Loading...
HomeMy WebLinkAbout1989-12-07 MinutesMINUTES OF A PLAT REVIEW MEETING A meeting of the Fayetteville Plat Review Committee was held on Thursday, December 7, 1989 in Room 111 of the City Administration Building, 113 West Mountain Street, Fayetteville, Arkansas. UTILITY REPRESENTATIVES - CITY REPRESENTATIVES• OTHERS PRESENT: Tom McElroy, Rick Evans, Larry Winkler A.1.2 Don Bunn, Mickey Jackson and Elaine Cattaneo Harry Gray of Northwest Engineers PRELIMINARY PLAT OF RUDY HATCHER SUBDIVISION RUDY HATCHER - N OF MISSION, ACROSS FROM LUNSFORD AVE The only item was a preliminary plat of the Rudy Hatcher Subdivision submitted by Rudy Hatcher and represented by Harry Gray of Northwest Engineers. The property is zoned R-1, Low Density Residential and contains 3.5 acres more or less with 11 proposed lots. HARRY GRAY - REPRESENTATIVE He stated that this is actually two different pieces of property with Jim Williams owning the south half and Rudy Hatcher the north half. He noted that this property joins the Spring Creek Subdivision. The sewer. line will come out. of the new main that is being put in that subdivision. Mr. Gray advised that there are two houses on this: one that will remain on Hatcher's portion and one that will be removed on Williams' portion. DON BUNN - CITY ENGINEER Don Bunn, City Engineer, advised that the lot can't be created that will make the existing house non -conforming. He asked if the property Jim Williams owns is all the property that he had submitted for lot splits. Mr. Gray answered, yes, Mr. Williams has decided to join with Mr. Hatcher to do a subdivision instead. Bunn noted that the cul-de-sac is o.k. Water and sewer is available and the right-of-way dedication is shown. He asked how they plan to notify the adjoining property owners. Mr. Gray stated that they will notify by certified mail. LARRY WINKLER - SWEPCO He stated that they can catch part of this project (the back lots) from the Spring Creek Subdivision and the south lots will probably have to be served off of Highway 45. He advised that they will need a 20' easement along the south side all the way and a smaller easement, maybe 10', along the west edge. An easement will be needed on the north edge at least to lots 9 & 10. The street lights can be served from the easement between lots 5 & 6. • • • Plat Review December 7, 1989 Page 2 TOM MCELROY - SOUTHWESTERN BELL TELEPHONE McElroy advised that the easements as requested are satisfactory, but he would also like to request a 25' easement along the Highway 45 right-of-way. There is an existing underground line through there. Mr. Gray noted that they will show the building setback there as a utility easement also. MICKEY JACKSON - FIRE DEPARTMENT He noted that the fire hydrant needs to be moved up to the corner of Mission Blvd and the new street RICK EVANS - ARKANSAS WESTERN GAS Evans stated that all the easements that were requested will be satisfactory. CONNIE EDMONSTON - PARKS & RECREATION Edmonston was unable to attend the meeting but she stated that the land dedication amount would be .14 acres or $1,155 money in lieu. The Parks Board will be meeting on December 20th at 5 p.m. JIM JOHNSON - WATER METER DIVISION Johnson was unable to attend the meeting, but he stated that they will need to name the subdivision.