HomeMy WebLinkAboutOrdinance 4835 ORDINANCE NO.4835 AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVING A COST-SHARE WITH SLOAN PROPERTIES, INC. IN AN AMOUNT NOT TO EXCEED $21,503.40 FOR THE UPSIZING OF APPROXIMATELY 992' OF 8" WATER MAIN TO 12" WATER MAIN. WHEREAS, the City of Fayetteville's Water Master Plan calls for a portion of the 12" Water Main Grid to run along Persimmon Street through the subdivision Sloan Properties, Inc. is currently developing; and, WHEREAS, entering into a cost-share agreement with Sloan Properties, Inc. and utilizing their engineer and contractor to extend the 12" Water Main will avoid the added cost and unnecessary duplication of effort which would arise from the formal competitive bidding process. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1 . That the City Council of the City of Fayetteville, Arkansas hereby finds that such circumstances constitute an exceptional situation where competitive bidding is not feasible or practical, and waives the requirements of formal competitive bidding to approve a cost-share with Sloan Properties, Inc. in an amount not to exceed $21,503.40 for the upsizing of approximately 992' of 8" water main to 12" water main. ` .,%0j%jTR y'' .,, Gam , . . . . . , SG ,, �� Y Oc PASSED AND APPROVED this 21s' day of February, 2006. _� �.G E : FAYETTEVILLE : APPROVED: ATTEST: e�e n MIYA ,` By: By: 1�� . DAN COODY, Mayor SONDRA SMITH, City Clerk CONTRACTUAL AGREEMENT This Agreement made and entered into this 2&1 oY FZ 6YaaY�l , by and between the City of Fayetteville, Arkansas and Sloan Properties, Inc., Witnesseth: WHEREAS, Sloan Properties, Inc., is constructing a development along Persimmon Street east of the Legacy Point Subdivision; and WHEREAS, The developer will be extending an 8" main through the project site to provide water service an fire protection to the development; and WHEREAS, it will benefit the City of Fayetteville to upgrade this 8" water main extension to a 12" main. This upgrade will continue the creation of a 12" water main grid in this area in accordance with the water distribution master plan. NOW, THEREFORE, the City of Fayetteville and Sloan Properties, Inc. agree as follows: 1 . Upon the City Council and/or the Mayor approving the Water Main Cost-Share, the City of Fayetteville agrees to: A. Pay for 100% of the actual documented construction costs for the upsizing to a 12" water main along Persimmon Street. B. Pay a maximum-not-to-exceed cost of $21 ,503 .40 for the afore mentioned water main construction as was provided by Sloan Properties, Inc. and made a part of this agreement. C. Reconsider the costs if the future and actual construction prices exceed the maximum-not-to-exceed amount that was furnished by Sloan Properties, Inc. The contractual agreement shall be required to be reevaluated and re- approved by the Mayor and/or City Council as appropriate prior to proceeding with construction. D. Make all efforts to provide payment to Sloan Properties, Inc. within thirty (30) days after receipt of the invoice(s) but cannot guarantee the thirty day schedule. 2. Sloan Properties, Inc. agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable water main installation. B. Provide a copy of the invoice(s) from the Contractor and a completed lien waiver executed by the Contractor upon acceptance of the water main installation. 3 . It is further understood that the contract for construction is between Sloan Properties, Inc. and his Contractor and that the City has no contractual obligation with either the Contractor or the Engineer. The City's only obligation shall be to participate in a contractual agreement with a not-to-exceed amount of $21 ,503 .40 for the water main upgrade. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: CITY OF FAYETTEVILLE Sloan operties, Inc. By: By: DAN DY, Mayor City of Fayetteville, Arkansas Budget Adjustment Form Budget Year Department: Impact Fee Expense Date Requested Adjustment Number Division: 2005 2/2/2006 Program: Project or Item Added/Increased: Project or Item Deleted/Reduced: $21 ,503 is requested in the Water Impact Fee Cost $21 ,503 from the Use of Fund Balance Account. Sharing Project. Justification of this Increase: Justification of this Decrease: Funds will be used for a cost share project with Sloan There is sufficient fund balance remaining to comply with Properties, Inc. The project is the Legacy Point 4 City policy. Subdivision along Persimmon east of Double Springs Road. Increase Expense Budget (Decrease Revenue Budget) Account Name Account Number Amount Project Number Water line improvements 2300 9300 5808 00 21 ,503 04039 1 Decrease Expense Budget (Increase Revenue Budget) Account Name Account Number Amount Project Number Use of fund balance 2300 0930 4999 99 21 ,503 Approval Signatures Budget Office Use Only DORequested By Date Type: A B C E 2 �`' 6 Date of Approval ~ udget AAna er Date Initial Date 2 3 d b Posted to General Ledger ent D r t Date Initial Date Aw - 3- Q6 Posted to Project Accounting Vinand & Inter 1 ervices Dir, ctor Date Initial Date Entered in Category Log Mayor to Initial Date City of Fayetteville Staff Review Form 7035 City Council Agenda Items 5larn n r1fyS or J t� W" Contracts eo -r 5Adm 21 -Feb-06 City Council Meeting Date Matt Casey Engineering Operations Submitted By Division Department Action Required: Approval of a cost-share and bid waiver in the amount of $21 ,503.40 with Sloan Properties, Inc. for the upsizing of approximately 992' of 8" water main to 12". Water Impact Fee $21 ,503.40 $ Cost Sharing Cost of this request Category/Project Budget Program Category / Project Name 2300.9300.5808.00 $ Water and Sewer Improvements Funds Used to Date Program / Project Category Name 04039 $ 1 N rGGG ✓wG Project Number Remaining Balance Fund Name Budgeted Item Budget Adjustment Attached �x Previous Ordinance or Resolution # Departme Director Date Original Contract Date: Original Contract Number: ' ALZ7Z3c City Attorney Received in City Clerk's Office ENTER 2131049 Financ and Internal Service Director ate Received in Mayor's Office BfiBtED l2` G oG 3 0 Mayor A Date Comments: City Council Meeting of February 21 , 2006 CITY COUNCIL AGENDA MEMO To: . Mayor and City Council Thru : Gary Dumas, Director of Operations From : Ron Petrie, P. E., City Engineer Date: February 2, 2006 Subject: Proposed Cost Share in the amount of $21 ,503.40 with Sloan Properties, Inc. for the upsizing of approximately 992 feet of 8" water main to a 12" water main through the Legacy Point 4 subdivision. RECOMMENDATION Staff recommends that the City cost-share with Sloan Properties, Inc., the developer, to upsize approximately 992 feet of 8" water main to a 12" main. By participating in the construction of these improvements, the City will be continuing a 12" grid in the water line distribution system in this area. BACKGROUND The developer is constructing a residential development east of the existing Legacy Point subdivision. As a part of this development, the developer is required to construct a water main extension to provide water service and fire protection to the site. DISCUSSION The developer currently has a residential subdivision (Legacy Point 4) under construction east of the existing phases of the Legacy Point subdivision. An extension of Persimmon Street will be constructed though this phase of the development. An 8" water main is required along Persimmon Street as a part of the development to provide water service and fire protection. . Persimmon Street is identified on the Water Master plan as a corridor for a portion of a 12" grid between Highway 16 and Highway 62. It would benefit the City to cost-share with the developer for the construction of this portion of the planned grid. 1 City Council Meeting of February 21 , 2006 Construction costs have been provided to the City for these improvements by Sloan Properties, Inc. as follows: Developer's Share $ 269708.40 City's Share $ 21 ,503.40 Total $ 489211 .80 BUDGETIMPACT The funds for this water line distribution project will come from the Impact Fee Fund's use of fund balance. The water impact fee methodology "Buy-In Approach" is based partially on the cost of a water line distribution and transmission system of 12" lines and larger. A budget adjustment is attached with this request to fund the proposed project. The final costs to the City will be based upon actual costs as documented by Sloan Properties, Inc subject to review by the City and may, or may not exceed the submitted estimate. However, the City's share will not exceed the estimate without additional authorization. 2 ORDINANCE NO. AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVING A COST-SHARE WITH SLOAN PROPERTIES, INC. IN AN AMOUNT NOT TO EXCEED $21,503.40 FOR THE UPSIZING OF APPROXIMATELY 992' OF 8" WATER MAIN TO 12" WATER MAIN. WHEREAS, the City of Fayetteville's Water Master Plan calls for a portion of the 12" Sewer Main Grid to run along Persimmon Street through the subdivision Sloan Properties, Inc. is currently developing; and, WHEREAS, entering into a cost-share agreement with Sloan Properties, Inc. and utilizing their engineer and contractor to extend the 12" Water Main will avoid the added cost and unnecessary duplication of effort which would arise from the formal competitive bidding process. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1 . That the City Council of the City of Fayetteville, Arkansas hezebby finds that such circumstances constitute an exceptional situation where competit ibidd g is not feasible or practical, and waives the requirements of formal cor petrt'ive adding to approve a cost-share with Sloan Properties, Inc. in an amount-not+tole�c�ed $2- t 503.40 for the upsizing of approximately 992' of 8" water main to 1 " w ter m in. PASSED AND APPROVED this 21s' of February2006. P OVED: J00,B Y• DA40O DY, Mayor ATTESy. By: ; SMITH, City Clerk V JORGENSEN & ASSOCIATES CIVIL ENGINEERS SURVEYORS 124 WEST SUNBRIDGE, SUITE 5 • FAYETTEVILLE, ARKANSAS 72703 (479) 442-9127 • FAX (479) 5824807 DAVID L. JORGENSEN, P.E., P.L.S. January 31 , 2006 CHRISTOPHER B. BRACKETT, P.E. City of Fayetteville 113 W. Mountain Street Fayetteville, AR 72701 Attn: Ronald Petrie, P.E. Re: Legacy Pointe Phase IV — Waterline Cost Share Dear Ron; Enclosed please find the additional cost for the 12" waterline installation at the Legacy Pointe Phase IV Subdivision. I have included the cost for the 8" waterline and the cost for the 12" waterline. 8 " Waterline Installation: 992 LF of 8" Waterline @ $21 .45/LF $21 ,278.40 2 — 8" Crosses @ $525.00 each $ 1 ,050.00 4 — 8" Gate values @ $995.00 each $37980.00 1 — 8" Tee @ $400.00 each $400.00 Total $26,708.40 12 " Waterline Installation: 992 LF of 12" Waterline @ $32.90/LF $32,636.80 2 — 12" Crosses @ $850.00 each $ 1 ,700.00 4 — 12" Butterfly values @ $2800.00 each $ 119200.00 1 — 811x 12" Tee @ $550.00 each $550.00 5 - 8"x12" Reducers @ $425 .00 each $2, 125.00 Total $48,211 .80 Additional Cost . 217503. 40 Please call concerning any questions, comments or concerns you may have. Thank you. Sincerely; Christopher B. Brackett, P.E. • STRUCTURAL DESIGN • LAND DEVELOPMENT • WATER SYSTEMS • WASTEWATER SYSTEMS • LAND SURVEYING - - - YW S"Mn 5 4 iq • TWO I a I I eryE I I , I I L F - -1 r - - — — — — - - - - - �� - - - - - - - — o� I - I I �� I I �° •� s H � � � S w N��� I I I I 74R I ; - - I L- - - - — , � — Rik - - - rvn wwa awn .y I I ?' € ' v 1 I 1 � RAl � - - -IL — — - - - - - - - - - o a > I I w N WIN t 1 Ywn I R -- •ro.. _ — --- _ I I %[Jim 1 I � so G N r ITF II O N N v � � I I II I m„�A L•.Tf JORGENSEN & ASSOCIATES CIVIL ENGINEERS • SURVEYORS 124 WEST SUNBR[DGE, SUITE 5 • FAYMEVILLE, ARKANSAS 72703 • (479) 442-9127 • FAX (479) 582-4807 SCALE. N. T. S. I DATE REVISED CHECKED BY.- DRAWN BY: BJR DATE: OIFEB06 CBB J:ISLVD120040661LEGACYPH4PLQNS 12 " WATERLINE INSTALLATION LEGACY POINTE PHASE IV 0 D ' < x m n n ^ 0 d M ' m N b S o d O o � _ n K Z � d 3 c D too m � A m r o m () 0 C O O m 0 0 0 0 0 0 0 0 0 0 o n ar 0 0 0 0 0 0 0 0 0 0 !+ () m 0 O N m w 0 0 n a . O ' O O m O 0 N t0 C m W O j Z 3 a' 3 a gr 0 0 m o c y � n c ❑ m 3 � o• m m n N Z O Z O O O a O W W O D m fn O O # d m n � d X n N Z m o N # O O W Clarice Pearman - Sloan cost share Page 1 From: Clarice Pearman To: Casey, Matt Date: 3/1/06 5:58PM Subject: Sloan cost share Matt, Attached is a copy of the resolution passed by City Council, February 21 , 2006 regarding a cost share with Sloan Properties. I have forwarded to budget the original budget adjustment via interoffice mail and I will forward to the auditor the original of the purchase requisition. Thanks. Clarice CC: Bell, Peggy; Deaton, Vicki