HomeMy WebLinkAbout2003-10-16 - Agendas - Final • AGENDA FOR THE AIRPORT BOARD MEETING
October 16, 2003
1 :30 p.m,
Airport Conference Room
• 1 . Welcome, Chairman Charles Wallace,
2. Minutes of the September 11 , 2003 meeting.
3. Receiving of Reports.
A. Charles Wallace, Chairman.
B. Ray Boudreaux, Director.
C. James Nicholson, Financial Coordinator.
D. Louise Powers, T-Hangar Report.
E. Construction Report, Wayne Jones.
F. Maintenance Report, Ray Boudreaux.
4. Old Business.
• 5. New Business.
A. "Aviation Maintenance Professionals" (AMP) Lease Amendment for
aircraft rental.
Action : To amend permitted use.
B. Ozark Military Museum Sign.
Action: Approval of sign.
C. New Vision Media Group Ministries and the Argroup, LLC. (Lease Data
Sheet attached).
Action: Approval of concert.
D. Security of Museum Displays.
Action:
6. Other Business.
A. Items from the Airport Board.
B. Items from the Public.
7. Discussion Items.
8. Adjourn.
• MINUTES FOR THE AIRPORT BOARD MEETING
September 11, 2003
MEMBERS PRESENT: Charles Wallace, Rick McKinney, Frank Sperandeo, Dave
Bowman, Otto Loewer, Bob Nickle
MEMBERS ABSENT: Mike Andrews
STAFF PRESENT: Ray Boudreaux, James Nicholson, Louise Powers
OTHERS PRESENT: David Hollman-Flying Investments; Terry Collier-tenant; Wayne
Jones-McClelland Engineers; Judy Hammond-Arkansas Air Museum; AdamWallworth-
NWA Times; Leonard McCandless-Ozark Military Museum; Dan Craft-Morning News;
Chris Cheadle-Peg/FGC TV; Cherie Boudreaux-citizen
ITEM -#1 : Welcome, Chairman Charles Wallace. Welcomed all attending and
announced he was changing the agenda line up as some of the members will have to
leave. He reflected on September l 1 'h, to remember those who had lost their lives, those
• closest to them, and those doing wherever they could to help.
ITEM #6: New Business.
A. Self Serve System Brief. C. Wallace explained a pilot would be able to fuel his own
aircraft without having to go through the FBO for fueling. It was approved at the last
meeting for a not-to-exceed amount of $25,000. J. Nicholson said staff had attended the
bid opening. The bid was to supply and install the tank and the dispensing unit. There
were three bidders. Crusen Equipment of Little Rock had the low bid of $32,384.83. R.
Boudreaux said the Airport will apply for assistance from the Arkansas State Aeronautics
Commission. The State has expressed an interest in assisting in a 50/50 grant. The pad
will be additional and the work will be done in-house.
A motion to approve the award of the bid to Crusen for $32,384.83 for the
self serve fueling system, provided the State Aeronautics approves the
grant, and to approve applying for the State Aeronautics grant was made
by-Dave Bowman and seconded by Frank Sperandeo. The motion carried.
B. New Lease Action :
1 . Executive Air Lease. R. Boudreaux referred to the Lease Data Sheet in the
agenda, saying this company is a 135 charter company. They have a King Air and a
Navajo. They also have a contract with the U. of A. to fly their planes. They will house
their aircraft in the FBO hangar and pay hangar rent. The one year lease for office space
• in the terminal has that rent waived for one -year. They have eight pilots.
A motion to approve the lease was made by Rick McKinney and
seconded by Dave Bowman. The motion carried.
1
r -
• 2. AR Group Lease. R. Boudreaux said they would like to rent the four offices at the
north end of the terminal for several of their related businesses and also rent the old car
wash building and the land around it for their Agricat business. They will fence the area.
T. Johnson explained they would use the offices north of the restaurant for the
restaurant's office, they waterproofing business and for their publishing business. They
believed their additional businesses on the airport would increase traffic to the restaurant.
R. Boudreaux stated the Agricat business is a nationwide company and AR Group is a
main distributor for them. They will do the financing for the tractors and will also do
financing for aircraft. F. Sperandeo expressed his concerns that approving the lease was
not following the Airport Board's mission to lease to aviation businesses and that the
grounds area would look like a used car lot. B. Nickle said he considered the existing car
wash building an eye sore now and unattractive. Brand new equipment that is bright and
shinny will be an improvement. T. Johnson said they plan to repaint the building. The
only vehicles will be trade-ins not earlier than 1999. They will also have people flying
in to visit their Agricat business. O. Loewer stated he saw this as a grey zone, it is a
family owned business, several businesses, supporting the local community. Their
businesses will feed off each other, and will create activity on the airport. He said when
we rent to non-aviation businesses, we want to make sure the rent is comparative to
aviation related businesses.
A motion to approve the lease was made by Rick McKinney and
• seconded by Frank Sperandeo. The motion carried.
R. Boudreaux mentioned the restaurant's Expo had gone well and said their vendors had
been high quality.
3. Blackman Auctions Lease. R. Boudreaux said the City's Fleet Department had
approached the Airport for a location. They will auction some of the City's equipment
and equipment from other municipalities. We probably will get $3,000. The location
would be the last two rows of the parking lot and along the grass. It would last 15 days,
with 5 days to set up. Approving the lease would be in the spirit of being in partnership
with the City. There would be a clean up clause in the lease.
A motion to approve the lease was made by Rick McKinney and
seconded by Dave Bowman. The motion carried.
C. New FBO Hangar Tenants.
1 . COENCO Inc. KA 90. R. Boudreaux explained that this item and the next item did
not require a vote, but were informational items to inform the Board of new tenants in the
FBO hangar.
2. Executive Air, KA 200. New tenant in the FBO hangar.
ITEM #2 : Minutes of the July 10, 2003 meeting.
• A motion to approve the minutes was made by Rick McKinney and
seconded by Dave Bowman. The motion carried.
2
f • .
• ITEM #3 : Minutes of the August 14, 2003 meeting.
A motion to approve the minutes was made by Dave Bowman and
• - seconded by Frank Sperandeo. The motion carried.
ITEM #4: Receiving of Reports.
A. Charles Wallace, Chairman. Explained the Airport Board had been working hard
on the revisions of the Airport's Minimum Standards, which are the rules businesses on
the Airport must comply. Once all the revisions have been completed, they will be
published for review. Copies may be picked up in the Airport Administration Office. A
public meeting will be held and finally it will go to the City Council for approval.
B. Ray Boudreaux, Director. R. Boudreaux told of the FAA Certification Inspection
and some runway markings that were to be corrected and enhanced. Those will be fixed
shortly. The first Airshow 2004 planning meeting will be next Tuesday. He told of
attending the Arkansas Economic Development Council meeting and a trip report is in
the agenda packet. Bids were opened for the taxiway extension for the Forest Service,
the bid was under the engineers' estimate. W. Jones stated the bid was 6% under budget.
R. Boudreaux stated a meeting is scheduled for Friday to discuss the final design of the
U. of A. hangar.
C. James Nicholson, Financial Coordinator. J. Nicholson discussed the charts in the
• agenda. Operations are up because of the June Airshow. Fuel sales shows a 23% growth
over the last 12 months. The FBO began its 3'd year on August ls`. Troy was able to buy
fuel before the fuel went up and just bought fuel again after it went down. He stated we
have been able to keep our fuel prices at the low end of the prices being charged by area
airports. He expressed "Thanks" to our Airport folks that bum turbine fuel. O. Lower
commented that color on the charts added a lot in presentation. He suggested adding to
the charts, how the last 12 months compared to the previous 12 months. F. Sperandeo
said a good marketing plan was needed to draw in the transient customers, suggesting
that to be competitive the Airport needed creative financing. R. McKinney stated some
airport tenants were not buying fuel here. J. Nicholson explained the Airport Budget is
going through the preliminary review at City Hall. He stated we need to take a hard look
at the Capital Projects, if we really want to prolong the solvency of the Airport Fund.
Some of the projections have changed as we bought the hood for the grill at the restaurant
and need. to, buy a forklift. We had to borrow a forklift to load 12 pallets of aluminum
wheels on a charter. They bought 600 to 700 gallons each trip. He spoke of the line item
for the-control tower cost. We haven't had to begin paying the Airport share. R.
Boudreaux stated we were concerned, and had contacted to contract tower people and
they said the FAA is still paying them and had not authorized them to start collecting
from us. Our share would be 70% of the cost to operate the tower. The formula is based
on several things including different types of operations, GA, military operations, airline
operations, and charter operations. J. Nicholson reported the Airport has had several new
tenants since the budget was submitted and those tenants will increase the Airport's
• revenue. R. Boudreaux said the Capital Improvement Project's Plan is just a plan, the
projects have to be voted on before they actually happen.
3
r
• D. Louise Powers, T-Hangar Report. All the T-Hangars and storage units are rented.
We have four to five on each list for the T-Hangars, several for the storage units, and two
for the 60' x 60' hangar. We had about 20 that overnighted in the FBO hangar, and have
six long term tenants, and the charter service has two planes in the FBO hangar.
E. Construction Report, Wayne Jones. The bids for the new project at the north end
of the terminal ramp came in $54.00 short of the budget. The pre-construction conference
is scheduled for next week and work will begin on the next Monday. Plans for the U. of
A. hangar are ready for the final review and will be ready to advertise next week.
Following that, design work will continue on the 60' x 60' hangars. Funding level will
decide whether to build one or two.
F. Maintenance Report, Ray Boudreaux. August was a major grass growing month.
Staff also worked on getting the restaurant area ready. Today they are working on the
roof.
ITEM #7: Other Business.
A. Items from the Airport Board. F. Sperandeo shared a newspaper article that had
been mailed to him of an airport in a similar situation as Fayetteville Municipal Airport.
B. Items from the Public. L. McCandless said the Ozark Military Museum had opened
up and was going good. They are looking for more items to be donated. R. Boudreaux
said they had presented a design for a sign and it was under review. J. Hammond
• reported the Air Museum had two bus loads of tourist, they had rode the Arkansas
Missouri train. She reported they are working with the Aviatior's Grill and the small
planes hanging from the ceiling are on loan to them from the Air Musuem. The date for
the Airfest 2004 has been set for June 19'h and 20`h and asked for volunteers. She
reported she would be attending the ICAS Convention to view different air show acts and
they are already signing up acts for next year.
ITEM #8: Discussion Items.
C. Wallace said he would communicate with the Board to set the date for the Strategic
Planning Meeting. R. Boudreaux reported that Judy Hammond's job had changed. She
had come to work at the Air Museum as almost a volunteer. She has been at the Museum
for one year and has now been named a full-time director with and annual salary and
benefits. She is doing an excellent job. C. Wallace asked Terry Collier to pass along the
word about the work on the Airport's Minimum Standards.
Meeting Adjourned at 3:23.
• Dave Bowman, Secretary Date
4
f 1
FAYETTEVILLE
AIRPORT ADMINISTRATION OFFICE
�HE CITY OF FAYETTEVILLE. ARKANSAS Z
i
MONTHLY REPORT
Director, Aviation and Economic Development
Fayetteville, Arkansas
September 2003
In August the FAA representative from the Fort Worth office of the FAA conducted their
certification inspection of Fayetteville Municipal Airport, Drake Field. Two discrepancies were
documented both relating to the runway paint markings recently completed during the runway
rejuvenation project. The contractor corrected both discrepancies in September by covering the
yellow lines where they were painted over the white runway markings. We also put black paint
around the hold markings so that the yellow was easier to see. The certification letter listed several
suggestions that we also implemented. We sent along a copy of the new fire department training CD
that gives new firefighters orientation of the runways and taxiways and teaches them what the
markings mean. Terry Lawson did a great job putting the program together.
I attended the Arkansas Airport Operators Association Conference in Eureka Springs. A trip report
of the conference is attached to this monthly report. The highlight of the conference was the decision
of the Arkansas Department of Aeronautics to pay the entire 10% match for AIP projects. We had
• applied for a 5% match to our Forest Service project, but as a result of the decision, we were given
the entire 10% match which was an additional $68,484.00.
We opened bids for the self serve fuel system to be installed on the east side of the airport. The
system will have a 1000 gallon tank with dispensing system and credit card reader so that customers
can pull up and pump their own fuel. We have applied for a 50/50 State grant for the purchase and
installation of the system. The state will not have an October meeting, but has told us that the
application is in accordance with State guidance and fundable.
A committee was formed by the Airport Board to research the possibility of including a motor fuel
tank along with the new self serve Avgas tank. Some of our tenants continue to use the lower octane
fuel and would like to have the fuel available at the airport. The staff is looking into the possibility
of installing the tank and what the cost might be to provide the service.
We opened-proposals for the Hay Lease on the airport properties. The new contractor will start the
operation in October.
The U of A Hangar project is finally advertised and the bid opening scheduled for October 23 at
2:00. Hopefully we will start construction this fall.
We held a Preconstruction Conference for the USDA Forest Service Fire Base Project. FAA,
• USDA, NICE, APAC, all of the subcontractors and Airport Staff were in attendance. The project
ground breaking could occur in mid October. We will schedule a ceremony later. .
4500 SOUTH SCHOOL AVENUE. SUITE F • AIRPORT TERMINAL BUILDING • FAYETTEVILLE. AR 72701
PHONE 50 1 -718-7640 Exc. 5 • FAX 50 1 -718-7646
s+ 1
• Monthly Report
September 2003
Page Two
We continue to meet with the other City Directors and the City Budget Office on the 2004 budget.
We are under the target budget for the airport. The Economic Development budget is over target
because we have included some additional marketing funds to be used to market the Airport and the
City. We don't know if they will be approved. The core/non-core meetings continue as well. With
decreasing sales tax revenue, the City finds itself in a stressful time thus the many meetings to insure
that we are only budgeting necessary spending.
Arkansas Aviation Technology Center. will terminate the lease on their second building effective
October 1 , 2002. More than a year ago, they had petitioned the airport to reduce their lease amount
which was approved. They will store the equipment in a storage container next to the building. This
in no way implies that the school is having difficulty. They are doing well and their numbers are
increasing. They have not needed the building for a long time. This will allow more flexibility for
the airport. We have potential clients for the building and will continue to lease to Flying
Investments for storage of their Falcon 20 aircraft.
The contractor has started the project to pave the grass areas north of the terminal and to thus widen
Taxiway B to 50 feet. This project will complete the widening of Taxiway system except for the
portion of Taxiway B north of Taxiway D. The widening was done to accommodate the Forest
• Service aircraft.
I will attend the annual National Business Aviation Association Convention in Orlando October 5
through 9. We have borrowed the booth from the Town Center and have printed brochures and have
ordered marketing pens to pass out to the attendees. We are hoping to generate some business for
Fayetteville by our attendance. The convention is very expensive but hopefully will result in some
good contacts. Next year we will partner with the Arkansas Department of Economic Development
to attend and save some money.
Alderman Don Marr came out to the airport for a tour and briefing on what's happening. I think he
was surprised with the activity and improvements.
The Airport Board met for two strategic planning sessions to work the Minimum Standards rewrite.
We completed "the ieview and should be able to receive public comment sometime this month. It
will be presented to the City Council for final approval following the comment period and final
acceptance by the Airport Board.
Respe fully Submitted,
• Ray M. Boudreaux
Director
• FAYETTEVILLE
THE CITY OF FAYETTEVILLE. ARKANSAS
DAN COODY. MAYOR
TRIP REPORT
TO: Mayor Coody
Directors
FROM: Ray M. Boudreaux
DATE: September 14, 15 & 16, 2003
LOCATION: Best Western Inn of the Ozarks
Eureka Springs, AR
SUBJECT: Arkansas Airport Operators Association (AAOA) Conference
I attended the 2003 Arkansas Airport Operators Association 10`" Annual Conference in Eureka
Springs. The highlight of the conference was the presentation by Lt. Governor Winthrop
• Rockefeller. He was the luncheon speaker on day two of the conference. As a user of aviation, and
the owner of an airport, and the FBO manager, he was very aware of the impact of aviation to a
community. He commented that for every $ 1 .00 invested in airports there is a return of $6.70 in
economic impact. He said that Air Shows are bigger than NASCAR. Then he got onto the State
education issue. Between 1998 and 2003 the University system graduated 1 ,193 physical education
majors and only one physics graduate. Interestingly though, the Arkansas student-to-teacher is the
best in the Nation at 11 to 1 . He talked the remainder of his time on the education issue, but in the
end praised the aviation industry of Arkansas for its forward thinking and the progress made in the
last 20 years.
The opening of the conference was supposed to be the Mayor of Eureka. She was busy and sent
Lynn Berry, one of her department heads: She came later and again welcomed the conference to
Eureka.
The first presentation was by Tim Ernst, photographer. He prepared slide to music presentations on
Arkansas Waterfalls and the Buffalo River. Very Interesting.
Aviation and Economic Development Department
4500 South School, Suite F
Fayetteville, Arkansas 72701
• (479) 718-7642
Ray M. Boudreaux, Director
rboudreaux@ci.fayetteville.ar.us
• The Arkansas Department of Aeronautics Commission Meeting was before lunch. I have attached
their agenda for your information. Our request for $68,484.00 was approved to match the AIP
project for the Forest Service taxiway extension and ramp. The Commission approved $790,929 in
grants at the meeting. Later in the meeting, the Commission revised the match required of general
aviation airports. Instead of 5% State and 5% local for FAA AIP Grants, the State now pays the
entire 10% match for qualifying AIP projects. We received another $68,484.00 for the Forest
Service project. I have also attached the new state grant specifications as changed at the meeting.
After lunch, Mark Stodola, Esq. talked about legal issues that affect airports in Arkansas. I will
forward the package to the City Attorney for information and his action as necessary. The most
interesting was the fact that all publicly owned airports shall be exempt from ad valorem tax to the
same extent as all other public owned property used for public purposes.
The FAA roundtable was several FAA officials and each talked in his area of expertise. They asked
that the FY2005 project listing be in their Dallas office NLT March 1 , 2004. The approval criteria
has changed slightly and the projects must now be complete in 2 years without special approval.
Project must be a good project that satisfies an aviation need, it must be ready to put the funds to
work and the airport must be committed to the project and want it.
Ed Agnew, FAA, opened the meeting on Tuesday. The steady recovery of the airlines since the 9/11
atrocity is now documented. Grants are at the largest level in many years, many to fix security and
safety concerns. The AR/OK office processed 142 grants in the FY 03, 60 in Arkansas for $32MM.
• Unfortunately, end of year funding is drying up as all grants are being fully expended. They are still
not allowing security systems for GA (general aviation) airports, but fencing/gates are still OK for
security and wildlife. He is convinced that GA airport security requirements are coming. There will
probably be two or three mandatory guidelines and many that are highly recommended. It will be
expensive.
David Olive talked about "What's New in Washington." He opened with this: "The FAA is
considering banning passengers on all domestic and international flights" (a joke). The talk got
better. The Aviation Reauthorization Bill has not yet passed due to the contract tower conflict. The
Tower Controllers' AFLCIO union is fighting hard to have the FAA stop contracting out for the
smaller airport towers. The fight has resulted in letters from both sides to representatives with
resolution of the problem not in the foreseeable future. Without a reauthorization bill, funding for
all FAA functions could be in jeopardy .
TSA was meeting the same dates as the conference and David Olive reported that the TSA could
enact new security requirements for GA airports and require the States to design the controls and
fund the installation. He attended several TSA meetings and has evaluated the agency as totally
dysfunctional.
Aviation and Economic Development Department
45011 South School, Suite F
Fayetteville, Arkansas 72701
• (479) 718-7642
Ray M. Boudreaux, Director
rboudreaux&i.fayetteville.ar.us
r
• Prentiss Andrews of the FAA Air Traffic Division talked about Airspace Studies and the
requirements for Form 7460- 1 . The form must be completed on all structures over 200 feet or within
20,000 feet of the runway or exceeding the 100/1 slope or on the airport property. The review
always includes a public comment period.
A hazard to air navigation is: A significant, substantial, adverse impact on a potential aviation
activity.
The final presentation was by Jerry Henderson and Rick Hamm of the TSA. They reiterated that the
GA rules would be released by the end of September.
-Will be by categories of airports
-Will include mandatory steps and recommended steps
-Cargo companies will be included
-Charters with more than 61 seats or more than 100,000 lbs gross weight
-Mostly common sense procedures
His final comment was that TSA requirements may, or may not, come with cash and if the States are
required to plan and enact procedures, there is a real possibility that there will be a fund shortfall.
It was a good conference that we will plan to attend next year.
• Respectfully submitted,
Ray . Boudreaux, D' for
Aviation and Econo c or
Aviation and Economic Development Department
4500 South School, Suite F
Fayetteville, Arkansas 72701
• (479) 718-7642
Ray M. Boudreaux, Director
rboudreaux&i.fayetteville.ar.us
DEPARTMENT OF AERONAUTICS
AERONAUTICS COMMSSION MEETING
AGENDA
SEPTEMBER 15, 2003
CALL TO ORDER
CHAIRMAN SPARKS
/ - VISITORS AND GUESTS
(/1 MINUTES OF THE AUGUST 13, 2003 MEETING
III
(/3 . FINANCIAL REPORT
• U W REQUESTS FOR STATE AIRPORT AID
DIRECTOR'S REPORT/PRESENTATIONS
4� NEW BUSINESS/GRANT PROGRAM
7. OLD BUSINESS
8. ADJOURN
JK/cb l
• J
DEPARTMENT OF AERONAUTICS
• FINANCIAL REPORT
REPORT FOR SEPTEMBER 1 , 2003
AUGUST YEAR AUGUST YEAR
2002 TO DATE 2003 TO DATE
SPECIAL REVENUEISALES TAX
CREDITED TO AERONAUTICS 230,745.68 518,215.38 . 393,461 .35 715,990.15
USE TAX (ACT 924 OF 1997)
USE TAX DISTRIBUTION TO AERONAUTICS25,152.95 767,587.31 80,903. 16 236,900.49
TOTALS 2559898.63 1 ,2859802.69 474,364.51 952,890.64
BALANCE AS OF SEPTEMBER 1 , 2003 11 ,429,693.32
•
GRANTS PAID AUGUST 2003 503,706.87 111571752.09
OUTSTANDING GRANTS AS OF SEPTEMBER 1 , 2003 51372,842.31
STATEAIRPORTAID 49592,952.58
FEDERAL AID 779,889.73
TOTAL 5,3729842.31
APPROPRIATION STATUS SPECIAL REVENUE
APPR. (ACT 8 of 2003) 81000,000.00
YEAR TO DATE PAID 1 ,157,752.09
AMOUNT AVAILABLE Id 61842,247.91
TODAY'S REQUEST FOR STATE AIRPORT AID:
NEW REQUEST FOR SEPTEMBER 2003 790,929.47 In
AMENDMENTS TO GRANTS 0.00 �Ov
TOTAL 790,929.47 X
IRSCAL YEAR ENDS i 6/30/2004
• NEW REQUESTS FOR STATE AIRPORT AID
VALNUT RIDGE — Request $4,200.00 to prepare Environmental Assessment for
2ext nsion of Runway 4. (Total cost of project is $84,000.00) (AIP)
ST MEMPHIS — Request $22, 144.00 for re-grading of runway and taxiway
shoulders to meet FAA requirements, seal coat for parallel taxiway, stub taxiways and a
portion of apron and purchase of a pavement sweeper. (Total cost of project is
$y1421875.00) (AIP)
SPRINGDALE — Request $4,790.00 for revenue investigation section, update of the
Height Zoning Ordinance and Noise Overlay Areas of the Master Plan. (Total cost of
p Ject is $95,800.00) (AIP)
RKADELPHIA — Request $3,250.00 to purchase 12.5 acres of property adjoining the
north end of the runway to increase safety in the runway protection zone. (Total cost of
;A' ect is $652000.00) (AIP)
YETTEVILLE — Request $68,484.00 to construct taxiway "A" extension. (Total cost
ofp ject-is $ 1 ,369,692.22) (AEP)
ORTHWEST ARKANSAS REGIONAL — Request $ 147,517.94 for construction of a
snow removal equipment building, security information signage, security fencing, and
• cost associated with the construction of terminal building. (Total cost of project is
,950,358.88) (AIP)
ORTHWEST ARKANSAS REGIONAL — Request $ 138,888.50 for construction of a
eneral Aviation Taxi lane. (Total cost of project is $2,777,777.00) (AEP)
ORTHWEST ARKANSAS REGIONAL — Request $ 10,000.00 for crack sealing of
approximately one-half of airport's runway pavement. (Total cost of project is
$20,000.00) (50-50%)
quest $53,409.03 for construction of hangar for local Agricultural
otal cost of project is $ 106,818.06) ($50-50%)
PRT SRT SMITH — Request $4,090.00 to purchase and install new beacon. (Total cost of
project is $8,180.00) (50-50%)
SOUTHERN ARKANSAS TECH (Camden Campus) — Request $2,000.00 for
SOUTHERN
Maintenance Scholarship. (Total cost of project is $2,0000) (No Match)
i
SOUTHERN ARKANSAS TECH (Texarkana Campus) — Request $2,000.00 for
ation Maintenance Scholarship. (Total cost of project is $2,000.00) (No Match)
1UPe Two I N
S ELLVILLE — Request $6,863.00 to replaces roof on T-Hangar. (Total cost of
proj ct is $ 13,727.00) (50-50%) J
NDON — Request $5, 100.00 to repair �f on maintenance hangar. (Total cost of
proj t is $ 10,200.00) (50-50%) \�
TORTHTON — Request $98,343.00 to repair and seal runway, taxiway, and apron.
of project is $ 109,270.00) (90- 10%)
Request $ 144,850.00 to overlay and re-mark runway, taxiway and apron
al cost of project is $ 160,950.00) (90-10%)
ITTLE ROCK — Request $75,000.00 for Phase III of West General Aviation
drainage project. (Total cost of project is $ 100,000.00) (75-25%)
•
FAYETTEVILLE
THE CITY OF FAYETTEVILLE, ARKANSAS -
DAN COODY, MAYOR
1500 School Ave., SUlte F
Fayetteville, AR 72701
178.718.75/2
AVIATION AND ECONOMIC DEVELOPMENT
RAY M. BOUDREAUX, DIRECTOR
TO: Airport Advisory Board Members
THRU : Ray M. Boudreaux, Director
FROM: James Nicholson, Financial Coordinator
DATE: October 15, 2003
SUBJECT: FBO Report
Tower Operations Graph: Below is a graph which depicts monthly aircraft operations as
counted by the Fayetteville Municipal Airport ATC Tower. This graph compares monthly
totals of aircraft operations since January 2002.
OPERATIONS - CUMULATIVE 2002 / 2003
N 35
TI E
30 ❑ 2002
0 255 M 2003
i` 20
15
10
5 &
O
FBO Fuel Sales: As can be seen in the graph below, fuel sales volume continues a trend
of growth over 2002. The September sales level is approximately 97% of the FBO's
monthly average volume for the past 12 months of 28,250 gallons. Volume sales have
increased 12 . 1 % over the same 12 month period, (Oct-Sept) in the year previous.
FUEL 5ALE5 - CUMULATIVE 2002 / 2003
o 350
a
i 300 ❑ 2002
0
250 2o 2003
200
150 0
5 I
0
• �Pa ��o bra ca- �P{ �� �s r� ��e �� �� o,�o
• Local Area Data : Retail fuel prices in the local area remained steady in September
following increases in August. In September, Fayetteville reduced prices $.06 & .08 for
JetA and 100LL respectively, corresponding to reduced wholesale costs. Following is a
comparison of regional retail fuel prices as of 10/15/03/03:
Regional Jet Center (XNA) Avgas: 3.08 Jet-A: 2.70
Pinnacle Air (ASG) 2.61 2.47
Beaver Lake (Rogers) 2.78 2.47
Hughes Aviation (Bentonville) 2.70 (SS-2.35) 2. 36
Siloam Springs (City-run) 2.35 (sS-1 .99) 2.25
Fayetteville Municipal 2.49 2.26
Regional Jet Center provides discounts on Jet-A; . 10 @ 500 gals+, .20 @ 1 ,000 gals +
Fayetteville offers discounts for cash sale and quantity discounts on jet fuel .
The Graph below illustrates wholesale fuel price fluctuation since January 15}, 2003. We
saw a decrease in September after high prices in August. Prices appear to be on the
increase again in October.
Wholesale Fuel Price Trend
sox
•
25% 'x Lhg Jct A
lox
—x Lhg 100LL
15%
r
u YJx
u
5%
u
� 5x —
d aox — — — —
.15x -
-2ox
E
Week 2005
FYV Fuel Ops Facts:
Average monthly fuel sales: 28,250 gals
September 2003 fuel sales: 21 ,627 Jet . 78.6%
5.865 Avgas - 21 .4%
27,492 Total
Jet-A sold to FYV-based customers in September: 12,929 - 59.7%
Jet-A sold to transient aircraft customers in September: 81698 - 40.3%
• Avgas sold to FYV- based customers in September: 21975 - 50.7%
Avgas sold to transient aircraft customers in September: 21890 - 49.3%
f �
• City of Fayetteville Arkansas
Airport - Drake Field
Operating Statement - Airport Board
For the Month Ending: 09/30/03
2002 2003 2003 2003 2004
Actual Budgeted Actual YTD Pdctd Yr End Budget
Operating'Revenue
Rents & Leases 2879035 336,350 258,490 358,068 370,200
Aviation Fuel 499,471 11100,000 461 ,180 7059647 853,000
Miscellaneous 16,461 35,000 21 ,621 26,472 22,500
Total Operating Revenue: 802,967 11471 ,350 7419291 1 ,090, 187 1 ,245,700
Operating Expenses
Personnel 312,807 361 ,612 253,332 337,776 370,802
Materials & Supplies 12,464 44,590 31 ,929 53,750 39,450
Aviation Fuel Purchases 320,641 630,000 331 ,969 476,204 522,000
Services & Charges 179,982 266,392 173,252 176,059 248,059
Cost Allocation to General Fund 1449612 144,612 108,459 1449612 144,612
Maintenance 48,874 550610 49,921 52,928 63,710
Operating Capital / Equipment 250206 - 41999 18,203 71500
ATC Tower Costs 1920500 1929500 195,000
Total Operating Expense 1 ,044,586 11695,316 9539861 19452,032 1 ,591 ,133
• Change In Fund Balance (241 ,619) (223,966) (212,570) (361 ,845) (3451433)
from Operations
• City of Fayetteville Arkansas Page 2
Airport - Drake Field
Airport Fund Statement - Airport Board
For the Month Ending: 09/30/03
Beginning Funds Available - 01 /01/2003 21474,359
Airport Fund Revenue YTD Projected YE Est 2004
Interest on Investments 61 ,457 79,996 459000
Non-Op Miscellaneous 90332 91334 -
Total Fund Revenue 70,789 89,330 45,000
Airport Fund Expense 2003 2004
Capital Project Expense / Grant Matching YTD Projected @ Completion Projected
AIP #29 - Pavement Rehab 69989 21 ,989
AIP #30 - Taxiway A Extension Design 29095 51836
AIP #31 - Taxiway A Ext. Construction
Hangar Rehabilitation 27,495 36,493 -
Corp Ramp Pavement 330,072 330,372 -
-FBO Hangar 518,792 518,792 -
Executive Hangar 2@ 60x60 18,200 300,000 -
East-side Self-serve 100LL - 17,967
10 Bay T-Hangar - 100,000
• UA Hangar -
AIP #32 - Taxiway A Ext. Phase II
Executive Hangar 2@ 60x60 258,100
100 x 200 Corporate Hangar
Roof Maintenance 200000
New Airport Entrance 100,000
Debt Service - -
Total of Project Expense - Airport Fund 9030643 1 ,231 ,449 478,100
Income Less Expense (832,854) (1 ,142,119) (433,100)
Change In Fund Balance from Operations (212,570) (3619845) (345,433)
Ending Funds Available 9/30/2003 11428,935 Est. 970,395 191 ,862
Outside Grant Funds Contributed
YTD Projected YE
State 595,231 743,162
Federal 163,517 1 ,787,864
US Forest 33,250 8879098
Total: 791 ,998 3,418,124
T T T
• LEASE DATA SHEET
TENANT: New Vision Media Group Ministries and the
Argroup, LLC
• ADDRESS: 4500 S. School St
Fayetteville, AR 72701
PHONE: 479.582.5355
PROPERTY LEASED: The Agricat Lot Leased by Argroup and unused
area of the Terminal lobby.
USE OF PROPERTY: Concert
BEGINNING DATE: October 25, 2003
TERM OF LEASE: October 25 with a day before to set up and a day
after to tear down.
OPTION TO EXTEND: N/A
• RENTAL FEES: $ 1 ,000.00
SPECIAL CONSIDERATIONS: N/A
DESCRIPTION: One time outdoor concert to be held in the Agricat
lot with a few displays in the Terminal lobby.
Argroup will be hosting the event and will use the
activity to bring additional business to their
restaurant. The group expects less than 1000
people.
RECOMMENDATION: Staff recommends approval.