HomeMy WebLinkAbout2010-02-11 - Agendas - Final 1 0O
Director Ray Boudreaux layeVvChairman - Bob Nickle
Financial Coordinator lames Nicholson s Vice Chair - Janice Stanesic
Senior Secretary Louise Powers Secretary - David Hollman
Member - Otto Loewer
Member - Vaughn DeCoster
Member . Richard Greene
Member - Tim McCarley
Agenda Fayetteville Executive Airport Board Meeting
1 :30 D.m., Thursday, February 11, 2010
Terminal Building Conference Room, 4500 S. School Avenue
City of Fayetteville, Arkansas
As a courtesy please turn off all cell phones and pagers.
1 . Welcome — Chairman.
2. Approval of the Airport Board Minutes of the January 14, 2010 meeting.
3. Receiving of Reports.
A. Director Boudreaux, report on Airport Activity.
B. Financial Coordinator James Nicholson report on FBO and Budget.
C. Louise Powers report on T-Hangars.
• D. Wayne Jones, McClelland Engineers, report on construction projects.
E. Museum reports.
F. Maintenance report.
4. Old Business.
A. Information: Request for Proposal, RFP 10-03, Wildlife Hazard Assessment
5. New Business.
A. Schedule Strategic Planning Meeting.
B. Information: IRON PIG Festival, 5K run, 1 mile walk, & 18 mile bike time trial.
6. Other Business.
A. Items from the Public.
B. Items from the Airport Board.
7. Meeting adjourned.
NOTE: Next Airport Board Meeting: Thursday, March 11. 2009
• Strategic Planning Meeting:
4500 SOUTH SCHOOL AVENUE. SUITE F • AIRPORT TERMINAL BUILDING • FAYETTEVILLE AR 72701
479.718.7642 • 479.718.7646 FAX • www.accessfayefleville.org/govemmenUaviabon
airport_economic_development@ci.fayelteville.ar.us
. MINUTES of the FAYETTEVILLE EXECUTIVE AIRPORT BOARD
January 14, 2010
MEMBERS PRESENT: Bob Nickle, Otto Loewer, David Hollman, Vaughn DeCoster,
Richard Greene, Tim McCarley
MEMBERS ABSENT: Janice Stanesic
STAFF PRESENT: Ray Boudreaux, James Nicholson, Louise Powers
OTHERS PRESENT: Frou Gallagher- Government Channel; Terry Lawson-
Fayetteville Fire Department; Craig Young-tenant; Warren Jones-Arkansas Air Museum;
Wayne Jones-McClelland Engineers; Blaise Sharkey and MaryKathryn Floyd-Million
Air Fayetteville; Bob Burbage-Superior Industries; Rick Bailey-tenant; Skip Descont-
NW Arkansas Times
ITEM #1 : Welcome — Chairman.
i
ITEM #2: Approval of the Airport Board Minutes of the December 10. 2009
meeting.
• A motion to approve the minutes was made by Tim McCarley and seconded by
Richard Greene. The motion carried.
ITEM #3: Receiving of Reports.
A. Engineer Wayne Jones, report on construction projects. Contractors are
removing ice out of the ditch to finish the culvert. Water and sewer lines north of Bailey
Drive and a line by Ernest Lancaster Drive need to be moved. Will be meeting early
next week with the utilities, primarily with AT&T, to determine what their cost would be,
and it appears they will absorb the cost of the relocation. As of December 261' the
construction was 15% complete.
B. Director Boudreaux, report on Airport Activity. Operations are down, the last two
Weeks of December the weather was really bad. Spoke of talks with Cooper Power and
AEDQ on getting easements released to the Airport, there is some problem between
Kearney's and Cooper Power, ownership of property and option to purchase; also it
involves one area that the Arkansas Environmental Quality Department has concerns.
The Airport has rented six spaces in the old tech hangar for oversized vehicles at $ 100.00
per month per space. Have continued to have talks with the proposed client for the tech
hangar, they are still working on financing.
C. Financial Coordinator James Nicholson, report on FBO and Budget. Last month
we had 1 ,842 aircraft operations. December is historically the slowest month of the
year. The average number of monthly operations in 2008 was 2,861 . Discussed the
• charts on the slides, there are some indicators that we are beginning to see growth in the
GA itinerant aircraft operations. Itinerant airtaxi is beginning to show an increase,
i 1
� 1
v
although no increase in fuel sales. There were 28,732 gallons of aviation fuel sold in •
December. Regarding the operating expenses, we had some unanticipated and large
expenses related to the HVAC system. Figures shown will be close to the final 2009
figures, there are some expenses and utility bills to post. Expenses have been kept at a
minimum, some repairs were delayed, and the Airport has skilled personnel that saved us
from having to hire contractors. Otto Loewer commented the people of Fayetteville
should be proud of what staff is doing here. The Airport is in good shape. He suggested
that anytime a report or speech is made, to invite people here to see the Airport, to see
where we are. He expressed appreciation for the spirit in which James has gone out and
collected data for the charts.
D. Louise Powers report on T-Hangars. There is one twin unit vacant now and
another will be empty at the end of this month.
E. Museum reports. Warren Jones said they had completed their fund raiser for the
year, receiving $32,000 over a six to eight week period, giving the Museum a head start
for 2010. Last year we started with a deficient. The next heating bill will be large, but
better to leave the heat on higher than to have leaking pipes. Mentioned one-third of the
ceiling tiles are down in the Conference Room due to leaks. A wedding reception has
already been booked for October. A joint venture with a business in Rogers will be Ribs
Ribbons and Blues. The president of "Women in Aviation" came and spoke to the EAA
members. Thanked Million Air for their help. He invited everyone to a surprise birthday
party for one of the Airport members (Janice Stanesic, also on the Ark. Air Museum
Board) on Wed. 20th at 5:30 at the Savor Restaurant.
F. Maintenance report. Staff has replaced broken pipes in the three north corporate •
hangars. Leon bladed the runway on Christmas and had the Airport open by noon.
ITEM # 4: Old Business.
A. Update: Fuel Flowage rates. Ray reported that Rogers had raised their flowage fee
to $0. 15 a gallon. It would be beneficial to the Airport's budget, but would be hard on
the FBO, they would pass it along to their customers, and they don't want to raise the
price to their customers. The flowage fee has not been raised at this Airport in ten years;
it is approved by City Ordinance. Springdale raised their hangar rent and has talked about
raising their flowage fees. Otto Loewer asked if it was possible to have a fuel flowage
rate for itinerate and based customers. Blaise Sharkey stated he wasn't aware of the fee
being collected anywhere as Mr. Loewer had described. Ray explained the 10 cent fee is
collected on every gallon that is delivered to the Airport fuel storage tanks. Blaise said
Million Air has sent in a bid for a military fuel contract; questions came back and they
have been answered, and the bid has received a bid code. Ray said the Little Rock Air
Force Base has requested tactical approaches at night at Drake Field and has requested a
Letter of Agreement. Chairman Bob Nickle asked staff to put together information on
fuel flowage fees, possibly could increase the fee one or two cents instead of five cents.
Richard Greene questioned the fact that the Rogers Airport has the Wal-Mart fleet and
would that have anything to do with the flowage fee increase. He also commented he
didn't think this was the time to up the cost to the people on the Airport. Ray said with
the Airport Budget being what it is, it was his job to bring information to the Board on
ways to increase the revenue. Chairman Nickle suggested putting the matter on the back •
shelf.
2
• AIRPORT BOARD CONSENSUS : To shelve the question of increasing the fuel
flowage fee for at least six months.
B. Discussion: Airport Goals. The Airport's "Goals (Airport's Mission Statement)"
goes through the year 2011 . Terry Gulley had asked for Airport Goals for 2010 and what
we submitted to him is in the agenda. Ray suggested having a Strategic Planning
Meeting. Otto Loewer mentioned a broader vision, conditions change, goals change from
2007 to2011 .
ITEM # 5: New Business.
A. Wildlife Hazard Assessment. We thought we could have the study done through the
McClelland Contract, but have found out we will have to go out for bids. We will have
to have a one year program. The FAA will pay for the program out of entitlement funds.
It will have to be a registered, certified biologist. The FAA is requiring this because of
the plane landing in the Hudson River because of a bird strike.
B. Discussion: FBO Contract Renewal. This will be an April Airport Board action
item. If there are no changes it should be able to go to the Mayor for signature, not
though the City Council. Asked the Board to review and give any comments to Ray or
James. If anyone needs a copy of the lease it can be emailed, it is 30 to 40 pages.
ITEM # 6: Other Business.
A. Items from the Public. Craig Young said he had used the computer/intemet in the
• Pilots Briefing Room on the eastside of the Airport and it works great. Thanks. Rick
Bailey said kudos to Million Air for assisting with the Grace Flights out of Fayetteville to
Dallas. MaryKathryn called ahead to Million Air in Dallas and they received a $ 1 .00 off
the retail price of fuel.
B. Items form the Airport Board. Ray asked if anyone wants a new hangar, come in
and sign a lease and we will build a new corporate hangar. Need a T-Hangar, come see
us.
MEETING ADJOUNED AT 2:45 p.m.
David Holtman, Secretary Date .
3
eiFayvee AVIATION DIVISION
ARKANSAS FAYETTEVILLE EXECUTIVE AIRPORT • DRAKE FIELD
February 2, 2010
MONTHLY REPORT
Aviation Department
Fayetteville, Arkansas
For the Month of January, 2010
• ACTIVITY: We presented the totals for 2009 at the January Board meeting and the results were
grim.' 2009 flight operations were down 31 % from the peak recorded in 2006. Fuel sales were
down 26%. The record snowfall in January did not help the numbers for the month. Friday
January 29'" the runway had to be closed overnight because the lights were covered with snow.
We spent most of the day Saturday January 30 plowing the runway, taxiways and aprons and
unburying the lights. Several large sports charters diverted to other airports due to the weather
adversely affecting operations and sales. We are still anticipating a slow recovery for 2010 based
on industry forecasts but based on our January experience it could be very slow.
• RUNWAY 16 RSA IMPROVEMENT PROJECT: Sweetser Construction made some
• progress on the Airport Branch box culvert but was halted by the snow: Kearney/Cooper property
acquisition remains at a standstill. ADEQ granted Cooper's application to enter the Brownfields
Program which will allow the company to receive a level of limited liability for any potential
cleanup activity once they acquire the property. Their plan is to activate their option with
Kearney and then sell the City the piece that we need to complete the project. Brownfields can
take from 6 to 9 months so we are pursuing condemnation to get the property purchased. We are
now in contact with Kearney General Council to work out the details. They would like to sell the
property to us without a condemnation but must work out details. with Cooper Power. We are
hoping that Kearney and Cooper are now.making some real progress.
• RUNWAY OBSTRUCTION REMOVAL PROJECT: No activity this month due to the
weather. We will complete all tree removal before the trees leaf out.
• AIRPORT BLOOD DRIVE: The bloodmobile will be at the Airport on May 7th and on July
9'". Call Lou for more information and to arrange an appointment time. Thank you to all that
participated, we had nine donors; spread the word, bring a friend next time.
• FORMER AVIATION TECHNICAL SCHOOL BUILDING: There is still room for
additional oversized vehicles in the building. All current tenants seem satisfied with the
arrangement. Call the Airport Office if you would like to rent a space.
• T HANGAR FOR RENT: We still have one T Hangar for rent in Hangar "A." We have
turned over six units the last two months so there are several new tenants on the field. Please
introduce yourself and welcome them to Drake. Please pass the word to your friends that space is
ilable.
espectfully ubmitted,
• Ray ou ux, Director
500 SOUTH SCHOOL AVENUE, SUITE F • AIRPORT TERMINAL BUILDING • FAYETTEVILLE AR 72701
479.718.7642 , 479.718.7646 FAX • accessfayetteville.org/govemmentfaviafion
airport_eoonomic-develdpment@ci.fayetteville.ar.us
•
• aeevle
ARKANSAS
Airport Progross Report
TO: Fayetteville Executive Airport Board
THRU: Ray M. Boudreaux, Director
FROM: James Nicholson, Financial Coordinator
DATE: February 11, 2010
Tower Operations:
Operations - 12 Month Comparison —2008-10 —2008-06 - - - 2007-08
4,000
3.500
3,000
O
$ 2,500
2,000
1,500
FEB MAR APR MAY JIRD AL AUG S8 OCT NOV DEC JAN
• Month
Feb-Jan 12 Month Annual Comparison a ROLLING TNIaVE MONTH TOTALS
so
50
0 30
T 20
g 10
2000.01 2001.02 2002.03 200304 200405 2005.06 2006-07 2007-08 2008.06 2006.10
Period
Aircraft Operations Trends
2 Year Historical / 1 Year Look Me" - ow �eew nwe —OA e.n nye
2300
2000 •
1500
• � 1000
500
0
Aircraft Operations Trends Akd AVT", w,r
2 Year Hisbarbal I 1 Year 1..00h Ahead AYfYIY. T.�tl —Ar T"IT _N� TiwY
125
1W
75
b
25
FBO Fuel Sales Charts:
Fuel Sales - 12 Month Compadson 2008-10 —2008-09 2007-08
55 —
50
45
40
35
b
30
25 •
20
FEB OVA APR MAV JUN JUL AUG SEP OCT NOV DEC JAN
Montt
FUEL SALES ■ ROLLs1G TWELVE MONTH TOTALS
Feb-Jan 12 Month Annual Comparison
800
500
p�pa 400
O 300
e 200
= 100
2001-02 2002-03 2003-04 2000-05 200508 2005-07 2007-08 2008-09 2008-10
Period
Trends: Ratio of JetA. Sales to Ian WR Opp �4
18 Month Hlrtory. 8 Monty Look Ahead
40.0 —___.— _ _ _,��......�,..... _.�..................a�..
35.0
30.0
25.0
200 -
0 ------------------
4 15. •
10.0
5.0 - -
00
h
•
70WQmi9AeAPgRjdSdnbVPWcm d7Wx RjdSdWbVMs9h210
e�rx mal
� o
VT
nrarxs
eLsot6LL nw xow
mewr m n
aax .wrl FM wn wa Iwr
Local Fuel Prices: Fuel prices within 50 miles of FYV as of
Ident FBO Name Jet FS 10OLL FS 10OLL SS 91 MoGas A $ Jet JA E 10OLL
TOH City of Tahlequah both selfsery 3.69 3.99 no chg no ch
VBT Summit Aviation 4.05 4.15 3.95 no chg no chg_
SLG City of Siloam Springs 4.13 4. 15 3.65 .10 no ch
ASG Pinnacle Air Services 4.44 4.43 4.02 .05 .01
FYV Million Air Fayetteville / City SS 4.74 4,67 4.13 3.06 .05 .02
• FSM TAC Air 4.77 5.15 4.60 .20 .11
ROG Beaver Lake Aviation 4.79 4.40 .21 no ch
XNA Regional Jet Center 4.79 4.93 .21 .50
Fuel Prices: National
JET-A ANO AVOAt/ !•!OC GALLON RVaL O'RIC � i
JO[-A Jst-A Jot-A Avg6• Avg6e Avg60
Mlgll LOW Avq "IQ" LOW ^WQ
RplOn Prlcs P[l0� Prlc• PACO PrICs
G{{t{fn 36.06 43.36 {6.22 {9.02 SZ-OS
NOrin wO{t Aleunbm
SO-3O 33.56 {1.60 46. 10 .00 {6.02
gr{et Le K�� 36.20 33.+S H-96 39.+S 33-00 56.03
Western 36.20 {3.90 04.09 STOI 3+.16 1116.,66
Ceno-el 36.06 S3.01 S .Zo 50.+6 33.63 N.00
6eutM1ern 46.60 3a.66 {6A0 S7.10
Seumweel 33.7a Sa. 35 1111.93 "-a&
26_26 ia.+6 {e.90 S9.0+ 3a.0+ {6.10
�i LQt]1WT�ixJm 1lm�T� GZJOO OGO.� cy�yjCL-1'I CL4T.: c-C@Y•MF-Qa s(�J` - -J QaRLfiLSIY3IIiL.
00o QC`OC'1MX J . W.�� 6�'sa oe�(t�c0 Ooc® G OO�Ra t¢�. 02f[en cn laco 0.!'111
Oc-UUi41 1339 ®C�22 u�Q03-i-: � Q.L.z3 OQ-i /' Y^YVIF QRZ-D (.1SCt zy P-3 G>�11E'1Y-Yil G�6dIIb
m sueloeee A commewut A noo �. �Yb>�r•. L-m ��s
G�2=t9�.� .aD c�0 .2GL» c�0 OOO I_
Oen�mt»r - J6nu6ry OIMOrerlcss
®®®®®®®
w en 0"en0 S0.t0 SO.00 So.Oa+ SO. SO.00 {O.01
6eelern 50.11 SO.00 30.0SO-00 00 SO.00 SO.OI
w unteln
SO-IS ({0.03) 30.02 90.03 (50_06) (50.03)
Or ftt rn Kee a 30.16 30.00 SO.06 SO.00 SO.00 40.03
W ntval 30.06 SO.00 50.06 SO.00 30A3 SO.O3
00ntna SO.l3 CSO - 11 SG-OD 30.00 no.**
13 50.03
Seu[n0r 30.06 SO-0 SO.06 SO.O2 SO-00 30.03
• 9eu[M1wee[ SO- 10 SO-00 SO. 13 SO.O3 SO.00 S0.02
SO.l3 (30.02) 30.06 40.03 SD.OI 30.02
T 0 .
ae evle
Y ARKANSAS
FAYETTEVILLE EXECUTIVE AIRPORT
OPERATING SUMMARY
MONTH ENDING 1/31/2010 AIRPORT BOARD
OPERATING ACTIVITIES 2008 2009 2009 2010 2010 2010
Actual Budget Actual Budget Budget YTD Actual YTD
REVENUE
Rents 8 Leases 469,292 498,200 468,030 468.078 39,007 33,323
Aviation Fuel 126,272 140,056 126,022 124,839 10,403 7,677
Contract FBO 107,682 108,848 107,449 107,749 8,979 9,529
Miscellaneous 16,669 2,500 5,328 5,000 417 2,600
INCOME RECEIVED FROM OPERATING ACTIVITIES 719,915 749,604 706,829 705,666 58,806 53,129
EXPENSES
Personnel 313,187 327,808 324,943 383,193 29,476 28,184
Materials 8 Supplies 23,213 30,712 12,469 15,470 1 ,289 301
Aviation Fuel Purchases 72,987 85,000 69,915 77,626 6,469 4,231
Services 8 Charges 167,429 172,818 155,394 188,568 15,714 1,963
Cost Allocation to General Fund 65,976 8,830 8,830 7,915 660 666
Maintenance 33,990 56,702 54,565 54,881 4,573 1 ,290
ATC Tower Costs - - - - - -
Interest on West GA Hangars Loan (accrued) 35,000 32,667 32,667 30,334 2,528 2,528
INCOME USED FOR OPERATING ACTIVITIES 711,782 714,537 658,782 757,987 60,709 39,161
NET INCOME FROM OPERATING ACTIVITIES - GAIN / (LOSS) 8,133 35,067 48,048 (52,321) (1,904) 13,967
INVESTING ACTIVITIES 2008 2009 2009 2010 2010 2010
Actual Budget Actual YTD Budget Budget YTD Actual YTD
NON-OPERATING INCOME
Saks Tax Revenue 842 27,619 2,302 -
Interest on Investments 26,326 24,000 22,111 21 ,500 1,792 -
Other- Gain (Loss) on sale of assets 5.480 350,870 350,870 - - -
, CAPITAL IMPROVEMENTS EXPENSE - -
05046 AIP #21 Airport Export Equip (Airband Radios) 2,677
06020 SkyVenture Improvements Rebate 5.000
07024 Runway Approach Obstruction Study 45,000 - -
07039 AIP #36 Coned Runway 16 Safety Area Deficiency 130,640 27,260 23,611 - -
07039 AIP #37 Correct Runway 16 Safety Area Deficiency Phase II 7,193 170,407 161,037 7,429 -
08055 Replace Airport Fence - Flood Damage 9,200 - - -
08074 Airport HVAC Improvements (Terminal) 4,820 130,876 119,051 - -
07039 AIP #38 Correct Runway 16 Safety Area Deficiency Phase 111 - 3,813,208 628,471 2,698,897 -
09021 Hangar Fire - disposition of insurance proceeds 350,870 13.209 - -
MinorEquipment - Portable Lighting Rig 3,878 - -
USED FOR INVESTING ACTIVITIES 172,724 4,117,751 575,434 2,657,207 -
FINANCING ACTIVITIES 2008 2009 2009 2010 2010 2010
Actual Budget Actual YTD Budget Budget YTD Actual YTD
LOANS
Payments on Loan Principal (accrued) 46,667 46,667 46,667 46,667 3.889 31889
GRANTS STATE / FEDERAL
Received from Dept Aero - Re-S5lping 73.448 - - -
Received from Dept Aero - Obstruction Study 45,000 - - -
Due/Received from Slate Grants on Fed Projects - 200.760 10,098 190,660 -
Due/Recelved from AIP #36 Correct RW 16 RSA 64,623 57,297 57,297 - -
Due/Received from AIP #37 Correct RW 16 RSA Phase II - 69.993 69,993 - -
Received from FEMA Replace Airport Fence - 2008 Flood Damage - 8,050 8.050 - -
Due/Received from Airport MVAC Improvements - State Grant - 102.000 102,000 - -
Due/Received from AIP #38 Correct RW 16 RSA Phase III - 3,622,548 716,861 2,563,952 -
NET INCOME FROM FINANCING ACTIVITIES 136,404 4,013.981 917,632 2,707,945 (3,889)
AIRPORT CASH BALANCE 567,622 498.919 943,292 941,709 953,370
CURRENT ENCUMBRANCES (CAPITAL)
MCE TASK ORDER #15 - Engineering AIP#37 7,429 371 7,429
NICE TASK ORDER #1 - Engineering AIP#38 204,551 10,228 204,551
Sweetser Construction Inc. - Construction AIP#38 2,620,466 131 ,023 2,620,466
Land Costs AIP#38 - estimated remaining 217,200 10,860 217,200
TERM LIABILITIES
Hangar Loan Principal 606,666 559,999 556.110
APPROVED GRANTS - CAPITAL PROJECTS
RW16 Phase 1811 - -
RW16 Phase III (2,905,687) (2,563,952)
AIRPORT CASH MINUS LIABILITIES 192,667 229,228 @YE (88,434)
• City of Fayetteville, Arkansas ayle Ve
WA
•
Purchasing Division — Room 306
113 W. Mountain
PVJ
ARKANSAS Fayetteville, AR 72701
Phone: (479) 575-8289
RFP ( REQUEST O . PROPOSAL)
REQUEST FOR PROPOSAL: RFP, 10-03, Wildlife Hazard Assessment
DEADLINE: Wednesday, February 24, 2010 at 2:00 PM , Central Standard Time
DELIVERY LOCATION : Room 306 — 113 W. Mountain, Fayetteville, AR 72701
PURCHASING AGENT: Andrea Foren, CPPB, aforenCaici.fayetteville.ar.us, 479.575.8220
DATE OF ISSUE AND ADVERTISEMENT: Monday, February 08, 2010
REQUEST FOR PROPOSAL
RFP 10=03" Wildlife Hazard Assessment
• No late proposals will be accepted . RFP'S shall be submitted in sealed envelopes labeled `RFP 10-
03, Wildlife Hazard Assessment", with the name and address of the Proposer.
RFP's shall be submitted in accordance with the attached City of Fayetteville specifications and RFP
documents attached hereto. Each Proposer is required to fill in every blank and shall supply all
information requested; failure to do so may be used as basis of rejection.
The undersigned hereby offers to furnish & deliver the articles or services as specified, at the prices & terms stated
herein, and in strict accordance with the specifications and general conditions of bidding, all of which are made a part of
this offer. This offer is not subject to withdrawal unless upon mutual written agreement by the Proposer/Bidder and City
Purchasing Manager.
Name of Firm:
Contact Person: Title:
E-Mail : Phone:
Business Address:
City: State: Zip:
• Signature: Date :
City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 1 of 12
City of Fayetteville •
RFP 10-03, Wildlife Hazard Assessment
Advertisement
City of Fayetteville, Arkansas
NOTICE: Request for Proposal
RFP 10-03, Wildlife Hazard Assessment
The City of Fayetteville is requesting proposals from qualified firms or groups of firms interested in
performing a Wildlife Hazard Assessment and a Wildlife Hazard Management Plan for the Airport. The
City intends to select a firm to provide these services at Fayetteville Executive Airport, Drake Field. The
consulting services will be administered by the Airport staff, and will commence following the execution of
a Professional Services Contract with the selected respondent and approval by the Fayetteville City
Council.
Interested parties should submit proposals to the Fayetteville Purchasing Division in City Hall, Room 306, 113
W. Mountain, Fayetteville, Arkansas, 72701 . Proposals are due before Wednesday. February 24. 2010
before 2:00 PM, CST.
Copies of the requirements for RFP 10-03 can be obtained by visiting our website at
www.accessfavetteville.org and clicking on "Business" then "Bids, RFP's and RFQ's" under the "Services"
category (then click the RFP tab).
The City reserves the right to reject any proposal and ,to waive formalities deemed to be in the City's best
interest. •
"Pursuant to Arkansas Code Annotated §22-9-203 The City of Fayetteville encourages all quafified small,
minority and women business enterprises to bid on and receive contracts for goods, services, and
construction. Also, City of Fayetteville encourages all general contractors to subcontract portions of their
contract to qualified small, minority and women business enterprises."
City of Fayetteville
By: Andrea Foren, CPPB
Purchasing Agent
479.575.8220
City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 2 of 12
• City of Fayetteville
RFP 10-03, Wildlife Hazard Assessment
Terms and Conditions
1 .) All Proposers shall be in compliance with all Federal, State, and Local requirements and regulations.
2.) No payments or Proposals may be based on time and material costs.
3.) Awarded Proposer shall submit invoices regularly. Payment terms shall be net 30 days from date of
invoice.
4.) All contract amendments and modifications shall be made in writing and properly approved by the City of
Fayetteville Mayor and City Council.
5.) Proposals shall be received at the address listed below and are due Wednesday, February 24, 2010 at
2:00 PM, CST.
City of Fayetteville
Attention: Andrea Foren — Room 306
Reference: RFP 10-03
113 W. Mountain
Fayetteville, AR 72701
6.) It is the responsibility of the Proposer to have its sealed proposal at the Purchasing Office prior to the
date and time of opening. No late proposals will be accepted. Proposals received after the scheduled
proposal deadline will remain unopened and will not be considered.
• 7.) The City of Fayetteville reserves the right to reject any or all proposals, waive formalities and make
the award based on the best interest of the City.
8.) It shall be clearly understood that any costs incurred by the Proposer in responding to this request for
proposal is at the Proposer's own risk and expense as a cost of doing business. The City of Fayetteville
shall not be liable for reimbursement to the Proposer for any expense so incurred, regardless of whether or
not the proposal is accepted.
9.) Any inquiries or requests for explanation in regard to the City's requirements should be made
promptly to Andrea Foren, City of Fayetteville, Purchasing Agent via e-mail (aforen ci.favetteville.ar.us) or
telephone (479.575.8220). No oral interpretation or clarifications will be given as to the meaning of any
part of this request for proposal. All questions, clarifications, and requests, together with answers, if any,
will be provided to all firms via written addendum. Names of firms submitting any questions, clarifications,
or requests will not be disclosed until after a contract is in piece.
10.) Any conditions or expectation on -the part of the Proposer for performance by the City must be set
forth in the proposal. The City is not obligated to consider the Proposer's post submittal terms and
conditions.
11 .) At the discretion of the City, one or more firms may be asked for more detailed information before
final ranking of the firms, which may also include oral interviews. NOTE: Each Proposer shall submit an
"Authorized Negotiator Information" form.
12.) The City will not be responsible for misdirected proposals. Proposer should call the Purchasing
Office at (479) 575-8220 to insure receipt of their proposal documents prior to opening time and date listed
• above.
City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 3 of 12
13.) Any information provided herein is intended to assist the Proposer in the preparation of proposals
necessary to properly respond to this RFP. The RFP is designed to provide qualified Proposers with
sufficient basic information to submit proposals meeting minimum specifications and test requirements, but
is not intended to limit a RFP's content or to exclude any relevant or essential data.
14.) The RFP and any addenda issued may be obtained from www.accessfayetteville.orq and clicking
"Bids, RFP's and RFQ's" under the "Businesses" category then tab titled "RFP's". Proposers are at liberty
and are encouraged to expand upon the details, qualifications and proposals to give additional evidence of
their ability to perform and provide a system as described in this RFP. All updates and changes to the RFP
will be posted on the website and Proposers are encouraged to check daily for new information or updates.
Each Proposer is required before submitting a proposal to be thoroughly familiar with the requirements and
specifications listed in this RFP. Additional allowances will not be made due to Proposers lack of
knowledge relating to the terms, conditions and specifications contained within this RFP. It is the
responsibility of the Proposer to determine if any component(s) of this specification do not meet the
required standards of applicable federal, local, state law or specifications.
15.) The proposal must contain the signature of a duly authorized officer or agent of the Proposers
company empowered with the right to bind and negotiate on behalf of the Proposer for the amounts and
terms proposed.
16.) "'The Proposer Is required to submit one (1) original and five (5) copies of the proposal. In
addition, one (1 ) electronic copy of all submitted documents shall be submitted on a properly
labeled CD. The use of Adobe (PDF) Is highly recommended but not mandatory. All electronic
copies shall be compatible with Adobe and Microsoft Windows applications.
17.) it is intended that the all documents pertaining to this request for proposal shall defineand describe the •
complete services to which they relate.
18.) The Proposer is advised to examine all documents and current parameters of the services in becoming
fully informed as to their conditions. This includes the conformity with specific standards and the character,
quality and quantity of the reports and services required. Failure to examine these areas will not relieve the
successful Proposer of his obligation to furnish all deliverables and services necessary to carry out the
provisions of the contract.
19.) The City of Fayetteville will consider the degree to which each Proposer has submitted a complete
proposal without irregularities, excisions, special conditions, or alternative proposals for any item unless
specifically requested in the RFP.
20.) Proposers irrevocably consent that any legal action or proceeding against it under, arising out of or in
any manner relating to this Contract shall be prevailed by Arkansas law. Proposer hereby expressly and
irrevocably waives any claim or defense in any said action or, proceeding based on any alleged lack of
jurisdiction or improper venue or any similar basis.
21 .) The successful Proposer shall not assign the whole or any part of this Contract or any monies due or to
become due hereunder without written consent of City of Fayetteville. In case the successful Proposer
assigns all or any part of any monies due or to become due under this Contract, the Instrument of assignment
shall contain a clause substantially to the effect that is agreed that the right of the assignee in and to any
monies due or to become due to the successful Proposer shall be subject to prior liens of all persons, firms,
and corporations for services rendered or materials supplied for the performance of the services called for in
this contract. •
City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 4 of 12
J
• 22.) The successful Proposer's attention is directed to the fact that all applicable Federal and State laws,
municipal ordinances, and the rules and regulations of all authorities having jurisdiction over the services
shall apply to the contract throughout, and they will be deemed to be included in the contract as though
written out in full herein. The successful Proposer shall keep himself/herself fully informed of all laws,
ordinances. and regulations of the Federal, State, and municipal governments or authorities in any manner
affecting those engaged or employed in providing these services or in any way affecting the conduct of the
services and of all orders and decrees of bodies or tribunals having any jurisdiction or authority over same. If
any discrepancy or inconsistency should be discovered in these Contract Documents or in the specifications
herein referred to, in relation to any such law, ordinance, regulation, order or decree, s/he shall herewith
report the same in writing to City of Fayetteville.
•
• City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 5 of 12
• l
City of Fayetteville •
RFP 10-03, Wildlife Hazard Assessment
Authorized Negotiator Information — TO BE SUBMITTED WITH ALL PROPOSALS
At the discretion of the City, one or more firms may be asked for more detailed information before
final ranking of the firms, which may also include oral interviews. NOTE: Each Proposer shall
submit to the City a primary contact name, e-mail address, and phone number (preferably a
cell phone number) where the City selection committee can call for clarification or interview
via telephone.
Rif : Pnma C o tacforma ion
Name of Firm :
Name of Primary Contact:
Title of Primary Contact:
Phone#1 (cell preferred): Phone#2:
E-Mail Address:
r4RT ontac for Lela ly _ i din! -on racts.: •
Is the primary contact (listed in PartI) able to legally bind contracts? YES NO (circle one)
If no, please list contact that can legally bind a contract for the firm:
Name:
Title:
Phone#1 (cell preferred): Phone#2:
E-Mail Address:
Date:
Signed:
,ART _ arse of assilnedi �I i eama a ann Bolois rmf multi e)�
Name:
Does this person have professional training or extensive experience in wildlife hazard management •
operations? YES NO (circle one)
City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 6 of 12
. City of Fayetteville
RFP 10-03, Wildlife Hazard Assessment
Project Information
The City of Fayetteville is requesting proposals from qualified firms or groups of firms interested in performing a
Wildlife Hazard Assessment and a Wildlife Hazard Management Plan for the Airport. The City intends to select a
firm to provide these services at Fayetteville Executive Airport, Drake Field. The consulting services will be
administered by the Airport staff, and will commence following the execution of a Professional Services Contract
with the selected respondent and approval by the Fayetteville City Council.
Federal Aviation Administration (FAA) Advisory Circular No: 150/5100-14D provides, guidance to the Airport in the
selection and employment of these services.
Deadline for submittals Is Wednesday, February 24, 2010 before 2:00 PM, CST.
1. SCOPE OF SERVICES FOR WILDLIFE HAZARD ASSESSMENT
Aircraft collisions with birds and other wildlife are a serious economic and public safety problem. The City of
Fayetteville seeks a Professional Consulting firm to conduct a Wildlife Hazard Assessment in accordance with 14
CFR 139.337. The City of Fayetteville is seeking:
(1 ) A wildlife hazard assessment, conducted by a qualified wildlife damage management biologist having
experience in wildlife hazard management in airports. Such assessment must include at least the
following:
a. An analysis of the events or circumstances that prompted the assessment.
b. Identification of the wildlife species observed and their numbers, locations, local movements, and
daily and seasonal occurrences.
c. Identification and krcation of features on and near the Airport that attract wildlife in consultation with
• local, state, and federal jurisdictions and authorities.
d. A description of wildlife hazards to air carrier operation.
e. Recommended actions for reducing identified wildlife hazards to air carrier operations.
f. The wildlife hazard assessment must be submitted to the FAA.
(2) Since the FAA has previously determined that a wildlife hazard management plan is needed, when the
wildlife hazard assessment is approved by the FAA, the consultant will be required to formulate a wildlife
hazard management plan using the wildlife hazard assessment as a basis.
The wildlife hazard management plan must provide measures to alleviate or eliminate wildlife hazards to
air carrier operations and must include at least the following:
a. A list of the individuals having authority and responsibility for implementing each aspect of the plan.
b. A list prioritizing the following actions identified in the wildlife hazard assessment and target dates for
their initiation and completion:
I. Wildlife population management;
ii. Habitat modification; and
iii. Land use changes.
c. Requirements for and, where applicable, copies of Local, State, and Federal wildlife control permits.
d. Identification of resources that the Airport will provide to implement the plan.
e. Procedures to be followed during air carrier operations that at a minimum include
i. Designation of personnel responsible for implementing the procedures;
ii. Provisions to conduct physical inspections of the aircraft movement areas and other areas
critical to successfully manage known wildlife hazards before air carrier operations begin;
iii. Wildlife hazard control measures.
iv. Ways to communicate effectively between personnel conducting wildlife control or observing
wildlife hazards and the air traffic control tower;
v. Measures to notify pilots and other relevant agencies, person or agencies of potential wildlife
• threats to aviation; and
City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 7 of 12
vi. Measures to coordinate wildlife control with relevant local, state, and federal jurisdictions and •
authorities.
f. Procedures to review and evaluate the wildlife hazard management plan every 12 consecutive
months or following an event in which an air carrier aircraft experiences multiple wildlife strikes,
substantial damage from striking wildlife, engine ingestion of wildlife; or wildlife of a size or in
numbers, capable of causing one of the above events is observed to have access to any Airport
flight pattern or aircraft movement area. These procedures should include:
i. The plan's effectiveness in dealing with known wildlife hazards on and in the Airport's vicinity and
ii. Aspects of the wildlife hazards described in the wildlife hazard assessment that should be
reevaluated
g. A training program conducted by a qualified wildlife damage management biologist to provide Airport
personnel with the knowledge and skills needed to successfully carry out the wildlife hazard
management plan.
(3) Before the plan is accepted by City of Fayetteville it must be approved by the FAA.
(4) The Wildlife Damage Management Biologist(s) conducting the Wildlife Hazard Assessment and
conducting the training program for airport personnel involved in controlling Wildlife Hazards at the Airport
must be qualified according to AC 150/5200-36.
(5) The consultants will comply with all FAA Advisory Circulars in the 150 series including those that contain
standards and procedures for wildlife hazard management at airports and the current version of the
FAA/USDA document-Wildlife Hazard Management at Airports.
11. ADDITIONAL PROJECT CONSIDERATIONS
This project will be partially financed by grants administered by the Arkansas Department of Aeronautics and the
FAA This project is contingent upon receipt of such a grant(s) or other grants along with the securing of other •
required approvals.
Because the professional services may necessitate access to the secure areas of the airfield, it will be necessary for
the selected respondent to coordinate activities with the Airport Administration Office.
III. PROJECT APPROACH AND SELECTION CRITERIA
To be considered to provide Wildlife Hazard Assessment services, a Letter of Interest containing a concise but
detailed narrative indicating the proposed approach to providing the required services must be submitted, in addition
to the other information described below. Each interested firm must present its qualifications for hazardous wildlife
. studies. The approach may be structured in any way deemed to be responsive to the needs of the City of
Fayetteville as generally described herein as the Scope of Services. The "Project Approach" section should
.demonstrate an understanding of the project and provide an explanation of previous experience with airport
hazardous wildlife studies and/or similar Wildlife Hazard Assessment efforts. Firms should explain any proposed
coordination between the prime and proposed sub-consultants as well as explain coordination with the Airport's
operational needs, and provide any other information that may assist the Selection Committee in making a selection.
The criteria' and the weighted values to be used by the Selection Committee in evaluating responses for the
selection of a firm(s) to perform this service(s) are listed below. Each point value is adjacent to the criterion and
totals 100 points. Please address each criterion in your Project Approach.
1 ) 30% Qualifications in Relation to Specific Project to be Performed: Information reflecting
qualifications of the firth. Indicated specialized experience and technical competence of the firm
in connection with the type and complexity of the service required. Subcontractors, if used, must
be listed with information on their organization. Firm's demonstrated ability to meet requirements
within 14 CFR 139.337. "REQUIREMENT: Proposal documents shall list ALL Wildlife Damage
Management Biologists who would be assigned to this project that have professional training or
experience in wildlife hazard management in airports. •
City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 8 of 12
• 2) 20% Experience, Competence, and Capacity for Performance: Information reflecting the names,
titles, and qualifications (including experience and technical competence) of the major personnel
assigned to this specific project. Provide detailed breakdown of subcontractors staff to be used
and how they are to be used to supplement your staff.
3) 20% Proposed Method of Doing Work: A proposed work plan (description of how the project would
be conducted as well as other facts concerning approach to scope you wish to present) indicating
methods and schedules for accomplishing each phase of work. Include with this the amount of
work presently underway. This criteria includes anticipated participation due to the desire of the
City to work with Disadvantaged Business Enterprises.
4) 20% Past Performance: Previous evaluations shall be considered a significant factor. If previous
evaluations with the City are not available, the professional firm's past performance records with
the City and others will be used, including quality of work, timely performance, diligence, ability to
meet past budgets, and any other pertinent information. Finn will provide a list of similar jobs
performed and person whom we can contact for information.
5) 10% Price
IV. DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION
The City of Fayetteville, in accordance with Title VI of the Civil Rights Act of 1964, 42 U.S.C. Section 2000d et. sea.
and 49 CFR Part 26 issued pursuant to The Airport and Airway Development Act, affords Disadvantaged Business
Enterprises (DBEs) full opportunity to submit an indication of interest in response to this invitation and will not
discriminate against any interested firm on the ground of race, creed, color, sex, age, or national origin in a contract
award. In addition, the City of Fayetteville has established annual goals for DBE participation on Airport projects.
Prospective consultants should review the Airport's DBE Program and 2010 Goal Update documents during their
• preparation of a response to this Request for Proposal (RFP).
The City of Fayetteville, in order to encourage the use of DBE firms, has set a DBE participation goal of 2.3% for this
contract. The Airport desires to achieve, to the.greatest extent possible, quality participation by certified DBE firms in
order to achieve its 2010 updated goal. Although DBE participation is not a requirement for this contract,
respondents are challenged to present a creative and responsive plan that provides for DBE participation that is
commercially meaningful and useful. The Airport encourages and favors the following arrangements to ensure
quality participation: (1 ) Participation as a prime consultant, (2) Joint Venture, (3) Partnership, and (4) Sub-
consultant. Proposals will be evaluated, in part, on the respondent's stated intention to ensure quality participation.
The DBE firm(s) that may be participating In this project must be certified by the State of Arkansas.
DBE Proposals at the time of submittal. Joint ventures and partnerships must be in existence at the time of
submittal. The identity of the proposed certified DBE participant(s) and their participation percentage shall be
indicated.
At least ten (10) days prior to award, the successful respondent shall provide the City of Fayetteville with copies of
executed subcontracts, certified copies of articles of incorporation, partnership agreements, and/or joint venture
agreement if a DBE (minority or woman) is a shareholder/officer, partner or one of the ventures.
The DBE firm(s) participating in this project must perform a commercially useful function. The failure of a DBE
firm(s) to perform a commercially useful function, as defined in 49 CFR Part 26, shall constitute grounds for the City
of Fayetteville to impose appropriate legal remedies.
The respondent is required to perform and submit documentation of Good Faith Efforts as described in the City of
Fayetteville's DBE Program, Subpart C, and 49 CFR Part 26.53 in order to secure DBE participation.
The City of Fayetteville affords no preference based upon the geographical area in which a DBE firm is located.
• City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 9 of 12
V. SUBMITTAL OF PROPOSAL •
An interested firm must provide references showing relevant capabilities and experience for the preceding 3 years.
Elaborate qualifications statements and brochures are not desired.
Any sub-consultants proposed to be used, including DBE sub-consultants, must also submit references containing
information pertinent to the work to be performed. The prime firm must specify which areas of work will be
accomplished by each sub-consultant and the percentage of the total contract this work effort will constitute. Please
ensure that an organizational chart is included.
The Letter of Interest that supplements the references should discuss the extent of the firm's experience in the
disciplines of hazardous wildlife studies especially at air-carrier airports. If an association or joint venture of firms is
contemplated, the expertise of each individual firm in hazardous wildlife studies should be clearly defined as well as
the level of involvement of each firm in the services and the proposed means of coordination between firms. A joint
venture will be considered a "firm".
Respondents are required to adhere to the FAA's Wildlife Hazard Assessment procedures and systems and the
mitigation program currently utilized by the Airport.
Only timely received proposals, meeting the requirements of this RFP, will be considered. No Proposals will be
considered or accepted that are submitted by a firm that is in default under the terns of any existing agreement with
the Airport or other similar agency, or has failed to perform its obligations faithfully under any previous agreement
with the Airport or other similar agency. Each lead consultant firth or lead member of a joint venture shall submit
only one Proposal. Sub-consultant or sub-joint venture firms may submit their proposals with more than one lead
consultant firth and/or joint venture. A Proposal will be rejected if there is any evidence of collusion with another
firmrJoint venture. A firm that responds as a prime or as a partner In a joint venture responding as a prime
cannot as a sub-consultant submit Its qualifications to another responding prime. Furthermore, a firth that
responds as a prime or as a partner In a joint venture team responding as a prime cannot be a partner in a •
joint venture that submits its qualifications as a sub-consultant to another responding prime. Proposals shall
be signed by an authorized representative of the firm.
Submission Requirements
Elaborate qualifications statements, proposals, and brochures are not desired. Clarity and concise, orderly treatment
are important and must contain the following:
a. Letter of Interest indicating proposed approach to the required professional services, previous experience,
approach to project coordination, list of DBE participants and percentage participation, and responses to
each of the Selection Criteria. Each interested firm must present its qualifications for hazardous wildlife
studies.
b. Complete 3 year reference listing for each prime firm, joint venture firm, and sub-consultant and an
organizational chart.
c. Statement of Agreement to background investigation and criminal history record check.
d. A `Project Approach' that identifies the suggested structure of the organization and management methods.
e. A description and identification of the firth's relationship to or with other firths (Subsidiary of another firm,
Partner in Joint Venture, etc.). Also include the Primary Location, Address, Telephone, Email, and Facsimile
numbers of the organization.
f. Identification of the key personnel assigned to this project. At a minimum, identify the Principal-in-Charge
and any other key personnel you see fit. Provide a
biographical sketch of these individuals describing their relevant background. Also provide the following for
each individual, Employer — if different than firm (i.e., parent company or consulting firm), Address — if
different than firm, Telephone, Email, Fax.
g. Description of your cost management systems and their relationship. Your proposal should exhibit the means
and mechanisms to be used in the management and verification/monitoring of construction and schedule
information for the program.
h. Limit submission to 20 pages- resumes may be included as an appendix.
I. The Proposer is required to submit one (1 ) original and five (5) copies of the proposal. In •
addition, one (1 ) electronic copy of all submitted documents shall be submitted on a properly
City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 10 of 12
• labeled CD. The use of Adobe (PDF) Is highly recommended but not mandatory. All electronic
copies shall be compatible with Adobe and Microsoft Windows applications. All proposal
documents shall be received prior to the deadline stated In this document.
Courier/Hand Delivery:
Mail Delivery:
Any response that is received after the stated deadline will not be considered by the City of Fayetteville. The time
will be tracked according to the City of Fayetteville's electronic clock located in the Purchasing Division.
Furthermore, any submission that fails to include all required documentation may be considered non-responsive.
Faxed or e-mailed responses will not be accepted.
VI. QUESTIONS ON SCOPE OF SERVICES
Questions concerning elements described in the Scope of Services section of the RFP should be addressed in
writing to Andrea Foren via e-mail at aforen[ci.favetteville.ar.us. Questions shall be directed as soon as possible.
VII. SELECTION OF CONSULTANT
Following receipt of the Proposals, a Selection Committee will review all responses and recommend an applicant(s)
to the City of Fayetteville. The Selection Committee may schedule interviews with the most qualified firs in order to
make a final selection. The City of Fayetteville will accept or reject the Selection Committee's recommendation. The
City of Fayetteville reserves the right to cancel this RFP, accept or reject any/all submissions, waive any
technicalities and/or informalities or re-advertise, for any reason, particularly, when deemed in the best interest of
the City of Fayetteville.
The law of the State of Arkansas shall govern the Agreement. Any disputes relating to this RFP or related
• agreement must be resolved accordingly.
In the process of developing a scope and fee for these services, the selected consultant, each sub-consultant and/or
subcontractor, and/or member of a joint venture may be asked to submit a statement of auditable overhead
expenses, certified by the consultant's auditor, the Airport's auditor, a state auditor, or a federal government auditor.
The statement shall be in accordance with Federal Acquisition Regulation 48 CFR Part 31 , Contract Cost Principle
and Procedures, and be based on an audit performed within the consultant's last two fiscal years.
VIII. PREPARATION COST OF QUALIFICAITONS
Costs associated with preparation of each submittal shall be bome by the applicant(s). The City of Fayetteville is not
responsible for any costs with responding to this RFP and considers all submittals accepted as non-returnable.
IX. PROPOSAL SUBMITTAL CHECKLIST
Please be sure that all items listed below are included in the response to this RFP and are fully completed and
properly executed. If any of these Items are not Included or are partially completed or not properly executed,
the Selection Committee can declare the response not responsive or request clarification, and may remove
the submittal from further consideration.
1. Letter of Interest. Each submittal shall include a letter of interest as outlined in Sections III and V of this
RFP. A duly authorized representative of the prime firm should sign the letter.
2. Project Approach. Each response should include a detailed project approach section. Limit project
approach to 5 pages. See Sections III and V.
City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 11 of 12
' f
3. Organizational Chart. The response should include an organizational chart illustrating project organization and •
areas of responsibility by firm and person-in charge. The chart should be dear and concise with individuals
identified. See Section V.
4.Three Year Reference List. Each prime and each sub-consultant (including sub-consultant to a sub-consultant)
must provide City of Fayetteville with a list of references for similar projects completed in the past 3 years. This
must be completed and signed by a duly authorized representative of the firm. If the prime and/or any sub-
consultants fail to submit these references, the response will be declared non-responsive. See Section V.
NOTE: A Joint Venture is considered a "firm" and requires submission of only one reference list; however,
experience and project history for all joint venture partners must be outlined. If the Joint Venture has any sub-
consultants, these sub-consultants must submit separate reference lists.
S. DBE Certirication: All identified DBE sub-consultants must be Arkansas DBE certified at the time the
response is. submitted. If any identified DBE sub-consultants are not Arkansas certified, they must submit their
complete certification package to the State of Arkansas to become certified.
6. Letter of DBE Certification. All identified DBE sub-consultants must include the most current DBE
Certification/Recertification letter for each currently certified DBE sub-consultant to be used on the project.
X. PROPOSAL SUBMITTAL CHECKLIST FORM
Yes No
1 . Authorized Negotiator Info. Form - -
2. Letter of Interest - -
3. Project Approach - -
4. Organizational Chart
5. Three Year Reference List - -
6. DBE Certification Submit - -
7. Letter of Current DBE - -
Certification (Encouraged, but not required)\
City of Fayetteville, AR
RFP 10-03, Wildlife Hazard Assessment
Page 12 of 12
• To: Fayetteville Airport Board
From: Bruce Dunn, Race Director
Re: Application of Special Event (Iron Pig Festival, April 03, 2010)
Date: February 10, 2010
Special events request:
On behalf of Bruce Dunn and All Sports Productions, I hereby request a special
events permit in order to hold the second annual Iron Pig Festival. The 2010 event will
also include a 5K run, 1 Mile Walk and 18-mile bike time trial. The requested venue is
the same as last year using the Drake Airport Parking lots and runway with the primary
area of use being the parking lots and service access road located next to Hwy 71 . The
event is scheduled for Saturday, April 03, 2010. The race will begin at 9:OOam and all
race activities will be concluded by 2pm. Volunteers and participants will begin arriving
by 5am.
o Event Timeline — see attachment
o Safety Plan: see attachment
• Background:
Bruce Dun is the owner/race director of All Sports Productions, which is a sports
event management company that promotes cycling, triathlon, running , adventure race
and other outdoor events. In addition to the Joe Martin Stage Race, these events
include: Ozark Valley Triathlon, Har-Ber Meadows Criterium, Chile Pepper Cross
Country Festival and the Lewis and Clark Adventure Races.
Festival special event Program specifics :
o Date
o Set-up — Friday, Apd102, 2010
o Race Day - Saturday, April 03, 2010. See attachment for specific race
day timeline.
o Competitors:
o The number of participants will range from 250 to 400 participants.
Competitors are separated by age and/or gender. Management of the
competitors will occur with staggered waves and with an electronic chip
timing system.
o Event sanctioning :
o The duathlon is permitted, insured and sanctioned through USA Triathlon,
the national governing body of duathlons and triathlons in the United
• States. Certificates of Liability will be issued for all involved parties
including the City of Fayetteville, Drake Air Field and Arkansas Air
Museum. The run will be sanctioned through USA Track and Field and
Page 1 of 3
� v
•
the bike time trial will be sanctioned through USA Cycling. All certificates
of liability will cover the each event and each entity separately.
o Competition format:
o Duathlon - 3 mile run, 18 mile bike, 3 mile run.
o 5K Run & 1 mile walk — on airport runway using the same course as the
first leg of the duathlon and occurring simultaneously.
o 18-mile bike time trial — using the same course as the duathlon bike
course.
o Pre-staging and event set-up:
o In order to maintain organization, the transition area (bike racks),
start/finish line will need to be set-up on Friday, April 2.
o Course Marking :
o All course markings will be done with signage on orange cones. No paint
will be used on surfaces.
o Parking Plan:
o Many of the competitors will car pool on race morning . Estimated number
of vehicles on race day will be approximately 250 vehicles. Parking for
race participants will be in front of the terminal with the front row and any
additional staff areas reserved for terminal participants. Additional parking •
may be required using the lots located north and adjacent to the terminal
parking. Volunteers and law enforcement will coordinate parking on race
day and insure a smooth flow of traffic for both customers of the terminal
and race participants.
o Services:
o Trash Containment: additional trash and recycling receptacles will be
provided by the race. All race routes and area of use will be thoroughly
canvassed by volunteers following the event.
o Porta Potties: adequate porta potties will be provided by race and based
on number of participants and spectators. Bathrooms inside terminal will
not be advertised, but could possibly be used by elderly, handicap or race
staff. Terminal usage will be minimal.
o Safety Plan:
o See attached plan. Both ambulance and race medical staff, as well as the
Washington Co. Sheriffs, Fayetteville Police, Greenland Police, and
Arkansas State Police Departments will be present at the event.
In summary, All Sports Productions requests the permission of the Fayetteville Airport
Board to_obtain-a-special-events permit in order to hold the second annual Iron Pig
Duathlon, Iron Pig 5K Run/1 Mile Walk and Iron Pig Bike Time Trial.
•
Page 2 of 3
• We look forward to working with the City of Fayetteville, Drake Field and the Arkansas
Air Museum to have a successful event. Please feel free to contact Bruce Dunn, 479-
466-4022 if you have any questions or comments.
Enclosures:
o Safety Plan
o Race and route information
o Race day timeline
o Race Director Bio — on file from last year.
•
•
Page 3 of 3
d
FESTIVAL
2010 —Timeline
Race day:
♦ 6:30am transition opens
♦ 7:00am packet pickup inside terminal
♦ 8:30am pre-race meeting and announcements
♦ 8:30 am all other law enforcement arrive
♦ 8:40am Color Guard, National Anthem and Prayer
♦ 8:50am last chance to return to transition
♦ 8:45am close airport runway and set cones/barricades/signage
♦ 8:55am close transition
♦ 8:55am stage first run group
♦ 9:00am 1 Mile Fun Run/Walk
♦ 9: 10am Duathlon group one
♦ 9: 12am Duathlon group two
♦ 9: 14am Duathlon run group three
♦ 9:20am 5K Run
♦ 9: 15am first runner into transition
♦ 9:20am first biker out of transition
♦ 9:40am first biker at turn around (Woolsey Rd)
♦ 10:00am last runner on airport runway
♦ 10:05am sweep airport runway
♦ 10: 15am last runner into first transition
♦ 10:25am open airport runway
♦ 10: 15am first return biker to transition
♦ 10:20am first runner on 2nd run course
♦ 10:30am first runner at 2nd run course turn around
♦ 10:40am first finisher
♦ 10:55am last biker at turn around point
♦ 11 :30am last biker into transition
♦ 11 :30am transition area opens to retrieve bikes
♦ 11 :55am last runner at 2nd run course turn around
♦ 12:25pm final finisher
♦ 12:30pm Awards/prizes ceremony
♦ 1 :30-?pm tear down/cleanup
•
Iron Pig Duathlon
• April 03, 2010
SAFETY PLAN
ACCOUNTABILITY OF PARTICIPANTS
Accountability of all participants (a tracking system ) at key times and
locations is one of the most important aspects of a Safety Plan .
Accountability will be accomplished by :
Computerized timing system
Each athlete will wear a computerized timing chip which will be scanned
during the duathlon :
1 . At start of first run
2 . At the end of the first run
3 . At start of bicycle course
4 . At end of bicycle course
5 . At start of run
6 . At end of run (finish line)
A. The "transition coordinator" will know which participant (by bib number
and name) has not returned for each leg of the duathlon by referring to the
computerized timing system .
B . Bike course coordinator and marshals on the bicycle course at strategic
geographical locations
C. Event personnel following the last individual in each leg of the transition
Accountability and Safety will be addressed in detail for each individual event
• leg of the triathlon (run, bicycle, and run) .
FIRST RUN COURSE — 3 miles
Description: (first leg) held on airport runway . Runners will proceed south
from parking lot staging area along service road and then proceed east
between commercial hangers to runway . Runners will proceed south to end
of runway and then proceed north to end of runway. Runners will return on
taxiway and proceed back to start area . Volunteers will be stationed
throughout the run course to provide directions to runners.
Time : the runway would be closed for 45 minutes, although all participants
will be off the actual runway in less than 30 minutes.
Communication : The Run course coordinator will have direct
communication with airport personnel . In addition, the Run Course
Coordinator will follow the last runner in 4-wheel ATV in case someone needs
to picked up and transported . This safety measure will insure that the
runway can be reopened on time.
THE BIKE COURSE — 18 miles
Description : The bicycle course leaves the transition area at Drake Field
area , and travels south on Hwy 71 . Law Enforcement will control the north
and southbound traffic on Hwy 71 while cyclists exit onto Hwy 71 . Greenland
police will control stoplight to allow cyclists to proceed through the light. One
• law enforcement vehicle will lead the first cyclists to the run-a -round point at
Woolsey road (approx 9 miles from Drake Field ) . Cyclists will exit right off
Hwy 71 , turn around and proceed north back to Drake Field . An Arkansas
Page ] of 4
4
•
State Trooper and volunteers will stop traffic at the turn-a -round point.
Cyclists will adhere to the rules of the road and will primarily ride on the
shoulders .
Communications and Medical Headquarters will be located at Drake ,
Field . Course Marshals and Accountability officers will be utilized at all
intersections to ensure athletes stay on the course and do not mistakenly
take the wrong route and get lost. Since the bicycle course is not a "closed
course" and is open to public use, the Course Marshals will also inform other
users of the ongoing event.
Signage will also be utilized to ensure athletes stay on course. Course.
Bicyclists are required to stay to the right of the road . Orange cones will be
placed at corners and intersections . The signage and orange cones will be
placed on the course on Hwy 71 to alert motorists of the event and any areas
to slow or stop. The Bike course coordinator will "sweep") the a bike course
following the last bicyclist throughout the length of the course. This "sweep"
ensures that no one is left behind on the course and identifies the last
bicyclist to the Course Marshals and safety and law enforcement personnel .
Signage will be placed along roads and near the intersections in order to
advise motorists of the event and the presence of bicyclists on the edge of
the roads.
SECOND RUN COURSE — 3 miles •
Description : the final run is a 3-mile loop from the transition area . The run
will proceed along sidewalk to Ernest Lancaster Drive where runners will run
to the end of the road . They will then return to Hwy 71 and will run on inside
of north bound lane (cones will be placed along road to provide a barrier
from traffic) and return to finish line located on access road in front of
terminal . Race personnel will be located at turnaround and Hwy 71/Ernest
Lancaster Dr intersection.
Support Station # 1 : Start/Finish line
The run course Support Stations will provide :
1 . Water
2 . Electrolyte drink.
EMERGENCY MEDICAL SUPPORT
A. Trained emergency medical personnel will be placed at the transition area
along with Central EMS .
B. The Support Stations will provide :
1 . Assessment of injured
2 . Basic First Aid and Life Support
D. Advance notice to local Fire Departments of planned event
E. Advance notice to local Hospitals of planned event
PREVENTION :
A. Education of the event participants •
1 . Educating in sharing roadways. Participants will be required to sign a
statement that they have read, understand, and will abide by the rules
Page 2 of 4
outlined both on the event website and at registration .
2 . Warning signs of potential hazards (if any) on the course
3 . Event participants acting as course safety "marshals" reporting any
injuries of their fellow athletes .
4. Participants having prior knowledge of the bicycle course prevents
surprises . Participants can have knowledge of what to expect of the course :
a . Course maps will be available on -the event website
b. Encouraging participants to pre-ride the bicycle course during the weeks
prior to the duathlon
5 . The course route will be clearly "marked", and with Course
Marshals at all intersections
6 . Participants choosing to drop out of the duathlon must check in
at the support station, with a Course Marshal or a Course Accountability
Officer to allow for accountability.
7 . Educating the public. Two weeks prior to the duathlon, signage will be
posted and maintained to inform the public of the upcoming event. Signage
will be posted in terminals.
Signage will include the following information :
a . Date and time of the event
b. Map highlighting the roads and trails utilized for the bicycle course
d . Contact information (Event Director home phone number)
8 . USA triathlon sanctioning rules require all participants to wear approved
helmets during the entire bicycle portion . Helmets must be worn and buckled
• before leaving the transition area and kept on until reentry into the transition
area . Failure to wear approved helmet results is immediate disqualification .
9 . A "safety talk" given by the Event Director is a routine procedure prior to
all triathlons . At this time all safety rules are reviewed, and any other special
concerns are repeated . All athletes are required to be present and attentive
during this approximately 10-minute talk.
B . Physiological Support of participating athletes
1 . Self support. Most athletes are self-supporting on the bicycle portion of a
duathlon . USAT rules prohibit duathletes from accepting support of any kind
from other athletes or spectators. Self-reliance is always practiced (except in
emergency/injury situations) . Participants will be encouraged to carry with
them :
a . Water bottles. Most athletes carry at least 1 water bottle on their bicycle
and/or wear a hydration system on their back.
b . Carbohydrate . Most athletes carry energy bars and gels. NOTE : Leaving
any equipment or materials on a bicycle course results in immediate
disqualification from the triathlon (USAT rule) . That is, no water bottles,
inner tubes, inflation. devices, or food wrappers can be left on the course.
However, these items can accidentally fall onto the course. The "sweep" (the
safety event bicyclist following the last bicyclist) will pick up any materials
found along the way.
2 . Event Support Station
One Support Stations will be located at the transition area . This Support
Station will provide : 1 ) Water, 2) Electrolyte drink. and 3) Communications
• to Medical Headquarters
Page 3 of 4
Transition Area Safety Plan
All participants will be required to set up their transition area before 9 : 30
am . At 9 : 30 am the transition area will be secured by volunteers and both
exits and entrances will be closed by volunteers. During the event the
transition area will only be open to participants. The accountability of all
participants will be accomplished by the computerized timing system .
Participants may not remove any equipment, or personal items from the
transition area until the last participant has transitioned from the bike to the
second run and is on the final run portion of the race. At that time
volunteers will only allow participants back into the transition area to collect
personal equipment.
•
•
Page 4 of 4
IG RUN COURSES
W IIJ A T H L I
3 .111I. ... j . .ijobike3mileran 3 miles . 7113 1 Ernest Lancaster
1 1Ernest Lancaster Rd
1 I u
n `
rr `
1 1 n
a
r r
r ► r r �
x rr
r '
r '
r �# private '
► I r i hangers T ,
rr �
0 turnaround
run 2
► tri � '
rr 8
1 1 r r
► I r #
n
rr
► Irr
rr
rr
1 1 r i
rr
rr
1 1 r r
FORM
r #
Run 2
Transition
1 1 u
1 1 0
C
- T
1 1 7n E n
Aid Station
FINIS Run i
Aid Statics
Greenland
s I
o -x
a
cel to
c
of Ia
.II G
Ot I �
l