HomeMy WebLinkAbout1999-09-07 - Agendas - Final s
, ' FAYETTEVILLE
. .
•
THE CITY OF FAYETTEVILLE, ARKANSAS
FINAL AGENDA
FAYETTEVILLE CITY COUNCIL
SEPTEMBER 7, 1999
A meeting of the Fayetteville City Council will be held on September 7, 1999 at 6:30 p.m. in Room
219 of the City Administration Building located at 113 West Mountain Street, Fayetteville,
Arkansas.
The following items will be discussed:
A. CONSENT AGENDA
1. APPROVAL OF THE MINUTES: Approval of the minutes from the August 17,
1999 City Council meeting.
2. BENHAM GROUP: A resolution approving Amendment No. 2 with the Benham
Group for inspections services in connection with the water and sewer line relocation
work on Dickson Street in the amount of $58,587.00 and a budget adjustment.
3. BID 99-66: A resolution awarding Bid 99-66 to Williams Ford Tractor and
Equipment in the amount of $50,499.00 for the purchase of a heavy duty skid steer
with attachments.
4. DESTRUCTION OF RECORDS: A resolution authorizing the destruction of
selected City record originals which have been maintained for the required length of
time and which have been microfilmed.
5. SYCAMORE / LEVERETT - ENGINEERING : A resolution approving a contract
with Garver Engineers for engineering services for the bidding and construction
phases of the Sycamore / Leverett intersection and drainage improvements in the not-
to-exceed amount of $55,050.00.
6. SYCAMORE / LEVERETT - CONSTRUCTION: A resolution approving a
construction contract for Bid 99-68, Sycamore / Leverett intersection and drainage
improvements, to Sweetser Construction in the amount of $522,695 .30; project
contingency of $88,270.00; and a budget adjustment of $ 136,825.00
•
113 WEST MOUNTAIN 72701 501521.7700
FAX 501575-8257
Final Agenda •
City Council
September 7, 1999
7. RUPPLE ROAD: A resolution approving a construction contract with McClinton-
Anchor for the Rupple Road Street and Drainage Improvements in the amount of
$658,900.00 and a project contingency of 15% of the construction cost, $98,835 .00.
The total amount requested is $757,735.00; and approval of budget adjustment in the
amount of $327,817.00 to increase current available funding from $429,918.00 to
$757,735.00.
8. FEDERAL AVIATION LEASE: A resolution approving a lease with the Federal
Aviation Administration for office space for office space for their System Support
Center. The lease is for five years with an annual compensation of $25,909.33 . This
lease replaces their expired lease for a 2,205.05 square foot building at a rate of
approximately $ 11 .75 per square foot annually. The Airport Board approved this
lease at their August 1999 meeting.
9. TOWER SITE: A resolution approving an agreement with MSA Limited Partnership
(Alltell Communications) for lease of tower space on the Gully Road Water Tank for
the purpose of installing radio communications equipment and appurtenances
(building and antenna).
B. OLD BUSINESS
1. RZ 99-16.10: An ordinance approving rezoning request RZ 99- 16. 10 submitted by
Marshall Carlisle on behalf of Mid-Southern Enterprises for property located at the
northwest comer of Wedington Drive and Salem Road. The property is zoned R-O,
Residential Office, and contains approximately 5.2 acres. The request is to rezone the
property to C- 1 , Neighborhood Commercial. The request was left on the second
reading at the August 17, 1999 meeting.
C. NEW BUSINESS
1. VA 99-9: An ordinance approving vacation request VA 99-9 submitted by Roger
Trotter of Development Consultants, Inc. on behalf of Clary Development Corp. for
Lots 1 and 3, Wedington Place Addition. The property is zoned C-2, Thoroughfare
Commercial. The request is to vacate a 20' utility easement between Lots I and 3 .
2, VA 99-10: An ordinance approving vacation request VA 99- 10 submitted by Tim
McMahon on behalf of McMahon Brothers Construction Inc. for property located at
1603 Jordan Lane. The property is zoned R-1 , Low Density Residential. The request
is to vacate the northernmost 2' of the 10' utility easement along the south property •
line.
Final Agenda
• City Council
September 7, 1999
3, PLANNING COMMISSION APPEAL: An appeal regarding the decision of the
Planning Commission to deny rezoning requests RZ 99- 18, RZ 99- 19, RZ 99-20,
RZ 99-21 , RZ 99-22, and RZ 99-23 .
4, BID 99-67: A resolution awarding Bid 99-67 to the lowest bidder, Presto Products
Co., for the purchase of plastic trash bags to be used in our volume-based sanitation
rate program in the amount of $ 165,935 and a budget adjustment in the amount of
$34,945.
5. OAK GROVE VACATIONS: An ordinance approving the vacation of three 1988
water/sewer easements across Lots 1 , 5 and 6, all in Block 4 of Drake' s Replat of
Block 4 of Gates Subdivision of Oak Grove Addition. The vacated easements will be
replaced with new easements associated with the actual line location.
6, BID WAIVER: An ordinance approving a bid waiver to purchase one "Test Release"
diesel-powered 4-wheel drive 80/82 HP tractor with full new unit factory supported
• warranty provided. This will allow the Mayor to approve for purchase the unit
recommended by the Fleet Operations Division, Parks Maintenance Division, and the
Equipment Committee. This unit will be utilized by the City of Fayetteville Parks
Maintenance Division.
7, GREATHOUSE PARK: Discussion and possible action regarding the Greathouse
Park Bridge and the tree removal required due to flood prevention for its construction.
•
Page 3
J
J
MINUTES OF A MEETING •
OF THE
FAYETTEVILLE CITY COUNCIL
AUGUST 17, 1999
A meeting of the Fayetteville City Council was held on August 17, 1999 at 6:30 p.m. in Room
326 of the City Administration Building located at 113 West Mountain Street, Fayetteville,
Arkansas.
PRESENT: Mayor Hanna; Aldermen Reynolds, Austin, Davis, Daniel, Santos, Young, Russell;
City Planner Tim Conklin; Public Works Director Charles Venable; Administrative Services
Director Kevin Crosson; City Attorney Jerry Rose; City Clerk Heather Woodruff; Staff; Press,
and Audience.
e BSENT.Alderman-Trumbo
ITEMS DISCUSSED ACTION TAKEN
Approval of minutes Minutes approved •
Mt. Olive Water Association Approved Res. 105-99
Detention Center Approved Res. 106-99
Family Violence Shelter Approved Res. 107-99
Shelter Rehabilitation Approved Res. 108-99
Hwy 265 Utility Relocation Approved Res. 109-99
Rezoning RZ 99-16. 10 Left on second reading
Rezoning RZ 99-17.00 Passed Ord. 4177
Amber Drive Street Name Change Failed
Dickson Street Water and Sewer Relocations Approved Res. 110-99
Cell Tower Ordinance Left on second reading
•
CITY COUNCIL
September 7, 1999
ROLL POLL
t�
AIPSIM
DAVIS
TRUMBO
DANIET
MAYOR 14ANNA
SANTOR
REYNOLDS
AUSTIN
nAVIR
lRlJMRQ
DANIEL '�
CITY COUNCIL
September 7, 1999
ROLL
Vol NCT
RTIRSE.1 -1 , Al
HEYNOIDS
DAVIS
TRUMBO y
MAYOR 14AIVNA
Hq
Q
RFVNOT US
AUSTIN
DAVER
DANIEL ✓ ✓
2 — v . a?—o -0 • ;P- o - 0 .
SANTOR
DAVIS
lRllMRQ
MAYOR HANNA
t/ ✓ !✓
3 -0 -0 .
CITY COUNCIL
September 7, 1999
2 �
ROLL L
RAMIUS
✓ ✓
DAVIS '� ✓
TRUMBO
DANIEL
MAYOR HANNA
A31P
RT IqRFT ,T ,
TRI TMR()
DANIEL
MAYOR HAMMA
Z
0409r 2 c.9
W)l Wry
✓ ✓ ✓
RT ISRET .1 ,
ATTqTTM
TRITMRO
MAY()R HANNA
CITY COUNCIL
September 7, 1999oc r2
ROLL /vw/
qAMTOR
✓ •/ �/
VM Ncl
RF QT T)4Z
ATNTIN
DAVIS ✓
TRUMBO
VM Wrl
RUSSELL
A I IS TIN
DAVIS kv� AN
TRTIMRn
DANIEL
CITY COUNCIL
September 7, 1999
ROLL
RANTOR
Vol ING
HEYNOT US
AT ISTIN
DAVIS
TRUMBO
MAYOR MANNA
- S-
q�_ zw
RRYNOT US
AUSTIN X/
DAVIS A
DANIEL
MAYOR 14ANNA
24q - Z gq.23
SANTOR
ATTqTTM
DAVIS
TRUMBO
DANIFT , 4z
MAYOR HANNA
o--;�?-o , 3 -s-v.
FAYETTEVILLE
• THE CITY OF FAYETTEVILLE, ARKANSAS
TENTATIVE AGENDA
FAYETTEVILLE CITY COUNCIL
SEPTEMBER 7, 1999
A meeting of the Fayetteville City Council will be held on September 7, 1999 at 6:30 p.m. in
Room 219 of the City Administration Building located at 113 West Mountain Street,
Fayetteville, Arkansas.
The following items will be discussed:
A. CONSENT AGENDA
1. APPROVAL OF THE MINUTES: Approval of the minutes from the August
17, 1999 City Council meeting.
2. BID 99-67: A resolution awarding Bid 99-67 to the lowest bidder, Presto
• Products Co., for the purchase of plastic trash bags to the used in our volume
based sanitation rate program in the amount of $ 158,550 and a budget adjustment
in the amount of $27,560.
3. BID 99-66: A resolution awarding Bid 99-66 to Williams Ford Tractor and
Equipment in the amount of $50,499.00 for the purchase of a heavy duty skid
steer with attachments.
4. DESTRUCTION OF RECORDS: A resolution authorizing the destruction of
selected City record originals which have been maintained for the required length
of time and which have been microfilmed.
5. SYCAMORE / LEVERETT -- ENGINEERING: A resolution approving a
contract with Garver Engineers for engineering services for the bidding and
construction phases of the Sycamore / Leverett intersection and drainage
improvements in the not-to-exceed amount of $55,050.00.
6. SYCAMORE / LEVERETT -- CONSTRUCTION: A resolution approving a
construction contract for Bid 99-68, Sycamore / Leverett intersection and drainage
improvements, to Sweetser Construction in the amount of $522,696.30; project
contingency of $88,270.00; and a budget adjustment of $ 136,825.00
113 WEST MOUNTAIN 72701 501521-7700
FAX 501575-8257
Tentative Agenda •
City Council
September 7, 1999
7, RUPPLE ROAD: A resolution approving a construction contract with
McClinton-Anchor for the Rupple Road Street and Drainage Improvements in the
amount of $658,900.00 and a project contingency of 15% of the construction cost,
$98,835 .00. The total amount requested is $757,735 .00; and approval of budget
adjustment in the amount of $327,817.00 to increase current available funding
from $429,918.00 t o $757,735 .00.
8. FEDERAL AVIATION LEASE: A resolution approving a lease with the
Federal Aviation Administration for office space for office space for their System
Support Center. The lease is for five years with an annual compensation of
$25,909.33 . This lease replaces their expired lease for a 2,205.05 square foot
building at a rate of approximately $ 11 .75 per square foot annually. The Airport
Board approved this lease at their August 1999 meeting.
9. TOWER SITE: A resolution approving an agreement with MSA Limited
Partnership (Alltell Communications) for lease of tower space on the Gully Road
Water Tank for the purpose of installing radio communications equipment and
appurtenances (building and antenna). •
B. OLD BUSINESS
1. RZ 99-16.10: An ordinance approving rezoning request RZ 99- 16. 10 submitted by
Marshall Carlisle on behalf of Mid-Southern Enterprises for property located at the
northwest corner of Wedington Drive and Salem Road. The property is zoned R-O,
Residential Office, and contains approximately 5.2 acres. The request is to rezone the
property to C- 1 , Neighborhood Commercial. The request was left on the second reading
at the August 17, 1999 meeting.
C. NEW BUSINESS
1. VA 99-9: An ordinance approving vacation request VA 99-9 submitted by Roger Trotter
of Development Consultants, Inc. on behalf of Clary Development Corp. for Lots 1 and
3, Wedington Place Addition. The property is zoned C-2, Thoroughfare Commercial.
The request is to vacate a 20' utility easement between Lots 1 and 3 .
2. VA 99-10: An ordinance approving vacation request VA 99- 10 submitted by Tim
McMahon on behalf of McMahon Brothers Construction Inc. for property located at 1603
Jordan Lane. The property is zoned R- 1 , Low Density Residential. The request is to
vacate the northernmost 2' of the 10' utility easement along the south property line. .
3. PLANNING COMMISSION APPEAL: An appeal regarding the decision of the
Planning Commission to deny rezoning requests RZ 99- 18, RZ 99- 19, RZ 99-20,
RZ 99-21 , RZ 99-22, and RZ 99-23.
MINUTES OF A MEETING
OF THE
FAYETTEVILLE CITY COUNCIL
AUGUST 17,1999
A meeting of the Fayetteville City Council was held on August 17, 1999 at 6:30 p.m. in Room
326 of the City Administration Building located at 113 West Mountain Street, Fayetteville,
Arkansas.
PRESENT: Mayor Hanna; Aldermen Reynolds, Austin, Davis, Daniel, Santos, Young, Russell;
City Planner Tim Conklin; Public Works Director Charles Venable; Administrative Services
Director Kevin Crosson; City Attorney Jerry Rose; City Clerk Heather Woodruff; Staff; Press,
and Audience.
ABSENT:_Alderman Trumbo
PROCLAMATION
Alderman Daniel introduced Brenda Thiel, Wanda Stephens and Berta Sykes. They presented
the Women's Equality Day proclamation, read by Brenda Thiel. declaring August 26, 1999 as
Women's Equality Day in Fayetteville.
CONSENT AGENDA
APPROVAL OF THE MINUTES
Approval of the minutes of the August 3, 1999 City Council meeting.
MT. OLIVE WATER ASSOCIATION
A resolution authorizing the City to grant a water line permanent and temporary construction
easement (0.455 acres) to Mt. Olive Water Association for the construction and operation of a
water line along the East Boundary of Lake Wilson.
RESOLUTION 105-99 AS RECORDED IN THE OFFICE OF THE CITY CLERK
DETENTION CENTER
A resolution authorizing the Mayor and City Clerk to convey 186 square feet of City property to
Washington County, Arkansas as outlined by the footprint of the Washington County Detention
Center on City-owned property west of Mill Avenue.
RESOLUTION 106-99 AS RECORDED IN THE OFFICE OF THE CITY CLERK
•
City Council Minutes
August 17, 1999
Page 3
FAMILY VIOLENCE SHELTER
A resolution approving a contract with Foster Witsell Evans and Rasco for architectural services
in conjunction with construction of a Shelter and offices for the Project for Victims of Family
Violence. Compensation for architectural services and engineering costs is $51 ,900 with a
project contingency of $5, 190 for a total cost of $57,090.
RESOLUTION 107-99 AS RECORDED IN THE OFFICE OF THE CITY CLERK
SEWER REHABILITATION
A resolution approving change orders to the sewer rehabilitation construction contracts for a net
reduction of $27,623 .44. Cost changes include:
a. Insituform, TexArk, for an increase of $69,370.50
b. Jones Brothers, Inc. for a reduction of $75,495 .30
C. T-G Excavating, for a reduction of $21 ,498.64
RESOLUTION 108-99 AS RECORDED IN THE OFFICE OF THE CITY CLERK
HIGHWAY 265 UTILITY RELOCATION
A resolution approving the Highway-Utility Construction / Relocation agreement with the
Arkansas State Highway and Transportation Department for water and sewer relocations and
adjustments on Highway 265 (between Highways 45 and 16.) Per the agreement, $ 1 ,465,759.34
(51 .44%) of the actual cost of the eligible portions will be reimbursable to the City by the
Highway Department.
RESOLUTION 109-99 AS RECORDED IN THE OFFICE OF THE CITY CLERK.
Alderman Daniel moved to approve the consent agenda. Alderman Austin seconded the
motion. Upon roll call the motion carried unanimously.
OLD BUSINESS
No old business.
NEW BUSINESS
RZ 99-16.10
An ordinance approving the rezoning request RZ 99-16. 10 submitted by Marshall Carlisle on
behalf of Mid-Southern Enterprises for property located at the northwest corner of Wedington
Drive and Salem Road. The property is zoned R-O, Residential Office, and contains •
approximately 5 .2 acres. The request is to rezone the property to C- 1 , Neighborhood
• City Council Minutes
August 17, 1999
Page 4
Commercial.
Mr. Rose read the ordinance for the first time.
Alderman Daniels agreed with staff. She felt they had a lot of commercial zoning available. She
thought they needed to move toward infill with commercial zoning in the area.
Alderman Austin questioned the type of business Mid-South Enterprises was.
Mr. Carlisle, attorney for the owner of Mid-South (Sam Rogers), had developed property for
over 30 years in this area. He explained they had made an application for C-2 zoning. They had
amended their application to comply with what was now being recommended by the Planning
Commission. They had tried to zone the property in order for it to provide services of every kind
that was not available on Wedington Drive at the present time. Wedington Drive is one of the
places the City had with residential area that did not have any of the services that were available
on Highways 71 or 62. They were trying to make those services available. Knowing the history
of Sam Rogers, if he said he was going to develop, he was going to develop it.
Alderman Davis stated there were no commercial areas in this location except for the C-2, which
was east of Salem at this point. There was a lot of housing in this area and the city was going to
continue to grow west. He thought this was something that would benefit the people out west.
He was for the rezoning.
Alderman Daniel stated she had received a lot of calls from the people in the Salem area. They
were very concerned that people were taking advantage of them because the land was cheaper
out there. There had been some development which had devalued the property. There was no
guarantee of the quality that was going to go in there.
Alderman Reynolds stated he was in favor of the C-1 zoning because the people he had spoken
to did not want C-2 zoning. He noted they had done everything the Planning Commission had
asked them to do. He thought they should support them.
Alderman Russell asked City Planner Tim Conklin if the property east of the subject property
followed the 2020 Plan. Mr. Conklin replied that the land was planned to be commercial.
Alderman Santos thought with all the residential growth out there, a commercial C-1 zoning was
appropriate zoning for this area. They were supposed to provide services for commercial
services for neighborhoods to keep people from having to drive. The Planning Commission had
approved the rezoning 6-2-0. He thought it would be the proper thing to do with the property.
• Alderman Daniel thought it would be a good idea to leave the rezoning on the first reading
a
City Council Minutes •
August 17, 1999
Page 5
because it was a significant rezoning.
Mayor Hanna recalled in the 1980s when they were working on their twenty year plan. It had
been recommended to set aside 500 acres in that area for commercial property to possibly have a
second mall. They were going to have to have commercial property to service the area. He
thought the rezoning was very appropriate.
Mr. Conklin stated the Planning Department had not received an opposition to the rezoning.
Alderman Austin moved to suspend the rules and move to the second reading. Alderman
Reynolds seconded the motion. Upon roll call the motion carried by a vote of 6-0-1. Young
abstained.
Mr. Rose read the ordinance for the second time.
Alderman Davis moved to suspend the rules and move to the third and final reading.
Alderman Santos seconded the motion. Upon roll call the motion failed by a vote of 4-2-1. •
Daniel and Russell voted nay; Young abstained.
Mr. Rose stated the ordinance would remain on the second reading. It required a 2/3 vote to
move to the third and final reading.
RZ 99-17
An ordinance approving rezoning request RZ 99-17 submitted by Marshall Carlisle on behalf of
Mid-Southern Enterprises for property located at the northwest comer of Wedington Drive and
Salem Road. The property is zoned R-2, Medium Density Residential, and contains
approximately 4.77 acres. The request is to rezone the property to R-O Residential Office.
Mr. Rose read the ordinance for the first time.
Alderman Russell moved to suspend the rules and move to the second reading. Alderman
Reynolds seconded the motion. Upon roll call the motion carried by a vote of 6-0-1. Young
abstained.
Mr. Rose read the ordinance for the second time.
Alderman Santos moved to suspend the rules and move to the third and final reading. •
Alderman Davis seconded the motion. Upon roll call the motion carried by a vote of 6-0-1.
Young abstained.
• City Council Minutes
August 17, 1999
Page 6
Mr. Rose read the ordinance for the third and final time.
Mayor Hanna called for the vote. Upon roll call the motion carried by a vote of 6-0-1.
Young abstained.
ORDINANCE 4177 AS RECORDED IN THE OFFICE OF THE CITY CLERK.
AMBER DRIVE
A resolution approving the changing of the name of Hackberry Street to Amber Drive, to make
Amber the continuous street name running east and west through the Charleston Place P.U.D.
Mayor Hanna stated he had received a call from Ms. Cunningham, a resident on Hackberry_, who
had been a long time resident there. He had gone over this with staff. He explained when the
first entrance off Mission had been named Amber Drive. When the street went in there were two
or three possible directions the street could have gone.
• Alderman Daniel stated she had driven through the area. She thought it was a matter of
practicality. Hackberry was very short compared to Amber Drive.
Alderman Davis explained the residents along Hackberry had been there for over twenty years.
Neither of the two residents on Hackberry wanted the street name changed because of all the
things they would have to change. The only people the name change would affect as far as 911
would be those two residences. They would like for the council to vote this down because of
their longevity on that street.
Alderman Daniel stated she was thinking about making a motion where the name change would
not go into affect for one year to give the residents time to make the changes.
Alderman Santos expressed concern about emergency vehicles being misled by street names.
Mayor Hanna explained when someone has lived at an address for over 20 years or more, a lot of
people you would not normally hear from every year would have the address.
Alderman Russell agreed that it was an inconvenience, but compared it with the safety of the
residents. What bothered him was that the plat of the subdivision had been conditionally
approved on the street name change. He questioned if the developer could explain the
convenience to the residents. He read a letter from one of the area residents.
• Alderman Santos thought the letter was more of an opposition to the subdivision rather than the
street name change.
City Council Minutes •
August 17, 1999
Page 7
Mr. Venable stated he had looked at the complaints listed in the letter. There were a couple of
trees down. They could not tell if they were on her property or not, but they would have them
removed as soon as they could. They did have a drain that came across the yard and went into
the street. With it there was supposed to be a swell cut which would run back into the ditch. The
sidewalk would have to be worked out with the drainage. All these things they would make sure
were done as they finish the development. They had not been aware of the problems until they
received this letter.
Alderman Austin expressed concern that the impact of this development was on the longtime
residents rather than the developer. They were not gaining anything other than the expense and
inconvenience of changing their address and some adverse living conditions. He thought the
developer could compensate for their inconvenience.
Alderman Daniel asked if the residents had been notified.
Mr. Conklin replied the residents had been notified of the preliminary plat back in 1997 when it
was approved. He had looked in the file and the Cunninghams were on the notification list. In
regards to the street connection, Amber Drive, the right-of-way was stubbed out and the •
Hackberry Street had been stubbed out for a future street connection. The Planning Commission
had wanted the two streets to connect the two. They had required the developer to connect the
two streets together, which was the reason they had one street with two names.
Mayor Hanna added when the two developments had been started they did not know how they
would be configured.
Alderman Young stated this is one of those subdivisions that had been there a while. He thought
the only danger in a 911 situation would be to those two residences. Most people would assume
that it was Amber Drive. He asked if the development had a final plat yet.
Mr. Conklin replied the final plat had been approved in June of this year. The name of the street
on the plat was Amber Drive. That was a recommendation made in 1997 by the City's 911
coordinator to have Amber Drive as the name of the street.
Alderman Young asked since the approval of the final plat had been based on the approval of the
street name change, how was the final plat approved already.
Mr. Rose stated the final plat had been approved according to staff comments. One of the staff
comments was, "a street name change needs to presented to the City Council in order to change
the short section of Hackberry to Amber Drive. This requires the applicant to submit a letter •
requesting the change and the staff will process the agenda request."
S-
• City Council Minutes
August 17, 1999
Page 8
Alderman Santos moved to change the short section of Hackberry to be Amber to make a
continuous street through from Winwood to Old Wire Road. Alderman Russell seconded
the motion.
Alderman Daniel proposed an amendment to wait one year before changing the street
name. Alderman Young seconded the motion. Upon roll call the amendment failed by a
vote of 3-4-0.
Mayor Hanna called for the vote on the resolution. Upon roll call the motion failed by a
vote of 4-4-0. Reynolds, Austin, Davis, and Hanna voted nay.
DICKSON STREET WATER AND SEWER RELOCATION
A resolution approving the award of a contract to relocate certain water and sewer lines on
Dickson Street, and to construct a new 12-inch water line for additional fire protection and
general improvement of the water system.
• Alderman Davis asked if this would be completed by Thanksgiving.
Mr. Venable replied part of it would be. It depended on the contractor and the weather.
Alderman Young stated the only concern he had was for the people on Dickson Street.
Contractors were normally used to working in a field. He noted the bid was high, because it was
located in the old section of town and that they had to take into consideration the merchants
along Dickson Street.
Mr. Venable added there would be some inconvenience, but the traffic would still be moving.
This was the first phase of renovating the area.
Mr. Bunn explained the bid did not include construction management. They would bring to the
next meeting of the City Council a contract for construction management for his job which
would speed up the project.
Alderman Young moved to approve the resolution. Alderman Davis seconded the motion.
Upon roll call the motion carried unanimously.
RESOLUTION 110-99 AS RECORDED IN THE OFFICE OF THE CITY CLERK
• CELL TOWER ORDINANCE
An ordinance establishing criteria to assess and reduce visual and land use impacts associated
1
City Council Minutes •
August 17, 1999
Page 9
with the development of wireless communication facilities in the City of Fayetteville, Arkansas.
Mr. Rose read the ordinance for the first time.
Alderman Austin stated the recommendation had come from the Ordinance Review Committee.
He commended Bob Davis, Jerry Rose and Tim Conklin for their hard and detailed work on the
ordinance. They had worked with the representatives of the carriers to bring it to them.
Alderman Young questioned page 6, Section C. 1 .13, regarding the location of existing towers.
Alderman Austin answered they had changed "existing towers" to 'original tower," in order to
capture the height of the original tower and not allow the height of the tower to grow each time
they added a co-locator.
Alderman Russell questioned the "efforts to demonstrate their efforts to co-locate". He asked if
they were asked to locate on an existing structure that was not necessarily a tower.
Alderman Santos stated they were encouraging co-locations by allowing administrative approval •
by co-location and by avoiding the conditional use process.
Alderman Russell questioned the termination of the conditional use. He questioned what " City"
meant, the Mayor or Staff.
Mr. Rose replied it could be who they wanted. He suggested it would be whoever granted the
conditional use. In this case it would be the Planning Commission.
Alderman Russell moved to substitute the word "Planning Commission" for the word
"City" in Section 9, B. Alderman Young seconded the motion. Upon roll call the motion
unanimously.
Alderman Austin moved to suspend the rules and move to the second reading. Alderman
Russell seconded the motion. Upon roll call the motion carried unanimously.
Mr. Rose read the ordinance for the second time.
Mr. Hunter Stewart, Real Estate Manager for Southwestern Bell Wireless, stated he had attended
all but the very last session on the ordinance. There had been input from the staff, industry, and
community. He stated everyone had worked well together. He questioned one section which
referenced the use of publicly owned structures. He asked if that included undeveloped property, •
and if it would be exempt from the conditional use process as they would do with a private land
owner.
• City Council Minutes
August 17, 1999
Page 10
Mr. Rose replied it would be the same process.
Mr. Stewart questioned the use of existing vegetation in certain areas where it would not be
compatible with the surroundings, whether variances would be allowed.
Alderman Davis replied he would be allowed to apply for a variance.
Mr. Stewart asked what the typical notification distance would be for a commercial development
within the City of Fayetteville.
Mr. Conklin replied it was the adjoining property owners.
Mr. Stewart felt he was being discriminated against in the sense he had to advertise and provide
photographs. They were isolating them as an industry by requiring them to do those things and
not requiring the same of a developer of a shopping center. Why would they ask them to do 500
feet and not a developer.
• Alderman Davis replied it was his understanding that the maximum of anything of this nature
was 500 feet.
Mr. Conklin clarified they had certain conditional uses which did have a notification area of 500
feet. He gave examples of a dance hall or a sexually-oriented business.
Mr. Stewart was offended that he had been lumped with something that had been perceived to be
negative. He asked the council to reconsider the distance of notification.
Alderman Davis replied with the revenue that they made from cell towers and cellular
communications, having to notify people within 500 feet should not cost them that much.
Alderman Santos noted the ordinance required certified mail for adjoining property owners and
regular mail for the remaining property owners within the 500 feet area.
Alderman Davis stated people wanted to be notified. A lot of people had felt that they had not
been notified. He thought this would be one way which would solve the problem. This way they
would have to go across the street. At one time they were planning a quarter of a mile
notification.
Alderman Young added part of the reasoning for the extended notification area was the fact that
the tower was so high. He added if a residential lot was 100 feet wider then five more people
• would be notified. He lived in the central part of the city and five hundred feet there would not
mean that many additional notifications would be required.
City Council Minutes •
August 17, 1999
Page 11
Alderman Russell stated the towers did affect people further away, at least visually, than a
shopping center would. It was the nature of the structure and not the industry. The purpose of
the ordinance was to regulate the visual affects.
Alderman Davis stated they had to decide if they wanted more structures or fewer structures.
Because of that they had increased the height from 80 to 150 feet.
Mr. Stewart conceded that it had been a give and take process.
Alderman Young added they could always come back and change the ordinances.
Alderman Russell commented that he had been looking at the map in a fairly dense area, and had
determined that they were looking at approximately 50 people that would need to be notified.
Alderman Santos added they were not planning on passing the ordinance tonight. They were
planning a special meeting to give another week for public comment. There would be a special
council meeting before the agenda session next Tuesday.
Mr. Jeff Erf, area resident, stated that he would like to leave the notification distance at 500 feet •
or even more. The towers affected the scenic vista and other people. It was his understanding
that the city would, with their GIS system, help find the property owners.
Mr. Bob Sigafoos, a property owner near St. John's Lutheran Church, asked how the residents
would be protected by this ordinance.
Mr. Conklin answered that the current ordinance that they had was a conditional use process.
Those who had been involved in the St. John's Lutheran Church had used a process where they
had held a public hearing. During that time they took public input and then the Planning
Commission made a decision. This ordinance offered additional safe guards; they now had a
safe zone for the tower to be set back from residential dwelling units, and requirements for
screening and noise control. If the tower is not maintained they would have the ability to require
it to be maintained or removed if it were abandoned. It also encouraged co-location. The
incentive was administrative approval. It encouraged the providers to come to the city, and
survey the existing structures and towers within the city to determine if they could co-locate.
The providers in this community had been working really well together and they have been co-
locating their facilities on each other's towers in Fayetteville. This ordinance provided
incentives for the cell providers to look at existing structures and towers to co-locate. It also
increased the distance from dwelling units.
Mr. Sigafoos asked if they could come into a residential neighborhood. •
r
L
• City Council Minutes
August 17, 1999
Page 12
Alderman Davis replied that they could and the only way they could defeat that was for the
people in the neighborhood to come out in protest.
Mr. Sigafoos replied it had been a circus and cost the citizens time. He wanted to see something
in the ordinance that would protect the residential neighborhoods.
Alderman Davis replied legally they were not allowed to do that according to the communication
laws.
Alderman Austin added one thing they were forgetting about was the height of the tower which
would give them that much buffer. Distance was protection.
Alderman Davis explained even though the ordinance allowed a 150-foot tower, the Planning
Commission did not have to approve a 150-foot tower. Legally they could not restrict them
completely. The only way to restrict them would be through a tear system which allowed
different heights for different zoning districts. However they had not been able to work a system
out.
• Alderman Russell asked Mr. Sigafoos what he meant by having something in the ordinance that
protected the residential neighborhoods by insuring that the heights were shorter or a band.
Mr. Sigafoos preferred not to have them in residential neighborhoods at all but to primarily
locate them in commercial neighborhoods. The towers stuck out like a sore thumb in residential
neighborhoods.
Alderman Austin found that during these meetings these providers only go where they are asked
to go. The traffic determined where they were to go. When people asked for the service they
were providing the service by going into the neighborhood. The more densely the cell towers
become packed, the closer they had to get to the people.
Mr. Sigafoos stated that most people were busy which led the council to believe that no one
cared. But he thought the residents were interested. They wanted to be protected.
To clarify for Ms. Daniel, Mr. Conklin stated that they required the applicant to go to the county
assessment records and provide them with a list of the property owners and place them on
mailing labels. The staff then mailed the notifications.
Alderman Russell asked if a large apartment complex were within the 500 feet would they only
have to notify the landlord or each individual apartment.
• Mr. Conklin replied that was correct. It was the property owner that was notified.
If
City Council Minutes •
August 17, 1999
Page 13
Mr. Bobby Farrell, 2413 Twin Oaks Court, stated he worked for the telephone company. He was
glad an ordinance could be worked out. He thought the cell phone users would support the cell
towers.
A special City Council meeting will be held before the next agenda session for the cell tower
ordinance.
Meeting adjourned at 7:30 p.m.
•
•
AGENDA REQUEST FORM , SEPTEMBER 7 COUNCIL MEETING
FROM Don Bunn PW Admin Public Works
Name Division Department
ACTION REQUIRED Approval of Amendment No . 2 with The Benham Group for
inspection services in connection with the water and sewer line relocation
work on Dickson Street in the amount of $ 58 , 587 . 00 , and a Budget
Adjustment .
COST TO CITY
$ 58 , 587 . 00 $ 700 , 000 . 00 Water and Sewer
Cost of this Request Category/ Project Budget Category/ Project Name
4470 9470 5808 00 $ 696 , 134 . 00
Account Number Funds Used to Date Program Name
99027 0010 $ 3 , 866 . 00 Sales Tax
Project Number Funds Remaining Fund Category
BUDGET/CONTRACT REVIEW �yXX� BBupdgete Lten, XX Budget Adj . �Attached
Budget Coordinator DateAchin Services Director Date
� q
Acco i ig er Date A Coordinato Date
'3o
C ty ttorn Date Le al Auditor Date
Purc� hasing Officer Date
f
STAFF RECOMMENDATION The Staff recommends approval of Amendment No . 2 with
The Benham Group for inspection services in connection with the water and
sewer line relocation work on Dickson Street in the amount of $ 58 , 587 . 00 ,
an Budget Adjustment .
8 / 16 / 99
t blic Wor (s Director Date Cross Reference
partme D ctor Date New Item : Yes No
Prev Ord/Res # 165 - 98
A i Services Director Date
314 Orig . Contract # 689
Ma or Date Orig . Contract Date 12 / 15 /98
FAYETTEN LLE
THE CITY OF FAYETTEVIEEE, ARKANSAS
DEPARTMENTAL CORRESPONDENCE
August 26, 1999
To: Fayetteville City Council
From: Don Bunn , Ass't Public Works Director k/ )
Thru: Charles Venable, Public Works Director
Fred Hanna, Mayor
Subject: Contract Amendment No. 2, Benham Group
Inspection Services During Construction
Dickson Street Water and Sewer Relocations
On August 17, 1999 the City Council approved the construction contract in connection with
the relocation of water and sewer lines on Dickson Street. The project is being done prior to
the street enhancement work scheduled for the spring and summer of 2000. The design
work was done under an engineering contract with The Benham Group.
Our contract with the Benham Group did not include services during construction , however,
it did provide for an amendment to the basic contract which would cover those costs under
the same terms and conditions as given for the design services. In accordance with the
terms of the basic agreement, this Amendment No. 2 for construction management services
is presented for approval.
The contract amendment calls for full time inspection on the job. This means that whenever
the contractor is working , the Benham Group will have someone present to observe the
construction. Providing full time inspection on normal construction projects is somewhat
unusual, however, for this kind of job where the work area is a busy city street and where
there is so much uncertainty about actual conditions to be encountered , we feel it is worth
the extra cost involved .
The cost of the proposed amendment is $58,587.00. This is based on a final completion
date of March 1 , 2000. If for some reason , construction runs beyond the date given for final
completion, another amendment may be necessary to provide for the additional inspection
services. The work includes a full time inspector on the job, administrative and clerical
services during that time, and the furnishing of "as-built" drawings of the completed work. It
is the recommendation of the Staff that Contract Amendment No. 2 be aoproved in the
amount of $58.587.00 along with a budget adjustment.
i
COMMENT SHEET
Project: Engineering Contract, Inspection Services
Water and Sewer Relocations, Dickson Street
Engineer/Contractor: The Benham Group
Notes to Reviewers: This purpose of this contract amendment is to provide for inspection
services during construction in connection with the water and sewer relocations in
Dickson Street. The contract is to go to the Agenda Meeting of the City Council on
Tuesday, August 31 .
AMENDMENT TO THE AGREEMENT FOR
CONSULTING SERVICES
For the Downtown Dickson Street Enhancement Project
Water and Sewer Construction Administration
BETWEEN:
The CONSULTANT and the CLIENT
The Benham Group City of Fayetteville, Arkansas
1801 Forest Hills Boulevard 113 West Mountain
Bella Vista, AR 72715 Fayetteville, AR 72701
THE PARTIES AGREE AS FOLLOWS:
WHEREAS, The Benham Group (TBG) and the City of Fayetteville (City) are parties to an Agreement
for Consulting Services dated December 15, 1998, (the Agreement), and,
WHEREAS, the City has now awarded a constriction contract for the water and sewer improvements,
and,
WHEREAS, in order to provide professional construction observation and contract administration, a full
time inspector and periodic engineering administration are required of the design consultant,
WHEREAS, all other terms and conditions of the agreement remain in force,
NOW THEREFORE TBG and the City hereby mutually agree to increase the scope of work in the
Agreement to include the above described contract administration for the construction period from the
date of this amendment to February 15, 2000. The City agrees to compensate TBG $ 58,587.00 for the
additional work based on the attached estimate of fees and effort. The Contract in the Agreement is
hereby increased from $388,698.04 to $447,285.04.
IN WITNESS TO THEIR ACCEPTANCE to the terms and conditions of this Amendment, TBG and the
City hereby execute this Amendment to the Agreement for Consulting Services on this day of
1999.
ACCEPTED BY: ACCEPTED BY:
CITY OF FAYETTEVILLE, ARKANSAS THE BENHAM GROUP
By: By: 2e
Gary L. Camahan
Title: Title: Vice President
amenddicksorrwUmpd
r
THE BENHAM GROUP
DICKSON STREET
UTILITY CONSTRUCTION ADMINISTRATION
DESCRIPTION INSPECTOR CIVIL
ENGR TECH CLERICAL TOTAL
(hrs.) (hrs.) (hrs.) (hrs.) HRS
Contract Administration 50 12 62
On-Site Ins 'on 1000 100 1 100
Record Drawin s 8 401 48
SUBTOTAL 1000 158 40 12 1210
RATE $ 16 $ 23 $ 15 $ 12
SUBTOTAL UTILITY CONST. ADMIN. $ 16,000 $ 3,634 $ 600 S 144 S 20378
SUBTOTAL WITH OVERHEAD 150% $ 50t945
PROFIT 15% $ 7 642
TOTAL S 58,587
6f27199
CAmanhours.ads Page 1
City of Fayetteville, Arkansas
Budget Adjustment Form
Budget Year Department: Sales Tax Capital Improvement Fund Date Requested Adjustment #
1999 Division: 08 /27 / 99
Program:
Project or Item Requested: Project or Item Deleted:
Additional funding is requested for the Dickson Street Water & Funding for this request is from the Water & Sewer Cost Share
Sewer Line Replacement Project. Project.
Justification of this Increase: Justification of this Decrease:
The funds are needed to pay for on site construction The City establishes funding for cost share projects annually and
observation services. for the project. funds projects as they are identified. Funding for Water &
Sewer Cost Share project remains in both Sales Tax Capital
Improvement Fund and Water & Sewer Fund.
Increase Expense (Decrease Revenue)
Account Name Amount Account Number Project Number
Waterline Improvements 54 , 721 4470 9470 5808 00 99027 10
Decrease Expense (Increase Revenue)
Account Name Amount Account Number Project Number
Waterline Improvements 54 , 721 4470 9470 5808 00 97021 20
Approval Signatures Budget Office Use Only
Requested By Date Type: A B C OD E
Bildgtt Manager Datb Date of Approval
Department Director Date Posted to General Ledger
Admin. Services Director Date Posted to Project Accounting
Mayor Date Entered in Category Log
Blue Copy: Budget & Research / Yellow Copy: Requester D.\DATA\99BUDG1:7NBUDGTADADCKSNWSI. WK4
BID 99-66
sTAFF REVIEW FORM A.3 Page 1
_XX AGENDA REQUEST
CONTRACT REVIEW AUG 13 1999
GRANT REVIEW CITY OFFAYETTEVILLE
�r the Fayetteville City Council meeting of September 7 . 1999 CITY CLERK'S CFFICE
ntn
W . A . Oestreich Fleet Operations Administrative Servi
Name Division Department
Arrr TnN RrQIITRRn •
Acceptance of the lowest qualified Bidder meeting specifications for the
purchase of a Heavy Duty Skid Steer W/Attachments , Bid 99 - 66 , Item # 1 . The
vendor for this purchase will be Williams Ford Tractor & Equipment , P . O . Box
1346 , Fayetteville , AR 72702 (Vendor 12860 ) .
rreT Tn rTTv *
Cost : $ 50 . 499 . 00 Trade Allowance : N/A Net Cost : $ 50 . 499 . 00
$ 50 . 499 . 00 $ 173 . 571 . 00 Repl /Exp Misc . Veh & E sir)
Cost of this Request Category/ Project Budget Category/Project Name
9700- 1920 - 5802 . 00 $ 53 , 919 . 00 Vehicles & Eguipm n
Account Number Funds Used To Date Program Name
98065- 1 $ 119 . 652 . 00 Shon
Project Number Remaining Balance Fund
BET • VIEW : XX Budgeted tem Budget Adjustment Attached
uddget coordinator haministraelve Services Director
NTRACT/GRANT/LEASE REVIEW : GRANTING AGENCY :
A ountirVg Mkhac_ r Date ADA Coo dina Date
rQ id - 9 j-1
Ci Attorney Date Internal Auditor Date
�\ �e� k J-9 -99
Purchasing Officer Date
CTnFF Rrrr)m wnDTTnw1
Acc9rptance of Bid 99- 66 with the Authorization to Purchase Item # 1 .
Divisi n Head Date Cross Reference
New Item : Yes No
par enEServices
Date
Prev Ord/Res $ '
i ' strairector y�///Date� �' V" Orig Contract Date :
or Date