for approval of a large scale development, located to the west of Betty Jo and to the south of Wedington, presented by Rick Collins. The property consists of 76.35 acres. The property is zoned A-1, Agriculture, and a conditional use was approved for Mr. Collins on March 11, 1991. RICK EVANS - ARKANSAS WESTERN GAS Mr. Rick Evans, Arkansas Western Gas, requested that 20 feet of the 50 -foot setback across the front be designated as a utility easement. In response to a question from Mr. Evans, Mr. Collins explained Phase II could be in the near future but Phase III could be in 6 or 7 years. KEN RAIDER - OZARK ELECTRIC Mr. Raider explained they would need an application from Mr. Collins. He stated they would work with Mr. Collins when he decided where he wanted the electric lines. PERRY FRANKLIN - TRAFFIC DIVISION Mr. Franklin explained if they were planning on putting any signs, planters, etc. at the highway which would be taller than 30 inches within 25 feet of the intersection, they would need to contact him. Mr. Franklin explained the solid waste division did require a certain size and strength of concrete pad. He suggested Mr. Collins contact the Solid Waste Division. DAVID TUCKER - SOUTHWESTERN BELL TELEPHONE Mr. Tucker informed Mr. Collins there were two buried telephone \3°i •' • • Plat Review July 3, 1991 Page 2 cables down the south side of Highway 16 that were not shown on the plat. He explained the driveway would cross the cables and should they need to be lowered, there would be a charge. He further stated he would like to have a 15 -foot easement along the east side of the property so they could bring a cable into the building. He explained they would work with Ozark Electric so there would be only one easement. JIM BEAVER - ENGINEERING Mr. Beaver stated the sewer easement was not showing on the plat and would need to be shown. He asked if drainage was a problem. Mr. Collins stated there was no problem. He pointed out there were two large ponds on the property. Mr. Beaver asked where stormwater would run off from the parking areas. Mr. Collins stated that in some areas they would have to have some catch basins to take the water to the ponds. SHARON LANGLEY - PLANNING OFFICE Ms. Langley stated the parking calculations would need to be placed on the plat: 1 space per 1,000 feet of the miniature golf site, 1 space per practice driving range and 1 space per batting cage. DON BUNN - ENGINEERING Mr. Bunn pointed out that this portion of Wedington Dr. was on the Master Sidewalk Plan and sidewalks would be required. In response to a question from Mr. Collins, Mr. Bunn stated the sidewalk was from the property right-of-way and should be five foot wide. The meeting adjourned at 9:15 a.m.