HomeMy WebLinkAboutOrdinance 5175 ORDINANCE NO, 5175 AN ORDINANCE TO WAIVE COMPETITIVE BIDDING AND TO AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $43,315.00 PLUS A $5,000.00 PROJECT CONTINGENCY TO SWEETSER CONSTRUCTION, INC. TO REPLACE THE EXISTING DRAINAGE STRUCTURE UNDER CENTER STREET AND COMPLETELY REPAIR THE STREET AND APPURTENANCES WHEREAS, it was recently discovered that an old, stone arch supporting Center Street over a creek has partially fallen in endangering the street and traffic and requiring closure of the street; and WHEREAS, the need for very prompt replacement of this drainage structure and repair of the vital road connection precludes the opportunity for normal competitive bidding. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1 : That the City Council of the City of Fayetteville, Arkansas hereby determines and declares that an emergency situation has arisen because of the immediate need to repair and reopen Center Street such that normal competitive bidding is neither feasible nor practical. Therefore, the City Council hereby waives normal competitive bidding and approves the lowest qualified bid (submitted under an abbreviated bidding process) by Sweetser Construction, Inc. ;n the amount of $43 ,315 .00, plus a contingency of $5,000.00. °�.�R"/TR %� G.' a \T Y PASSED and APPROVED this 2nd day of September, 2008. ; FAYETTEVILLE ° APPROVED: ATTEST: y�•,9 5.;A xy. RKANSP.J�3 ,v�TON � %`���` '7 " � �� GTONdN By: By: iI (�i7Ac� /1'Wcxt� DAN COODY, Mayor SO RA E. SMITH, City Clerk/Treasurer Contractor Quote for Repair of Center Street Drainage Structure The City of Fayetteville has recently become aware of washout areas under Center Street that could potentially compromise the integrity of the road surface causing failure. The street has been closed and will remain closed until the drainage structure has been replaced and the roadway reconstructed. The Contractor's signature below indicates that he has made a field inspection of the existing failure with the City Engineer and has fiilly assessed the amount of labor, equipment, and materials required to provide a complete "tum key" repair for the lump sum dollar value submitted below. Contractor shall schedule his work to re-open the street as top priority within 2 weeks. All other work including the culvert tie-in not under the roadway shall be totally complete within 6 weeks from the first day of construction. The following is a brief list of work items anticipated to complete this project: • Remove and dispose (R&D) pavement, curb & gutter, sidewalk, sanitary manhole, drop inlet, natural stone culvert, concrete slab, tree, etc. Temporarily remove and then reinstall a private chain link fence and metal posts. • Excavate & install new 10'x10' precast box culvert over gravel bedding (remove shale rock, if necessary to fit box). Precast box shall be cut to provide opening for new drop inlet. • Cast-in-place concrete transitions with reinforcing steel (min. #5 bars @ 12" o.c. each way) to connect precast box to existing concrete culverts on each end (drill and epoxy rebar). • All fill material under roadway shall be compacted Class 7 base, and then 6" of 4000 psi concrete pavement with 2" of asphalt surfacing. Existing excavated dirt can be used as fill outside of roadway. • Install new concrete curb & gutter, concrete sidewalk, drop inlet, topsoil, seed and mulch • Work around, support or relocate existing utilities. Any City water or sewer conflicts will be resolved by City forces. • All work shall meet City of Fayetteville Standard Specifications. • Contractor shall be responsible for all standard construction safety, e.g. excavations as required by 29 CFR 1926 Subpart P, Occupational Safety and Health Standards. This list is by no means all inclusive. Contractor understands that this work is being accomplished under an emergency situation. Contractor shall provide all items needed to complete the work and return the roadway and surrounding site to its pre-existing condition. Lump Sum Price $ *.3 3 20 tm A ree A V I(I,es SWGQ{ $ CAP` ONS fhLJGt)C�� 77A. e . II / 1 IIla,>7 (T. -�u9� P'I . SGQ Printed Name Signature Title Phone Number Date ARKANSAS CONTRACTOR LICEN&nEETSER CONSTRUCTION, INC. 0=47040 590 W. POPLAR FAYETTEVILLE, AR 72703 r � . �. r , ' i ` b City of Fayetteville Staff Review Form � L n ASI y� City Council Agenda Items Qd CGt Crigk� dz and cjOuA p gloZb�pg Contracts, Leases or Agreements 9!2/2008 `/�( � tQn City Council Meeting Date (is " , Agenda Items Only Ron Petrie Engineering Operations Submitted By Division Department cw &1 Action Required: cP /s. Approval of a4eselatien awarding a lump sum contract with . , Inc. in the amount of $96@;668-68 for the replacement of the existing drainage structure under Center Street including the complete repair of the street and appurtenances, approving a ?moo project contingency in the amount of $6@-98, and approval of a bid waiver in order to accept contract price quotes. $ S, coo . 00 �f8� 3 /S. 00 t*!ElAr $ 576,010.00 Other Drainage Improvements Cost of this request Category / Project Budget Program Category ! Project Name 4470.9470.5817.00 $ 19,827.00 Bridge & Drainage Improvements Account Number Funds Used to Date Program / Project Category Name 02108 $ 556,183.00 Sales Tax Capital Improvement Fund Project Number Remaining Balance Fund Name Budgeted Item Budget Adjustment Attached Previous Ordinance or Resolution # Departmen Direc Dale c Original Contract Date: Original Contract Number: City Attorney Date Received in City C � � �PCM�AZ&Moa Clerk's Office Finance and Internal Service Director Date v Received in Mayors Office t Mayor Ay'r Date Comments: rl �. o uJo-d Revised April 16, 2007 City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 9/2/2008 City Council Meeting Date Agenda Items Only Ron Petrie Engineering Operations Submitted By Division Department O 'A rn W Action Required : Approval of aregaution awarding a lump sum contract with Sweetser Construction, Inc. in the amount of $43,315.00 for the replacement of the existing drainage structure under Center Street including the complete repair of the street and appurtenances, approving a project contingency in the amount of $5,000.00, and approval of a bid waiver in order to accept contract price quotes. $48,315.00 $ 576,010.00 Other Drainage Improvements Cost of this request Category / Project Budget Program Category / Project Name 4470.9470.5817.00 $ 19,827.00 _ Bridge & Drainage Improvements Account Number Funds Used to Date Program / Project Category Name 02108 $ 556,183.00 Sales Tax Capital Improvement Fund Project Number Remaining Balance Fund Name Budgeted Item Budget Adjustment Attached O Previous Ordinance or Resolution # Department Director Date Original Contract Date: Original Contract Number: City Attorney Dale -Receivedyn-Gity— Clerk's Office Finance and Internal Service Director Date Received in Mayor's Office Mayor Date Comments: Revised April 16, 2007 City Council Meeting of September 2, 2008 CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru : Gary Dumas, Director of Operations From: Ron Petrie, City Engineer Date: August 28th, 2008 Subject: Center Street Culvert Replacement RECOMMENDATION : Approval of a resolution awarding a lump sum contract with Sweetser Construction, Inc. in the amount of $ 43,315 .00 for a complete "turn-key" replacement of the existing drainage structure under Center Street including the complete repair of the street and appurtenances, approving a project contingency in the amount of $ 5,000.00, and approval of a bid waiver in order to accept the lowest price quote. BACKGROUND : The City of Fayetteville has recently become aware of a large washout area under Center Street that could potentially compromise the integrity of the road surface causing failure. The street has been closed and will remain closed until the drainage structure has been replaced and the roadway reconstructed. DISCUSSION : Since this work needs to be initiated immediately, Engineering is requesting that the City Council approve a bid waiver to accept quotes from 3 local contractors equipped to accomplishment this work in a timely manner. Contractor shall schedule his work to re-open the street as top priority within 2 weeks. All other work including the culvert tie-in not under the roadway shall be totally complete within 6 weeks from the first day of construction. BUDGETIMPACT: This project will be paid from funds available in Other Drainage Improvements, Bridge & Drainage Improvements within the Sales Tax Capital Improvement Fund . 1 II ORDINANCE NO, AN ORDINANCE TO WAIVE COMPETITIVE BIDDING AND TO AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $43,315 .00 PLUS A $5,000.00 PROJECT CONTINGENCY TO SWEETSER CONSTRUCTION, INC. TO REPLACE THE EXISTING DRAINAGE STRUCTURE UNDER CENTER STREET AND COMPLETELY REPAIR THE STREET AND APPURTENANCES WHEREAS, it was recently discovered that an old, stone arch supporting Center Street over a creek has partially fallen in endangering the street and traffic and requiring closure of the street; and WHEREAS, the need for very prompt replacement of this drainage structure and repair of the vital road connection precludes the opportunity for normal competitive bidding. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1 : That the City Council of the City of Fayetteville, Arkansas hereby determines and declares that an emergency situation has arisen because of the immediate need to repair and reopen Center Street such that normal competitive bidding is neither feasible nor practical. Therefore, the City Council hereby waives normal competitive bidding and approves the lowest qualified bid (submitted under an abbreviated bidding process) by Sweetser Construction, Inc. in the amount of $43 ,315 .00, plus a contingency of $5,000.00. PASSED and APPROVED this 2nd day of September, 2008. APPROVED : ATTEST: DAN COODY, Mayor SONDRA E. SMITH, City Clerk/Treasurer City Council Meeting of September 2, 2008 CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Gary Dumas, Director of Operation From: Ron Petrie, City Engineer Date: August 26th, 2008 Subject: Center Street Culvert Replacement RECOMMENDATION: Approval of a resolution awarding a lump sum contract with Inc. in the amount of $ for a complete "turn-key" replacement of the existing drainage structure under Center Street including the complete repair of the street and appurtenances, approving a 10% project contingency in the amount of $ and approval of a bid waiver in order to accept the lowest price quote. BACKGROUND : The City of Fayetteville has recently become aware of a large washout area under Center Street that could potentially compromise the integrity of the road surface causing failure. The street has been closed and will remain closed until the drainage structure has been replaced and the roadway reconstructed. DISCUSSION: Since this work needs to be initiated immediately, Engineering is requesting that the City Council approve a bid waiver to accept quotes from 3 local contractors equipped to accomplishment this work in a timely manner. Contractor shall schedule his work to re-open the street as top priority within 2 weeks. All other work including the culvert tie- in not under the roadway shall be totally complete within 6 weeks from the first day of construction. BUDGETIMPACT: This project will be paid from funds available in Other Drainage Improvements, Bridge & Drainage Improvements within the Sales Tax Capital Improvement Fund. 1 Contractor Quote for Repair of Center Street Drainage Structure The City of Fayetteville has recently become aware of washout areas under Center Street that could potentially compromise the integrity of the road surface causing failure. The street has been closed and will remain closed until the drainage structure has been replaced and the roadway reconstructed. The Contractors signature below indicates that he has made a field inspection of the existing failure with the City Engineer and has fully assessed the amount of labor, equipment, and materials required to provide a complete "turn key' repair for the lump sum dollar value submitted below. Contractor shall schedule his work to re-open the street as top priority within 2 weeks. All other work including the culvert tie-in not under the roadway shall be totally complete within 6 weeks from the first day of construction. The following is a brief list of work items anticipated to complete this project: • Remove and dispose (R&D) pavement, curb & gutter, sidewalk, sanitary manhole, drop inlet, natural stone culvert, concrete slab, tree; etc. Temporarily remove and then reinstall a private chain link fence and metal posts. • Excavate & install new 10' x10' precast box culvert over gravel bedding (remove shale rock, if necessary to fit box). Precast box shall be cut to provide opening for new drop inlet. • Cast-in-place concrete transitions with reinforcing steel (min. #5 bars @ 12" o.c. each way) to connect precast box to existing concrete culverts on each end (drill and epoxy rebar). • All fill material under roadway shall be compacted Class 7 base, and then 6" of 4000 psi concrete pavement with 2" of asphalt surfacing. Existing excavated dirt can be used as fill outside of roadway. • Install new concrete curb & gutter, concrete sidewalk, drop inlet, topsoil, seed and mulch • Work around, support or relocate existing utilities. Any City water or sewer conflicts will be resolved by City forces. • All work shall meet City of Fayetteville Standard Specifications. • Contractor shall be responsible for all standard construction safety, e.g. excavations as required by 29 CFR 1926 Subpart P, Occupational Safety and Health Standards. This list is by no means all inclusive. Contractor understands that this work is being accomplished under an emergency situation. Contractor shall provide all items needed to complete the work and return the roadway and surrounding site to its pre-existing condition. Lump Sum Price $ Printed Name Signature Title Phone Number Date r �jUN � GQ d 3' I ' NSG \ 1 O J FLOOR ELEVAT N CHANGE v r m v � in cv `N APPROX . LOCATION ------ *� I \ OF STRUCTURE \\ FAILURE r I m q ' NIGH ri v N m cv q• STRUCTURE FAILURE TANGLEW ❑ ❑ D CREEK AT CENTER STREET AUG . 8 , 2008 Ip j Q N_ S p J j m S p 10 d V ry O N m 6 m (1 O p O w w m n � O Q w < d o Jn N_ Z d 9 3 C D (n y m J p y d y m N ^ m \ ' C QI p C O w b W j D N W Q O m N m ry (D n . < w w w w w w w w w w w ¢ N 0 0 0 0 0 0 0 0 0 o y ¢ 0 0 0 0 0 0 0 0 0 o Q o O N J N O n D Q Q � J O¢ O p � m m o . ➢ c w n m 0 0 p o � 3 a 0 0 O N m p ¢ it m w y x m w m 3 m C O d ry �i 11 d_ K m m d C Q' . J d d^ N J m C N m w o o d m J N ¢ p O m D d W U V d Z Z O O IX X P O A E m m O y x N d U U O ➢ m O O O m O O tt N m O J � n � d m � Z N o m m � m 0 +M 9.4.08 Clarice Pearman - Ord. 5175 Page 1 From: Clarice Pearrnan To: Petrie, Ron Date: 9.4.08 4:37 PM Subject: Ord. 5175 Attachments: 5175 Sweetser Construction Inc.-Center Street.pdf CC: Audit; Vice, Peggy Ron: Attached is a copy of the above ordinance passed by City Council, September 2, 2008 waiving the competitive bidding requirements for Sweetser Construction to repair Center Street. Please let me know if there is anything else needed for this item. Have a good day. Thanks. Clarice P.S. I am forwarding your purchase requisition to Purchasing however it is not signed by you. They will probably call you to come to sign it before they process it. cbp