HomeMy WebLinkAbout1999-07-12 - Agendas - Final • MEETING NOTICE
The Advertising and Promotion Commission will meet on Monday, July 12, 1999, at 2:00 p.m.
at the City Hall Council Chambers.
ADVERTISING AND PROMOTION COMMISSION
July 12, 1999 2 :00 p.m. City Hall Council Chambers
I Call to Order
II. Reports
A. Approval of Minutes for June 14
B. Financial Report
C. Convention and Visitor Activity - Marilyn Johnson
D. Blackwood/Martin/CJRW Report — Susan Wallace
III. Old Business
A. Town Center
IV. New Business
•
V. Adjourn
Informational Items —
Trolley Operations Report
• GROUP: ADVERTISING & PROMOTION COMMISSION
DATE: June 14, 1999
PRESENT: Heather Daniel, Alex Jerde, Carl Maguire, Curtis Shipley, Jim Waselues,
and Marilyn Johnson
ABSENT: Joe Fennel and Fred Hanna
The regular meeting of the Advertising and Promotion Commission was called to order at
the City Hall Council Chambers at 2:00 p.m. by Commissioner Curtis Shipley.
MINUTES
Moved by Jerde, second by Waselues to approve the minutes of the May 10 meeting.
Motion carried.
FINANCIAL REPORT
Steve Davis presented the financial report. Expenses in May were $65,469 with major
expenditures in advertising agency contract and payment to Washington County
Historical Society. Collections for May were $96, 120, down 1 .22% over last May.
Year to date collections are $459,862 up 6.05°/x.
• Moved by Daniel, second by Jerde to approve the financial report. Motion carried.
CONVENTION AND VISITOR DEVELOPMENT REPORT
Marilyn Johnson reviewed activity report in agenda packet. She worked with 2
conventions, the Great Race, Veteran's Day parade, and the NCAA subregional baseball
tournament. Media relations were also emphasized during the month.
Inquiries are up for the month and year-to-date.
ADVERTISING AGENCY REPORT
Susan Stirewalt reported that inquiries indicate that placement is working and no changes
will be made in that placement. She will hold report on web site until July in order to
present a more complete site.
OLD BUSINESS
TOWN CENTER
Richard Alderman reported that the Nabholtz has been determined to the low bidder.
They have initiated meetings to negotiate the cost down approximately $ 1 million in
order to get the project down to bid amount. Within 2 weeks (sometime before July 4),
he should be able to come back for decision on adjustments to the job so that a
presentation can be made to the city. Commissioners should anticipate a called meeting
• before July 4.
• NEW BUSINESS
None
There being no further business, the meeting was adjourned.
Respectfully submitted,
9&4,4�
Marilyn Johnson
Director, Convention and Visitor Development
•
•
City of Fayetteville, Arkansas
Monthly HMR Tax Collections 1997-1999
• 1997 1998 1998 1999 1999
Total Total Change Over Total Change Over
HMR Taxes HMR Taxes Prior Year HMR Taxes Prior Year
January $ 73,809 $ 82, 157 11 .31 % $ 89,125 8.48%
February 73,099 83,759 14.58% 88,757 5.97%
March 76,808 80,815 5.22% 91 ,271 12.94%
April 88,050 89,603 1 .76% 94,588 5.56%
May 87,221 97,309 11 .57% 96,120 -1 .22%
June 84,417 98,318 16.47% 104,709 6.50%
July 79,784 94,621 18.60% 0
August 84,099 913336 8.61 % 0
September 82,984 933903 13. 16% 0
October 959030 95,649 0.65% 0
November 889147 98,784 12.07% 0
December 795492 88,266 11 .04% 0
Total $ 992,939 $ 1 ,094,521 10.23% $ 564,571 6.13%
• HMR Tax Collections By Month
120
100
BO
Is
N
60
0
F
40
20
0
January February March April May June July August Septembe October November December
O 1997 ® 1998 Ea 1999
•
\HMRTAX
Advertising & Promotion Commission
Financial Report -Expenditures
For the Month Ending June 30, 1999
• 1999 YTD June
� Budget Item Budget Expenses Remaining Expenses
800 Telephone Number (Chamber of Commerce) $ 10,000 $ 5,000 $ 5,000 $
Audit Expense 150 150 0 150
Brochure Development 17,000 1 ,880 15,120
Chamber of Commerce Operations Contract 100,000 75,000 25,000
Collection Expense - City of Fayetteville 22,500 11 ,291 11 ,209 2,094
Convention Support 6,100 2,800 3,300 800
Public Notification (BMA Contract) 232,375 108,085 124,290
Town Center Architectural Services 261 ,789 189,526 92,263 60,064
Town Center Equipment & Furnishings 100,000 100,000
Town Center Marketing Manager (Salary/Expenses) 21 ,240 21 ,240
Special Projects
AAAAA State Basketball Tournament 3,200 3,200 0
Air Museum 32,000 16,000 16,000
Annual Champions Day (State High School Championship) 3,000 3,000 0
Ark. High School Baseball Coaches All-Star Game 800 800 0 800
Ark. Overall High School Baseball Finals 0 0
Ark. State Boys Golf Tournament 0 0
Ark. State High School Cross Country Championships 1 ,200 1 ,200
Basketball Congress Int. State Basketball Tournament 800 800
• Botanical Garden Society - Master Plan 8,000 8,000
Fay. Public Library Genealogical Collection 21 ,094 21 ,094 0
First Night 2,800 20800
Gary Hampton Memorial Tournament 1 ,600 1 ,600
HAWKS AAU Basketball Tournament 1 ,600 1 ,600 0
Holiday Hoops 9,600 9,600
Joe Martin Memorial Stage Race 960 840 120 840
North Arkansas Symphony Society 1 ,248 1 ,248
Ozark Classic Cup XVI Soccer Tournament 2,160 2,160
Razorback SAMS 3,480 31480
Square Gardens 16,338 8,908 7,430 1 ,132
Trolley Operations 20,000 13,235 6,765 70
Univ. of Arkansas Museum 5,724 949 4,775
Walton Arts Center - Brochures 1 ,200 600 600
Washington County Historical Society - Roof Repl. 10,400 10,400 0
Wood Bat Classic 800 800 0
Rim Reapers (not to exceed) 4,620 4,620
Air Museum (Air Fest) 3,000 31000 0 3,000
Razorback Baseball NCAA Tournament 3,001 3,001 0 3,001
Subtotal Special Projects 158,625 87,426 71 ,199 8,843
• TOTAL USES $ 949 779 $ 481 ,158 $ 468.621 $ 71 .951
M&PEXP99
• ACTIVITY REPORT
SUNE91999
INQUIRY RESPONSES
June 1999 Tourist - 140 1999 Year to Date — 1711
June 1998 Tourist - 239 1998 Year to Date — 1804
June 1999 Advertising Response — 3145 1999 Year to Date — 18390
June 1998 Advertising Response — 2397 1998 Year to Date — 13136
June 1999 Relocation — 95 1999 Year to Date — 801
June 1998 Relocation — 164 1998 Year to Date — 974
June 1999 Total Inquiries — 3380
June 1998 Total Inquiries — 2800
Year to Date Total Inquiries 1999 — 20902
Year to Date Total Inquiries 1998 — 15914
CONVENTION ACTIVITY
• Conventions — Great Race
Tourist Activities - Veteran's Day parade meeting & press conference
Miscellaneous - Northwest Arkansas Tourism Association mixer
State Parks and Tourism Commission meeting- Bentonville
Arkansas Musicipal League
University of Arkansas freshman orientation sessions
All Season's Trail brochure reprinted
Media Relations — Fayetteville.com (website) — Tate Wolfe
Arkansas Democrat Gazette - Jonesboro
Midwest Living — Tara Bower (March/April issue Farmer's Market)
•
Top HMR Collections — May
Clarion
Hilton
Jose' s
Red Lobster
Ryan's
Ozark Brewing Company
A. Q. Chicken
Chili's
McDonald's 50's
Kentucky Fried Chicken
Applebee's
Rio Bravo
•
•
• Tourist Inquiries 1999
Jan Feb Mar Apr May Jun IJul Aug Sep Oct Nov Dec TOTAL
AL 3 2 5 1 1 12
AK 1 12
AZ 2 1 4 4 1 2 14
AR 46 47 91 43 57 36 320
CA 6 11 19 6 9 6 57
CO 3 5 3 4 1 16
CT 1 1 2 1 5
DE 1 1
DC 1 1
FL 4 2 15 3 7 2 33
GA 1 4 1 3 2 11
HI 1 1
ID 2 1 3
IL 11 8 66 13 14 4 116
IN 3 2 15 4 10 34
IA 2 4 30 6 5 2 49
KS 7 10 31 11 14 3 76
KY 11 71 5 4 2 19
LA 4 10 39 101 17 6 86
ME 1 1 2
MD 1 2 1 2 3 1 10
MA 4 1 2 2 9
MI 4 7 16 3 6 1 37
MN 6 2 33 4 7 2 54
MS 2 4 8 4 5 1 24
MO 6 20 43 241 29 16 138
• MT 3 1 4
NE 2 2 4 2 3 13
NV 1 1 1 1 1 5
NH 1 1
NJ 1 3 4
NM 1 1 3 5
NY 2 2 2 6
NC 2 4 1 2 9
ND 1 1 2
OH 3 51 241 4 7 4 47
OK 11 181 39 191 30 13 130
OR 1 1 3 5
PA 1 3 2 1 1 8
PR 2 2
RI 1 1
SC 1 2 3
SD 4 3 7
TN 2 41 10 6 6 3 31
TX 19 39 65 29 44 25 221
UT 2 11 1 3
VT 1 1
VA 2 1 2 3 8
WA 2 2 1 1 1 7
WV 1 1 1 3
WI 1 29 4 6 2 42
WY 0
APO 1 1
CAN 2 1 3 2 8
• FOR 1 1 2 4
1711
1661 2241 6351 230 311
6 140 0 0 0 0 0 0 1711
ADVERTISING INQUIRIES BY STATE - 1999
• JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC Tourist Relm TOTAL
AL 2 2 46 48 42 45 185
AK 0 0 1 4 4 4 13
AZ 1 3 17 48 32 27 128
AR 7 20 547 201 108 162 1045
CA 14 17 72 187 120 143 553
CO 1 4 14 43 20 24 106
CT 0 1 11 26 25 22 85
DE 0 1 14 9 8 5 37
DC 0 0 3 1 0 5 9
FL 8 10 70 165 113 139 505
GA 4 5 42 61 46 51 209
HI 1 0 22 5 6 12 46
ID 0 1 9 10 10 9 39
IL 24 18 158 868 438 215 1721
IN 11 3 56 346 226 76 718
IA 7 13 29 396 158 76 679
KS 6 7 47 232 166 61 519
KY 4 3 37 63 41 56 204
LA 8 13 129 145 81 143 519
ME 0 1 4 16 4 8 33
MD 3 6 26 53 28 27 141
MA 3 3 28 30 30 24 118
MI 13 12 63 377 205 104 774
MN 10 6 50 434 214 68 782
MS 4 5 64 61 40 57 231
MO 16 9 344 572 366 218 1525
MT 1 3 4 5 12 6 31
NE 4 3 9 90 57 41 204
NV 0 0 14 16 8 6 44
NH 0 0 10 6 4 6 26
NJ 0 5 27 77 47 57 213
NM 1 5 11 13 21 20 71
NY 5 16 64 155 113 111 464
• NC 5 4 60 89 78 78 34
7
NO 0 0 28 18 9 19 74
OH 14 7 53 363 243 141 821
OK 23 9 233 244 170 107 786
OR 2 5 15 31 21 27 101
PA 4 7 52 114 101 81 359
RI 0 0 6 7 4 4 21
SC 3 7 35 38 29 37 149
SO 1 1 57 46 21 8 134
TN 3 7 107 85 64 59 325
TX 20 32 476 742 292 310 1872
LIT 1 2 7 10 16 12 48
VT 0 0 7 8 2 4 21
VA 1 6 42 60 55 43 207
WA 2 3 24 33 29 25 118
WV 2 1 17 28 18 18 82
WI 14 14 38 469 213 105 853
WY 0 0 4 9 7 4 24
APO 0 0 3 2 2 4 11
CAN 0 1 3 18 15 10 45
FOR 2 2 5 13 14 23 59
TOTAI 255 303 3314 7188 4194 3145 0 0 0 0 0 0 16399
•
ADVERTISING INQUIRIES BY STATE - 1999
• JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC Tourist Re1w TOTAL
AL 2 2 46 48 42 45 185
AK 0 0 1 4 4 4 13
AZ 1 3 17 48 32 27 128
AR 7 20 547 201 108 162 1045
CA 14 17 72 187 120 143 553
CO 1 4 14 43 20 24 106
CT 0 1 11 26 25 22 85
DE 0 1 14 9 8 5 37
DC 0 0 3 1 0 5 9
FL 8 10 70 165 113 139 505
GA 4 5 42 61 46 51 209
HI 1 0 22 5 6 12 46
ID 0 1 9 10 10 9 39
IL 24 18 158 868 438 215 1721
IN 11 3 56 346 226 76 718
IA 7 13 29 396 158 76 679
KS 6 7 47 232 166 61 519
KY 4 3 37 63 41 56 204
LA 8 13 129 145 81 143 519
ME 0 1 4 16 4 8 33
MD 3 6 26 53 26 27 141
MA 3 3 28 30 30 24 118
MI 13 12 63 377 205 104 774
MN 10 6 50 434 214 68 782
MS 4 5 64 61 40 57 231
MO 16 9 344 572 366 218 1525
MT 1 3 4 5 12 6 31
NE 4 3 9 90 57 41 204
NV 0 0 14 16 8 6 44
NH 0 0 10 6 4 6 26
NJ 0 5 27 77 47 57 213
NM 1 5 11 13 21 20 71
NY 5 16 64 155 113 111 464
• NC 5 4 60 89 78 78 374
ND 0 0 28 18 9 19 74
OH 14 7 63 363 243 141 821
OK 23 9 233 244 170 107 786
OR 2 5 15 31 21 27 101
PA 4 7 52 114 101 81 359
RI 0 0 6 7 4 4 21
Sc 3 7 35 38 29 37 149
SD 1 1 57 46 21 8 134
TN 3 7 107 85 64 59 325
TX 20 32 476 742 292 310 1872
UT 1 2 7 10 16 12 48
VT 0 0 7 8 2 4 21
VA 1 6 42 60 55 43 207
WA 2 3 24 33 29 25 116
W V 2 1 17 28 18 16 82
WI 14 14 38 469 213 105 853
WY 0 0 4 9 7 4 24
APO 0 0 3 2 2 4 11
CAN 0 1 3 16 15 10 45
FOR 2 2 5 13 14 23 59
TOTAI 255 303 3314 7188 4194 3145 0 0 0 0 0 0 18399
•
• Advertising Inquiries by State - June, 1999
FC FBT HT H&A Jou MC ML MWTNATA SL SNI ST TM VAC TOTAL
AL 22 9 1 4 2 7 45
AK 2 1 1 4
AZ 8 6 1 3 1 6 1 1 27
AR 37 7 2 8 6 7 56 17 5 17 162
CA 58 32 1 21 4 21 5 1 143
CO 9 2 1 1 2 1 4 3 1 24
CT 4 8 5 4 1 22
DE 2 1 1 1 5
DC 1 2 1 1 5
FL 51 28 2 25 3 8 19 3 139
GA 18 8 7 2 16 51
HI 3 4 2 3 12
ID 5 1 1 1 1 9
IL 61 14 26 18 58 14 15 3 6 215
IN 28 1 9 6 22 7 3 76
IA 14 3 1 10 3 27 6 12 76
KS 21 3 3 5 14 8 6 1 61
KY 28 3 11 7 3 1 3 56
LA 28 6 10 19 13 23 42 2 143
ME 4 1 1 2 8
MD 12 1 2 2 3 6 1 27
MA 13 5 3 2 1 24
MI 33 8 1 19 31 5 6 1 104
MN 21 1 2 9 7 19 6 2 1 68
MS 11 2 1 7 4 5 6 13 1 7 57
MO 53 4 17 20 93 23 5 2 1 218
• MT 1 5 6
NE 12 1 7 4 12 4 1 41
NV 3 1 2 6
NH 4 1 1 6
NJ 33 13 1 6 1 2 1 57
NM 5 2 8 1 4 20
NY 52 26 2 20 4 2 4 1 111
NC 33 6 1 22 1 14 1 78
ND 4 2 1 12 19
OH 50 15 1 17 13 8 22 5 1 9 141
OK 58 5 16 11 3 2 10 2 107
OR 18 1 2 3 2 1 27
PA 39 15 1 2 16 1 1 4 1 1 81
RI 3 1 4
Sc 18 1 6 3 8 1 37
SD 4 1 1 1 1 8
TN 23 7 2 9 1 5 12 59
TX 90 30 5 1 71 25 1 32 35 5 14 1 310
LIT 7 2 1 1 1 12
VT 1 2 1 4
VA 27 2 4 2 8 43
WA 8 4 1 5 4 1 2 25
WV 9 1 4 1 1 16
WI 32 7 1 21 10 21 11 2 105
WY 3 1 4
APO 1 1 2 4
CAN 6 2 1 1 10
• FOR 3 13 3 4 23
TOTAI 1094 313 36 138 84 355 274 146 306 259 15 66 20 39 0 3145
• ADVERTISING INQUIRIES - 1999
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL
Tourist 0
ACW 1 1 2
AY 0
BH 18 28 26 72
CWT 0
FC 4 500 802 726 1094 3126
FBT 332 262 313 907
HT 70 10 182 47 36 345
H&A 151 138 289
Journey 11 84 95
MC 415 446 611 355 1827
ML 104 87 1429 728 274 2622
MT 146
MVG(TMG 773 535 1308
NATA 45 167 358 533 245 306 1654
OK 21 97 63 181
SL 43 33 454 383 250 259 1422
SNI 1304 183 38 15 1540
ST 66
TA 12 12
TM 7 4 160 525 70 20 786
T50&B 58 58
• USA 1257 399 1656
Vac 188 58 39 285
Meetings
SM 0
TOTAL 255 303 3314 7188 4194 3145 0 0 0 0 0 0 18399
ACW-Am. Civil War
BH-Better Homes & Gardens
CWT-Civil War Times
D-D Magazine
FC-Family Circle
HT-Historic Traveler
H&A-Home and Away
MC-McCalls
ML-Midwest Living
MVG-Midwest Vacation
NG-Nati Geog Traveler
NTG-NATA
OK-Oklahoma Today
SL-Southern Living
SMI-State Mag. Insert
SM-Successful Meetings
SV-Summer Vacation
• TA-Travel America
TJ-Texas Journal
RELOCATION INQUIRIES 1999
I
Jan Feb Mar Apr May June July Aug Sep Oct Nov IDec TOTAL
AL 3 2 3 1 9
AK 0
• AZ 5 5 6 2 2 3 23
AR 21 16 29 18 26 19 129
CA 9 7 14 21 10 6 67
CO 3 2 6 2 4 1 18
CT 1 2 1 4
DE 0
DC 0
FL 6 3 5F-4— 2 5 25
GA 3 11 5 4 2 16
HI 1 1
ID 1 1 2
IL 5 6 141 7 7 7 46
IN 1 1 2 1 1 6
IA 4 2 7 2 31 11 1 19
KS 1 2 5 2 4 3 17
KY 3 3 1 7
LA 1 3 4 7 4 5 24
ME 1 1 1
MD 1 2 1 1 1 6
MA 1 3 1 2 7
MI 7 4 4 3 3 2 23
MN 2 5 51 5 5 1 23
MS 1 2 21 1 6
MO 3 5 6 9 6 3 32
MT 11 2 1 4
NE 11 1 1 1 4
NV 3 1 4
NH 1 1 2 1 5
•
NJ 1 3 2 1 7
NM 2 1 1 4 4 1 13
NY 2 2 1 1 1 7
NC 1 1 1 2 1 6
ND 0
OH 6 7 4 1 3 21
OK 5 4 4 3 8 5 29
OR 2 1 1 1 5
PA 2 2 4
PR 0
RI 0
SC 2 4 3 9
SD 21 1 1 4
TN 4 5 3 1 1 15 29
TX 171 10 24 12 30 93
UT 1 1 2
VT 1 1 2
VA 1 2215 .
4
WA 4 1 8
WV 1 1 1 4
WI 2 3 5 2 19
WY 1 1
APO 1 1 2
CAN
FOR 1 1
801
• TOTAL 129 113 176 130010101010 801
WRIENSERG DELONY A DAVTDSON ARCHITECTS
July 09, 1999
Ms. Marilyn Johnson
A & P Commission
City of Fayetteville
113 West Mountain Street
Fayetteville, Arkansas 72701
Re: Fayetteville Town Center
A & P Commission
Value Engineering Pricing
Dear Marilyn:
Attached is a recap of items from work with Nabholz Construction Company to create a
possible list of cost reductions from the bidding of the above project. This recap is a result of
several previous lists and work with the apparent low bidder to reduce costs from the project
as bid. At this time we have been able to identify items that will reduce the project costs
from $8,361 ,833 .00 to $7, 569,292.00.
• We have also included for your review the contractor' s work sheet showing all pricing
options that have been looked at. Some of these items we feel do not represent an acceptable
value for the work proposed and we have not included them in the recap of suggested cost
reductions for that reason.
Sincerely,
WITTENBERG, DELONY & DAVIDSON, INC.
Richard Alderman, AIA
Principal, Northwest Arkansas Office
c: Mr. Charles Venable, City of Fayetteville
Attachment 8 pages VE items
• NORIM MAMAWAS COKE
IOOW. CEMER SURE 102
FAYFREYAIE, AR 72701.4W
5017443.6W
501/443-9515 FAX
• FAYETTEVILLE TOWN CENTER
REVISED VALUE ENGINEERING 1 COST REDUCTION ITEMS
7-09-1999
Page 1 of 2
General Conditions
1 .0 Change construction time to 18 months $ 303000.00
1 . 1 Change construction boundaries to allow use of Rock Street & $ 72,000.00
City leased lot
$ 102,000.00
Allowances
2. 1 Delete landscape allowance $ 753000.00
2.2 Reduce testing allowance from $30,000.00 to $ 15,000.00 $ 15,000.00
2.3 Delete interior signage allowance $ 15,000.00
2.4 Delete reinforcing allowance of 5 tons $ 2,316 00
$ 107,316.00
Changes to Waterproofing Requirements
3 . 1 Change Floor sealers in deck and exhibition hall $ 37,971 .00
• 3 .2 Change to Contractor suggested Terrace & Plaza $ 183884.00
waterproofing systems
3 .3 Change below-grade waterproofing system except $ 4,773 .00
at Mountain Street
3 .4 Change to Contractor suggested Terrace traffic coating $ 48.763 .00
$ 110,391 .00
Elevators / Freight Elevators
4. 1 Delete smaller freight elevator - provide all rough-in $ 99,456.00
requirements
4.2 Delete one passenger elevator - provide all rough-in $ 30,478.00
requirements
$ 1293934.00
Exterior Items
5. 1 Delete canopies from north and south $ 12,970.00
5 .2 Change pre-cast to split face CMU on deck, $ 61264.00
pre-cast on bldg. to remain
5 .3 Change face brick type $ 177405 .00
5 .4 Delete herringbone in-fill pattern $ 15,207.00
•
• FAYETTEVILLE TOWN CENTER
REVISED VALUE ENGINEERING / COST REDUCTION ITEMS
7-09-1999
Page 2 of 2
5 . 5 Delete removable bollards $ 31651 . 00
5 .6 Delete 8 " painted handrails $ 11 ,763 .00
5 . 7 Change parking deck barrier to site cast with exp. agg. finish $ 185508.00
5 . 8 Delete paining of under side of parking deck $ 33. 143 . 00
$ 1181911 .00
Interior Items
6. 1 Delete Freezer - provide rough-in $ 12,250. 00
6.2 Delete Electric window shades - provide rough-in & electrical $ 24,350.00
6.3 Delete Vertical Blinds - provide blocking $ 53625 . 00
6.4 Delete operable partitions-provide bulkheads & tracks $ 88,091 .00
6.4 Delete mesh storage room wall $ 3 ,314.00
6. 5 Delete storage millwork from back wall of service desk 421 $ 35482.00
6.6 Change round interior columns from precast to GFRP $ 5-383 .00
$ 142,495 .00
Glass & Glazier Changes
7. 1 Change auto entrances to swing doors $ 6,632.00
7.2 Change from Kynar to Clear anodized accept at tower $ 9,650.00
7. 3 Delete low E glazing requirement $ 10.646.00
$ 261928.00
Electrical Items
8. 1 Change light fixtures (pending cut sheets for review & approval) $ 19,424.00
8.2 Delete selected light fixtures $ 13 ,544.00
8. 3 Allow transformer to be on grade $ 3-092.00
$ 36,060.00
Mechanical Items
9. 1 Change RTU- 1 & RTU-3 to constant volume $ 6,000.00
9.2 Delete graphic control system $ 2,200.00
9.3 Delete Energy Management System $ 3,961 .00
9.4 Change ductwork at RTU- 1 $ 2,064.00
• 9. 5 Delete fintube heat at tower $ 4.281 .00
$ 181506. 00
JUL-08- 1999 15 . 20 NRBHOLZ CONSTRUCTION 1 501 631 0286 P . 02i08
• FAYETTEVILLE TOWN CENTER
VALUE ENGINEERING - NCC
JULY 81 1"9
1 . Delete use of 8" painted round steel handrail from top of all exterior to dplaz walls:
DEDUCT: $ ill 763.001
2. Delete cooler and freezer units from storage level, keep all rough-in details for future
installation:
DEDUCT: $ <12 250.00
3 . Delete aluminum and glass canopies from south vestibule entry and east side of tower entry.
Canopy on main north tower entry to remain.
DEDUCT: $ r12.970.
4. Delete sidewalks, curbs, gutters and street work on Block, Rock and East Streets. All work
on Mountain Street to remain. All utility patching and other site work to remain.
DEDUCT: $ <16. 124.00>
• 5 . Delete all work for topsoil, sodding and site preparation from the project including topsoil
work in the planters on the plaza. Note that the landscape allowance only included final plant
materials all other work is in the base bid.
DEDUCT: $ < 4.223.001 ^Id
6. Delete the removable bollards shown at the entry to the plaza.
DEDUCT: $ 73,651 .001
7. Delete precast work under brick on the three sides of the parking deck and replace with split
face concrete masonry units. Precast on tower entry and south vestibule em '
n.
DEDUCT: $ 1 6 264.001
8. Provide alternate pricing for specified brick pavers. Price alternate brick and concrete unit
masonry products.
DEDUCT: $ NO BID
9. Provide alternate pricing for the building face brick. Use ACME Denton 121 instead of
Endicott masonry specified.
DEDUCT: $ t777405,00> V
10. Provide alternate pricing for face brick used on walls in plaza area. Use ACME Denton 121
• instead of Endicott masonry specified.
DEDUCT: $ WITH #9
Page #1
JUL-08- 1999 15 : 20 NAHHOLZ CONSTRUCTION 1 501 631 0286 P . 03i08
• 11 . Delete brick edging from plaza, provide score lines to replace edging. Brick at round entry to
remain. A O
DEDUCT: $ < 6, 161 .00> 1 �+
12. Delete in-fill herringbone pattern in pavers at round entry, edging strips to form main grid
pattern to remain, replace with concrete.
DEDUCT: $ I S 207.00>
_20-
a MOMMOMMMMOM4
13, Change 8'-0" aluminum doors at entrances and doors to exterior from exhibition hall to
standard height units, provide glass transoms above.
DEDUCT: $ < 765.00> �Vb
14. Delete vertical blinds. Blocking to remain. DEDUCT: $ < 5 625.00
15. Delete electric window shade units from exhibition hall. Electrical conduit and rough-in to
remain for future installation. ,/
DEDUCT: $ 4 350.00
16. Change four interior round precast column covers to GFRP (glass fiber reinforced plastic)
products instead of precast concrete. GFRP to match details, reveals, and shapes shown for
• precast.
DEDUCT: $ 1 5 383.00
16a. Dryvit finish in lieu of GFRP on item 16. DEDUCT: $ <76-228,06>_ (1J0
17. Delete operable partitions from exhibition hall. Tracks, supports, &arcing, bulk heads and
other rough-in items to remain for future installation.
DEDUCT: $ 1788,091 .0
18. Delete wire mesh partitions from storage room 424.
DEDUCT: $ 3 314.00> "
19. Delete the smaller of the two freight elevators. Shaft, rough-in, electrical and other
requirements for future installation to remain.
DEDUCT: $ 456.00
20. Omit chair rail at Entrance Hall 403. DEDUCT: $ < 1 .265.00
21 . Redesign vanity and mirror configuration to flat wall and standard vanity framing at Men's
Toilet 406 and Women's Toilet 405.
DEDUCT: $ NO BID
22. Delete one passenger elevator. Shaft, rough-in, electrical and other requirements for future
• installation to remain.
DEDUCT: $ �0 478.00>
Page #2
JUL-08- 1999 15 : 21 NABHOLZ CONSTRUCTION 1 501 631 0286 P . 04i08
• 23. Delete auto entrance doors at Entrance Tower 401 and replace with regular swing door as
used in Vestibule 402.
DEDUCT: $ 76732,00
24. Delete millwork at west wall of Service Desk 421 . DEDUCT: $ 1 < 3,482.00>1
25. Delete wood base at Entrance Hall 403 and replace with vinyl:
DEDUCT: $ < 854.00>
25a. Change remaining millwork specified as stained from
quartered book matched plain Aniegre to plain sliced
Birch. DEDUCT: $ < 500.00>
Additional Value Engineering / Cost Saving Ideas for Consideration:
PAINTING
26. Delete accent color at reveals: a. Interior DEDUCT: $ < 1530.00> Mb
(see note on A3.4)
b. Exterior DEDUCT: $ _< 1 .094.00>
(See color "C" on ext . elevation color schedule
26a. Delete painting of ceilings in the parking deck (all levels)
• plaza parking level 3c and service drive per finish
schedule items 29. DEDUCT: $ G33 143.00
MASONRY
27. Change precast barriers at perimeter of parking deck to site cast conc
with exposed aggregate flat faces. DEDUCT: <l8 508.0
271. To change site cast concrete barriers to smooth finish
with paint. DEDUCT: $ <22.268.00> NO
WATERPROOFING:
28. Floor sealers: Utilize Lapidolith on the parking decks, and Sonothance VOC
on the interior concrete floor in lieu of sealer specified
DEDUCT: $ M37,971 .00>
29. Below-grade waterproofing: Delete drainage panels at all foundation walls /
except the Mountain Street wall, and install membrane (as specified) v/
protection board. DEDUCT: $ L< 4,773.00>1
30. Below-grade waterproofing: To also delete the drainage panels at the
Mountain Street wall and install protection board. DEDUCT: $ < 791 .00>
• 31 . Terrace and Plaza Waterproofing System: Change Performance Roof Systems
membrane with drainage panels to Sonnebom HLM5000 (already specified for the
Page #3
JUL-08-1999 15 : 21 NABHOLZ CONSTRUCTION 1 501 631 0286 P . 05i08
• planter areas) with PC- 1 board. DEDUCT: $ <l8 884.00>
32. Terrace Traffic Coating: Change the terrace traffic coatingDEDUCT: $ <48 763.00>
to Sonnebom Sonoguard.
GLASS & GLAZING
33 . Deduct to use clear anodized in lieu of painted material on all metal e Qn=w
tower above precast band. DEDUCT:$ < 91650.00>1
34. At Tower F & G frames (3F and 1G) use 1 " solar cool green/ low E <15.042,00>
in lieu of sandblasted glass or silk screen glass. DEDUCT: $ 1'
35. Delete third glass canopy of main north tower entry. DEDUCT: S<10,982.00>�d
35a. Delete pairs of doors (doors labeled "A" -4 doors) in exhibition
hall 400 between grids 3 & 4 and 6 & 7. DEDUCT: $ < 1 036.00> N d
35b. Delete pairs of doors (doors labeled "A"- 5 doors) in exhibition
hall 400 at all remaining doors to exterior and provide single
doors centered in opening. DEDUCT: $ < 2.512.00>
• 35c. Delete requirements for Low E glazing. Solar cool green and sand v
blasting to remain. DEDUCT: $ < 10 646.00>
ELECTRICAL
36. Light fixture deductive option #1 . This option reduces the quality of UbLDAMMSA.
but are furnished with T8 lamps and electronic ballast. DEDUCT: $ <l9 424.00>
36a. To change option #1 light fixtures to option #2 light fixture from original
light fixture. DEDUCT: $ <29,624.00>
36b. To delete (6) type LI , (8) type G2, (12) type L59 (8) type L3, (4) typ l/
and (3) type Tl fixtures from light fixture package #1 DEDUCT: $ <13 544.00>
36c. To delete (6) type Ll , (8) type G2, (12) type L5, (8) type L3 , (4) type KI
and (3) type Tl fixtures from light fixture package #2 DEDUCT: $ <12,472.00>
37. Light fixture deductive option #2. This option changes T8 lamps and electronic
ballast to T12 lamps and magnetic energy saving ballast.
DEDUCT: $ < 4 848.00> L
MECHANICAL
38. Deduct for making RTU-1 and RTU-3 constant volume units as ongi
• (units were changed in addendum) DEDUCT: $ < 6X0.00>1 000.00>
Page #4
1 501 631 0286
JUL-08- 1999 16 : 42 NRBHOLZ CONSTRUCTION 1 501 631 0286 P . 01i01
A4w p, A
• 39. Replace RTU- 1 , 3 & 4 with three (3) thirty (30) ton units. This would allow one
or two units to be shut down to save energy. DEDUCT: $ <10,000.00>
40. Deduct for deleting color graphic control system using standard con
loss computer. DEDUCT: $
40a. Deduct to change Energy Management system to a standard control
system. DEDUCT: $ < 3,961 .0
41 . Change air device SD-2 "Flow bar" diffuser (added per addendum #2) back to
originally specified 44" x12" SD-2 as shown on sheet MI . 1 ,
DEDUCT: $ < 11752.00>
42, Change Air device SD-3 from airfoil blade construction to standard
construction. DEDUCT: k.< 832.00>
43. Omit rectangular R/A duct from RTU-1 . Fire damper and duct abov
kitchen to RTU-1 to remain. DEDUCT: $ < 2064.00>
44. Change spiral duct as shown on sheet Ml . I to rectangular duct with 1"
• duct liner. DEDUCT: $ < 1 .032.00> (�
44a. Delete hot water circulating pump and line requirement.
DEDUCT: $ < 800.00>
44b. Delete eight (8) Fin-Tube heaters in tower. DEDUCT: $ 4 281 .00>
DOORS & FRAMES
45. Change prefinished metal to 24 gauge steel P/F in lieu of .040" aluminum.
DEDUCT: $ < 1 ,137.00>
46. To supply 18 gauge insulated hollow metal doors at exterior locations in lieu of
16 gauge as specified. DEDUCT: $ < 620.00>
47. To supply plain sliced White Birch doors in lieu of quartered, book matched plain Aniegre.
n(4t1vAv1 5 - ay DEDUCT: $ < 2. 175.00> Id V
47a. To supply "rotary cut" Birch in lieu of quartered, book matched plain Aniegre.
ave DEDUCT: $ �4, /off Nb
ELEVATOR: '- P� P- tce
48. Passenger Elevator- use Dover standard suspended ceiling in lieu of down
light. DEDUCT: $ < 1 .036.00> N 0
• 49. Passenger Elevator - use Dover standard DLP cab design in lieu of DAP
removable. DEDUCT: $ < 1 .235.00> Nb
Page #5
TOTAL P . 01
JUL-08-1999 15 : 22 NRBHOLZ CONSTRUCTION 1 501 631 0286 P . 07i08
• 50. Passenger Elevator - use Dover backed enamel finish on entrances in lieu of
94 stainless steel. DEDUCT: $^< 1,292.00>
51 . Passenger Elevator - use Dover safety edge and light raydoor DEDUCT:protection 26i 00> �0
in lieu
of door detector.
52. Passenger Elevator - use Dover, one speed doors in lieu of center opening. 656.00> p NI
DEDUCT: $_
53 . Freight Elevators- eliminate the ventilating fan not normally provided on freight
DEDUCT: $_ < 152.00> N �
54, Freight Elevators- eliminate handrails or bumper rails not required. < 68.00>
DEDUCT: $
55. Freight Elevators - eliminate glass sight gauge on oil tank unit
DEDUCT: $ < 226.00> NN
56. Freight Elevators - eliminate audible signal per ANSI not required on freight.
DEDUCT: $..:<..68.00> {O
• 57. Freight Elevators - eliminate arrival lanterns not normally for freights.
DEDUCT: $^< 413 .00>
ALLOWANCES
58. Reduce testing allowance from $30,000 to $ 15,000 DEDUCT: $W00000
59. Delete landscaping allowance. DEDUCT: $60. Delete interior signage allowance. DEDUCT: $
GENERAL CONDITIONS
61 . Change construction duration from 14 months to 18 months.
DEDUCT: $ <30 000.00>
62. Allow GC control and access of Rock Street and southeast City lease ✓
gravel parking lot for duration of project. DEDUCT: $ 42 000.0
63. Delete the portion of storage room 201 in level 2A under the transformer enclosure.
Move retaining walls to south and east, delete block walls, slab on deck and north &
• west beams. This allows transformer to be installed on garde. gym.
DEDUCT: $ < 3,0092,000>
Page 46
JUL-08-1999 15 : 22 NRBHOLZ CONSTRUCTION 1 501 631 0286 P . 08i08
• 64. At wall section 4/A3. 1 on inside of vestibule 402 and lobby 403 side of vestibule 402
and section 5/A4.7 on lobby 403 side of entrance tower 401 , delete the 8x8 glazed
tile and precast coping and provide gypsum board on studs painted. And section
5/A4.7 on inside only of entrance tower 401 , delete 8x8 glazed tile above arched A `
brick and provide gyp board painted. DEDUCT: $ < 7.426.00> / �+�+
65. Delete all cost stone planters. DEDUCT: $ < 7. 100.00> N b
66. Delete reinforcing allowance of 5 tons to be used at Engineer' s discre ' n
DEDUCT: $ < 2,316.00>
•
•
Page #7
TOTAL P . 08
City of Fayetteville - Trolley Operation
Regular Route
• 1998 Activity 1999 Activity
Average Average
Trip Days of Trips Per Trip Days of Trips Per
Month Count Operation Day Count Operation Day
Jan. 19600 23.50 68.09 1 ,457 22.00 66.23
Feb. 19609 22.00 73.14 1 ,529 22.00 69.50
March 1 ,630 24.00 67.92 1 ,899 25.00 75.96
April 1 ,728 24.00 72.00 19884 24.50 76.90
May 11804 22.50 80.18 13996 23.50 84.94
June 11857 24.00 77.38 0 0.00 0.00
July 1 ,930 23.00 83.91 0 0.00 0.00
Aug. 19844 23.50 78.47 0 0.00 0.00
Sept. 11678 23.00 72.96 0 0.00 0.00
Oct. 11973 24.50 80.53 0 0.00 0.00
Nov. 1 ,438 21 .00 68.48 0 0.00 0.00
Dec. 11644 23.00 71 .48 0 0.00 0.00
20.735 278.00 74.54 8.765 117.00 74.91
Average Trips Per Day
100
• eo
60
40
20
0
Jan. Feb. March April May June July Aug. Sept. Oct. Nov. Dec.
O 1996 ® 1999
Trip
Summary of Other Trolley Trips (May, 1999) Count
City of Fayetteville - City Council 20
City of Fayetteville - Planning Commission 22
Fayetteville Chamber of Commerce 16
St. Joseph's Catholic Church 35
Val-Pak - Merle Taylor 20
Older Adult Programs 35
Older Adult Programs 20
• TOTAL - OTHER TROLLEY TRIPS 168
\TROLLEY