Loading...
HomeMy WebLinkAboutOrdinance 4716 ORDINANCE NO.4716 AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVING PAYMENT TO KING ELECTRICAL CONTRACTORS, INC. OF $ 100,000.00 TO PROVIDE ELECTRICAL UTILITY RELOCATION SERVICES REQUIRED TO ALLOW THE CONTINUED DEMOLITION OF THE MOUNTAIN INN; AND APPROVING THE USE OF UP TO $33,763 .00 OF THE PREVIOUSLY APPROVED PROJECT CONTINGENCY. WHEREAS, City staff recently became aware of the need to relocate certain electrical utilities to allow the Mountain Inn demolition to proceed on schedule; and, WHEREAS, the extremely tight schedule of the Mountain Inn demolition does not allow sufficient time to select an electrical contractor through the formal competitive bidding process; and, WHEREAS, King Electrical Contractors, Inc. has an ongoing contractual relationship with the City of Fayetteville to provide electrical contractor services, and is capable of competently performing electrical utility relocation services. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1 . That the City Council of the City of Fayetteville, Arkansas hereby finds that such circumstances constitute an exceptional situation where competitive bidding is not feasible or practical; waives the requirements of formal competitive bidding, and approves payment to King Electrical Contractors, Inc. of $ 100,000.00 to provide electrical utility relocation services required to allow the continued demolition of The Mountain Inn. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves the use of up to $33,763 .00 of the previously-approved Project Contingency for electrical utility relocation. PASSED and APPROVED this 21 '` day of June, 2005. APPROVE By: DAN COO Y, Mayor ATTEST: By: &16& SO DRA SMITH, City ClerkrUs •rvvY 0 •.�'� c ; FAYETTEVILLE * so as so see °'J1;���ON��� City of Fayetteville Staff Review Form Y7 / 6 City Council Agenda Items or q Contracts /'.S 21 -Jun-05 City Council Meeting Date Coy Hurd Building Services Finance & internal Services Submitted By Division Department Action Required: Approve an ordinance waiving competitive bidding for electrical relocation services required to allow the demolition of the Mountain Inn and related buildings and authorizing King Electrical Contractors, Inc to provide these electrical utility relocation services in an amount not-to-exceed $100,000.00 which utilizes the remaining uncommitted funds o $66,237 and up-to $33,763 of the previously contingency. _Ijighway 71 East S uare $66,237.00 $ 8873000.00 Redevelopment District #1 Cost of this request Category/Project Budget Program Category / Project Name 4490-9490-5805-00 $ 820,763.00 Account Number Funds Used to Date Program / Project Category Name 05038-2 $ 66,237.00 TIF Capital Improvements Project Number Remaining Balance Fund Name Budgeted Item Budget Adjustment Attached Previous Ordinance or Resolution # Department Director Date Original Contract Date: e�D� / Original Contract Number: � � Qr City Attorney Received in City Clerk's Office Finance and Internal Service Director Date Received in Mayor's Office Mayor Date Comments: FAYETTEVILE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE June 21 , 2005 City Council Meeting TO: Mayor Dan Coody and Fayetteville City Council THROUGH: Stephen Davis, Financial and Internal Services Directo/lam \ FROM: Coy Hurd, Project Manager �J DATE: June 8, 2005 SUBJECT: A resolution to designate $66,237 toward utility placement work associated with the construction of the new hotel to occupy the existing Mountain Inn site (in addition to $33,763 of the previously approved contingency fund; total not to exceed $ 100,000), and a waiver of the competitive bidding for these electrical services. Recommendation: City Staff recommends that the City Council designate $66,237 of the funds generated by the Tax Incentive Finance bonds to be used to pay for the work accomplishing the permanent utility placement (electrical work) necessary for the long-term power needs of the proposed new hotel complex to be constructed on the site. Background: The City Council has designated $887,000 of the funds generated by the T.I.F. Bonds to be used toward demolition, resolution of access issues, and utility relocation. The Patton Company's contract for the demolition of the buildings and the hazardous materials abatement is $688, 138. Environmental Enterprise Group' s contract for oversight of demolition and abatement efforts is $30,855. The contingency fund for the demolition/abatement effort has been authorized as $ 101 ,770. The amount remaining from the designated $877,000 is $66,237. Discussion : The City has agreed (by way of contract with John Nock et. al.) to utilize $887,000 toward preparation of the Mountain Inn site in anticipation of construction efforts at that location. Once the City has expended these funds, Mr. Nock has agreed to accept the site in such condition as it is then in. June 9 memo, page two Electrical work during this first phase is being done by King Electric (and their subcontractors) through their existing contract with the city. If approved, this $66,237 will be used toward work needed to supply the building site with permanent electrical power. Examples of these efforts are trenching and laying electrical conduit, purchase and installation of the electrical meter bases that will serve the future facilities, and placement of the electrical vault on the site. The utility relocation work identified thus far includes: I ) relocating the electrical transformer in the alleyway, currently attached to the Mountain Inn Building. The demolition contractor has had to resequence the removal of the buildings to accommodate the Developers commitment to keep the Hoftbrau, Taste of Thai, and Petra Cafe open. The cost of the electrical relocation could total near $ 100,000. 2) relocating the existing natural gas service. The Arkansas Western Gas Company is doing most of this work at their own costs, but may petition for reimbursement for some of the costs. 3) relocating the water and sewer lines to serve the buildings that remain and the new buildings to be built. The cost of this work will probably be between $70,000 and $ 100,000. The drawings and specifications for this work are yet to be developed. Until this is accomplished, the forecast of the total cost can not be more precise. 4) The final item that the Developers have identified as potential use of T.I.F. bond proceeds (to this point) is the removal of an underground fuel storage tank. This tank is located in the alleyway outside of the demolition project boundary. The proposed cost for the removal of this tank is $ 13,800. Because the City has only $66,237 remaining from the T.I.F. proceeds, Staff recommends programming all of these funds to electrical relocations and notifying that that any further utility work will be paid for by the Developer. King Electric Company has an existing contract with the City that allows $20,000 per project. Staff is asking that an exception be made to allow that company to do this electrical work. Due to the extreme schedule for this work and the undefined nature of some of the tasks which must be completed, it is imperative that King Electric Company be given dispensation on the $20,000 ceiling on this particular project. Memo, page three Budgetary Impact: These funds are currently budgeted towards the project and reside in Account Number 4490 9490 5315.00. ORDINANCE NO, AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVING PAYMENT TO KING ELECTRICAL CONTRACTORS, INC. OF $66,237.00 TO PROVIDE ELECTRICAL UTILITY RELOCATION SERVICES REQUIRED TO ALLOW THE CONTINUED DEMOLITION OF THE MOUNTAIN INN; AND APPROVING THE USE OF UP TO $33 ,763 .00 OF THE PREVIOUSLY APPROVED PROJECT CONTINGENCY. WHEREAS, City staff recently became aware of the need to relocate certain electrical utilities to allow the Mountain Inn demolition to proceed on schedule; and, WHEREAS, the extremely tight schedule of the Mountain Inn demolition does not allow sufficient time to select an electrical contractor through the formal competitive bidding process; and, WHEREAS, King Electrical Contractors, Inc. has an ongoing contractual relationship with the City of Fayetteville to provide electrical contractor serves, and is capable of competently performing electrical utility relocation services. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1 . That the City Council of the City of Fayetteville, Arkansas hereby finds that such circumstances constitute an exceptional situation where competitive bidding is nor-=fsible or practical; waives the requirements of formal competitive bidding, and approyesp e to King Electrical Contractors, Inc. of $66,237.00 to provide electrical utility rel,o a s r ces required to allow the continued demolition of The Mountain Inn. � ' t Section 2. That the City Council of the City of Fayettev7 le, F ansas hire ' y approves the use of up to $33 ,763 .00 of the previously-app ved Probe t. ontin ency for ; ectrical utility :r relocation. PASSED and AP, O this 2151 d'y a'fJ . e, 2005: PROV By. DAN COODY, Mayor ATT ST- B y . SMITH, City Clerk RESOLUTION NO. 88-00 A RESOLUTION AWARDING BID NO. 00-48 TO CHRIS KING IN AN AMOUNT SET FORTH IN THE BID TABULATION AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT FOR ELECTRICAL, COMMUNICATIONS AND RELATED SERVICES FOR THE YEAR 2000, WITH FIVE ONE YEAR RENEWAL OPTIONS . BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1 . That the City Council hereby awards Bid No. 00-48 to Chris King in an amount set forth in the bid tabulation and authorizing the Mayor and City Clerk to execute an agreement for electrical, communications and related services for the year 2000, with five one year renewal options. A copy of the bid tabulation and agreement is attached hereto marked Exhibit "A" and "B" and made a part hereof. PASSED AND APPROVED this 5th day of July , 2000. APPROVED- By: gv�n� Fred Hanna, Mayor ATTEST: By: Az 4 Heather Woodruff, CityCler1, STAFF REVIEW FORM XX AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council meeting of July 3 , 2000 FROM : Harold J . Dahlinger Building Maintenance Administrative Services Name Division Department - ACTION REQUIRED : Award of Bid # 00 - 48 for electrical services to Chris King Electric for the remainder of the year 2000 with five one year renewal options . COST TO CITY : $Various See Attached Various Cost of this Request Category/Project Budget Category/Project Name Various See Attached Various Account Number Funds Used To Date Program Name See Attached See Attached Various Project Number Remaining Balance Fund BUDGETREVIEW : X Budgeted Item Budget Adjustment Attached udget aag Administrative Services Director CONTRACT/GRANT/LEASE REVIEW : GRANTING AGENCY : ACcou n M er, Dat{e Internal Auditor Date City Attorne Date ADA Coordinator Date R \IA� (G - 19-00 Purchasing Officer Date STAFF RECOMMENDATION : Award of Bid #00 - 48 to Chris King Electric and award of a Contract . Divisio B 611 D� ' Cross Reference New Item : Yes No D rtm� irec r tDte Prev Ord/Res # ' Ad ' n ' trate Sery ces Director Orig Contract Date : May r Page E SUED RMEA ROW( Description Bid #00 -48 Flarltrical Contract Keetinq Oate 743,LQj1 Ccnents: Reference Canents: Budaet Coordinator OAccountiag Kanager , -- Q 3er � Piot City Attorney Purchasing Officer ADA Ccordinator Interna[ Auditor FAYETTEVIELE • THE MY OF FAYMEAUE, ARKANSAS DEPARTMENTAL CORRESPONDENCE TO: The Fayetteville City Council THRU: Fred Hanna, Mayor John Maguire, Administrative Services Director FROM: Harold Dahlinger, Facilities Superintendent 96 DATE: June 12, 2000 RE: BID AWARD RECOMMENDATION Attached is the Agenda Request for the award of Bid #00-48 to the lowest bidder meeting requirements for electrical work and related service needs of the City of Fayetteville for the calendar year 2000 (with option for five (one year) tens renewal). I recommend acceptance of the rates provided by Chris King Electric for Bid #0048. Previous experience with this vendor on other City projects has shown that quality and workmanship is at a level which allows us to be very comfortable in recommending this bidder for the various projects which are budgeted for calendar year 2000. Chris King Electric has provided services to the City of Fayetteville for the past four years under a similar contract. We have found his services to be outstanding and very cost effective to the City and its projects. Utilization of an annual acceptance of a bidder in this particular area should eliminate time delays in the bidding process on individual projects along with the ability to negotiate details of specific projects to assist in keeping better control of job pricing. The budgeted amounts for these services will be taken from the applicable programs as specific projects are identified. AGREEMENT FOR ELECTRICAL , COMMUNICATIONS AND RELATED SERVICES This , AGREEMENT executed this 4_ day of , 2000 , between the City of Fayetteville , Arkansashetdinafter called the " City " and Kine Electrical Contractors hereinafter called the " Contractor " , and having an address at 2145 Moore Fayetteville , AR 72704 IN CONSIDERATION OF THE FOLLOWING COVENANTS contained herein the parties agree as follows : 1 . The Contractor shall at the written request of the City provide material , labor and equipment for electrical , communications and related service ( s ) for the following : a . New construction as requested for jobs not bid separately ; b . Repair as requested for jobs not bid separately ; C . Additional work as required and as directed by owner . 2 . The first term of this agreement shall be from award of contract through December 31 , 2000 . The City has the option to renew this contract for five consecutive one year terms . Annual increases will be allowed based on the Consumer Price Index for All Urban Consumers ( Index ) as published by the U . S . Department of Labor , Bureau of Labor Statistics , published as of October 31 , using 1982 - 84 as the base year . The initial index to be used is October , 1999 . 3 . City shall pay Contractor for services rendered as set out in Contractor ' s Bid . Charges will be invoiced to City at the end of each Contractor ' s monthly accounting periods based upon the fee schedule outlined in Contractor ' s Bid and the expense charges to the project during the preceding accounting period . All invoices are due upon receipt and shall be paid by the City unless disputed within thirty ( 30 ) days of their receipt . 4 . The contract documents which comprise the contract between City and the Contractor consist of this contract and the following documents : a . Bid form identified as Invitation to Bid 00 - 48 with the specifications , conditions , and requirements typed thereon ; b . The Contractor ' s proposal and all supporting documents and correspondence submitted by the Contractor in response to Bid 00 - 48 . 5 . These contract documents constitute the entire agreement between the City and the Contractor and may be modified only by a duly executed written instrument signed by the City and the Contractor . 6 . Contractor shall not assign his duties under the terms of this contract . 7 . Contractor agrees to hold the City harmless and indemnify the City against any and all claims for property damage , personal injury or death , arising from Contractor ' s performance of this contract . 8 . The Contractor shall furnish a certificate of insurance addressed to the City , showing that he carries the following insurance which shall be maintained throughout the term of the contract . Workers Compensation Statutory Amount Comprehensive General and Automobile Insurance Bodily Injury Liability $ 500 , 000 for each person injured . $ 1 , 000 , 000 for each accident . Property Damage Liability $ 250 , 000 for each accident . $ 500 , 000 aggregate The insurance shall include explosion , collapse and underground coverage . The premiums for all insurance and the bond required herein shall be paid by the Contractor . 9 . Contractor agrees to begin work within ten ( 10 ) days after issuance by the City of a " work order " or " Notice to Proceed " and to complete the work within the time agreed to by the parties . 10 . All work called for herein shall be coordinated directly with the project manager for each project as designated by the City . 11 . City shall have the right to terminate this Agreement for City ' s convenience upon written notice of Contractor , and I Contractor shall terminate performance of services on a schedule acceptable to City. In the event of termination for City's convenience City shall pay Contractor for all services performed to date of termination. 12. Nothing in this agreement shall be construed to give any rights or benefits to anyone other than Contractor and City. (Left Blank Intentionally) 0 IN WITNESS WHEREOF, City and Contractor have executed this agreement, the effective date of which shall be .% CITY OF F YETTEVILLE By: Freff Hanna, Mayor P '00� dR.O.M.d"M ...lrjjT= I ATTEST - By: _: � 9� Contractor-Coipai Secretary �.: _` VO/VL/LULU 1V. UJ aV1J•VV61L ' 1 Ill V -Y 1 V 1 VI\M aV�I .V� INVITATION TO BID 0 U ' _. - T-- I "License Require ELECTRICAL SERVICES ` 1 Labor rate for the following: *Master Electrician per hour hour $25�00hr. 'Journeyman Electrician per hour I tour $ 2 00 hr. ('Apprentice Electrician per hour hour $ .Or7 hr. Laborer per hour hour $ 100 hr. 2 Percent additional rate for overtime % 3 Percent Additional rate for Sundays & Holidays q Material Cost Plus Markup Pecent % 5 I Guaranteed Emergency 9 hr. Response Time 6 Guaranteed Regular r�7 hr. Response Time _ Response 7 Dump Truck with Operator $--y So0 hr. 6 Bobcat backhoe with Operator $—ES00 hr. 9 Backhoe with Operator $__6L S00 hr. 10 Bucket Truck with Operator $ gSon N. 11 I Personnel Lift $ 610 o hr. 12 Platform Lift $ 1817 hr. 13 Rental Equipment Cost Plus Markup 1 3 0/0 These services will be ordered as needed throughout the contract period. There is no guaranteed minimum or maximum amount. CONTRACTOR'S LICENSE NUMBER:i 063 70yO RESTRICTIONS OR EXCEPTIONS TO THE BID MUST BE NOTED: Upon signing th!s Bid, the bidder certifies that they have read and agree to the requirements set forth in this bid proposal, Including specifications, terms and standard conditions, and pertinent Information regarding the articles being bid on, and agree to VIYJIVIVC IV IV V\ 1 Il�I�y 1..------ - BIDS in /C4h' G q43 -O006 I WILL BE BUSINESS ADDRESS: Cp AND TATS: REJECTED 2/45 GJ ry?"fe � gk72?VY'! e ��,//>e AUT�IO�t�.ED $1 ATU E; TI : -7-0-?0t/ =_� 00 11 KING ELECTRICAL CONTRACTORS 2145 W MOORE LANE PAYETTEVILLE ARKANSAS King Electric has 29 full time employees that specialize in commercial and industrial wiring. We also have employees specifically trained in the Hubbell Premise Wiring for data and telecommunicatio#s. They also are trained in leviton fiber optic terminating. We have personal lifts, platform lifts, mechanical benders for conduit up to 4", pipe threaders, meggars, wire tracers, ladders, and other ,equipment owned to do any size of electrical job. Our personal has been trained to use all of the above equipment in a sa`e and workmanlike manner. We are in the process of all emp oyees attending the 10 hour OSHA safety training class. W� just received an award from our insurance company for 3 ye4rs of no work loss personal injury. All lead men carry digital pager;$ and mobile telephones. All trucks are equipped to do most service calls. Chris King y 1 z1716 FAYETTEVIPLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE June 21, 2005 City Council Meeting TO: Mayor Dan Coody and Fayetteville City Council THROUGH: Stephen Davis, Financial and Internal Services Directo777777���►►► FROM: Coy Hurd, Project Manager /i'i/►►►���''""'''"""'''"""""" V"Y DATE: June 8, 2005 SUBJECT: A resolution to designate $66,237 toward utility placement work associated with the construction of the new hotel to occupy the existing Mountain Inn site (in addition to $33,763 of the previously approved contingency fund; total not to exceed $100,000), and a waiver of the competitive bidding for these electrical services. Recommendation: City Staff recommends that the City Council designate $66,237 of the funds generated by the Tax Incentive Finance bonds to be used to pay for the work accomplishing the permanent utility placement (electrical work) necessary for the long-term power needs of the proposed new hotel complex to be constructed on the site. Background: The City Council has designated $887,000 of the funds generated by the T.I.F. Bonds to be used toward demolition, resolution of access issues, and utility relocation. The Patton Company's contract for the demolition of the buildings and the hazardous materials abatement is $688,138. Environmental Enterprise Group's contract for oversight of demolition and abatement efforts is $30,855. The contingency fund for the demolition/abatement effort has been authorized as $101,770. The amount remaining from the designated $887,000 is $66,237. Discussion: The City has agreed (by way of contract with John Nock et. al.) to utilize $887,000 toward preparation of the Mountain Inn site in anticipation of construction efforts at that location. Once the City has expended these funds, Mr. Nock has agreed to accept the site in such condition as it is then in. June 9 memo, page two Electrical work during this first phase is being done by King Electric (and their subcontractors) through their existing contract with the city. If approved, this $66,237 will be used toward work needed to supply the building site with permanent electrical power. Examples of these efforts are trenching and laying electrical conduit, purchase and installation of the electrical meter bases that will serve the future facilities, and placement of the electrical vault on the site. The utility relocation work identified thus far includes: 1) relocating the electrical transformer in the alleyway, currently attached to the Mountain Inn Building. The demolition contractor has had to resequence the removal of the buildings to accommodate the Developers commitment to keep the Hoffbrau, Taste of Thai, and Petra Cafe open. The cost of the electrical relocation could total near $100,000. 2) relocating the existing natural gas service. The Arkansas Western Gas Company is doing most of this work at their own costs, but may petition for reimbursement for some of the costs. 3) relocating the water and sewer lines to serve the buildings that remain and the new buildings to be built. The cost of this work will probably be between $70,000 and $100,000. The drawings and specifications for this work are yet to be developed. Until this is accomplished, the forecast of the total cost can not be more precise. 4) The final item that the Developers have identified as potential use of T.I.F. bond proceeds (to this point) is the removal of an underground fuel storage tank. This tank is located in the alleyway outside of the demolition project boundary. The proposed cost for the removal of this tank is $13,800. Because the City has only $66,237 remaining from the T.I.F. proceeds, Staff recommends programming all of these funds to electrical relocations and notifying that that any further utility work will be paid for by the Developer. King Electric Company has an existing contract with the City that allows $20,000 per project. Staff is asking that an exception be made to allow that company to do this electrical work. Due to the extreme schedule for this work and the undefined nature of some of the tasks which must be completed, it is imperative that King Electric Company be given dispensation on the $20,000 ceiling on this particular project. Memo, page three Budgetary Impact: These funds are currently budgeted towards the project and reside in Account Number 4490 9490 5315.00. .... <........ ._.__....._;--- _. CONTRACT On this 151 day of March, 2005, the City of Fayetteville and Developers, Richard Alexander and John Nock agree as follows: WHEREAS, the City of Fayetteville desires to remove the blighted area of the Mountain Inn and surrounding vacant structures (the County Courts Building, the Red Bird Cafe and the old Niblock Law Office); and WHEREAS, the City of Fayetteville will be greatly benefited if, after the removal of this blight, a valuable new structure will be constructed on this cleared site bringing jobs, Sales taxes, and Hotel, Motel and Restaurant taxes, and stimulating increased economical activity and vitality and increased property valuation throughout downtown Fayetteville; and WHEREAS, Developers Richard Alexander and John Nock have proposed to purchase the cleared blighted area for $300,000.00 and build about a 22.5 Million Dollar Hotel, Condominium, Parking Deck, and Convention facility on this site. NOW, above premises considered, the City of Fayetteville and the Developers, Richard Alexander and John Nock agree as follows: 1. The City of Fayetteville agrees to issue tax increment financing bonds pursuant to its ordinances establishing the Highway 71 East Square Redevelopment District Number 1 of Fayetteville as amended to include . most of the Downtown Master Plan area, the Amended Project Plan for this enlarged District, the Bond Ordinance, Bond Purchase Ordinance (if i necessary), Amendment 78, and SubChapter 3 of Chapter 168 of Title 14, Community Redevelopment Generally. These TIF bonds shall be issued to obtain net usable proceeds of $3.5 million to the City of Fayetteville to effectuate the Amended Project Plan as approved by ordinance by the City Council on March 15, 2005. 2. The City of Fayetteville agrees to use the net available $3.5 million proceeds from the TIF bonds to purchase: (a) the blighted Mountain inn property for $1.2 million; (b) the County Courts Building for $413,000.00; (c) the vacant Niblock Law Office for $500,000.00; (d) the vacant Red Bird Cafe for $500,000.00. Total for land acquisition $2,613,000.00 If bond proceeds in net usable amount of $3.5 million are available by April 19, 2005, the closing for all four properties shall be April 20, 2005. 3. The City of Fayetteville agrees' ` • to semthe remainder of the $3.5 w 41 .1w.:_.. 5 yEY million not expended for land acquisition for demolition and site preparation to include: (a) demolition (including asbestos removal) of the newer part of the Mountain Inn, the Courts Building, the Niblock Law Office and the Red Bird Cafe; (b) resolution of access issues and utility relocation; qT , vr..59e, ,.we;w-.Y ^.'����"�y�'�"'���4�r, �(c) , aW` dr06 erupgradesa(onsite) tw- If the demolition and site preparation costs exceed $887,000.00 (the remaining bond proceeds after land acquisition costs) the City's responsibilities end after its full expenditure of $3.5 million on this project. If demolition and site preparation can be accomplished for less than $887,000.00, any remaining money shall be used to pay TIF bond indebtedness. 4. Developers Richard Alexander and John Nock agree to purchase the four parcels purchased and demolished by the City of Fayetteville for a �`i I � _ jTl) ASS Poi - a� C'�r,�.+Jr�--vvp°ky` , ' „ k, total of $300,000.0.0,..��'heaDe`,�elovers„a�ree fo�tiurchase tliese,par"eels<aat $887000'b,,,0 for Demolition and Site Preparation even if all such cannot be accomplished for an $887,000.00 expenditure. If all of the estimated $887,000.00 costs for demolition and site preparation is not needed to accomplish the demolition, resolution of access 7 ty .� upgrade an utili issues on site water and sewer u ade if needed, and asbestos and other necessary environmental remediation, Developers Richard Alexander and John Nock agree that any remaining money shall be used for repayment of TIF indebtedness. 5. Developers Richard Alexander and John Nock agree to construct or cause the construction of the Planned Development Project approximately as described on page 7 of the Amended Project Plan: (a) approximately 144 room, full service hotel; (b) approximately 18 condominiums; (c) approximately 12,000 square foot conference/meeting space; (d) approximately 300 space multistory parking garage; (e) restaurants, small shops, day spa; (f) rooftop botanical garden. 6. If economic conditions change or require an alternative development, Developers Richard Alexander and John Nock can satisfy this requirement by constructing or causing the construction of an approximately Equivalent Project subject to approval by the City Council, whose approval shall not be unreasonably withheld. 7. Developers Richard Alexander and John Nock agree that architectural or engineering contracts for the construction of this Planned Development Project or the Equivalent Project shall be entered into in 2005. 8. Developers Richard Alexander and John Nock agree that the construction contract for this Planned Development Project or the Equivalent Project shall be entered into no later than June 1, 2006. 9. Developers Richard Alexander and John Nock agree that the Planned Development Project or the Equivalent Project shall be finished and open for business and/or occupation no later than September 1, 2007, 10. Force-majeure. All requirements for completion dates are subject to force- majeure and may also be extended by the Fayetteville City Council for good cause as requested and shown by the Developers. 11. Non -assignable, This Contract may not be assigned to another party without the previous written consent by the City of Fayetteville after an authorizing City Council Resolution. 12. Jurisdiction and venue. Arkansas law shall control the interpretation of this Contract and jurisdiction and venue shall be the Washington County Circuit Court, Fayetteville, Arkansas, 13. Waiver. The waiver of one of the terms or completion dates in this contract shall only apply, to that term or completion date and such waiver may be limited or conditional. 14. Freedom of Information Act. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, Developers Richard Alexander and John Nock will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19- 101 et. seq.) Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. 15. Liquidated Damages. The City of Fayetteville is incurring substantial TIF debt in order to accomplish its Project Plan so that the Planned Development Project can be constructed promptly enough to ensure the federal tax credits obtained by the Developers can be utilized. Without this need to obtain immediate clear title and ownership of all four parcels, the City of Fayetteville. would likely seek to condemn such blighted structures at a potentially lower cost. Therefore, if Developers Richard Alexander and John Nock fail to meet any of the requirements of the project dates for engineering, architect or construction contracts, the City of Fayetteville may opt to receive the conveyance of the four parcels of property back from the Developers for the payment by the City of Fayetteville to the Developers of $10,000.00. 12 If the construction of the Planned Development Project or the Equivalent Project is not completed and open for business or occupation by September 1, 2007, the City of Fayetteville shall receive $25,042.00 per month ($834.73 per day) until the Planned Development Project or Equivalent Project is completed and open for business or occupation (but not to exceed twelve months for a total of $300,504.00 in liquidated damages). This amount represents the estimated loss of monthly sales tax and HMR tax to the City of Fayetteville that the Planned Development Project should generate according to the Developers' estimates provided to the Fayetteville City Council in February, 2005. In agreement to all terms, conditions and promises made above, the City of Fayetteville by Mayor Dan Coody and the Developers Richard Alexander and John Nock have signed below. CITY OF FAYETTEVILLE By: MAW AMMAWMATO DOC O-ODY Mayor 7X= ;FAYETTEVILLE; 5 FAYET'TEVILLE THE CITY OF FAYETTEVILLE, ARKANSAS • DEPARTMENTAL CORRESPONDENCE • June 21, 2005 City Council Meeting TO: Mayor Dan Coody and Fayetteville City Council THROUGH: Stephen Davis, Financial and Internal Services Directc FROM: Coy Hurd, Project Manager/ DATE: June 8, 2005 SUBJECT: A resolution to designate $66,237 toward utility placement work associated • with the construction of the new hotel to occupy the existing Mountain hm site (in addition to $33,763 of the previously approved contingency fund; total not to exceed $100,000), and a waiver of the competitive bidding for these electrical services. Recommendation: City Staff recommends that the City Council designate $66,237 of the funds generated by the Tax Incentive Finance bonds to be used to pay for the work accomplishing the permanent utility placement (electrical work) necessary for the long-term power needs of the proposed new hotel complex to be constructed on the site. Background: The City Council has designated $887,000 of the funds generated by the T.I.F. Bonds to be used toward demolition, resolution of access issues, and utility relocation. The Patton Company's contract for the demolition of the buildings and the hazardous materials abatement is $688,138. Environmental Enterprise Group's contract for oversight of demolition and abatement efforts is $30,855. The contingency fund for the demolition/abatement effort has been authorized as $101,770. The amount remaining from the designated $887,000 is $66,237. Discussion: The City has agreed (by way of contract with John Nock et. al.) to utilize $887,000 toward preparation of the Mountain Inn site in anticipation of construction efforts at that location. Once the City has expended these funds, Mr. Nock has agreed to • accept the site in such condition as it is then in. • June 9 memo, page two Electrical work during this first phase is being done by King Electric (and their subcontractors) through their existing contract with the city. If approved, this $66,237 will be used toward work needed to supply the building site with permanent electrical power. Examples of these efforts are trenching and laying electrical conduit, purchase and installation of the electrical meter bases that will serve the future facilities, and placement of the electrical vault on the site. The utility relocation work identified thus far includes: 1) relocating the electrical transformer in the alleyway, currently attached to the Mountain Inn Building. The demolition contractor has had to resequence the removal of the buildings to accommodate the Developers commitment to keep the Hoffbrau, Taste of Thai, and Petra Caf6 open. The cost of the electrical relocation could total near $100,000. 2) relocating the existing natural gas service. The Arkansas Western Gas Company is doing most of this work at their own costs, but may petition for reimbursement is for some of the costs. 3) relocating the water and sewer lines to serve the buildings that remain and the new buildings to be built. The cost of this work will probably be between $70,000 and $100,000. The drawings and specifications for this work are yet to be developed. Until this is accomplished, the forecast of the total cost can not be more precise. 4) The final item that the Developers have identified as potential use of T.I.F. bond proceeds (to this point) is the removal of an underground fuel storage tank. This tank is located in the alleyway outside of the demolition project boundary. The proposed cost for the removal of this tank is $13,800. Because the City has only $66,237 remaining from the T.I.F. proceeds, Staff recommends programming all of these funds to electrical relocations and notifying that that any further utility work will be paid for by the Developer. King Electric Company has an existing contract with the City that allows $20,000 per project. Staff is asking that an exception be made to allow that company to do this electrical work. Due to the extreme schedule for this work and the undefined nature of some of the • tasks which must be completed, it is imperative that King Electric Company be given dispensation on the $20,000 ceiling on this particular project. 70 • • Memo, page three • 0 Budgetary Impact: These funds are currently budgeted towards the project and reside in Account Number 4490 9490 5315.00. CONTRACT On this 15"' day of March, 2005, the City of Fayetteville and Developers, Richard Alexander and John Nock agree as follows: I WHEREAS, the City of Fayetteville desires to remove the blighted area of the Mountain Inn and surrounding vacant structures (the County Courts Building, the Red Bird Cafe and the old Niblock Law Office); and WHEREAS, the City of Fayetteville will be greatly benefited if, after the removal of this blight, a valuable new structure will be constructed on this cleared site bringing jobs, Sales taxes, and Hotel, Motel and Restaurant taxes, and stimulating increased economical activity and vitality and increased property valuation throughout downtown Fayetteville; and WHEREAS, Developers Richard Alexander and John Nock have • proposed to purchase the cleared blighted area for $300,000.00 and build about a 22.5 Million Dollar Hotel, Condominium, Parking Deck, and Convention facility on this site. NOW, above premises considered, the City of Fayetteville and the Developers, Richard Alexander and John Nock agree as follows: 1. The City of Fayetteville agrees to issue tax increment financing bonds pursuant to its ordinances establishing the Highway 71 East Square Redevelopment District Number 1 of Fayetteville as amended to include most of the Downtown Master Plan area, the Amended Project Plan for this enlarged District, the Bond Ordinance, Bond Purchase Ordinance (if necessary), Amendment 78, and SubChapter 3 of Chapter 168 of Title 14, Community Redevelopment Generally. These TIF bonds shall be issued to obtain net usable proceeds of $3.5 million to the City of Fayetteville to effectuate the Amended Project Plan as approved by ordinance by the City Council on March 15, 2005. 0 • 2. The City of Fayetteville agrees to use the net available $3.5 million proceeds from the TIF bonds to purchase: (a) the blighted Mountain hin property for $1.2 million; (b) the County Courts Building for $413,000.00; (c) the vacant Niblock Law Office for $500,000.00; (d) the vacant Red Bird Cafe for $500.000.00. Total for land acquisition $2,613,000.00 If bond proceeds in net usable amount of $3.5 million are available by April 19, 2005, the closing for all four properties shall be April 20, 2005, 3. The City of Fayetteville gr=es o ':; en of the $3.5 million not expended for land acquisition for demo tion and site preparation to include: (a) demolition (including asbestos removal) of the newer part of the Mountain Inn, the Courts Building, the Niblock Law Office and the Red Bird Cafe; (b) resolution of access issues and utility relocation; aver P ; c ( m.: " I ebn.site ; If the demolition and site preparation costs exceed $887,000.00 (the remaining bond proceeds after land acquisition costs), the City's responsibilities end after its full expenditure of $35 million on this project. If demolition and site preparation can be accomplished for less than $887,000.00, any remaining money shall be used to pay TIF bond indebtedness. 4. Developers Richard Alexander and John Nock agree to purchase the four parcels purchased and demolished by the City of Fayetteville for a total of $300,000.0k.� Ws ° ee to )3urch ?e arcels fi.UIO l 1 for Demolition and Site Preparation even cannot be accomplished for an $887,000.00 expenditure. • If all of the estimated $887,000.00 costs for demolition and site preparation is not needed to accomplish the demolition, resolution of access 2 • an u Mf7ffffM§ sI on site water and sewer upgrade if needed, and asbestos and other necessary environmental remediation, Developers Richard Alexander and John Nock agree that any remaining money shall be used for repayment of TIF indebtedness. S. Developers Richard Alexander and John Nock agree to construct or cause the construction of the Planned Development Project approximately as described on page 7 of the Amended Project Plan: (a) approximately 144 room, full service hotel; (b) approximately 18 condominiums; (c) approximately 12,000 square foot conference/meeting space; (d) approximately 300 space multistory parking garage; (e) restaurants, small shops, day spa; (f) rooftop botanical garden. 6. If economic conditions change or require an alternative • development, Developers Richard Alexander and John Nock can satisfy this requirement by constructing or causing the construction of an approximately Equivalent Project subject to approval by the City Council, whose approval shall not be unreasonably withheld. 7. Developers Richard Alexander and John Nock agree that architectural or engineering contracts for the construction of this Planned Development Project or the Equivalent Project shall be entered into in 2005. 8. Developers Richard Alexander and John Nock agree that the construction contract for this Planned Development Project or the Equivalent Project shall be entered into no later than June 1, 2006. 9. Developers Richard Alexander and John Nock agree that the Planned Development Project or the Equivalent Project shall be finished and open for business and/or occupation no later than September 1, 2007. 10. Force-majeure. All requirements for completion dates are subject to force- majeure and may also be extended by the Fayetteville City Council for good • cause as requested and shown by the Developers. • 11. Non -assignable. This Contract may not be assigned to another party without the previous written consent by the City of Fayetteville after an authorizing City Council Resolution. 12. Jurisdiction and venue. Arkansas law shall control the interpretation of this Contract and jurisdiction and venue shall be the Washington County Circuit Court, Fayetteville, Arkansas, 13. Waiver. The waiver of one of the terms or completion dates in this contract shall only apply. to that term or completion date and such waiver may be limited or conditional. 14. Freedom of Information Act. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If • a Freedom of Information Act request is presented to the City of Fayetteville, Developers Richard Alexander and John Nock will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19- 101 et. seq.) Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. 15. Liquidated Damages. The City of Fayetteville is incurring substantial TIF debt in order to accomplish its Project Plan so that the Planned Development Project, can be constructed promptly enough to ensure the federal tax credits obtained by the Developers can be utilized. Without this need to obtain immediate clear title and ownership of all four parcels, the City of Fayetteville would likely seek to condemn such blighted structures at a potentially lower cost. Therefore, if Developers Richard Alexander and John Nock fail to meet any of the requirements of the project dates for engineering, architect or construction contracts, the City of Fayetteville may opt to receive the conveyance of the four parcels of property back from the Developers for the payment by the City of Fayetteville to the Developers of $10,000.00. E 4 • • If the construction of the Planned Development Project or the Equivalent Project is not completed and open for business or occupation by September 1, 2007, the City of Fayetteville shall receive $25,042.00 per month ($834.73 per day) until the Planned Development Project or Equivalent Project is completed and open for business or occupation (but not to exceed twelve months for a total of $300,504.00 in liquidated damages). This amount represents the estimated loss of monthly sales tax and HMR tax to the City of Fayetteville that the Planned Development Project should generate according to the Developers' estimates provided to the Fayetteville City Council in February, 2005. In agreement to all terms, conditions and promises made above, the City of Fayetteville by Mayor Dan Coody and the Developers Richard Alexander and John Nock have signed below. CITY OF FAYETTEVILLE Mayor 7X= D, OOD 111 _ 11 I I I 1 y 0, ;FAYETTEVILLE; 5 From: Clarice Pearman To: Hurd, Coy Date: 6/24/05 1:31 PM Subject: Ord. 4716 Coy, Attached is a copy of the ordinance passed by City Council, June 21, 2005 waiving competitive bidding for King Electrical Contractors. Thanks. Clarice CC: Deaton, Vicki y\. u I Arkansas 'Democrat �' m ,/I1T ; azettj) "Norduvest ArkA sasl most Wider Read Nei"paper" AFFIDAVIT OF PUBLICATION I, Erin Emis. do solemnly swear that I am the Legal Clerk of the Arkansas Democrat-Gazette/Northwest Arkansas Times newspaper, printed and published in Lowell, Arkansas, and that from my own personal knowledge and. reference to the files of said publication, that advertisement of: 9 was inserted in the regular editions on PO#. RECEIVED Publication Charge: $ JUL 0 5 2r)B5 Subscribed and sworn to before me this CITY OFFAYETTEVILLE qCITY CLERK'S OFFICE / day of 12005. /////���//0,n` L� ///� ORDINANCE xO.4716 ESsi._Ja�i:,�L(M✓ / AN ORDINANCE WAMNG THE REQUIREMENTS OF FORMAL C O KIN T EL BIDDING AND APP CONTRACTORS, ]e evi le _\ PAYMENT TO KING ELECTRICAL CONTRACTORS, �( NotarNonaPublic Sharlene D. NC. OF $100,000.00 TO PROV DE ELECTRICAL /fr y Williams U L V RELOCATION SERVICES REQUIRED TO Notary Public MOUNTAIN NN; ALLOW THE OAND APPROV NG USOF THE ARKANSAS StatQ of Arkansas TO $33�163.W OF THE PREVIOUSLY APPROVED PROJECT My Commission EXp i r : WNERBAB City staff became aware of the DODO to relocate certain electrical Wldies to allow In xpirc Inn demolition to Proceed on schedule; and, October 18, 2014 1111ER6ASr the eM emaN tight schedule of Me Mountain Inn demolibon does rot allow suific ant time to select an elecWcal contractor tftrough Me formal competitive bidding process; ead, ** Please do not pay from Affidavit. WHEREAS, King Dectrical Contractors, Inc. has an ongoing conerectual ralatlonshlp with the Cry of Fayetteville to provide olectdoai centracta services, and is capable of competency Performing aboulos An invoice will be sent. utility relocation services. MOWN THEREFORE. BE R ORDAINED BY THE CRY COUNCIL OF THE CRY OF FAYET- TEVILLE, ARIUNBAB; Section 1. That the Gry Council of the GN of Fayetteville, Arkansas hereby finds that such dreum- stances ocnsttute W excepuonai sihl8ticn where competlIAO bdding is not feasible or preancel; waivsa the requirements Of formal competIM bidding, and approves peyraam to Zang Dechice Contactors, Inc. Of $100,000.00 to provide electrical ucilily rebtatlon services required to allow the continued demo- lition of The Mountain Inn, Section 2. That the City Council of the Cry of FayettevillD. A�yansas hereby approves Me use of up to $33.163.00 of the previcusry-approved project Caningennq tar elecircal ulllity relocation. n PASSED and APPROVED this 21st day Of June, 2005, APPROVED: By: DAN COODY, Nlw� P.O. BOX 1607 • 212 N. EAST AVENUE • FAYETTEVILLE, ARKANSAS 72701 • 479-571-6470