HomeMy WebLinkAboutOrdinance 4542r ORDINANCE NO. 4542 AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVING A COST -SHARE AGREEMENT WITH WIV-FAYETTEVILLE, LLC IN AN AMOUNT OF $25,512.00 PLUS A CONTINGENCY OF $39826.00 FOR A TOTAL OF $295338.00 FOR THE CONSTRUCTION OF 350 FEET OF 8-INCH WATER MAIN WHEREAS, the Fayetteville Planning Commission has approved a Large Scale Development for Walgreen's on Joyce Boulevard which calls for the construction of a water main extension; and WHEREAS, it will be of great benefit to the City and businesses in the Mall area to construct a water main loop extension in this area; and WHEREAS, entering into a cost -share agreement with WIV-Fayetteville LLC and utilizing their engineer and contractor will avoid the added cost and unnecessary duplication of effort which would arise from the formal competitive bidding process; and WHEREAS, the City Council finds that such circumstances constitute an exceptional situation where competitive bidding is not feasible or practical. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby waives the requirements of formal competitive bidding and approves a cost -share agreement with WIV-Fayetteville LLC in an amount of $25,512.00 plus a contingency of $3,826.00 for a total of $29,338.00 for the construction of about 350 feet of 8-inch water main to further the water main loop system near the Northwest Arkansas Mall. PASSED and APPROVED this the 17`s day of February, 2004. cFVETTE, APPROVED: By: SONDRA SMITH, City Clerk DAN COODY, Mayor CONTRACTUAL AGREEMENT This Agreement, made and entered into this F Aruar!l 11, Jjd!i, by and between the City of Fayetteville, Arkansas and WIV-Fayetteville, LLC, Witn th WHEREAS, WIV-Fayetteville, LLC, will be hiring a contractor for the construction of a Walgreen's at the northwest corner of Joyce Blvd. and Shiloh Dr.; and WHEREAS, there is an existing 8" water line on the west side of this site that connects to the 8" main along Joyce Blvd. The developer will be extending this 8" main through the project site to provide service and fire protection to the Walgreen's development; and WHEREAS, there is an existing system of water mains that serves the entire Northwest Arkansas Mall complex and several businesses in this area. The mains end approximately 350 feet north of the Walgreen's development. This entire network of mains has only one point of connection that crosses Highway 7 1 B at Zion Road; and WHEREAS, it will benefit the City of Fayetteville to extend this 8" water main to connect to the existing main north of the development at the same time by the same contractor. This extension will create a loop in this area and prevent numerous businesses, including the Mall, from having the water shut off in case of a water main break. NOW, THEREFORE, the City of Fayetteville and WIV-Fayetteville, LLC agree as follows: Upon the City Council and/or the Mayor approving the Water Main Cost -Share, the City of Fayetteville agrees to: A. Pay for 100% of the actual documented construction costs & inspection costs for the 8" water main along Shiloh Drive from Georgetown Square Road to connect with the existing water main approximately 350 feet to the north. B. Pay a maximum -not -to -exceed cost of $29,338.00 for the afore mentioned water main construction as was provided by WIV-Fayetteville, LLC contractor and made a part of this agreement. C. Reconsider the costs if the future and actual construction & inspection prices exceed the maximum -not -to -exceed amount that was furnished by WIV-Fayetteville, LLC. The contractual agreement shall be required to be reevaluated and re -approved by the Mayor and/or City Council as appropriate prior to proceeding with construction. D. Make all efforts to provide payment to WIV-Fayetteville, LLC within thirty (30) days after receipt of the invoice(s) but cannot guarantee the thirty day schedule. 2. WIV-Fayetteville, LLC agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable water main installation. B. Provide a copy of the invoice(s) from the Contractor and a completed lien waiver executed by the Contractor upon acceptance of the water main installation. C. Not proceed with the proposed construction unless/until the proposed contractual agreement is approved by the City Council and/or the Mayor. It is further understood that the contract for construction is between WIV- Fayetteville, LLC and his Contractor and that the City has no contractual obligation with either the Contractor or the Engineer. The City's only obligation shall be to participate in a contractual agreement with a not -to -exceed amount of $29,338.00 for the water main installation. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: CITY OF FAYETTEVILLE By: DAN COODY, ayor 0 WIV-Fayetteville, LLC By: NAME OF FILE: Ordinance No. 4542 wlagreement CROSS REFERENCE: Item # Date Document 1 12/22/03 memo to mayor & city council 2 draft resolution 3 copy of vicinity map 4 11/08/03 letter to James Koch from Harman & Son Const., Inc. 5 11/04/03 letter to James Koch from Harman & Son Const., Inc. 8 draft agreement 7 copy of purchase requisition 8 copy of vendor file maintenance form g 01/02/04 Staff Review Form 10 02/25/04 memo to Earnest & Conklin 11 NOTES: • 0 ?//71d City Council Meeting of January 20, 2,91 V Fayeffpjt /1 CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Hugh Earnest, Chief Administrative Officer From: Tim Conklin, Community Planning and Engineering Services Director I C Date: December 22, 2003 Subject: Proposed Walgreen's Cost Share in the amount of $25,512.00 with a contingency of $3,826.00 with WIV-Fayetteville, LLC for the installation of approximately 350 feet of 8" water main. RECOMMENDATION Staff recommends that the City cost -share with WIV-Fayetteville, LLC the developer, to construct approximately 350 feet of 8" water main. By participating in the construction of these improvements, the City will be creating a loop in the water main system in this area and eliminating the gap in the system. On November 7, 2002, the Planning Commission approved the Large Scale Development for Walgreen's. The proposed development is located at the northwest corner of Joyce Blvd. and Shiloh Dr. As a part of this development, the developer will be constructing a water main extension to provide service and fire protection to the site. The site grading and water and sewer extensions have been approved for the site and construction is underway. There is existing water main along Joyce Blvd. There is also a system of mains that serves the Northwest Arkansas Mall and several other businesses in this area. This network of mains is fed from one point of connection at the intersection of Highway 7 1 B and Zion Road. In the event of a water main break on this connecting line, the Mall and many of the surrounding businesses would be without water. It would benefit the City of Fayetteville to have this gap in the water main system eliminated and to further loop the system in this area. �r �.,as r�ud�nJc //L20/a SL _64 4 %fD Z1/716W M%IJ • City Council Meeting of January 20, 2004 Construction bids have been provided to the City for these improvements by WIV- Fayetteville, LLC.as follows: Developer's Share $ 37,920.00 City's Share $ 259512.00 15% Contingency(City's Share) $ 3,826.00 Total $ 679258,00 BUDGETIMPACT Based upon the information provided by the Budget & Research Division, there is a proposed budget of $150,000.00 in the Water and Sewer Cost Sharing Account for 2004. The final costs to the City will be based upon actual costs as documented by WIV- Fayetteville, LLC. subject to review by the City and may, or may not exceed the submitted estimate. However, the City's share will not exceed the estimate without additional authorization. 2 I ORDINANCE NO. AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVING A COST -SHARE AGREEMENT WITH WIV-FAYETTEVILLE, LLC IN AN AMOUNT OF $25512.00 PLUS A CONTINGENCY OF $3,826.00 FOR A TOTAL 49 $2%338.00 FOR THE CONSTRUCTION OF 350 FEET OF 8-INCH WATER MAIN WHEREAS, the Fayetteville Planning Commission has approved a Large Scale Development for Walgreen's on Joyce Boulevard which calls for the construction of a water main extension; and WHEREAS, it will be of great benefit to the City and businesses in the Mall area to construct a water main loop extension in this area; and WHEREAS, entering into a cost -share agreement with WIV-Fayetteville LLC and utilizing their engineer and contractor will avoid the added cost and unnecessary duplication of effort which would arise from the formal competitive bidding process; and WHEREAS, the City Council finds that such circumstances constitute an exceptional situation where competitive bidding is not feasible or practical. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby waives the requirements of formal competitive bidding and approves a cost -share agreement with WIV-Fayetteville LLC in an amount of $25,512.00 plus a contingency of $3,826.00 for a total of $29,338.00 for the construction of about 350 feet of 8-inch water main to further the water main loop system near the Northwest Arkansas Mall. PASSED and APPROVED this the 20`h day of January, 2004. ATTEST: By: SONDRA SMITH, City Clerk 199 �hf By: DRAFT DAN COODY, Mayor r a m � qq YY� Wkt 14gk�:aja zcpg?B.SR,� n� tng3€gepY y ,a, Ma 1 e4fi 1A Val kp3 9i�86ap�g� e� � u� ""°• i, epR "all l yy Y!i L Y• 8 3 S� kR,pp"hpa gaY}A' ahh =� 32 �r ��y &ak49�i5d MEN 11/08/2003 10:16 8173365i HARMAN AND SON PAGE 02/02 Harman & Son Construction, Inc. 1633 Rogers Rd. Fort Worth, TX 76107 817-336-5780 Fax 817-336-5797 www.harma n and son.com 11/8/03 (Revised) Mr. James Koch CEI Engineering Associates, Inc. 3317 SW T Street Bentonville, AR 72712 RE: Watcr Line Extension Shiloh & Joyce Dcar, Mr. Koch: See below cost for the offsite waterline extension for the referenced project. If you should have any questions please don't hesitate to call. Description Qty Cost Total 1. 8" C-900 365 LF $24 $8.760 2. 8" x 8" MJ Tee 1 S800 $800 3. 8" Ml Gate Valvc 1 $800 $800 4. 8" MJ 45 degree bend 2 $500 $1,000 5. Connect to fire hydrant 1 $1100 $1,1.00 6. Asphalt repair/patch 1 $7500 $7,500 7. Gravel bedding 100tons $13 $12300 $4,252 OH &P $255512 Total Sincerely, Ga e H an Project Manager Harman & Son Consmiction, Inc. SENT BY: CEI ENGINEERING; 50 4702730472; NOV-14e 2:43PM; PAGE 3/3 11/14/2003 13:20 817336 HARMAN AND SON PAGE 02/02 & Son Constri 1633 Rogers Rd. Fort Worth, TX 76 817-336.5780 Fax 817-336-5797 www.harmanandsoo.com 11/14/03 (Revised) Mr. James Koch CEI Engineering Associates, Inc. 3317 SW 1 Street Bertronville, AR 12712 R6' Water Line Hxrension Shiloh & Joyce Dear, Mr. Koch: See below cost for the total water line extension for the referenced project. If you should have any questions please don't hesitate to call. Description (OFFSITE) 8" C-900 8"x 8" MJ Tee a" MJ Gate Valve 8" MJ 45 Degree Bend Connect to Fire Hydrant Asphalt Repair/patch Gravel Bedding Sub -Total (ONSITE) 8" C-900 G- C•900 8"x 8" MJ Tee 8'-Ml Gate Valve 811MJ 45 Degree Bend Gravel Bedding 8"x 9" Tapping Sleeve & Valve 8x6"Tee 6" MJ Gate Valve 8" x 8" M1 Cross 8" MJ Ring Fire Hydrant Assembly 6" MJ Cap 8" x 6" Reducer Gravel Class 7 Base Concrete Blocking Sub -Total Total AProlect'm ger Harman & Son Construction, Ine. Qty 365LF 1 1 2 1 i 100 Tons 535LF 8OLF t 9 2 60 Tons 3 2 140 4 Cost S24 $300 $800 S500 $1,100 $7,500 $13 $24 $22 $800 $800 $500 $11 S2,600 $660 $630 $900 $400 $2090 S400 S450 Sl3 S100 Total $8,760 $800 $800 $1,000 s1,100 S7,500 S1,300 $12, 940 S1,760 $800 S7,2GO $1,000 $780 S2,600 S600 $100 5800 S400 S4,18O SACO S450 S 1,820 $400 421,260 a On f P A 4,PS'Z S37,920 $59,190 CONTRACTUAL AGREEMENT This Agreement, made and entered into this , by and between the City of Fayetteville, Arkansas and WIV-Fayetteville, LLC, Witnesseth: WHEREAS, WIV-Fayetteville, LLC, will be hiring a contractor for the construction of a Walgreen's at the northwest comer of Joyce Blvd. and Shiloh Dr.; and WHEREAS, there is an existing 8" water line on the west side of this site that connects to the 8" main along Joyce Blvd. The developer will be extending this 8" main through the project site to provide service and fire protection to the Walgreen's development; and WHEREAS, there is an existing system of water mains that serves the entire Northwest Arkansas Mall complex and several businesses in this area. The mains end approximately 350 feet north of the Walgreen's development. This entire network of mains has only one point of connection that crosses Highway 71B at Zion Road; and WHEREAS, it will benefit the City of Fayetteville to extend this 8" water main to connect to the existing main north of the development at the same time by the same contractor. This extension will create a loop in this area and prevent numerous businesses, including the Mall, from having the water shut off in case of a water main break. NOW, THEREFORE, the City of Fayetteville and WIV-Fayetteville, LLC agree as follows: Upon the City Council and/or the Mayor approving the Water Main Cost -Share, the City of Fayetteville agrees to: A. Pay for 100% of the actual documented construction costs & inspection costs for the 8" water main along Shiloh Drive from Georgetown Square Road to connect with the existing water main approximately 350 feet to the north. B. Pay a maximum -not -to -exceed cost of $29,338.00 for the afore mentioned water main construction as was provided by WIV-Fayetteville, LLC contractor and made a part of this agreement. C. Reconsider the costs if the future and actual construction & inspection prices exceed the maximum -not -to -exceed amount that was furnished by WIV-Fayetteville, LLC. The contractual agreement shall be required to be reevaluated and re -approved by the Mayor and/or City Council as appropriate prior to proceeding with construction. D. Make all efforts to provide payment to WIV-Fayetteville, LLC within thirty (30) days after receipt of the invoice(s) but cannot guarantee the thirty day schedule. 2. WIV-Fayetteville, LLC agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable water main installation. B. Provide a copy of the invoice(s) from the Contractor and a completed lien waiver executed by the Contractor upon acceptance of the water main installation. C. Not proceed with the proposed construction unless/until the proposed contractual agreement is approved by the City Council and/or the Mayor. It is further understood that the contract for construction is between WIV- Fayetteville, LLC and his Contractor and that the City has no contractual obligation with either the Contractor or the Engineer. The City's only obligation shall be to participate in a contractual agreement with a not -to -exceed amount of $29,338.00 for the water main installation. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: CITY OF FAYETTEVILLE WIV-Fayetteville, LLC By: By: a DAN COODY, Mayor Ah § ( ! « u ,&k7�i� ( � / ( § |& , ! _ E \ ! ƒ / § (�? � � }\cn ( \0(\w : � [ ( ; ! ! REQUEST FOR VENDOR FILE MAINTENANCE (CHECK ALL AVAILABLE RESOURCES, VENDOR LIST, ACCESS SYSTEM PRIOR TO SUBMISSION OF THIS REQUEST) DATE OF REQUEST: 12/29/03 REQUESTED BY: DEPTJDIVISION: Engineering EFFECTIVE DATE: TELEPHONE EXTENSION: 429 Matt Casey ASAP NEW VENDOR: VENDOR CHANGE: VENDOR RE-ENTRY: O VENDOR #: VENDOR #: VENDOR NAME: WIV-Fayetteville, LLC STREET OR P.O. BOX: 541 North Fairbanks Court, Suite 1890 CITY: Chicago STATE: IL ZIP CODE: 60611 ATT: PHONE: 312-645-0722 E-Mail Fax # REMITTANCE ADDRESS IF DIFFERENT FROM ABOVE: NAME: ADDRESS: CITY, ST, ZIP: TYPE OF ORGANIZATION CORPORATION 000): 0 FEDERALID 82-0565492 PARTNERSHIP (200): 0 OR INDIVIDUAL (300): 0 SOCIAL EMPLOYEE (400): 0 PENSION (500): 0 NON-PROFIT (6001: 0 NEW VENDOR: VENDOR CHANGES: VENDOR RE-ENTRY: W-9 FORM MAILED: PURCHASING OFFICE USE ONLY ENTERED BY: DATE: G. L. FILE: INVENTORY FILE: s TA•REVIEW FORM - FINANCIAL OBLIGAN x AGENDA REQUEST CONTRACT REVIEW GRANT REVIEW For the Fayetteville City Council Meeting of: January20,2004 FROM Matt Casey Engineering Community Planning & Engineering Name Division Department ACTION REQUIRED: Approval of a cost -share and bid waiver in the amount of $25,512.00 with a contingency of $3,826.00 with WIV-Fayetteville, LLC. for the construction of approximately 350' of 8" water main. COST TO CITY: $29,338.00 Cost of this request $ 150,000.00 Category/Project Budget 5400.5600.5808.00 $ Account Number 02067 Project Number Funds Used to Date Water & Sewer Cost Sharing Program Category / Project Name Water & Sewer Improvements Program / Project Category Name $ 150,000.00 Water & Sewer Fund Remaining Balance BUDGET REVIEW: Budgeted Item z:: 11 -Z `/ mod? Budget Manager Date Fund Name Budget Adjustment Attached q o3 D� Inter al ditor Date two Id 3 03 Date Purchasing Manager Date STAFF RECOMMENDATION: Staff recommends approval of the cost share and bid waiver. Received in Mayor's Office Division Head Date Department Director Date Finance & Internal Services Dir. Date W,F 10 • D.te nr-•rta Cross Reference: Previous Ord/Res#: Orig. Contract Date: Orig. Contract Number: New Item: Yes No FAYETTEVI LLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPOND To: Hugh Earnest, Chief Administrative Officer ✓ Tim Conklin, Community Planning & Engineering From: Clarice Buffalohead-Pearman City Clerk Division Date: February 25, 2004 Re: Ordinance No. 4542 Attached is a copy of the above ordinance passed by the City Council February 17, 2004, waiving the competitive bidding and approval of a cost -share agreement with WIV-Fayetteville. Tim I have attached two originals of the agreement to your memo. This ordinance with attachments will be recorded in the city clerk's office and microfilmed. If anything else is needed please let the clerk's office know. /cbp attachments cc: Nancy Smith, Internal Auditor FAYETTEVI LLE THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENTAL CORRESPONDENCE To: Hugh Earnest, Chief Administrative Officer Tim Conklin, Community Planning & Engineering 1/ From: Clarice Buffalohead-Pearman City Clerk Division Date: February 25, 2004 Re: Ordinance No. 4542 Attached is a copy of the above ordinance passed by the City Council February 17, 2004, waiving the competitive bidding and approval of a cost -share agreement with WIV-Fayetteville. Tim I have attached two originals of the agreement to your memo. This ordinance with attachments will be recorded in the city clerk's office and microfilmed. If anything else is needed please let the clerk's office know. /cbp attachments cc: Nancy Smith, Internal Auditor