HomeMy WebLinkAbout1986-07-24 Minutes•
•
MINUTES OF A PLAT REVIEW MEETING
A meeting of the Fayetteville Plat Review Committee was held on Thursday,
July 24, 1986 in Room 111 of the City Administration Building, 113
West Mountain, Fayetteville, Arkansas.
UTILITY REPRESENTATIVES PRESENT: Dennis Burrack and Dale Cheatham
CITY REPRESENTATIVES PRESENT: Don Bunn, Clayton Powell, Sandra
Carlisle and Tessi Franzmeier
SEVENTH DAY ADVENTIST CHURCH - EXPANSION OP LSD
1707 CROSSOVER -ROAD - LAVON"SMITH
The only item of consideration today was the proposed expansion of
the large scale development for Seventh Day Adventist Church for a
small school with one classroom, located at 1707 Crossover Road, this
property is zoned P-1, Institutional. The representative for this
expansion of LSD was not present.
LARRY POAGE - FIRE DEPARTMENT
Poage saw no problems and had no comment.
DON BUNN - CITY ENGINEER
Bunn saw no problems and had no comment.
DENNIS BURRACK - SWEPCO
Burrack stated they would locate if any excavation was done.
DALE CHEATHAM - SOUTHWESTERN BELL
Cheatham stated if there was service at the existing building and
they wanted service to the new building they will have to provide
it, Southwestern Bell would not provide service between the two buildings.
CLAYTON POWELL - PUBLIC CONTRACTS
Powell stated there is 80' of required ROW for HWY 265/Crossover Road
and the City would accept a bill of assurance for the sidewalk across
the front of the property.
•
•
Plat Review
July 24, 1986
Page 2
SANDRA CARLISLE - PLANNING DIRECTOR
All setbacks are fine. Will need two sets of As -Build plans and all
adjoining preoperty owners need to be notified by signing the plat,
sending certified letters or by publishing an ad in the legal section
of the local newspaper. No extra parking is needed for such a small
building as the requirement is 1 space per 1500 square feet. Since
no additional parking is required and the church has been in existence
since before the Ordinance, she will not require asphalt or chip and
seal on the existing parking lot. The South property line is fenced
and has vegetation so no screening requirement is necessary. The
Plannfing Office will provide a Bill of Assurance for the sidewalk
on 265 for execution by the church officials.
160