Loading...
HomeMy WebLinkAbout1991-06-20 Minutes• • • MINUTES OF A PLAT REVIEW MEETING A meeting of the Fayetteville Plat Review Committee was held on Thursday, June 20, 1991 in Room 111 of the City Administration Building, 113 West Mountain Street, Fayetteville, Arkansas. UTILITY REPRESENTATIVES: Rick Evans, Ken Raider, and L. O. Ferguson CITY REPRESENTATIVES: Don Bunn and Sharon Langley OTHERS PRESENT: Wayne Lane FINAL PLAT - PARADISE PLACE TOM HOPPER - W OF CROSSOVER, S OF JOYCE The only item on the agenda was a request for approval of a final plat for Paradise Place, located to the west of Crossover and to the south of Joyce, presented by Wayne Lane, Crofton and Tull. The property consists of 18.7 acres with 32 lots proposed. The property is zoned R-2, Medium Density Residential. KEN RAIDER - OZARK ELECTRIC Mr. Ken Raider, Ozark Electric, stated they were already putting lines in and the existing easements were adequate for their use. RICK EVANS - ARKANSAS WESTERN GAS Mr. Rick Evans, Arkansas Western Gas, stated he had talked to Tom Hopper earlier and had pointed out there was a 15 -foot easement located on Lot 7, Block 3, which was not shown on the plat. He explained they had a two-inch line running through the easement to serve the apartment on the adjoining property. L. O. FERGUSON - WARNER CABLE Mr. L. O. Ferguson, Warner Cable, stated most of their work was completed on this project and the existing easements were adequate. DON BUNN - CITY ENGINEER Mr. Bunn asked the status of the remaining construction. Mr. Lane explained the project should be completed within the next month. He stated the sewer line was in but he was not sure about the water line. He further stated they were preparing to run the curbing on the streets. Mr. Bunn explained the city would require a contract between the owners of the property and the city placing a lien on the appropriate number of lots to assure completion of construction. He further explained the subdivision covenants would need to be 131 • • • Plat Review June 20, 1991 Page 2 filed at the time the final plat was approved and a file stamped copy given to the city. He stated he also wanted a note on the plat stating that the land was being developed as single-family housing only since the zoning was R-2. Mr. Lane requested that the existing 15 -foot water line easement on lot 8, block 2 be reduced by five feet. He explained the lot was not large enough to build on with the easement running through it. Mr. Bunn stated he was not inclined to reduce the size of an easement however he would talk to the developer. He further stated the developer knew the easement was there when they planned the subdivision. The meeting adjourned at 9:20 a.m.