HomeMy WebLinkAbout1985-05-14 - Minutes•
MICROFILMED
MINUTES OF THE MEETING
OF THE BOARD OF CONSTRUCTION APPEALS
A meeting of the Board of Construction Appeals was held on May 14, 1985,
at the City Administration Building, Room 111, Fayetteville, Arkansas.
MEMBERS PRESENT: J. Palmer Boggs, Tommi Ackley -Perkins, and Gary Deckart.
OTHERS PRESENT: Freeman Wood --Inspection Superintendent, and Beverly
Erwin --Inspection Clerk.
The meeting was called to order by acting chairman Boggs at 4:08 p.m.
In answer to Ackley -Perkins question, Wood stated that he was representing
the Arkansas State Highway Department.
Boggs asked who proposed that the bridge be built. Wood stated that the
State Highway Department did.
• The members took a few minutes to read over letters from the State Highway
Department and the Corps of Engineers.
Deckart asked if the reason for the 0.1 foot increase is because of the
pilings and abutments that would cause a small amount of back pressure.
Wood stated that he is correct.
Deckart also stated that the letter said one hundred (100) foot in back
of the bridge.
Wood stated that one hundred (100) foot to the South of the bridge or
South which would be upstream which would be Southeast back behind Paradise
Valley Golf course. At that point is where it would. be 0.1 foot above the
1.0 foot level that is allowed in the flood plain ordinance, so we are
talking about 0.1 foot over the allowed level.
Deckart asked if there are any residential structures that would be effected
if it did flood to that point.
Wood stated no.
Wood stated that the only structures that are close to it are some town-
houses which are up on a bank above it and the golf course on the other
side. The only building on the golf course is a hut which would not be
reached. He pointed out that 0.1 foot is not very much at all.
Page 2
Board of Const. Appeals
May 14, 1985
Boggs asked where this would affect the creek, and would the increase be
where the creek shallows out.
Wood stated that the ASHTD went to the Corp of Engineers and had them work
this project up. The Corp of Engineers is who did the flood plain maps.
Wood stated that he probably would not havecaught the increase. The Corp
of Engineers caught it and recommended that they go to the Board for a
variance.
Ackley -Perkins stated she saw no problem with a variance, if they felt they
needed one.
Wood stated they needed one. He commended them in saying that they were
nice enough to ask for the variance instead of just going ahead and doing
it and not saying anything to us.. He said that a representative would
have come up to the meeting but he didn't feel it was necessary for them
to come up from Little Rock.
Wood stated he felt that once the bridge was installed that it would help
the situation in general instead of hindering it. It wouldn't help the water
situation any but would help eliminate other safety hazards that are more life
endangering than 0.1 foot increase of flood water.
Deckart made a motion that the variance be accepted.
Ackley -Perkins seconded.
After no discussion, the motion carried with unaminity.
The meeting adjourned at 4:20 p.m.
•
•
REPLY TO
ATTENTION OF
DEPARTMENT OF THE ARMY
LITTLE ROCK DISTRICT, CORPS OF ENGINEERS
POST OFFICE BOX 667
LITTLE ROCK, ARKANSAS 72203-0867
April 11, 1985
Engineering and Planning Division
Planning Branch
Mr. Don Potter
Arkansas State Highway and
Transportation Department
P.O. Box 2261
Little Rock, Arkansas 72203
Dear Mr. Potter:
This is in response to your request for flood data at Old
Missouri Road crossing Mud Creek in Fayetteville.
We have run the backwater analysis of the proposed bridge using
the flood insurance data for Mud Creek-. A copy of the floodway data
with the conditions of the flood insurance study and a copy of the
same with the new bridge is enclosed.
Please note that the flood elevations just upstream from the new
bridge are lower. Only at bridge section 4.000 is the 100 -year
flood elevation raised 0.1 foot above the 1 -foot allowed floodway
encroachment. It is recommended that a variance be obtained from
the city of Fayetteville for the 0.1 -foot rise approximately
100 feet upstream from the bridge. We consider this structure
consistent with the procedure for good flood plain management.
Enclosure
,Sincerely,
/JerrfL. Durrin
/ Acting Chief, Engineering and Planning
Division
•
•
NOTICE OF APPEAL
TO BUILDING BOARD OF ADJUSTMENTS AND APPEALS
NA IE Arkansas State Highway Dept. DATE , May 14. 1985
• ADDRESS P. 0. Box 2261
Little Rock, Ar 72203
HOME TELEPHONE BUSINESS TELEPHONE 501-569-2000
ADDRESS OF PROPERTY WHERE VARIANCE REQUESTED:
Mud Creek Bridge and Approaches at Old Missouri Road f0 `
LEGAL DESCRIPTION OF PROPERTY WHERE VARIANCE REQUESTED: •U �)69
•
•
Section 35, Township 17 North, Range 30 West
VARIANCE REQUESTED:
REASONS FOR REQUESTING VARIANCE:
Because it produces a 0.1 foot increase above the 1.0 footincrease in the
flood elevation allowed with the floodway encroachment.
INTERPRETATION OF BUILDING OFFICIAL APPEALED FROM:
Because it produces a 0.1 foot increase above the 1.0 foot increase in the
flood elevation allowed with the floodway encroachment.
REASONS DECISION OF BUILDING OFFICIAL SHOULD BE MODIFIED OR
REVERSED:
non 1 Pnttnr/ AHTD
Signature
NOTE: A fee of $10.00 shall accorpany each Notice of Appeal.
Section 111.5 of the Building Code provides that the Board shall
meet within ten (10) days after Notice of Appeal has been re-
ceived. Section 112.1 of the Building Code provides that Notice
of Appeal shall be filed within ninety (90) days after the de-
cision is rendered by the building official.
•
•
•
•
ARKANSAS STATE HIGHWAY
AND
TRANSPORTATION DEPARTMENT
Henry Gray, Director
Telephone (501) 569-2000
April 23, 1985
City of Fayetteville
P. O. Drawer F
Fayetteville, AR 72701
ATTENTION: Mr. Freeman Wood
Building Inspection
Superintendent
Dear Mr. Wood:
P.O. Box 2261
Little Rock, Arkansas 72203
RE: AHTD Job No.'4928
Mud Creek Br. & Apprs.
Old Missouri Road
Washington County
The Arkansas State Highway and Transportation Department (AHTD)
has completed the design of a replacement for the Mud Creek
Bridge and Approaches at Old Missouri Road in Fayetteville. It
has been determined that the AHTD must request a Variance from
the City in order to construct this project in compliance with
local Building and Development Regulations.
The Little Rock District Corps of Engineers analyzed this pro-
ject for the City and the AHTD. They concluded that although
the project did not increase flood elevations upstream of the
proposed bridge, it did produce a 0.1 foot increase above the
1.0 foot increase in the 100 -year flood elevation allowed with
the floodway encroachment. The Corps considered this structure
to be consistent with the procedure for good floodplain manage-
ment and recommended that the AHTD obtain a Variance from the
City for the 0.1 foot rise approximately 100 feet upstream from
the bridge.
The AHTD Hydraulics Section certifies that the design of this
project does meet the floodplain objectives of Fayetteville.
We further certify that the project satisfies all requirements
for granting of a Variance as listed in Section 2944 of the
City of Fayetteville
April 23, 1985
• Page 2
•
•
Fayetteville Code of Floodplain Building and Development Regula-
tions. We request that the Building Board of Adjustment and
Appeals grant a Variance for the construction of this project.
A copy of the letter from the Corps dated April 11, 1985 and
construction plan sheets from this project are included for
your use. Since this project is due to be let to contract in
June 1985, your earliest possible considerations of this pro-
ject will be appreciated.
Sincerely,
. 1"„a.,!^„)
Don L. Potter
Engineer of Hydraulics
DLP/TFB:cl
•r+b
Enclosures