PRESENT: Dale Clark,
Bill Waite,
PRAB
SPRING PARR TOUR
PART I.
April 27, 1985
Rodney Ryan, David Lashley, Beverly'.Melton,
J.O. York, Bob-Emerson;;Connie Edmonston
MEETING: PRAB Park Tour came to order at 8 am Saturday, April 27,
1985 at Wilson Park. The tour proceeded until 12 noon.
The following comments and suggestions were made by
PRAB during the Park Tour:
WILSON PARK
- Tennis court problem with underground leakage.
fixed for this summer.
- Need more tennis practice backstops
Need to be
by the basketball courts.
- Flower pot on the north entrance - get rid
something in it.
of or plant
- Bridges to be handicapped accessable and rebuilt in 1985.
- One redwood playground structure is budgeted to
for the west portion of the park.
- Creek area beautified. Clear once section
see if it causes any erosion problems. Go
suggestions in the Master Plan.
be purchased
at a time and
back to Einert's
- When the interior roads are cut off (no date is set), consider
using the asphalt for tennis backstops and basketball courts.
- Move parking lot #2 south down to the existing asphalt road.
to avoid moving any trees to the north.
- On northwest side: washed out area
ties to prevent erosion.
- Get ride of the tree stumps.
build stairway of railroad
- Sidewalks on Prospect would help the retention of the
soil.
•
1
PRAB
Page 2
Park Tour
4-27-85
Wilson Park (Continued)
- Prospect Street is not wide enough. The Planning Commission
is talking about widening the street taking away from park
side possibly.
- Before closing off the interior roadways of the park, need
to budget money so that something can be put up to keep
cars on the perimeter of the park.
- Southeast corner: gazebo and garden area.
Plant more spring
pool parking lot.
bulbs on the south side of the swimming
- Take the bridge by the
a hazard.
pool out. It is not needed and is
- Need filldirt on the south side of Wilson Park.
- Sidewalk will be started soon on Park Street.
GREGORY PARK
- Remove yellow trash holder on the north side of the gate
since a trash barrel is not being used there.
- PRAB discussion of the access: road to the Veterans Hospital
running through Gregory Park a's: reques't'ed by Mr. Grimes:
- It would be difficult to obtain land in the center of
the city of this park size in the future.
- Gregory Park is a unique park in it's natural state`-
nature..park area.
- PRAB does have plans for Gregory Park - nature area,
horticulture walk.. areas, picnic area.
- Traffic running through the park is unsafe and opposes
PRAB's concept in keeping traffic out of a park.
- Other alternatives for access road are available such
as: mandatory to go north on Woolsey; west edge of
the park property have the access road; have access
road run down the property line to the east; right
turn land in and out of the Veterans Hospital.
- Wilson Park is overused, Gregory Park may help relieve
the congestion of Wilson Park and spillover into this
park.
•
PRAB
Page 3
Park Tour
4-27-85
Gregory Park (Continued - Access Road through the Park)
- Park budget to develop Gregory Park has yet to come
because of more demand of the other parks such as
Wilson Park, Lake Fayetteville, Walker Park North,
Finger Park.
- Using the east property line would shorten the street
and cost less. ???
- The road would need to be called a drive and stay
under the Veterans Hospital control.
MOTION: Emerson/York PRAB does not recommend to support
the Veterans Hospital access road running through Gregory
Park. -(Refer to discussion above) Motion passed unanimously
6-0
SREET ISLANDS
- Nelms cars park too close to the road to mow the strip.
- Ought to charge businesses a fee to maintain the islands
or to let them do their own maintenance.
- Compliment corner lot - "COLOR TILE":
letter.
LAKE FAYETTEVILLE SOUTH SHORE SITE
Sand volleyball court be place east of the existing court.
Construct decorative fence on west side along the road.
Use area west of picnic tables for something else. Kids
like this area.
Need to write thankyou
- Set policy for standing reservations:
- Reservations one week in advance.
- Place sign to say reserved, call FYC
- Dale take schedule out weekly to the Park
- Water line to the volleyball court. (not budgeted
- Build retaining wall to the east side
for 1985)
- Median strip between pits - split log fence along road to the
east.
•
c �)
c,.
•
PRAB
Page 4
Park Tour
4-27-85
Lake Fayetteville South Shore Site (Continued)
- Horseshow pits: northwest corner behind the ballards.
- 211 foot grade - the club want to level the area.
- Use middle as the level. Take dirt from the east to
the west.
- After dirtwork is completed, let the club build the
courts.
- Earth work cost - $400
- Eventually there will be 8 pits.
- MOTION: Emerson/Waite To do the dirtwork for the
horseshoe pits and additional sand volleyball court
at the same time out of the City budget or the
Park Trust Fund. Maximum amount of park money
qontributed to the projects is $1,000. Motion passed
Unanimously (6-0)
- Try to bring in fill dirt of possible.
- Need wooden playground
swing sets.
equipment along with the existing
- Redwood around garbage cans needs painting.
- Floating Dock Area:
- Volunteer to pickup dead wood
- Repair dock to keep corner (Styrafoam block on
is under water)
- Bridge
South side needs repair
- Steps need more RR ties.
- Check all tree markings and
- Question night lights
- Do rent until late if reserved
get them "dug in"
SE corner
- Restrooms are poor - small and inadequate (on septic
tank)
- Consider separate new restrooms away from the gazebo.
Septic tanks are located south crest of hill (between the
road and the crest of the hill).
- Need water fountain near
the volleyball pit.
- Around the property line Parks allowed Tyson to
rail fence. Helps beautifty park area too.
run a three
PRAB
Page 5
Park Tour
4-27-85
Lake Fayetteville South Shore Site (Continued)
- Investigate into another Levi Strauss Grant
fountain and playground equipment.
LAKE FAYETTEVILLE SOFTBALL COMPLEX
- Need culvert from property line to
- Ballards are needed for parking.
for the water
the north of field #1.
- Developer cut electrical lines north of the park. The
lines are still exposed.
- Need to post a bond.
- Letter to Mr. Grimes to correct this in the future.
- Need tarp to throw over
the fields to help keep them dry.
- Lay tile from gate of Field #1 south to the ditch.
- Haul SB2 to logs
- 2 Pitching machines to be installed soon
Additional kiddy play area equipment is badly needed.
- Place a sand pile down behind field #3.
- Need to do more activities down by creek.
- Next week the ditches will be pulled.
- Restrooms are inadequate and need to be larger.
- Go to civic clubs and ask for financial or help
playground equipment at the kiddy play area.
to get
- Need a storage building at each facility or park.
- Need more signs at all parks saying Fayetteville Parks and
Recreation Department. The public does not know that park
money goes into each of the area parks.
- Dale check into having Jim McCord write
developer that cut the electric line, .
- Concession Manager is doing great.
a letter to the
PRAB
Page 6
Park Tour
4-27-85
LAKE FAYETTEVILLE NORTH SHORE SITE
- Plat area for long term use of soccer
- Could help softball teams
and softball fields.
for assistance.
- Need to leave a space for parking, restrooms and concessions.
- Begin with
field #4 for softball.
- First plat the area and then build one permanent softball
backstop.
- Will need playground equipment.
- See if the Cooperative Extension
LAKE FAYETTEVILLE HOBBY USE AREA
will plat the area.
- Repair or replace fence along the main road so
that
3 -wheelers do not go through the field.
ASBELL PARK
- Parks is trying to work with the University in using the
fields to the east of Asbell Park for soccer.
- Backstop fence needs repaired.
(Field #1)
- Need a playground area south of field #1 up by the
fields. Need to watch the drainage area.
practice
Park Staff determine playground equipment needed for this
area and the prices so that PRAB can present them to
Civic Clubs for assistance.
FINGER PARK
- The swinging park benche needs to have the post reset -
- Drainage problem above the playground
need to replace the steps
- Needs bridges
- Plant bushes and
structure. Maybe
unstable.
flowers along the south side of the parking lot.
- Do something with the barn! (Hazzard, vandalism, eye sore)
ADJOURNMENT: PRAB Park Tour Part I. ended at 12 noon. The second
part of the Spring Park Tour is set for Monday, May 6th at 4pm.,
meeting at FYC south parking lot.