MINUTES OF A PLAT REVIEW COMMITTEE MEETING
A meeting of the Plat Review Committee was held at 9:00 A. M., Thursday,
February 23, 1978, in the Board of Directors Room, City Administration Building,
Fayetteville, Arkansas.
CITY. REPRESENTATIVES PRESENT:
UTILITY REPRESENTATIVES PRESENT:
Bobbie Jones, Angie Medlock, Clayton Powell,
Wally Brt, Don Bunn, Donnie Osburn, Bill Boudrey.
Clyde Terry, Kenneth Wagner, Dick Shaw,
Floyd Hornaday, Jimmy Crownover.
DEVELOPERS and/or ENGINEERS PRESENT: Ken Jones, Kent Clement, Don Mitchell,
Pat Demaree, Dewayne McChristian.
The first item for discussion was the
final plat of Winwood II, Phase II,
located west of Winwood Drive, Fayetteville
Land Company, developer.
Ken Jones was
WINWOOD II, PHASE II
Final Plat
W. of Winwood Drive
present representing McClelland Consulting Engineers.
1. Wally Brt (Sanitation Superintendent): No comments.
2. Clayton Powell (Street Superintendent): Said he would not have any objections
to changing the name of Hackberry Drive to Poplar Street, since it does
line up with Poplar,if the developer wishes to do so. Clayton Powell stated
that if the vacant lot between Winwood II, Phase I and Lot 3 of this phase
is ever allowed a building permit, there will be a drainage problem on
Hackberry Drive. He said he would like some designation noted on that lot.
Ken Jones stated that the developer plans to put an 18" drainage tile there
to control the drainage. Clayton Powell asked that this be reflected on the
plat.
Clayton Powell requested drop inlets at both ends of the street at their
terminal points and underdrain in the back. Designate the drainage easement
as being 15 feet wide and dedicated to the City so they can maintain it.
3. Bill Boudrey (Fire Department): No comments.
4. Don Bunn (City Engineer): No comments.
5. Kenneth Wagner (Arkansas Western Gas): Asked for a 25 foot utility easement
on the south side of Hackberry Drive. Also, a 25 foot easement on the
northwest side of Lot 3. If there is an existing easement on the northwest
side of Lot 3, outside the subdivision, you may get by with a lesser easement
on Lot 3. Also, if you would like to split the easement on the lot line,
that would be o.k. If it is split 121/2 feet on either side of the lot line,
that part outside this subdivision will need to be dedicated by separate
instrument.
6. Bobbie Jones (Planning Administrator): Designate the iron pins as 1 inch
by 30 inch and the concrete monuments as 4 inches by 4 inches, by 30 inches.
Add street lights in the legend. Asked if they would want a contract or
bond and Ken Jones said he would check on this. Also, add the mailing
address of the engineer.
Plat Review Committee Meeting
February 23, 1978 -2-
The corporate resolution and the certificate for dedication wording may
need to be changed. The Planning Commission does have the authority to
require sidewalks on Winwood Drive. Bobbie Jones questioned if there is
a street light at the intersection of Winwood Drive and Hackberry Drive.
Ken Jones did not know.
7. Donnie Osburn: Questioned if the land to the west would be built on and
Ken Jones said someone does have an option on that land. He felt they
would only build a single-family residence on that acreage and would use
Hackberry Drive as access.
The second item for discussion was the large PARNELL CONSTRUCTION CO...
scale development plan for Parnell Construction Large Scale Development
Company, located east of the Highway 71 Bypass E. of Hwy. 71 Bypass
and south of Highway 62. $ S. of Hwy 62
Kent Clement was present to represent Parnell Construction Company.
1. Donnie Osburn: No comments.
2. Don Bunn (City Engineer):: Asked if the proposed east/west street would
ever be extended to connect to the Frontage Road and Kent Clement said
they do plan to extend it at some time in the future.
3. Wally Brt (Sanitation Superintendent): Asked that they pave around the
back of the Builder's Supply Company and locate. the container in the rear.
He requested 25 feet of paving and a 20 foot radius on the curves. He
also asked for a pad 12 feet by 15 feet to place the container on.
4. Clayton Powell (Street Superintendent): Said the 50 foot dedication for
a future street on the eastside will need to be constructed to City
standards. He also noted that the 60 foot stub shown on the east will
need to be constructed to City standards if they plan to use it. The
required dedication for a residential street is only 50 feet. Kent
Clement said he had contacted the State Highway Department about how
much additional right of way would be needed for Highway 62 and they
said their plans are not definite yet. Clayton Powell said the developer
may be required to submit a performance bond to construct the Frontage Road
to current City standards when the Highway Department is ready to build it.
This right of way is already shown on the plat.
Kent Clement noted that part of this. -property is located in a Flood Hazard
Boundary Area (future development)' and they will have to work out drainage
problems and establish the floor elevation level before any excavating
or building.
5. Bill Boudrey (Fire Department): Said he would need two fire plugs --
one on the west side of the motel site and one approximatelyi:600 feet
east of the first plug. Both of these should be on the south side of
Highway 62.
6. Don Bunn (City Engineer): Water is on the south side of Highway 62.
If the highway department takes additional right of way on Highway 62,
the City may require an easement to relocate the water line. Don Bunn
said he would probably require an extension of the water line to the
south to meet the proposed future street, since it will be a public street.
Plat Review Committee Meeting
February 23, 1978 -3-
There is an 8 inch and a 6 inch sewer line which they can hook on to at
the south part of the property. Don Bunn said he will also need a
sewer easement from the south property line north to the proposed future
street.
7. Kenneth Wagner (Arkansas Western Gas): Gas is available to the west of this
development.
8. Dick Shaw (Southwestern Bell Telephone Company): Asked for a 25 foot
easement beyond the right of way asked for by the highway department for
Highway 62. Asked for a 15 foot utility easement between the proposed motel
site and the parking lot for the rental property and the Builder's supply..
Asked for a 2" PVC conduit on the south side of the Builder's supply running
south to the rental building, to tie the two buildings together. Also, PVC
conduit from the motel site to the rental building.
9. Floyd Hornaday (SWEPCO): Said SWEPCO has single -service available on the
south side of Highway 62 West and three-phase service on Hollywood.
Easements requested by the telephone company will be sufficient for SWEPCO.
10. Clyde Terry (Warner Cable): Easements requested will be sufficient. Asked
for 2" PVC conduit parallel with the telephone company to get from the motel
site to the Builder's Supply. He may also need conduit from the north
rental building to the south rental building.
11. Bobbie Jones (Planning Administrator): Questioned if the developer is planning
to construct the 60 foot street stub to Hollywood Avenue and Mr. Clementsaid
they are. Bobbie Jones said the developer would need to submit street and
drainage plans and profiles to the City Street Superintendent before beginning
any construction. The street stub must be built to minimum street standards.
There is an ordinance which requires a 50 foot right of way dedication for
property developed next to the bypass. The developer will probably be
required to submit either a contract or performance bond to build their
portion of the service road to current city standards at the call of the
City manager. Show the existing bypass right of way. If there is a service
road Barnes First Addition, it should be shown. The proposed motel
site will need to be rezoned to C-2 to permit the motel.
You will need a waiver from the Planning Commission on the distance between
the driveway and the future street stub. It is shown as 33 feet and the
ordinance requires 40 feet. You will be permitted to build 25 feet back
from the street right..of way with no:parking, and if there is at least 10%
landscaping.
Note the Point of Beginning. Note and reference any quarter section corners.
The storage yard should be..screened on all sides with a view -obscuring fence.
Notify the adjoining property owners on the east on Hollywood Avenue.
If you ever plan to sell any part of the property, you should file a sub-
division plat. This would probably be the easiest way to record the easements
and dedications.
We will need two contracts, one for the service road and one for the other
improvements.
We will need a revision by March 6 in order to go to the Planning Commission
on March 13.
Mr. Clement said he had talked to Mr. Lieberenz about some of this property
being in the flood plain. Bobbie Jones said they would need to get a flood
plain development permit before starting any excavating, filling, or building.
•
•
Plat Review Committee Meeting
February 23, 1978
12. Donnie Osburn. Asked if the three buildings would be separate units and
Mr. Clement said he did not know atLthis time. Donnie Osburn asked if the
two buildings would face Highway 62 and Mr. Clement said "Yes".
The last item for consideration was the
preliminary plat of Smoke Rise Subdivision,
located south of Highway 16 West, and west of
Highway 71 Bypass, Demaree, McChristian, and
Demaree, developers.
SMOKE RISE SUBDIVISION
S. of Hwy. 16 $
W. of Hwy. 71 Bypass
Preliminary Plat
Don Mitchell, Dewayne McChristian, and Pat Demaree were present to represent.
Don Mitchell said the developer may decide to incorporate Block B, Lots 1-8 with
Lot 9 and bring all of that in under a large scale development plan.
He noted that the maximum number of units on Block A would be 32 and on Block
B would be 28-38. The utility companies ask that the, -developer notify them
after deciding what they are going to do with Block B so they will be able to
order cable for utility services.
1. Clayton Powell (Street Superintendent): Questioned what they plan to do
with the drainage from the Frontage Road to the west. Don Mitchell said
they plan to take drainage to the east and out to the 6 x 10 box culvert.
Clayton Powell noted that the Frontage Road must be built to current City
standards, unless there is a waiver from the City Board of Directors.
This subdivision and Maple Terrace were both referred back to the Planning
Commission by the Board of Directors to correct problems with drainage:
and sewer. So far, I have not received any revisions on the drainage
from Maple Terrace's engineer. Whichever subdivision gets their plans to
me and approved first, the other subdivision will have to adjust their
plan to fit into the other. Inside the subdivision, we do not want open
drainage ditches; however, they may take drainage and channel it into an
existing open drainage ditch outside the subdivision. Mr. Powell, Mr.
Bunn, and Mr. Tomlinson all expressed concern over whether Maple Terrace's
drainage plans might cut Smoke Rise off from the existing sewer or water
lines in Maple Manor Subdivision to the north.
2. Don Bunn (City Engineer): Said the City is still looking at the possibility
of putting in a deeper sewer line. He said the developer will need either
an..8 inch water line or a 6 inch looped line.
Show the existing 15 foot water easement located approximately 150 feet
east of the northeast corner of the subdivision.
3. Kenneth Wagner (Arkansas Western Gas): Questioned where they would want
the gas meters. Don Mitchell felt they would want'them in the front of the
yards. The closest gas line is at the northwest corner of Maple Manor
Apartments.
4. James Crownover (Ozarks Electric): Said they could serve underground from
the back of the lots. He said there would be a transformer at every other
lot line. The territorial boundary between Ozarks and SWEPCO is approximately
six feet south of the northlot line of Block A. The owner will be
required to dig a trench 42 inches deep and furnish pads for the transformers.
The owner will also be required to furnish wire from the lot line to the
building.
•
Plat Review Committee Meeting
February 23; 1978 -5-
5. Dick Shaw (Southwestern Bell Telephone Company): Asked that the 25 foot
building setback on the rear lot lines of Block B be labeled building set-
back and utility easement, if they stay with the existing plan. If they
change their plans, he will have to come back to the telephone company and
Mr. Shaw will have to take easements at that time.
6. Floyd Hornaday (SWEPCO): Asked that they terminate the pavement for the
parking lot at the 25 foot building setback line. Mr. Hornaday said
SWEPCO will furnish the transformers and pads and the main line trench for
primary as long as the cost does not exceed $.40 per foot.
Mr. Hornaday noted that the street lights will be in SWEPCO territory.
He said he will need 2 inch PVC conduit under Jewell Road, if street lights
are put on the south side of the street. If the street lights are moved to
the north side of the street, be sure not to put them in the sidewalk.
7. Clyde Terry (Warner Cable): Said he will need a 20 foot easement on the
east side. He said he would go down the south side with Ozarks Electric.
He asked for a 2 inch PVC conduit across Jewell Road and across any parking
on the east end.
8. Bobbie Jones (Planning Administrator): Said they only need to show the
building setback from the street lines. On the east side along the service
road, note that it is building setback and utility easement. On the west
side of Lot 9, you will need a side setback, not a street line setback
There should be a street light at the intersection of Betty Jo. Drive
and Jewell Road. You should be able to put one at the southwest corner
of Lot 8, Block B, which will give you about 300 feet between this light
and the one at Betty Jo Drive. Also, add one at the northeast corner of the
subdivision. You may ask for a Planning Commission waiver on this. Other-
wise, they are required at street intersections and 300 foot intervals
between.
The lots will have to be 90 feet wide for anything other than duplexes.
Confirm the connection point of Jewell Road. You will be required to
submit a large scale development plan for Lot 9, Block B.
If there will not be any reflective covenants, it should reflect none.
Show the maximum density of Block A and B.
Mr. Lieberenz has shown the northeast and southeast corners as possiblyy
being in_the flood plain. You will have to establish this flood hazard
area and show it on the plat.
Before beginning construction on water and sewer, and streets and drainage,
the engineering plans and specifications will heed to be approved by the
Street Superintendent. When preliminaryplat has been approved, and
specifications approved, you may start construction.
No lots may be sold until the final plat is approved.
We will need a revision by March 6 to go to the Planning Commission March 13.
The meeting adjourned at 11:35 A.M.