Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
180-26 RESOLUTION
Page 1 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 180-26 File Number: 2026-2492 A RESOLUTION TO AWARD BID 26-43 AND AUTHORIZE A CONTRACT WITH CROSSLAND HEAVY CONTRACTORS, INC. IN THE AMOUNT OF $14,923,032.90 FOR CONSTRUCTION OF THE HIGHWAY 112 WIDENING PROJECT, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $125,000.00, AND TO APPROVE A BUDGET AMENDMENT WHEREAS, on January 3, 2017, the City Council passed Resolution 27-17 approving the City’s participation in a revised Partnering Agreement with the Arkansas Department of Transportation to make needed improvements to Highway 112 and the City agreed to assume ownership and responsibility upon completion; and WHEREAS, on September 19, 2017, the Mayor signed an Agreement of Understanding with ARDOT obligating the City to manage the improvements of Highway 112 from Poplar Street to Drake Street; and WHEREAS, since the agreement, the City has engaged a consultant engineer for the design of the project, all rights of way and easements have been acquired, and all franchise utilities have relocated their facilities for the road widening project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid 26-43 and authorizes a contract with Crossland Heavy Contractors, Inc. in the amount of $14,923,032.90 for the construction of the Highway 112 widening project, and further approves a project contingency in the amount of $125,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget amendment, a copy of which is attached to this Resolution, establishing a new project fund and recognizing grant revenue in the amount of $13,893,904.00. PASSED and APPROVED on August 18, 2026 Approved: _______________________________ Molly Rawn, Mayor Attest: _______________________________ Kara Paxton, City Clerk Treasurer Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Mailing address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov CITY COUNCIL MEMO 2026-2492 MEETING OF AUGUST 18, 2026 TO: Mayor Rawn and City Council THROUGH: Keith Macedo, Chief Information Officer Chris Brown, Public Works Director Justin Bland, City Engineer FROM: Paul Libertini, Staff Engineer SUBJECT: Bid #26-43 Hwy 112 (Poplar St. to Drake St.) Widening Project – Crossland Heavy Contractors, Inc. - Construction Contract Award RECOMMENDATION: A Resolution to award Bid #26-43 and authorize a contract with Crossland Heavy Contractors, Inc. in the amount of $14,923,032.90 for the construction of Hwy 112 (Poplar St. to Drake St.) widening project, approve a project contingency of $125,000, recognize $13,893,904.00 in grant revenue, and approve a budget amendment establishing a new fund to account for the proceeds of the grant. BACKGROUND: On January 3, 2017, the City Council approved the City’s participation in a revised Partnering Agreement with the Arkansas Department of Transportation (ARDOT) to make needed improvements to Hwy 112 (Resolution 27-17). Upon completion of the improvements to Hwy 112, the City agreed to assume ownership and responsibility of Hwy 112 from Hwy 16 (15th St) to Interstate 49. On September 19, 2017, the Mayor signed the Agreement of Understanding with ARDOT obligating the City to manage the improvements of Hwy 112 from Poplar Street to Drake Street. The City agreed to manage project design, right-of-way acquisition, utility relocations, bidding and construction management. ARDOT agreed to funding the full cost (100%) of the project, less any betterments requested by the City. Since the agreement, the City has engaged a consultant engineer for the design of the project. All rights of way and easements have been acquired, and all franchise utilities have relocated their facilities for the road widening project. The City received authorization from the ARDOT to advertise this project for construction bids on May 18, 2026. The bid opening was held on July 14, 2026. DISCUSSION: A total of four bids were received ranging $14,923,032 to $16,897,056. Crossland Heavy Contractors, Inc. was the low bidder. The Engineers’ opinion of probable cost was $18,202,029.10. The City has received a letter from our consultant, Burns & McDonnell, recommending award of this contract to Crossland Heavy Contractors, Inc. The contract time is 605 calendar days for final completion. Please note that as part of the Federal-aid process, the Mayor will be submitting the required Certification Letter to ARDOT requesting their review of the bid tabulations and concurrence in award of the contract to Crossland Heavy Contractors, Inc. The actual execution of the construction agreement will occur after receipt Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Mailing address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov of ARDOT concurrence. BUDGET/STAFF IMPACT: In accordance with our agreement, ARDOT will fund the majority of the cost of this contract. The City has secured grant funding in the amount of $644,000, which will require a 20% match in the amount of $161,000 (Resolutions 38-25 & 149-26). In addition, Water and Sewer utilities cost will be $224,130 for betterments on the project. The remaining $13,893,902.90 million will be paid by ArDOT. The federal grant Assistance Listing Number (ALN) is 20.205 and 20.287. The City will make payments to the Contractor and then submit the required paperwork to ARDOT requesting reimbursement. The Water and Sewer Fund will be used to pay for the water line upgrades in the amount of $224,130 and fund a project contingency of $25,000. ACCOUNT PROJECT AMOUNT 2236.621.9601-5809.00 32602.2601.1000 $13,893,902.90 4601.860.7236-5809.00 46020.7236.3800 $644,000.00 4702.860.7236-5809.00 46020.7236.3800 $161,000.00 5400.860.5600-5808.00 11011.2019.7236 $224,130.00 Total $14,923,032.90 ATTACHMENTS: 3. Staff Review Form, 4. Budget Amendment, 5. Document 00500 - Agreement Signed - Sealed - Hwy 112 Widening, 6. Crossland Heavy Contractors Corporate Resolution 2026-2027, 7. Bid #26-43 Letter of Recommendation of Award , 8. Bid 26-43 City Bid Tab, 9. Bid 26-43 Submittal - Crossland Heavy Contractors, Inc, 10. Job 040720_Federal-Aid Project Agreement, 11. NWARPC Award Letter $500K Hwy112_Poplar to Drake, 12. NWARMA Res & Ltr to ARDOT $144K Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Page 1 City of Fayetteville, Arkansas Legislation Text 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 File #: 2026-2492 A RESOLUTION TO AWARD BID 26-43 AND AUTHORIZE A CONTRACT WITH CROSSLAND HEAVY CONTRACTORS, INC. IN THE AMOUNT OF $14,923,032.90 FOR CONSTRUCTION OF THE HIGHWAY 112 WIDENING PROJECT, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $125,000.00, AND TO APPROVE A BUDGET AMENDMENT WHEREAS, on January 3, 2017, the City Council passed Resolution 27-17 approving the City’s participation in a revised Partnering Agreement with the Arkansas Department of Transportation to make needed improvements to Highway 112 and the City agreed to assume ownership and responsibility upon completion; and WHEREAS, on September 19, 2017, the Mayor signed an Agreement of Understanding with ARDOT obligating the City to manage the improvements of Highway 112 from Poplar Street to Drake Street; and WHEREAS, since the agreement, the City has engaged a consultant engineer for the design of the project, all rights of way and easements have been acquired, and all franchise utilities have relocated their facilities for the road widening project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid 26-43 and authorizes a contract with Crossland Heavy Contractors, Inc. in the amount of $14,923,032.90 for the construction of the Highway 112 widening project, and further approves a project contingency in the amount of $125,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget amendment, a copy of which is attached to this Resolution, establishing a new project fund and recognizing grant revenue in the amount of $13,893,904.00. Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A City of Fayetteville Staff Review Form 2026-2492 Item ID 8/18/2026 City Council Meeting Date - Agenda Item Only N/A for Non-Agenda Item Paul Libertini 7/28/2026 ENGINEERING (621) Submitted By Submitted Date Division / Department Action Recommendation: A Resolution to award Bid #26-43 and authorize a contract with Crossland Heavy Contractors, Inc. in the amount of $14,923,032.90 for the construction of the Hwy 112 (Poplar St. to Drake St.) widening project, approve a project contingency of $125,000, recognize grant revenue, and approve a budget amendment establishing a new fund to account for the proceeds of the grant. Budget Impact: 2236.621.9601-5809.00 / 4601.860.7227-5809.00 4702.860.7236-5809.00 / 5400.860.5600-5808.00 Hwy 112 Widening Grant / Bond Program Grant Matching Street Projects 2022 Bonds / Water & Sewer Account Number Fund 32602.2601.1000 46020.7236.3800 11011.2019.7236 Hwy 112 Widening Grant (Poplar St to Drake St) Streets Bond Projects-Hwy 112 (Poplar St to Drake St) W&S Relocations Bond Projects Project Number Project Title Budgeted Item?Yes Total Amended Budget $ 1,587,080.00 Expenses (Actual+Encum)$782,079.69 Available Budget $805,000.31 Does item have a direct cost?Yes Item Cost $ 15,048,033.00 Is a Budget Adjustment attached?Yes Budget Adjustment $ 14,243,034.00 $292.00 Remaining Budget $1.31 V20221130 Purchase Order Number:Previous Ordinance or Resolution #27-17 Change Order Number:Approval Date: Original Contract Number: Comments: 8/18/2026 Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A City of Fayetteville, Arkansas - Budget Amendment/Adjustment (Agenda)4 Errors Budget Year Division /Org2 ENGINEERING (621) BA Number 2026 Requestor:Paul Libertini BUDGET AMENDMENT/ADJUSTMENT DESCRIPTION: A Resolution to award Bid #26-43 and authorize a contract with Crossland Heavy Contractors, Inc. in the amount of $14,923,032.90 for the construction of the Hwy 112 (Poplar St. to Drake St.) widening project, approve a project contingency of $125,000, recognize grant revenue, and approve a budget amendment establishing a new fund to account for the proceeds of the grant. COUNCIL DATE:8/18/2026 ITEM ID#:2026-2492 Holly Black 7/28/2026 3:06 PM Budget Division Date TYPE:D - (City Council) JOURNAL #: GLDATE: RESOLUTION/ORDINANCE CHKD/POSTED:/ v.2026714TOTAL13,893,904 13,893,904 Increase / (Decrease)Project.Sub# Account Number Expense Revenue Project Sub.Detl AT Account NameGLACCOUNTEXPENSEREVENUEPROJECTSUBATDESCRIPTION X 2236.621.9601-4309.00 -11,115,123 32602 2601.1000 RE **Federal Grants - Capital 2236.621.9601-4302.00 -2,778,781 32602 2601.1000 RE **State Grants - Capital 2236.621.9601-5809.00 13,893,904 -32602 2601.1000 EX **Improvements - Street 4802.860.7236-5911.99 100,000 -46020 7236.3800 EX **Contingency - Capital Project 4802.860.7999-5899.00 (100,000)-46020 7999 EX Unallocated - Budget -- 5400.860.5600-5808.00 224,130 -11011 2019.7236 EX Improvements - Water Line 5400.860.5600-5911.99 25,000 -11011 2019.7236 EX Contingency - Capital Project 5400.720.5700-5815.00 (149,130)-02017 1 EX Improvements - Sewer 5400.720.5600-5808.00 (13,478)-11011 1 EX Improvements - Water Line 5400.720.5700-5911.99 (86,464)-11011 2102 EX Contingency - Capital Project 5400.720.5600-5314.00 (58)-11011 2102 EX Professional Services -- -- -- -- -- 1 of 1 Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 18 August Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 5 Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A August 18 Kara Paxton, City Clerk Treasurer Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 2140 Orange Drive, Suite 102 \ Springdale, AR 72762 burnsmcd.com July 16, 2026 Mr. Paul Libertini, PE City of Fayetteville 113 West Mountain Street Fayetteville, AR 72701 Re: Bid #26-43, Construction – Highway 112 Widening - Recommendation of Award Dear Mr. Libertini: Bids were received Tuesday, July 14, 2026 for the Highway 112 Widening project. A total of four bids were received. The low bidder is Crossland Heavy Contractors, Inc. with a total bid of $14,923,032.90. A copy of the certified bid tabulation showing the completed bids is included for your reference. The engineer’s opinion of probable construction cost for the project, prior to receipt of bids, was $18,202,029.10. We have reviewed the Bidders Qualifications Statement submitted by Crossland Heavy Contractors, Inc. and based upon the information provided, we believe them to be qualified to successfully complete this project. Therefore, we recommend that the City award this contract to Crossland Heavy Contractors, Inc. in the bid amount of $14,923,032.90. The contract documents require the furnishing of 100 percent performance and payment bonds prior to authorization of the Notice to Proceed. Completion of the project is to be within 605 days from the date of the issuance of the Notice to Proceed. If you have any questions, please do not hesitate to contact us. Sincerely, BURNS & McDONNELL Jonathan Ely, PE Project Manager enclosures cc: Mr. Trevel Young – City of Fayetteville Procurement Agent Mr. Kenny Fitch – City of Fayetteville Senior Procurement Agent Mr. William Pattengill, PE – Burns & McDonnell Resident Project Representative Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Certified Bid Tabulation Bid 26-43, Construction - Highway 112 Widening Bid Opening Date: July 14, 2026 ITEM NO.ITEM DESCRIPTION QTY.PAY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1.1 MOBILIZATION 1 LS 626,062.50$ 626,062.50$ 300,000.00$ 300,000.00$ 750,000.00$ 750,000.00$ 469,071.13$ 469,071.13$ 820,000.00$ 820,000.00$ 1.2 BONDS & INSURANCE 1 LS 94,500.00$ 94,500.00$ 180,138.00$ 180,138.00$ 105,000.00$ 105,000.00$ 141,163.19$ 141,163.19$ 90,800.00$ 90,800.00$ 1.3 TRENCH & EXCAVATION SAFETY 1 LS 47,250.00$ 47,250.00$ 57,650.00$ 57,650.00$ 73,000.00$ 73,000.00$ 67,796.59$ 67,796.59$ 95,000.00$ 95,000.00$ 2.1 ROADWAY CONSTRUCTION CONTROL 1 LS 157,500.00$ 157,500.00$ 34,600.00$ 34,600.00$ 225,000.00$ 225,000.00$ 354,770.89$ 354,770.89$ 50,000.00$ 50,000.00$ 2.2 CLEARING, GRUBBING, AND DEMOLITION 1 LS 210,000.00$ 210,000.00$ 225,500.00$ 225,500.00$ 212,000.00$ 212,000.00$ 93,863.29$ 93,863.29$ 245,000.00$ 245,000.00$ 2.3 UNCLASSIFIED EXCAVATION (PLAN QUANTITY)26537 CY 17.33$ 459,886.21$ 25.00$ 663,425.00$ 6.30$ 167,183.10$ 5.69$ 150,995.53$ 17.00$ 451,129.00$ 2.4 SELECT EMBANKMENT (PLAN QUANTITY)18823 CY 23.10$ 434,811.30$ 32.50$ 611,747.50$ 13.85$ 260,698.55$ 12.59$ 236,981.57$ 19.70$ 370,813.10$ 2.5 EMBANKMENT (PLAN QUANTITY)16007 CY 21.00$ 336,147.00$ 21.50$ 344,150.50$ 31.00$ 496,217.00$ 28.02$ 448,516.14$ 16.40$ 262,514.80$ 2.6 UNDERCUT AND BACKFILL 6750 CY 39.90$ 269,325.00$ 42.00$ 283,500.00$ 35.00$ 236,250.00$ 31.44$ 212,220.00$ 37.40$ 252,450.00$ 2.7 ROCK EXCAVATION 150 CY 173.25$ 25,987.50$ 280.00$ 42,000.00$ 420.00$ 63,000.00$ 420.52$ 63,078.00$ 210.00$ 31,500.00$ 2.8 TRAIL UNDERCUT AND BACKFILL (SP #6)1073 CY 47.25$ 50,699.25$ 41.00$ 43,993.00$ 37.00$ 39,701.00$ 33.61$ 36,063.53$ 38.25$ 41,042.25$ 2.9 SUBGRADE PREPARATION 40619 SY 1.31$ 53,210.89$ 3.00$ 121,857.00$ 6.00$ 243,714.00$ 5.10$ 207,156.90$ 2.95$ 119,826.05$ 2.10 4" TOPSOIL PLACEMENT (SOD + SEEDING AREAS)37440 SY 4.99$ 186,825.60$ 6.50$ 243,360.00$ 6.00$ 224,640.00$ 4.52$ 169,228.80$ 8.50$ 318,240.00$ 2.11 18" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT 483 LF 199.50$ 96,358.50$ 105.00$ 50,715.00$ 123.00$ 59,409.00$ 115.54$ 55,805.82$ 131.00$ 63,273.00$ 2.12 24" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT 396 LF 236.25$ 93,555.00$ 113.00$ 44,748.00$ 138.00$ 54,648.00$ 129.90$ 51,440.40$ 162.50$ 64,350.00$ 2.13 30" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT 124 LF 267.75$ 33,201.00$ 163.00$ 20,212.00$ 174.00$ 21,576.00$ 163.27$ 20,245.48$ 205.00$ 25,420.00$ 2.14 36" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT 92 LF 299.25$ 27,531.00$ 205.00$ 18,860.00$ 229.00$ 21,068.00$ 215.84$ 19,857.28$ 281.50$ 25,898.00$ 2.15 23"X14" H.E. REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT 47 LF 252.00$ 11,844.00$ 132.00$ 6,204.00$ 196.00$ 9,212.00$ 184.31$ 8,662.57$ 181.00$ 8,507.00$ 2.16 18" REINFORCED CONCRETE PIPE (CLASS III)3275 LF 173.25$ 567,393.75$ 57.00$ 186,675.00$ 102.00$ 334,050.00$ 96.00$ 314,400.00$ 82.00$ 268,550.00$ 2.17 24" REINFORCED CONCRETE PIPE (CLASS III)1780 LF 210.00$ 373,800.00$ 80.00$ 142,400.00$ 125.00$ 222,500.00$ 117.29$ 208,776.20$ 96.50$ 171,770.00$ 2.18 30" REINFORCED CONCRETE PIPE (CLASS III)762 LF 241.50$ 184,023.00$ 117.00$ 89,154.00$ 165.00$ 125,730.00$ 155.53$ 118,513.86$ 138.00$ 105,156.00$ 2.19 36" REINFORCED CONCRETE PIPE (CLASS III)940 LF 273.00$ 256,620.00$ 195.00$ 183,300.00$ 228.00$ 214,320.00$ 214.70$ 201,818.00$ 180.00$ 169,200.00$ 2.20 60"X38" H.E. REINFORCED CONCRETE PIPE (CLASS III)13 LF 399.00$ 5,187.00$ 332.00$ 4,316.00$ 413.00$ 5,369.00$ 389.12$ 5,058.56$ 382.50$ 4,972.50$ 2.21 18" R.C. FLARED END SECTION 7 EA 2,047.50$ 14,332.50$ 1,030.00$ 7,210.00$ 1,838.00$ 12,866.00$ 1,725.85$ 12,080.95$ 1,250.00$ 8,750.00$ 2.22 24" R.C. FLARED END SECTION 4 EA 2,467.50$ 9,870.00$ 1,160.00$ 4,640.00$ 1,987.00$ 7,948.00$ 1,866.82$ 7,467.28$ 1,350.00$ 5,400.00$ 2.23 36" R.C. FLARED END SECTION 1 EA 4,200.00$ 4,200.00$ 2,100.00$ 2,100.00$ 3,245.00$ 3,245.00$ 3,055.95$ 3,055.95$ 2,700.00$ 2,700.00$ 2.24 60"X38" ELLIPTICAL R.C. FLARED END SECTION 1 EA 5,250.00$ 5,250.00$ 7,030.00$ 7,030.00$ 8,217.00$ 8,217.00$ 7,772.82$ 7,772.82$ 7,200.00$ 7,200.00$ 2.25 23"X14" ELLIPTICAL R.C. FLARED END SECTION 2 EA 2,625.00$ 5,250.00$ 1,030.00$ 2,060.00$ 4,141.00$ 8,282.00$ 3,910.77$ 7,821.54$ 1,450.00$ 2,900.00$ 2.26 4'X4' DROP INLETS (TYPE C)15 EA 7,140.00$ 107,100.00$ 5,650.00$ 84,750.00$ 8,217.00$ 123,255.00$ 7,741.92$ 116,128.80$ 7,550.00$ 113,250.00$ 2.27 4'X5' DROP INLETS (TYPE C)14 EA 7,822.50$ 109,515.00$ 6,940.00$ 97,160.00$ 8,818.00$ 123,452.00$ 8,310.03$ 116,340.42$ 7,950.00$ 111,300.00$ 2.28 4'X6' DROP INLETS (TYPE C)5 EA 8,636.25$ 43,181.25$ 7,800.00$ 39,000.00$ 8,735.00$ 43,675.00$ 9,174.47$ 45,872.35$ 8,600.00$ 43,000.00$ 2.29 4'X7' DROP INLETS (TYPE C)3 EA 9,502.50$ 28,507.50$ 9,100.00$ 27,300.00$ 11,982.00$ 35,946.00$ 11,286.25$ 33,858.75$ 10,200.00$ 30,600.00$ 2.30 4'X8' DROP INLETS (TYPE C)3 EA 11,392.50$ 34,177.50$ 15,400.00$ 46,200.00$ 13,315.00$ 39,945.00$ 12,546.73$ 37,640.19$ 11,300.00$ 33,900.00$ 2.31 5'X5' DROP INLETS (TYPE C)5 EA 8,925.00$ 44,625.00$ 8,560.00$ 42,800.00$ 9,792.00$ 48,960.00$ 9,228.78$ 46,143.90$ 8,600.00$ 43,000.00$ 2.32 5'X6' DROP INLETS (TYPE C)1 EA 9,870.00$ 9,870.00$ 8,855.00$ 8,855.00$ 10,845.00$ 10,845.00$ 10,223.03$ 10,223.03$ 10,000.00$ 10,000.00$ 2.33 5'X8' DROP INLETS (TYPE C)2 EA 12,337.50$ 24,675.00$ 10,150.00$ 20,300.00$ 13,888.00$ 27,776.00$ 13,092.91$ 26,185.82$ 12,550.00$ 25,100.00$ 2.34 8'X5' DROP INLETS (TYPE C)2 EA 12,337.50$ 24,675.00$ 10,800.00$ 21,600.00$ 14,446.00$ 28,892.00$ 13,613.30$ 27,226.60$ 12,550.00$ 25,100.00$ 2.35 9'X8' DROP INLETS (TYPE C)1 EA 18,506.25$ 18,506.25$ 17,090.00$ 17,090.00$ 14,250.00$ 14,250.00$ 13,303.83$ 13,303.83$ 17,000.00$ 17,000.00$ 2.36 4' DROP INLETS (TYPE MO)2 EA 8,221.50$ 16,443.00$ 5,654.00$ 11,308.00$ 7,715.00$ 15,430.00$ 7,265.51$ 14,531.02$ 7,200.00$ 14,400.00$ 2.37 5' DROP INLETS (TYPE MO)4 EA 9,040.50$ 36,162.00$ 7,000.00$ 28,000.00$ 9,175.00$ 36,700.00$ 8,646.97$ 34,587.88$ 9,050.00$ 36,200.00$ 2.38 6' DROP INLETS (TYPE MO)5 EA 9,817.50$ 49,087.50$ 9,600.00$ 48,000.00$ 12,500.00$ 62,500.00$ 11,742.29$ 58,711.45$ 12,200.00$ 61,000.00$ 2.39 4'X4' JUNCTION BOXES (TYPE C)7 EA 7,192.50$ 50,347.50$ 5,735.00$ 40,145.00$ 8,000.00$ 56,000.00$ 7,529.34$ 52,705.38$ 7,550.00$ 52,850.00$ 2.40 5'X4' JUNCTION BOXES (TYPE C)1 EA 8,610.00$ 8,610.00$ 6,200.00$ 6,200.00$ 9,000.00$ 9,000.00$ 8,423.25$ 8,423.25$ 7,950.00$ 7,950.00$ 2.41 5' JUNCTION BOXES (TYPE MO)3 EA 7,612.50$ 22,837.50$ 7,020.00$ 21,060.00$ 9,250.00$ 27,750.00$ 8,677.97$ 26,033.91$ 9,050.00$ 27,150.00$ 2.42 4'X4' GRATED INLETS (TYPE C)1 EA 7,875.00$ 7,875.00$ 7,700.00$ 7,700.00$ 10,750.00$ 10,750.00$ 10,110.08$ 10,110.08$ 7,750.00$ 7,750.00$ 2.43 4' DROP INLET EXTENSION 41 EA 2,992.50$ 122,692.50$ 1,235.00$ 50,635.00$ 1,575.00$ 64,575.00$ 1,455.47$ 59,674.27$ 1,850.00$ 75,850.00$ 2.44 8' DROP INLET EXTENSION 6 EA 4,620.00$ 27,720.00$ 2,570.00$ 15,420.00$ 3,110.00$ 18,660.00$ 2,910.94$ 17,465.64$ 2,750.00$ 16,500.00$ 2.45 SIDEWALK UNDERDRAIN (SP #29)2 EA 1,995.00$ 3,990.00$ 1,225.00$ 2,450.00$ 6,100.00$ 12,200.00$ 5,672.11$ 11,344.22$ 1,350.00$ 2,700.00$ 2.46 DRAINAGE STRUCTURE BACK OPENING (SP #29)4 EA 1,312.50$ 5,250.00$ 1,235.00$ 4,940.00$ 1,360.00$ 5,440.00$ 1,261.55$ 5,046.20$ 1,250.00$ 5,000.00$ 2.47 CORE & GROUT EXISTING INLET (SP #37)4 EA 3,675.00$ 14,700.00$ 1,235.00$ 4,940.00$ 4,200.00$ 16,800.00$ 3,907.97$ 15,631.88$ 1,000.00$ 4,000.00$ 2.48 REMOVE TOP AND CONVERT TO JUNCTION BOX (SP #37)2 EA 4,200.00$ 8,400.00$ 2,870.00$ 5,740.00$ 2,891.00$ 5,782.00$ 2,698.79$ 5,397.58$ 3,600.00$ 7,200.00$ 2.49 REMOVE TOP AND RECONSTRUCT AT PROPOSED GRADE (SP #37) 1 EA 4,200.00$ 4,200.00$ 2,980.00$ 2,980.00$ 3,275.00$ 3,275.00$ 3,045.87$ 3,045.87$ 3,600.00$ 3,600.00$ 2.50 4'X3' PRECAST CONCRETE BOX CULVERT 766 LF 682.50$ 522,795.00$ 435.00$ 333,210.00$ 537.00$ 411,342.00$ 487.35$ 373,310.10$ 449.00$ 343,934.00$ 2.51 5'X3' PRECAST CONCRETE BOX CULVERT 224 LF 787.50$ 176,400.00$ 620.00$ 138,880.00$ 769.00$ 172,256.00$ 698.09$ 156,372.16$ 641.00$ 143,584.00$ 2.52 6'X3' PRECAST CONCRETE BOX CULVERT 5 LF 1,050.00$ 5,250.00$ 823.00$ 4,115.00$ 1,710.00$ 8,550.00$ 1,544.04$ 7,720.20$ 1,100.00$ 5,500.00$ 2.53 6'X3' WINGWALLS & APPURTENANCES 1 LS 24,150.00$ 24,150.00$ 4,840.00$ 4,840.00$ 13,926.00$ 13,926.00$ 4,788.38$ 4,788.38$ 18,000.00$ 18,000.00$ 2.54 RIP RAP 53 SY 126.00$ 6,678.00$ 135.00$ 7,155.00$ 69.00$ 3,657.00$ 64.21$ 3,403.13$ 125.00$ 6,625.00$ 2.55 FLOWABLE SELECT MATERIAL 70 CY 399.00$ 27,930.00$ 197.00$ 13,790.00$ 265.00$ 18,550.00$ 251.01$ 17,570.70$ 231.00$ 16,170.00$ 2.56 SELECT PIPE BACKFILL (CLASS 67)(IF AND WHERE DIRECTED) (SP #28) 500 CY 115.50$ 57,750.00$ 78.00$ 39,000.00$ 111.00$ 55,500.00$ 104.88$ 52,440.00$ 62.00$ 31,000.00$ 2.57 8" DEPTH AGGREGATE BASE COURSE 2756 SY 36.75$ 101,283.00$ 19.00$ 52,364.00$ 17.00$ 46,852.00$ 22.23$ 61,265.88$ 66.25$ 182,585.00$ 2.58 PRIME COAT 2149 SY 16.28$ 34,985.72$ 7.00$ 15,043.00$ 5.75$ 12,356.75$ 6.96$ 14,957.04$ 3.85$ 8,273.65$ 2.59 ASPHALT CONCRETE HOT MIX BINDER COURSE (ACHMBC)7143 TON 157.50$ 1,125,022.50$ 126.00$ 900,018.00$ 110.00$ 785,730.00$ 131.86$ 941,875.98$ 125.25$ 894,660.75$ 2.6 ASPHALT CONCRETE HOT MIX SURFACE COURSE (ACHMSC)7720 TON 183.75$ 1,418,550.00$ 150.00$ 1,158,000.00$ 131.00$ 1,011,320.00$ 156.19$ 1,205,786.80$ 154.75$ 1,194,670.00$ 2.61 ASPHALT CONCRETE HOT MIX BASE COURSE 8843 TON 136.50$ 1,207,069.50$ 120.00$ 1,061,160.00$ 105.00$ 928,515.00$ 124.95$ 1,104,932.85$ 117.95$ 1,043,031.85$ 2.62 PORTLAND CEMENT CONCRETE BASE (5" UNIFORM THICKNESS) (ARDOT 309) 2044 SY 126.00$ 257,544.00$ 60.00$ 122,640.00$ 50.00$ 102,200.00$ 61.88$ 126,482.72$ 66.50$ 135,926.00$ 2.63 PORTLAND CEMENT CONCRETE BASE (6" UNIFORM THICKNESS) (ARDOT 309) 856 SY 136.50$ 116,844.00$ 69.00$ 59,064.00$ 59.00$ 50,504.00$ 71.79$ 61,452.24$ 76.50$ 65,484.00$ 2.64 ASPHALT CONCRETE PATCHING FOR MAINTENANCE OF TRAFFIC 200 TON 236.25$ 47,250.00$ 288.00$ 57,600.00$ 250.00$ 50,000.00$ 300.37$ 60,074.00$ 280.00$ 56,000.00$ FORSGREN, INC. 1,005,800.00$ SCHEDULE A (BASE BID ITEMS) SCHEDULE B (ROADWAY AND DRAINAGE) GRANT GARRETT EXCAVATING, INC. 678,030.91$ Continues Next Page ENGINEER'S OPCC APAC-CENTRAL, INC.CONTRACT CROSSLAND HEAVY CONTRACTORS, INC. 928,000.00$ 767,812.50$ SUBTOTAL CONSTRUCTION COST SCHEDULE A (BASE BID ITEMS)537,788.00$ Page 1 Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Certified Bid Tabulation Bid 26-43, Construction - Highway 112 Widening Bid Opening Date: July 14, 2026 ITEM NO.ITEM DESCRIPTION QTY.PAY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL FORSGREN, INC.GRANT GARRETT EXCAVATING, INC.ENGINEER'S OPCC APAC-CENTRAL, INC.CONTRACT CROSSLAND HEAVY CONTRACTORS, INC. 2.65 CONCRETE CURB AND GUTTER (TYPE A)23058 LF 29.40$ 677,905.20$ 23.00$ 530,334.00$ 22.75$ 524,569.50$ 26.13$ 602,505.54$ 30.50$ 703,269.00$ 2.66 CONCRETE CURB AND GUTTER (TYPE E-1)460 LF 42.00$ 19,320.00$ 32.50$ 14,950.00$ 44.00$ 20,240.00$ 52.87$ 24,320.20$ 39.00$ 17,940.00$ 2.67 CONCRETE CURB (TYPE E)352 LF 36.75$ 12,936.00$ 32.50$ 11,440.00$ 57.00$ 20,064.00$ 68.78$ 24,210.56$ 44.00$ 15,488.00$ 2.68 4" THICK CONCRETE SIDEWALK 3920 SY 105.00$ 411,600.00$ 71.50$ 280,280.00$ 52.00$ 203,840.00$ 75.39$ 295,528.80$ 61.50$ 241,080.00$ 2.69 CONCRETE TRAIL W/FIBER (INCLUDING AGG. BASE) (SP #6) 7270 SY 157.50$ 1,145,025.00$ 87.00$ 632,490.00$ 78.00$ 567,060.00$ 91.61$ 666,004.70$ 102.50$ 745,175.00$ 2.70 CONCRETE DRIVEWAY APRONS 270 SY 168.00$ 45,360.00$ 84.50$ 22,815.00$ 102.00$ 27,540.00$ 127.06$ 34,306.20$ 111.50$ 30,105.00$ 2.71 CONCRETE DRIVEWAY 759 SY 152.25$ 115,557.75$ 79.00$ 59,961.00$ 90.00$ 68,310.00$ 111.14$ 84,355.26$ 83.50$ 63,376.50$ 2.72 AGGREGATE BASE COURSE DRIVEWAY 1030 SY 26.25$ 27,037.50$ 26.00$ 26,780.00$ 22.00$ 22,660.00$ 27.03$ 27,840.90$ 10.00$ 10,300.00$ 2.73 SEEDING AND MULCHING 4.54 ACRE 2,730.00$ 12,394.20$ 7,725.00$ 35,071.50$ 7,000.00$ 31,780.00$ 2,891.48$ 13,127.32$ 1,930.00$ 8,762.20$ 2.74 SOLID SOD 15470 SY 6.30$ 97,461.00$ 4.75$ 73,482.50$ 4.25$ 65,747.50$ 4.39$ 67,913.30$ 4.40$ 68,068.00$ 2.75 ADDITIONAL WATERING 387.6 MG 84.00$ 32,558.40$ 9.00$ 3,488.40$ 5.50$ 2,131.80$ 6.61$ 2,562.04$ 5.50$ 2,131.80$ 2.76 REMOVE AND REPLACE MAILBOXES 2 EA 262.50$ 525.00$ 460.00$ 920.00$ 450.00$ 900.00$ 600.74$ 1,201.48$ 415.00$ 830.00$ 2.77 4" PAVEMENT MARKING (THERMOPLASTIC)2391 LF 1.79$ 4,279.89$ 1.00$ 2,391.00$ 2.25$ 5,379.75$ 2.40$ 5,738.40$ 2.10$ 5,021.10$ 2.78 6" PAVEMENT MARKING (THERMOPLASTIC)9842 LF 2.10$ 20,668.20$ 1.00$ 9,842.00$ 2.30$ 22,636.60$ 2.58$ 25,392.36$ 2.26$ 22,242.92$ 2.79 10" PAVEMENT MARKING (THERMOPLASTIC)747 LF 6.30$ 4,706.10$ 3.50$ 2,614.50$ 4.27$ 3,189.69$ 4.81$ 3,593.07$ 4.20$ 3,137.40$ 2.80 12" PAVEMENT MARKING (THERMOPLASTIC)634 LF 15.75$ 9,985.50$ 6.00$ 3,804.00$ 6.41$ 4,063.94$ 7.21$ 4,571.14$ 6.30$ 3,994.20$ 2.81 24" PAVEMENT MARKING (THERMOPLASTIC)817 LF 21.00$ 17,157.00$ 12.00$ 9,804.00$ 12.81$ 10,465.77$ 14.42$ 11,781.14$ 12.60$ 10,294.20$ 2.82 PAVEMENT SYMBOLS (THERMOPLASTIC)76 EA 525.00$ 39,900.00$ 260.00$ 19,760.00$ 550.00$ 41,800.00$ 600.74$ 45,656.24$ 525.00$ 39,900.00$ 2.83 RAISED PAVEMENT MARKER (TYPE 2, RED/CLEAR) (SP #30) 144 EA 5.78$ 832.32$ 23.50$ 3,384.00$ 7.50$ 1,080.00$ 8.41$ 1,211.04$ 7.35$ 1,058.40$ 2.84 PAVEMENT MARKING REMOVAL 530 SF 15.75$ 8,347.50$ 3.50$ 1,855.00$ 4.27$ 2,263.10$ 4.81$ 2,549.30$ 4.20$ 2,226.00$ 2.85 D3-1 SIGN (SP #31)21 EA 472.50$ 9,922.50$ 375.00$ 7,875.00$ 350.00$ 7,350.00$ 390.48$ 8,200.08$ 350.00$ 7,350.00$ 2.86 D1-1d SIGN (SP #31)4 EA 682.50$ 2,730.00$ 480.00$ 1,920.00$ 445.00$ 1,780.00$ 498.61$ 1,994.44$ 440.00$ 1,760.00$ 2.87 REGULATORY SIGNS AND WARNING SIGNS (DESIGNATED BY R OR W) (SP #31) 683 SF 42.00$ 28,686.00$ 23.00$ 15,709.00$ 21.36$ 14,588.88$ 24.03$ 16,412.49$ 21.00$ 14,343.00$ 2.88 SIGN SUPPORTS (SP #31)109 EA 157.50$ 17,167.50$ 105.00$ 11,445.00$ 96.10$ 10,474.90$ 108.13$ 11,786.17$ 95.00$ 10,355.00$ 2.89 EROSION CONTROL 1 LS 21,000.00$ 21,000.00$ 68,525.00$ 68,525.00$ 102,000.00$ 102,000.00$ 126,600.65$ 126,600.65$ 125,000.00$ 125,000.00$ 2.90 TRAFFIC CONTROL AND MAINTENANCE 1 LS 262,500.00$ 262,500.00$ 65,760.00$ 65,760.00$ 430,000.00$ 430,000.00$ 219,924.35$ 219,924.35$ 350,000.00$ 350,000.00$ 2.91 AGGREGATE BASE FOR ROADWAY MAINTENANCE 200 TON 52.50$ 10,500.00$ 41.00$ 8,200.00$ 58.00$ 11,600.00$ 69.39$ 13,878.00$ 49.50$ 9,900.00$ 2.92 PORTABLE CHANGEABLE MESSAGE SIGN 1000 DAY 26.25$ 26,250.00$ 35.00$ 35,000.00$ 26.00$ 26,000.00$ 28.84$ 28,840.00$ 26.00$ 26,000.00$ 2.93 CAST-IN-PLACE DETECTABLE WARNING PANEL 803 SF 54.60$ 43,843.80$ 39.00$ 31,317.00$ 25.00$ 20,075.00$ 31.24$ 25,085.72$ 31.00$ 24,893.00$ 2.94 HANDICAP ACCESS RAMP 377 SY 94.50$ 35,626.50$ 88.00$ 33,176.00$ 104.00$ 39,208.00$ 174.21$ 65,677.17$ 99.00$ 37,323.00$ 2.95 PROJECT SIGNS 2 EA 1,575.00$ 3,150.00$ 1,100.00$ 2,200.00$ 1,014.41$ 2,028.82$ 1,141.40$ 2,282.80$ 1,000.00$ 2,000.00$ 2.96 COLD MILLING PAVEMENT 9500 SY 5.78$ 54,910.00$ 5.00$ 47,500.00$ 3.87$ 36,765.00$ 5.11$ 48,545.00$ 9.50$ 90,250.00$ 2.97 TREE PROTECTION FENCING 2973 LF 4.73$ 14,062.29$ 7.00$ 20,811.00$ 4.81$ 14,300.13$ 7.54$ 22,416.42$ 10.00$ 29,730.00$ 2.98 TRAFFIC SIGNAL CONTROLLER (MODIFICATION) (SP #32)1 EA 3,441.38$ 3,441.38$ 7,545.00$ 7,545.00$ 10,677.92$ 10,677.92$ 1,802.22$ 1,802.22$ 10,500.00$ 10,500.00$ 2.99 LED BLANK OUT SIGN (SP #19)1 EA 603.75$ 603.75$ 9,800.00$ 9,800.00$ 16,016.89$ 16,016.89$ 10,008.29$ 10,008.29$ 15,750.00$ 15,750.00$ 2.100 TRAFFIC SIGNAL HEAD, LED, (3 SECTION, 1 WAY) (SP #21 & ARDOT 706) 1 EA 2,152.50$ 2,152.50$ 1,150.00$ 1,150.00$ 2,135.58$ 2,135.58$ 1,934.38$ 1,934.38$ 2,100.00$ 2,100.00$ 2.101 TRAFFIC SIGNAL HEAD, LED, (4 SECTION, 1 WAY) (SP #21 & ARDOT 706) 3 EA 2,502.21$ 7,506.63$ 1,270.00$ 3,810.00$ 2,349.14$ 7,047.42$ 2,895.55$ 8,686.65$ 2,310.00$ 6,930.00$ 2.102 RELOCATION OF TRAFFIC SIGNAL HEAD (SP #23)5 EA 603.75$ 3,018.75$ 635.00$ 3,175.00$ 1,281.35$ 6,406.75$ 270.33$ 1,351.65$ 1,260.00$ 6,300.00$ 2.103 COUNTDOWN PEDESTRIAN SIGNAL HEAD, LED (SP #20 & ARDOT 707) 8 EA 2,385.69$ 19,085.52$ 880.00$ 7,040.00$ 1,601.69$ 12,813.52$ 1,489.83$ 11,918.64$ 1,575.00$ 12,600.00$ 2.104 AUDIBLE PEDESTRIAN WARNING SIGNALS (SP #36)8 EA 2,100.00$ 16,800.00$ 980.00$ 7,840.00$ 1,601.69$ 12,813.52$ 2,426.98$ 19,415.84$ 1,575.00$ 12,600.00$ 2.105 TRAFFIC SIGNAL CABLE (5C/12 A.W.G.) (ARDOT 708)1895 LF 4.73$ 8,963.35$ 3.00$ 5,685.00$ 4.27$ 8,091.65$ 4.21$ 7,977.95$ 4.20$ 7,959.00$ 2.106 TRAFFIC SIGNAL CABLE (5C/14 A.W.G.) (ARDOT 708)2360 LF 4.20$ 9,912.00$ 2.50$ 5,900.00$ 4.00$ 9,440.00$ 6.37$ 15,033.20$ 3.95$ 9,322.00$ 2.107 TRAFFIC SIGNAL CABLE (7C/14 A.W.G.) (ARDOT 708)450 LF 7.35$ 3,307.50$ 3.50$ 1,575.00$ 4.81$ 2,164.50$ 8.41$ 3,784.50$ 4.75$ 2,137.50$ 2.108 ELECTRICAL CONDUCTORS-IN-CONDUIT (1C/8 A.W.G., E.G.C.) (SP #18) 495 LF 2.83$ 1,400.85$ 2.00$ 990.00$ 2.14$ 1,059.30$ 3.36$ 1,663.20$ 2.10$ 1,039.50$ 2.109 NON-METALLIC CONDUIT (2") (ARDOT 710)65 LF 32.76$ 2,129.40$ 10.00$ 650.00$ 21.36$ 1,388.40$ 51.06$ 3,318.90$ 21.00$ 1,365.00$ 2.110 NON-METALLIC CONDUIT (3") (ARDOT 710)460 LF 57.36$ 26,385.60$ 34.50$ 15,870.00$ 53.39$ 24,559.40$ 61.88$ 28,464.80$ 52.50$ 24,150.00$ 2.111 CONCRETE PULL BOX (TYPE 2) (ARDOT 711)2 EA 1,985.82$ 3,971.64$ 1,210.00$ 2,420.00$ 2,135.59$ 4,271.18$ 2,378.93$ 4,757.86$ 2,100.00$ 4,200.00$ 2.112 CONCRETE PULL BOX (TYPE 2 HD) (ARDOT 711)4 EA 2,274.87$ 9,099.48$ 1,730.00$ 6,920.00$ 2,669.48$ 10,677.92$ 2,426.98$ 9,707.92$ 2,625.00$ 10,500.00$ 2.113 TRAFFIC SIGNAL PEDESTAL POLE WITH FOUNDATION (SS & ARDOT 715) 8 EA 6,598.63$ 52,789.04$ 2,880.00$ 23,040.00$ 9,076.24$ 72,609.92$ 5,490.74$ 43,925.92$ 8,925.00$ 71,400.00$ 2.114 REMOVAL OF TRAFFIC SIGNAL EQUIPMENT (SP #22)1 LS 9,471.53$ 9,471.53$ 1,730.00$ 1,730.00$ 16,016.89$ 16,016.89$ 3,388.16$ 3,388.16$ 17,500.00$ 17,500.00$ 2.115 VIDEO DETECTOR RELOCATION (ARDOT 733)4 EA 603.75$ 2,415.00$ 635.00$ 2,540.00$ 1,601.69$ 6,406.76$ 1,081.33$ 4,325.32$ 1,575.00$ 6,300.00$ 2.116 VIDEO DETECTOR ROTATION (SP #27)2 EA 301.88$ 603.76$ 635.00$ 1,270.00$ 533.90$ 1,067.80$ 1,081.33$ 2,162.66$ 525.00$ 1,050.00$ 2.117 VIDEO CABLE (ARDOT 733)850 LF 7.85$ 6,672.50$ 3.00$ 2,550.00$ 4.54$ 3,859.00$ 4.81$ 4,088.50$ 4.50$ 3,825.00$ 2.118 4" SCHEDULE 40 PVC CONDUIT WITH CAPS (FOR FUTURE) (SP #11) 1249 LF 23.10$ 28,851.90$ 27.00$ 33,723.00$ 64.07$ 80,023.43$ 39.05$ 48,773.45$ 63.00$ 78,687.00$ 2.119 CITY FIBER CONDUIT (OWNER SUPPLIED, CONTRACTOR INSTALLED) (SP #11)6000 LF 2.120 FIBER HANDHOLE (INCL. COVER LABELED "FIBER OPTIC") (SP #11)13 EA 2.121 SINGLE ROADWAY LUMINAIRE ASSEMBLY WITH FOUNDATION (TYPE S1 & TYPE S3) (SP #13) 28 EA 15,487.50$ 433,650.00$ 15,065.00$ 421,820.00$ 19,201.05$ 537,629.40$ 23,861.29$ 668,116.12$ 19,000.00$ 532,000.00$ 2.122 DOUBLE ROADWAY LUMINAIRE ASSEMBLY WITH FOUNDATION (TYPE S2) (SP #13) 37 EA 17,587.50$ 650,737.50$ 18,180.00$ 672,660.00$ 19,745.62$ 730,587.94$ 28,607.11$ 1,058,463.07$ 19,500.00$ 721,500.00$ 2.123 SHARED USE PATH LUMINAIRE ASSEMBLY (TYPE S4) (SP #13) 18 EA 9,187.50$ 165,375.00$ 13,335.00$ 240,030.00$ 17,084.68$ 307,524.24$ 16,243.94$ 292,390.92$ 16,800.00$ 302,400.00$ 2.124 DECORATIVE CONCRETE PAVING (8" UNIFORM THICKNESS) (SP #7) 1526 SY 183.75$ 280,402.50$ 205.00$ 312,830.00$ 210.84$ 321,741.84$ 211.32$ 322,474.32$ 159.00$ 242,634.00$ 2.125 TRANSIT STOP (HARDSCAPE ONLY, SHELTER BY OTHERS) (SP #15) 2 EA 17,850.00$ 35,700.00$ 8,275.00$ 16,550.00$ 17,992.30$ 35,984.60$ 96.89$ 193.78$ 20,000.00$ 40,000.00$ 2.126 RRFB (RECTANGULAR RAPID FLASHING BEACON), INSTALLED COMPLETE (SP #14) 8 EA 19,162.50$ 153,300.00$ 14,995.00$ 119,960.00$ 17,084.68$ 136,677.44$ 22,227.29$ 177,818.32$ 16,800.00$ 134,400.00$ 2.127 TEMPORARY FENCING (TYPE B) (SP #8)2150 LF 6.83$ 14,684.50$ 8.00$ 17,200.00$ 11.75$ 25,262.50$ 13.22$ 28,423.00$ 10.50$ 22,575.00$ 2.128 RED COLORED CONCRETE (TR1 TRAIL DETAIL)(8" THICK) (SP #10) 534 SY 183.75$ 98,122.50$ 165.00$ 88,110.00$ 177.29$ 94,672.86$ 168.60$ 90,032.40$ 151.00$ 80,634.00$ 3.1 BLACK WOVEN WIRE FENCE (SP #8)2105 LF 31.50$ 66,307.50$ 19.50$ 41,047.50$ 16.02$ 33,722.10$ 18.02$ 37,932.10$ 47.25$ 99,461.25$ 3.2 BLACK 5-STRAND CABLE FENCE (SP #8)2530 LF 63.00$ 159,390.00$ 43.00$ 108,790.00$ 34.70$ 87,791.00$ 39.05$ 98,796.50$ 26.25$ 66,412.50$ 3.3 RELOCATE ORNAMENTAL WROUGHT IRON FENCE (SP #8)250 LF 94.50$ 23,625.00$ 63.00$ 15,750.00$ 34.17$ 8,542.50$ 38.45$ 9,612.50$ 105.00$ 26,250.00$ 3.4 RELOCATE GATE (SP #8)2 EA 1,050.00$ 2,100.00$ 1,780.00$ 3,560.00$ 266.95$ 533.90$ 300.37$ 600.74$ 2,625.00$ 5,250.00$ 3.5 RELOCATE 5' TALL CHAINLINK FENCE (SP #8)2797 LF 23.66$ 66,177.02$ 44.00$ 123,068.00$ 32.03$ 89,587.91$ 36.04$ 100,803.88$ 42.00$ 117,474.00$ BID ITEM REMOVED PER ADDENDUM 3 BID ITEM REMOVED PER ADDENDUM 3 Continues Next Page 13,102,067.67$ 13,414,130.08$ SCHEDULE C (RIGHT OF WAY APPURTENANCES) SUBTOTAL CONSTRUCTION COST SCHEDULE B (ROADWAY AND DRAINAGE)15,109,916.95$ 12,651,481.35$ 12,134,496.90$ Page 2 Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Certified Bid Tabulation Bid 26-43, Construction - Highway 112 Widening Bid Opening Date: July 14, 2026 ITEM NO.ITEM DESCRIPTION QTY.PAY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL FORSGREN, INC.GRANT GARRETT EXCAVATING, INC.ENGINEER'S OPCC APAC-CENTRAL, INC.CONTRACT CROSSLAND HEAVY CONTRACTORS, INC. 3.6 TEMPORARY FENCING (TYPE B)(IF AND WHERE DIRECTED) (SP #8 & ARDOT 619)500 LF 10.50$ 5,250.00$ 8.00$ 4,000.00$ 11.75$ 5,875.00$ 13.22$ 6,610.00$ 15.75$ 7,875.00$ 3.7 MONUMENT SIGN RELOCATION - THE VINEYARDS ON GARLAND (SP #12) 1 LS 1,575.00$ 1,575.00$ 5,425.00$ 5,425.00$ 3,500.00$ 3,500.00$ 2,553.13$ 2,553.13$ 18,000.00$ 18,000.00$ 3.8 RELOCATE "WATERSHED RESEARCH & EDUCATION CENTER" SIGN (SP #9) 1 LS 840.00$ 840.00$ 3,030.00$ 3,030.00$ 3,500.00$ 3,500.00$ 2,553.13$ 2,553.13$ 18,000.00$ 18,000.00$ 3.9 MONUMENT SIGN RELOCATION - DOROTHY E. KING EQUINE PAVILION (SP #12) 1 LS 31,500.00$ 31,500.00$ 26,500.00$ 26,500.00$ 3,500.00$ 3,500.00$ 2,553.13$ 2,553.13$ 18,000.00$ 18,000.00$ 3.10 RELOCATE "FOOD SCIENCE DEPARTMENT" SIGN (SP #9)1 LS 525.00$ 525.00$ 5,425.00$ 5,425.00$ 3,500.00$ 3,500.00$ 2,553.13$ 2,553.13$ 18,000.00$ 18,000.00$ 3.11 RELOCATE " CROP, SOIL, AND ENVIRONMENTAL ALTHIEMER LAB" SIGN (SP #9) 1 LS 525.00$ 525.00$ 5,425.00$ 5,425.00$ 3,500.00$ 3,500.00$ 2,553.13$ 2,553.13$ 18,000.00$ 18,000.00$ 3.12 RELOCATE "POULTRY SCIENCE POULTRY HEALTH RESEARCH" SIGN (SP #9)1 LS 525.00$ 525.00$ 3,030.00$ 3,030.00$ 3,500.00$ 3,500.00$ 2,553.13$ 2,553.13$ 18,000.00$ 18,000.00$ 4.1 CONSTRUCTION CONTROL AND LAYOUT 1 LS 6,825.00$ 6,825.00$ 43,175.00$ 43,175.00$ 35,000.00$ 35,000.00$ 41,917.01$ 41,917.01$ 18,000.00$ 18,000.00$ 4.2 4" SEWER SERVICE LATERAL PIPE (PVC)26 LF 52.50$ 1,365.00$ 112.00$ 2,912.00$ 55.93$ 1,454.18$ 52.41$ 1,362.66$ 84.00$ 2,184.00$ 4.3 8" X 4" SEWER SERVICE WYE 2 EA 525.00$ 1,050.00$ 200.00$ 400.00$ 723.10$ 1,446.20$ 678.12$ 1,356.24$ 525.00$ 1,050.00$ 4.4 8" GRAVITY SEWER (PVC SDR-26)1100 LF 115.50$ 127,050.00$ 73.00$ 80,300.00$ 100.89$ 110,979.00$ 94.68$ 104,148.00$ 175.00$ 192,500.00$ 4.5 8" DIA. - REMOVE CLAY PIPE, REPLACE WITH PVC (DETAIL S25) 3 EA 2,835.00$ 8,505.00$ 1,010.00$ 3,030.00$ 2,935.84$ 8,807.52$ 2,752.93$ 8,258.79$ 15,750.00$ 47,250.00$ 4.6 4' ID SANITARY SEWER MANHOLE , 0' - 6' DEPTH 6 EA 7,875.00$ 47,250.00$ 8,985.00$ 53,910.00$ 9,298.86$ 55,793.16$ 8,709.12$ 52,254.72$ 8,400.00$ 50,400.00$ 4.7 4' ID SANITARY SEWER MANHOLE, ADDITIONAL DEPTH OVER 6'8 VF 630.00$ 5,040.00$ 375.00$ 3,000.00$ 450.38$ 3,603.04$ 420.52$ 3,364.16$ 525.00$ 4,200.00$ 4.8 CORE INTO EXISTING SS MANHOLE, RESHAPE INVERT 1 EA 3,990.00$ 3,990.00$ 1,900.00$ 1,900.00$ 2,927.33$ 2,927.33$ 2,737.10$ 2,737.10$ 4,725.00$ 4,725.00$ 4.9 PLUG, ABANDON AND FILL EXISTING GRAVITY SS 1133 LF 20.48$ 23,203.84$ 16.50$ 18,694.50$ 28.60$ 32,403.80$ 26.77$ 30,330.41$ 18.90$ 21,413.70$ 4.10 DISCONNECT AND SEAL EXISTING SS MANHOLE 5 EA 1,281.00$ 6,405.00$ 860.00$ 4,300.00$ 2,034.29$ 10,171.45$ 1,902.27$ 9,511.35$ 2,625.00$ 13,125.00$ 4.11 ABANDON EXISTING SS MANHOLE 3 EA 1,449.00$ 4,347.00$ 1,260.00$ 3,780.00$ 2,539.65$ 7,618.95$ 2,393.01$ 7,179.03$ 4,200.00$ 12,600.00$ 4.12 REMOVE AND DISPOSE EXISTING SS MANHOLE 2 EA 2,021.25$ 4,042.50$ 1,680.00$ 3,360.00$ 7,068.31$ 14,136.62$ 6,600.79$ 13,201.58$ 4,200.00$ 8,400.00$ 4.13 16" DIAMETER STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY)15 LF 241.31$ 3,619.65$ 1,960.00$ 29,400.00$ 639.54$ 9,593.10$ 602.82$ 9,042.30$ 525.00$ 7,875.00$ 5.1 CONSTRUCTION CONTROL AND LAYOUT 1 LS 15,750.00$ 15,750.00$ 1,000.00$ 1,000.00$ 45,000.00$ 45,000.00$ 38,274.82$ 38,274.82$ 32,550.00$ 32,550.00$ 5.2 8" DIA. WATER LINE (AWWA C900 DR14)1176 LF 121.20$ 142,531.20$ 75.00$ 88,200.00$ 87.60$ 103,017.60$ 82.35$ 96,843.60$ 100.00$ 117,600.00$ 5.3 12" DIA. WATER LINE (AWWA C900 DR14)4534 LF 128.14$ 580,986.76$ 105.00$ 476,070.00$ 115.14$ 522,044.76$ 108.54$ 492,120.36$ 145.00$ 657,430.00$ 5.4 16" DIA. STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY)268 LF 241.31$ 64,671.08$ 410.00$ 109,880.00$ 426.51$ 114,304.68$ 402.77$ 107,942.36$ 290.00$ 77,720.00$ 5.5 24" DIA. STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY)112 LF 305.92$ 34,263.04$ 520.00$ 58,240.00$ 606.75$ 67,956.00$ 573.37$ 64,217.44$ 450.00$ 50,400.00$ 5.6 DUCTILE IRON FITTINGS FOR WATER LINE 7956 LB 21.20$ 168,667.20$ 13.50$ 107,406.00$ 17.47$ 138,991.32$ 16.54$ 131,592.24$ 18.90$ 150,368.40$ 5.7 TAPPING SLEEVE AND VALVE (8"X8")9 EA 8,450.84$ 76,057.56$ 8,230.00$ 74,070.00$ 11,498.29$ 103,484.61$ 10,846.12$ 97,615.08$ 9,975.00$ 89,775.00$ 5.8 8" GATE VALVE 9 EA 2,952.63$ 26,573.67$ 3,020.00$ 27,180.00$ 3,816.19$ 34,345.71$ 3,615.21$ 32,536.89$ 4,725.00$ 42,525.00$ 5.9 12" BUTTERFLY VALVE 13 EA 5,640.99$ 73,332.87$ 8,850.00$ 115,050.00$ 10,648.03$ 138,424.39$ 10,092.12$ 131,197.56$ 8,925.00$ 116,025.00$ 5.10 CUT, CAP AND ABANDON EXISTING WATER LINE (8")9 EA 2,895.64$ 26,060.76$ 1,250.00$ 11,250.00$ 6,494.07$ 58,446.63$ 6,095.34$ 54,858.06$ 4,725.00$ 42,525.00$ 5.11 FLOWABLE FILL ABANDON 8" WATER LINE UNDER ROADWAY 2450 LF 21.50$ 52,675.00$ 16.50$ 40,425.00$ 13.90$ 34,055.00$ 13.03$ 31,923.50$ 18.90$ 46,305.00$ 5.12 FIRE HYDRANT ASSEMBLY INSTALLED COMPLETE (INCLUDING TEE & VALVE)15 EA 8,287.73$ 124,315.95$ 10,020.00$ 150,300.00$ 9,947.55$ 149,213.25$ 9,425.42$ 141,381.30$ 10,815.00$ 162,225.00$ 5.13 FIRE HYDRANT ASSEMBLY REMOVAL 5 EA 1,484.03$ 7,420.15$ 735.00$ 3,675.00$ 1,403.16$ 7,015.80$ 1,320.00$ 6,600.00$ 1,575.00$ 7,875.00$ 5.14 CONCRETE ANCHOR COLLAR 2 EA 4,192.21$ 8,384.42$ 4,125.00$ 8,250.00$ 3,696.88$ 7,393.76$ 3,462.62$ 6,925.24$ 2,625.00$ 5,250.00$ 5.15 5/8" WATER METER INSTALLED COMPLETE 1 EA 1,914.84$ 1,914.84$ 6,900.00$ 6,900.00$ 4,829.08$ 4,829.08$ 4,566.01$ 4,566.01$ 3,150.00$ 3,150.00$ 5.16 3/4" WATER METER INSTALLED COMPLETE 5 EA 2,365.89$ 11,829.45$ 6,900.00$ 34,500.00$ 4,829.08$ 24,145.40$ 4,566.01$ 22,830.05$ 3,675.00$ 18,375.00$ 5.17 1" WATER METER INSTALLED COMPLETE 2 EA 3,402.00$ 6,804.00$ 8,420.00$ 16,840.00$ 4,710.49$ 9,420.98$ 4,438.55$ 8,877.10$ 3,990.00$ 7,980.00$ 5.18 1-1/2" WATER METER INSTALLED COMPLETE 1 EA 4,536.00$ 4,536.00$ 16,650.00$ 16,650.00$ 10,671.71$ 10,671.71$ 10,103.49$ 10,103.49$ 7,350.00$ 7,350.00$ 5.19 2" WATER METER INSTALLED COMPLETE 2 EA 8,828.00$ 17,656.00$ 16,650.00$ 33,300.00$ 10,942.21$ 21,884.42$ 10,356.10$ 20,712.20$ 11,025.00$ 22,050.00$ 5.20 SDR9 POLYETHYLENE SLEEVE FOR WATER SERVICE LINE 580 LF 23.39$ 13,566.20$ 5.50$ 3,190.00$ 32.15$ 18,647.00$ 30.19$ 17,510.20$ 48.00$ 27,840.00$ 5.21 1" DIA. COATED COPPER SERVICE LINE 410 LF 39.69$ 16,272.90$ 41.00$ 16,810.00$ 63.66$ 26,100.60$ 60.02$ 24,608.20$ 48.00$ 19,680.00$ 5.22 2" DIA. COATED COPPER SERVICE LINE 675 LF 56.70$ 38,272.50$ 100.00$ 67,500.00$ 119.40$ 80,595.00$ 112.83$ 76,160.25$ 82.00$ 55,350.00$ 6.1 CONSTRUCTION CONTROL AND LAYOUT 1 LS 7,875.00$ 7,875.00$ 1,000.00$ 1,000.00$ 35,948.77$ 35,948.77$ 32,418.05$ 32,418.05$ 5,775.00$ 5,775.00$ 6.2 6" DIA. WATER LINE (AWWA C900 DR14)770 LF 115.76$ 89,135.20$ 58.00$ 44,660.00$ 61.56$ 47,401.20$ 57.85$ 44,544.50$ 90.00$ 69,300.00$ 6.3 12" DIA. STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY)259 LF 215.95$ 55,931.05$ 270.00$ 69,930.00$ 254.32$ 65,868.88$ 239.57$ 62,048.63$ 265.00$ 68,635.00$ 6.4 DUCTILE IRON FITTINGS FOR WATER LINE 350 LB 22.26$ 7,791.00$ 16.00$ 5,600.00$ 18.95$ 6,632.50$ 17.90$ 6,265.00$ 18.90$ 6,615.00$ 6.5 TAPPING SLEEVE AND VALVE (6"X6")2 EA 6,904.93$ 13,809.86$ 6,880.00$ 13,760.00$ 9,719.51$ 19,439.02$ 9,160.87$ 18,321.74$ 10,500.00$ 21,000.00$ 6.6 CUT, CAP AND ABANDON EXISTING WATER LINE (6")2 EA 2,895.64$ 5,791.28$ 1,050.00$ 2,100.00$ 13,614.90$ 27,229.80$ 12,775.43$ 25,550.86$ 3,675.00$ 7,350.00$ 6.7 FLOWABLE FILL ABANDONED 8" WATER LINE UNDER ROADWAY 600 LF 18.90$ 11,340.00$ 16.00$ 9,600.00$ 13.69$ 8,214.00$ 12.82$ 7,692.00$ 18.90$ 11,340.00$ 6.8 1" WATER METER INSTALLED COMPLETE 2 EA 3,572.10$ 7,144.20$ 4,200.00$ 8,400.00$ 8,098.24$ 16,196.48$ 7,667.21$ 15,334.42$ 3,990.00$ 7,980.00$ 6.9 2" DIA. COATED COPPER SERVICE LINE 200 LF 59.54$ 11,908.00$ 179.00$ 35,800.00$ 115.99$ 23,198.00$ 109.65$ 21,930.00$ 82.00$ 16,400.00$ Certified Correct: Date: SCHEDULE D (CITY OF FAYETTEVILLE SANITARY SEWER RELOCATIONS) SCHEDULE E (CITY OF FAYETTEVILLE WATER RELOCATIONS) SUBTOTAL CONSTRUCTION COST SCHEDULE E (CITY OF FAYETTEVILLE WATER RELOCATIONS)1,512,541.55$ 1,466,686.00$ 1,719,987.70$ 1,619,395.95$ 1,760,348.40$ 269,674.50$ 284,663.35$ 16,499,999.99$ 430,722.75$ 383,722.70$ 16,897,056.52$ 345,050.50$ SUBTOTAL CONSTRUCTION COST SCHEDULE D (CITY OF FAYETTEVILLE SANITARY SEWER RELOCATIONS)242,692.99$ 293,934.35$ 248,161.50$ 14,923,032.90$ SCHEDULE F (UNIVERSITY OF ARKANSAS WATER RELOCATIONS) SUBTOTAL CONSTRUCTION COST SCHEDULE F (UNIVERSITY OF ARKANSAS WATER RELOCATIONS)210,725.59$ 190,850.00$ 250,128.65$ 234,105.20$ 214,395.00$ TOTAL BID (SUBTOTAL CONSTRUCTION COSTS OF SCHEDULE A + B + C + D + E + F)18,202,029.10$ 16,090,584.46$ SUBTOTAL CONSTRUCTION COST SCHEDULE C (RIGHT OF WAY APPURTENANCES)358,339.52$ 247,052.41$ Page 3 7/16/26 Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Line #Description QTY UOM Unit Extended Unit Extended Unit Extended Unit Extended 1 1.1 MOBILIZATION 1 LS $300,000.00 $300,000.00 $750,000.00 $750,000.00 $469,071.13 $469,071.13 $820,000.00 $820,000.00 1.2 BONDS & INSURANCE 1 LS $180,138.00 $180,138.00 $105,000.00 $105,000.00 $141,163.19 $141,163.19 $90,800.00 $90,800.00 1.3 TRENCH & EXCAVATION SAFETY 1 LS $57,650.00 $57,650.00 $73,000.00 $73,000.00 $67,796.59 $67,796.59 $95,000.00 $95,000.00 2 2.1 ROADWAY CONSTRUCTION CONTROL 1 LS $34,600.00 $34,600.00 $225,000.00 $225,000.00 $354,770.89 $354,770.89 $50,000.00 $50,000.00 2.2 CLEARING, GRUBBING, AND DEMOLITION 1 LS $225,500.00 $225,500.00 $212,000.00 $212,000.00 $93,863.29 $93,863.29 $245,000.00 $245,000.00 2.3 UNCLASSIFIED EXCAVATION (PLAN QUANTITY)26537 CY $25.00 $663,425.00 $6.30 $167,183.10 $5.69 $150,995.53 $17.00 $451,129.00 2.4 SELECT EMBANKMENT (PLAN QUANTITY)18823 CY $32.50 $611,747.50 $13.85 $260,698.55 $12.59 $236,981.57 $19.70 $370,813.10 2.5 EMBANKMENT (PLAN QUANTITY)16007 CY $21.50 $344,150.50 $31.00 $496,217.00 $28.02 $448,516.14 $16.40 $262,514.80 2.6 UNDERCUT AND BACKFILL 6750 CY $42.00 $283,500.00 $35.00 $236,250.00 $31.44 $212,220.00 $37.40 $252,450.00 2.7 ROCK EXCAVATION 150 CY $280.00 $42,000.00 $420.00 $63,000.00 $420.52 $63,078.00 $210.00 $31,500.00 2.8 TRAIL UNDERCUT AND BACKFILL (SP #6)1073 CY $41.00 $43,993.00 $37.00 $39,701.00 $33.61 $36,063.53 $38.25 $41,042.25 2.9 SUBGRADE PREPARATION 40619 SY $3.00 $121,857.00 $6.00 $243,714.00 $5.10 $207,156.90 $2.95 $119,826.05 2.10 4" TOPSOIL PLACEMENT (SOD + SEEDING AREAS)37440 SY $6.50 $243,360.00 $6.00 $224,640.00 $4.52 $169,228.80 $8.50 $318,240.00 2.11 18" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT 483 LF $105.00 $50,715.00 $123.00 $59,409.00 $115.54 $55,805.82 $131.00 $63,273.00 2.12 24" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT 396 LF $113.00 $44,748.00 $138.00 $54,648.00 $129.90 $51,440.40 $162.50 $64,350.00 2.13 30" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT 124 LF $163.00 $20,212.00 $174.00 $21,576.00 $163.27 $20,245.48 $205.00 $25,420.00 2.14 36" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT 92 LF $205.00 $18,860.00 $229.00 $21,068.00 $215.84 $19,857.28 $281.50 $25,898.00 2.15 23"X14" H.E. REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT 47 LF $132.00 $6,204.00 $196.00 $9,212.00 $184.31 $8,662.57 $181.00 $8,507.00 2.16 18" REINFORCED CONCRETE PIPE (CLASS III)3275 LF $57.00 $186,675.00 $102.00 $334,050.00 $96.00 $314,400.00 $82.00 $268,550.00 2.17 24" REINFORCED CONCRETE PIPE (CLASS III)1780 LF $80.00 $142,400.00 $125.00 $222,500.00 $117.29 $208,776.20 $96.50 $171,770.00 2.18 30" REINFORCED CONCRETE PIPE (CLASS III)762 LF $117.00 $89,154.00 $165.00 $125,730.00 $155.53 $118,513.86 $138.00 $105,156.00 2.19 36" REINFORCED CONCRETE PIPE (CLASS III)940 LF $195.00 $183,300.00 $228.00 $214,320.00 $214.70 $201,818.00 $180.00 $169,200.00 2.20 60"X38" H.E. REINFORCED CONCRETE PIPE (CLASS III)13 LF $332.00 $4,316.00 $413.00 $5,369.00 $389.12 $5,058.56 $382.50 $4,972.50 2.21 18" R.C. FLARED END SECTION 7 EA $1,030.00 $7,210.00 $1,838.00 $12,866.00 $1,725.85 $12,080.95 $1,250.00 $8,750.00 2.22 24" R.C. FLARED END SECTION 4 EA $1,160.00 $4,640.00 $1,987.00 $7,948.00 $1,866.82 $7,467.28 $1,350.00 $5,400.00 2.23 36" R.C. FLARED END SECTION 1 EA $2,100.00 $2,100.00 $3,245.00 $3,245.00 $3,055.95 $3,055.95 $2,700.00 $2,700.00 2.24 60"X38" ELLIPTICAL R.C. FLARED END SECTION 1 EA $7,030.00 $7,030.00 $8,217.00 $8,217.00 $7,772.82 $7,772.82 $7,200.00 $7,200.00 2.25 23"X14" ELLIPTICAL R.C. FLARED END SECTION 2 EA $1,030.00 $2,060.00 $4,141.00 $8,282.00 $3,910.77 $7,821.54 $1,450.00 $2,900.00 2.26 4'X4' DROP INLETS (TYPE C)15 EA $5,650.00 $84,750.00 $8,217.00 $123,255.00 $7,741.92 $116,128.80 $7,550.00 $113,250.00 2.27 4'X5' DROP INLETS (TYPE C)14 EA $6,940.00 $97,160.00 $8,818.00 $123,452.00 $8,310.03 $116,340.42 $7,950.00 $111,300.00 2.28 4'X6' DROP INLETS (TYPE C)5 EA $7,800.00 $39,000.00 $8,735.00 $43,675.00 $9,174.47 $45,872.35 $8,600.00 $43,000.00 2.29 4'X7' DROP INLETS (TYPE C)3 EA $9,100.00 $27,300.00 $11,982.00 $35,946.00 $11,286.25 $33,858.75 $10,200.00 $30,600.00 2.30 4'X8' DROP INLETS (TYPE C)3 EA $15,400.00 $46,200.00 $13,315.00 $39,945.00 $12,546.73 $37,640.19 $11,300.00 $33,900.00 2.31 5'X5' DROP INLETS (TYPE C)5 EA $8,560.00 $42,800.00 $9,792.00 $48,960.00 $9,228.78 $46,143.90 $8,600.00 $43,000.00 2.32 5'X6' DROP INLETS (TYPE C)1 EA $8,855.00 $8,855.00 $10,845.00 $10,845.00 $10,223.03 $10,223.03 $10,000.00 $10,000.00 2.33 5'X8' DROP INLETS (TYPE C)2 EA $10,150.00 $20,300.00 $13,888.00 $27,776.00 $13,092.91 $26,185.82 $12,550.00 $25,100.00 2.34 8'X5' DROP INLETS (TYPE C)2 EA $10,800.00 $21,600.00 $14,446.00 $28,892.00 $13,613.30 $27,226.60 $12,550.00 $25,100.00 2.35 9'X8' DROP INLETS (TYPE C)1 EA $17,090.00 $17,090.00 $14,250.00 $14,250.00 $13,303.83 $13,303.83 $17,000.00 $17,000.00 2.36 4' DROP INLETS (TYPE MO)2 EA $5,654.00 $11,308.00 $7,715.00 $15,430.00 $7,265.51 $14,531.02 $7,200.00 $14,400.00 2.37 5' DROP INLETS (TYPE MO)4 EA $7,000.00 $28,000.00 $9,175.00 $36,700.00 $8,646.97 $34,587.88 $9,050.00 $36,200.00 2.38 6' DROP INLETS (TYPE MO)5 EA $9,600.00 $48,000.00 $12,500.00 $62,500.00 $11,742.29 $58,711.45 $12,200.00 $61,000.00 2.39 4'X4' JUNCTION BOXES (TYPE C)7 EA $5,735.00 $40,145.00 $8,000.00 $56,000.00 $7,529.34 $52,705.38 $7,550.00 $52,850.00 2.40 5'X4' JUNCTION BOXES (TYPE C)1 EA $6,200.00 $6,200.00 $9,000.00 $9,000.00 $8,423.25 $8,423.25 $7,950.00 $7,950.00 2.41 5' JUNCTION BOXES (TYPE MO)3 EA $7,020.00 $21,060.00 $9,250.00 $27,750.00 $8,677.97 $26,033.91 $9,050.00 $27,150.00 2.42 4'X4' GRATED INLETS (TYPE C)1 EA $7,700.00 $7,700.00 $10,750.00 $10,750.00 $10,110.08 $10,110.08 $7,750.00 $7,750.00 2.43 4' DROP INLET EXTENSION 41 EA $1,235.00 $50,635.00 $1,575.00 $64,575.00 $1,455.47 $59,674.27 $1,850.00 $75,850.00 2.44 8' DROP INLET EXTENSION 6 EA $2,570.00 $15,420.00 $3,110.00 $18,660.00 $2,910.94 $17,465.64 $2,750.00 $16,500.00 2.45 SIDEWALK UNDERDRAIN (SP #29)2 EA $1,225.00 $2,450.00 $6,100.00 $12,200.00 $5,672.11 $11,344.22 $1,350.00 $2,700.00 2.46 DRAINAGE STRUCTURE BACK OPENING (SP #29)4 EA $1,235.00 $4,940.00 $1,360.00 $5,440.00 $1,261.55 $5,046.20 $1,250.00 $5,000.00 2.47 CORE & GROUT EXISTING INLET (SP #37)4 EA $1,235.00 $4,940.00 $4,200.00 $16,800.00 $3,907.97 $15,631.88 $1,000.00 $4,000.00 2.48 REMOVE TOP AND CONVERT TO JUNCTION BOX (SP #37)2 EA $2,870.00 $5,740.00 $2,891.00 $5,782.00 $2,698.79 $5,397.58 $3,600.00 $7,200.00 2.49 REMOVE TOP AND RECONSTRUCT AT PROPOSED GRADE (SP #37)1 EA $2,980.00 $2,980.00 $3,275.00 $3,275.00 $3,045.87 $3,045.87 $3,600.00 $3,600.00 2.50 4'X3' PRECAST CONCRETE BOX CULVERT 766 LF $435.00 $333,210.00 $537.00 $411,342.00 $487.35 $373,310.10 $449.00 $343,934.00 2.51 5'X3' PRECAST CONCRETE BOX CULVERT 224 LF $620.00 $138,880.00 $769.00 $172,256.00 $698.09 $156,372.16 $641.00 $143,584.00 2.52 6'X3' PRECAST CONCRETE BOX CULVERT 5 LF $823.00 $4,115.00 $1,710.00 $8,550.00 $1,544.04 $7,720.20 $1,100.00 $5,500.00 2.53 6'X3' WINGWALLS & APPURTENANCES 1 LS $4,840.00 $4,840.00 $13,926.00 $13,926.00 $4,788.38 $4,788.38 $18,000.00 $18,000.00 2.54 RIP RAP 53 SY $135.00 $7,155.00 $69.00 $3,657.00 $64.21 $3,403.13 $125.00 $6,625.00 PACKAGE B - ROADWAY AND DRAINAGE $13,102,067.67$13,414,130.08$12,651,481.35$12,134,496.90 Total $14,923,032.90 Certification of Funds: $19,462,065 ($24,327,581 maximum allowed) Deadline: Tuesday, July 14, 2026 at 2:00 PM Bid 26-43, Construction - Highway 112 Widening BID TABULATION $537,788.00 $928,000.00 $678,030.91 $1,005,800.00PACKAGE A - BASE BID ITEMS APAC-Central, Inc.Grant Garrett Excavating Inc Forsgren, Inc. $16,897,056.52$16,499,999.99$16,090,584.46 Crossland Heavy Contractors, Inc. Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 2.55 FLOWABLE SELECT MATERIAL 70 CY $197.00 $13,790.00 $265.00 $18,550.00 $251.01 $17,570.70 $231.00 $16,170.00 2.56 SELECT PIPE BACKFILL (CLASS 67)(IF AND WHERE DIRECTED) (SP #28)500 CY $78.00 $39,000.00 $111.00 $55,500.00 $104.88 $52,440.00 $62.00 $31,000.00 2.57 8" DEPTH AGGREGATE BASE COURSE 2756 SY $19.00 $52,364.00 $17.00 $46,852.00 $22.23 $61,265.88 $66.25 $182,585.00 2.58 PRIME COAT 2149 SY $7.00 $15,043.00 $5.75 $12,356.75 $6.96 $14,957.04 $3.85 $8,273.65 2.59 ASPHALT CONCRETE HOT MIX BINDER COURSE (ACHMBC)7143 TON $126.00 $900,018.00 $110.00 $785,730.00 $131.86 $941,875.98 $125.25 $894,660.75 2.60 ASPHALT CONCRETE HOT MIX SURFACE COURSE (ACHMSC)7720 TON $150.00 $1,158,000.00 $131.00 $1,011,320.00 $156.19 $1,205,786.80 $154.75 $1,194,670.00 2.61 ASPHALT CONCRETE HOT MIX BASE COURSE 8843 TON $120.00 $1,061,160.00 $105.00 $928,515.00 $124.95 $1,104,932.85 $117.95 $1,043,031.85 2.62 PORTLAND CEMENT CONCRETE BASE (5" UNIFORM THICKNESS) (ARDOT 309)2044 SY $60.00 $122,640.00 $50.00 $102,200.00 $61.88 $126,482.72 $66.50 $135,926.00 2.63 PORTLAND CEMENT CONCRETE BASE (6" UNIFORM THICKNESS) (ARDOT 309)856 SY $69.00 $59,064.00 $59.00 $50,504.00 $71.79 $61,452.24 $76.50 $65,484.00 2.64 ASPHALT CONCRETE PATCHING FOR MAINTENANCE OF TRAFFIC 200 TON $288.00 $57,600.00 $250.00 $50,000.00 $300.37 $60,074.00 $280.00 $56,000.00 2.65 CONCRETE CURB AND GUTTER (TYPE A)23058 LF $23.00 $530,334.00 $22.75 $524,569.50 $26.13 $602,505.54 $30.50 $703,269.00 2.66 CONCRETE CURB AND GUTTER (TYPE E-1)460 LF $32.50 $14,950.00 $44.00 $20,240.00 $52.87 $24,320.20 $39.00 $17,940.00 2.67 CONCRETE CURB (TYPE E)352 LF $32.50 $11,440.00 $57.00 $20,064.00 $68.78 $24,210.56 $44.00 $15,488.00 2.68 4" THICK CONCRETE SIDEWALK 3920 SY $71.50 $280,280.00 $52.00 $203,840.00 $75.39 $295,528.80 $61.50 $241,080.00 2.69 CONCRETE TRAIL W/FIBER (INCLUDING AGG. BASE) (SP #6)7270 SY $87.00 $632,490.00 $78.00 $567,060.00 $91.61 $666,004.70 $102.50 $745,175.00 2.70 CONCRETE DRIVEWAY APRONS 270 SY $84.50 $22,815.00 $102.00 $27,540.00 $127.06 $34,306.20 $111.50 $30,105.00 2.71 CONCRETE DRIVEWAY 759 SY $79.00 $59,961.00 $90.00 $68,310.00 $111.14 $84,355.26 $83.50 $63,376.50 2.72 AGGREGATE BASE COURSE DRIVEWAY 1030 SY $26.00 $26,780.00 $22.00 $22,660.00 $27.03 $27,840.90 $10.00 $10,300.00 2.73 SEEDING AND MULCHING 4.54 ACRE $7,725.00 $35,071.50 $7,000.00 $31,780.00 $2,891.48 $13,127.32 $1,930.00 $8,762.20 2.74 SOLID SOD 15470 SY $4.75 $73,482.50 $4.25 $65,747.50 $4.39 $67,913.30 $4.40 $68,068.00 2.75 ADDITIONAL WATERING 387.6 MG $9.00 $3,488.40 $5.50 $2,131.80 $6.61 $2,562.04 $5.50 $2,131.80 2.76 REMOVE AND REPLACE MAILBOXES 2 EA $460.00 $920.00 $450.00 $900.00 $600.74 $1,201.48 $415.00 $830.00 2.77 4" PAVEMENT MARKING (THERMOPLASTIC)2391 LF $1.00 $2,391.00 $2.25 $5,379.75 $2.40 $5,738.40 $2.10 $5,021.10 2.78 6" PAVEMENT MARKING (THERMOPLASTIC)9842 LF $1.00 $9,842.00 $2.30 $22,636.60 $2.58 $25,392.36 $2.26 $22,242.92 2.79 10" PAVEMENT MARKING (THERMOPLASTIC)747 LF $3.50 $2,614.50 $4.27 $3,189.69 $4.81 $3,593.07 $4.20 $3,137.40 2.80 12" PAVEMENT MARKING (THERMOPLASTIC)634 LF $6.00 $3,804.00 $6.41 $4,063.94 $7.21 $4,571.14 $6.30 $3,994.20 2.81 24" PAVEMENT MARKING (THERMOPLASTIC)817 LF $12.00 $9,804.00 $12.81 $10,465.77 $14.42 $11,781.14 $12.60 $10,294.20 2.82 PAVEMENT SYMBOLS (THERMOPLASTIC)76 EA $260.00 $19,760.00 $550.00 $41,800.00 $600.74 $45,656.24 $525.00 $39,900.00 2.83 RAISED PAVEMENT MARKER (TYPE 2, RED/CLEAR) (SP #30)144 EA $23.50 $3,384.00 $7.50 $1,080.00 $8.41 $1,211.04 $7.35 $1,058.40 2.84 PAVEMENT MARKING REMOVAL 530 SF $3.50 $1,855.00 $4.27 $2,263.10 $4.81 $2,549.30 $4.20 $2,226.00 2.85 D3-1 SIGN (SP #31)21 EA $375.00 $7,875.00 $350.00 $7,350.00 $390.48 $8,200.08 $350.00 $7,350.00 2.86 D1-1d SIGN (SP #31)4 EA $480.00 $1,920.00 $445.00 $1,780.00 $498.61 $1,994.44 $440.00 $1,760.00 2.87 REGULATORY SIGNS AND WARNING SIGNS (DESIGNATED BY R OR W) (SP #31)683 SF $23.00 $15,709.00 $21.36 $14,588.88 $24.03 $16,412.49 $21.00 $14,343.00 2.88 SIGN SUPPORTS (SP #31)109 EA $105.00 $11,445.00 $96.10 $10,474.90 $108.13 $11,786.17 $95.00 $10,355.00 2.89 EROSION CONTROL 1 LS $68,525.00 $68,525.00 $102,000.00 $102,000.00 $126,600.65 $126,600.65 $125,000.00 $125,000.00 2.90 TRAFFIC CONTROL AND MAINTENANCE 1 LS $65,760.00 $65,760.00 $430,000.00 $430,000.00 $219,924.35 $219,924.35 $350,000.00 $350,000.00 2.91 AGGREGATE BASE FOR ROADWAY MAINTENANCE 200 TON $41.00 $8,200.00 $58.00 $11,600.00 $69.39 $13,878.00 $49.50 $9,900.00 2.92 PORTABLE CHANGEABLE MESSAGE SIGN 1000 DAY $35.00 $35,000.00 $26.00 $26,000.00 $28.84 $28,840.00 $26.00 $26,000.00 2.93 CAST-IN-PLACE DETECTABLE WARNING PANEL 803 SF $39.00 $31,317.00 $25.00 $20,075.00 $31.24 $25,085.72 $31.00 $24,893.00 2.94 HANDICAP ACCESS RAMP 377 SY $88.00 $33,176.00 $104.00 $39,208.00 $174.21 $65,677.17 $99.00 $37,323.00 2.95 PROJECT SIGNS 2 EA $1,100.00 $2,200.00 $1,014.41 $2,028.82 $1,141.40 $2,282.80 $1,000.00 $2,000.00 2.96 COLD MILLING PAVEMENT 9500 SY $5.00 $47,500.00 $3.87 $36,765.00 $5.11 $48,545.00 $9.50 $90,250.00 2.97 TREE PROTECTION FENCING 2973 LF $7.00 $20,811.00 $4.81 $14,300.13 $7.54 $22,416.42 $10.00 $29,730.00 2.98 TRAFFIC SIGNAL CONTROLLER (MODIFICATION) (SP #32)1 EA $7,545.00 $7,545.00 $10,677.92 $10,677.92 $1,802.22 $1,802.22 $10,500.00 $10,500.00 2.99 LED BLANK OUT SIGN (SP #19)1 EA $9,800.00 $9,800.00 $16,016.89 $16,016.89 $10,008.29 $10,008.29 $15,750.00 $15,750.00 2.100 TRAFFIC SIGNAL HEAD, LED, (3 SECTION, 1 WAY) (SP #21 & ARDOT 706)1 EA $1,150.00 $1,150.00 $2,135.58 $2,135.58 $1,934.38 $1,934.38 $2,100.00 $2,100.00 2.101 TRAFFIC SIGNAL HEAD, LED, (4 SECTION, 1 WAY) (SP #21 & ARDOT 706)3 EA $1,270.00 $3,810.00 $2,349.14 $7,047.42 $2,895.55 $8,686.65 $2,310.00 $6,930.00 2.102 RELOCATION OF TRAFFIC SIGNAL HEAD (SP #23)5 EA $635.00 $3,175.00 $1,281.35 $6,406.75 $270.33 $1,351.65 $1,260.00 $6,300.00 2.103 COUNTDOWN PEDESTRIAN SIGNAL HEAD, LED (SP #20 & ARDOT 707)8 EA $880.00 $7,040.00 $1,601.69 $12,813.52 $1,489.83 $11,918.64 $1,575.00 $12,600.00 2.104 AUDIBLE PEDESTRIAN WARNING SIGNALS (SP #36)8 EA $980.00 $7,840.00 $1,601.69 $12,813.52 $2,426.98 $19,415.84 $1,575.00 $12,600.00 2.105 TRAFFIC SIGNAL CABLE (5C/12 A.W.G.) (ARDOT 708)1895 LF $3.00 $5,685.00 $4.27 $8,091.65 $4.21 $7,977.95 $4.20 $7,959.00 2.106 TRAFFIC SIGNAL CABLE (5C/14 A.W.G.) (ARDOT 708)2360 LF $2.50 $5,900.00 $4.00 $9,440.00 $6.37 $15,033.20 $3.95 $9,322.00 2.107 TRAFFIC SIGNAL CABLE (7C/14 A.W.G.) (ARDOT 708)450 LF $3.50 $1,575.00 $4.81 $2,164.50 $8.41 $3,784.50 $4.75 $2,137.50 2.108 ELECTRICAL CONDUCTORS-IN-CONDUIT (1C/8 A.W.G., E.G.C.) (SP #18)495 LF $2.00 $990.00 $2.14 $1,059.30 $3.36 $1,663.20 $2.10 $1,039.50 2.109 NON-METALLIC CONDUIT (2") (ARDOT 710)65 LF $10.00 $650.00 $21.36 $1,388.40 $51.06 $3,318.90 $21.00 $1,365.00 2.110 NON-METALLIC CONDUIT (3") (ARDOT 710)460 LF $34.50 $15,870.00 $53.39 $24,559.40 $61.88 $28,464.80 $52.50 $24,150.00 2.111 CONCRETE PULL BOX (TYPE 2) (ARDOT 711)2 EA $1,210.00 $2,420.00 $2,135.59 $4,271.18 $2,378.93 $4,757.86 $2,100.00 $4,200.00 2.112 CONCRETE PULL BOX (TYPE 2 HD) (ARDOT 711)4 EA $1,730.00 $6,920.00 $2,669.48 $10,677.92 $2,426.98 $9,707.92 $2,625.00 $10,500.00 2.113 TRAFFIC SIGNAL PEDESTAL POLE WITH FOUNDATION (SS & ARDOT 715)8 EA $2,880.00 $23,040.00 $9,076.24 $72,609.92 $5,490.74 $43,925.92 $8,925.00 $71,400.00 2.114 REMOVAL OF TRAFFIC SIGNAL EQUIPMENT (SP #22)1 LS $1,730.00 $1,730.00 $16,016.89 $16,016.89 $3,388.16 $3,388.16 $17,500.00 $17,500.00 2.115 VIDEO DETECTOR RELOCATION (ARDOT 733)4 EA $635.00 $2,540.00 $1,601.69 $6,406.76 $1,081.33 $4,325.32 $1,575.00 $6,300.00 2.116 VIDEO DETECTOR ROTATION (SP #27)2 EA $635.00 $1,270.00 $533.90 $1,067.80 $1,081.33 $2,162.66 $525.00 $1,050.00 2.117 VIDEO CABLE (ARDOT 733)850 LF $3.00 $2,550.00 $4.54 $3,859.00 $4.81 $4,088.50 $4.50 $3,825.00 2.118 4" SCHEDULE 40 PVC CONDUIT WITH CAPS (FOR FUTURE) (SP #11)1249 LF $27.00 $33,723.00 $64.07 $80,023.43 $39.05 $48,773.45 $63.00 $78,687.00 2.121 SINGLE ROADWAY LUMINAIRE ASSEMBLY WITH FOUNDATION (TYPE S1 & TYPE S3) (SP #13)28 EA $15,065.00 $421,820.00 $19,201.05 $537,629.40 $23,861.29 $668,116.12 $19,000.00 $532,000.00 2.122 DOUBLE ROADWAY LUMINAIRE ASSEMBLY WITH FOUNDATION (TYPE S2) (SP #13)37 EA $18,180.00 $672,660.00 $19,745.62 $730,587.94 $28,607.11 $1,058,463.07 $19,500.00 $721,500.00 2.123 SHARED USE PATH LUMINAIRE ASSEMBLY (TYPE S4) (SP #13)18 EA $13,335.00 $240,030.00 $17,084.68 $307,524.24 $16,243.94 $292,390.92 $16,800.00 $302,400.00 2.124 DECORATIVE CONCRETE PAVING (8" UNIFORM THICKNESS) (SP #7)1526 SY $205.00 $312,830.00 $210.84 $321,741.84 $211.32 $322,474.32 $159.00 $242,634.00 2.125 TRANSIT STOP (HARDSCAPE ONLY, SHELTER BY OTHERS) (SP #15)2 EA $8,275.00 $16,550.00 $17,992.30 $35,984.60 $96.89 $193.78 $20,000.00 $40,000.00 2.126 RRFB (RECTANGULAR RAPID FLASHING BEACON), INSTALLED COMPLETE (SP #14)8 EA $14,995.00 $119,960.00 $17,084.68 $136,677.44 $22,227.29 $177,818.32 $16,800.00 $134,400.00 2.127 TEMPORARY FENCING (TYPE B) (SP #8)2150 LF $8.00 $17,200.00 $11.75 $25,262.50 $13.22 $28,423.00 $10.50 $22,575.00 2.128 RED COLORED CONCRETE (TR1 TRAIL DETAIL)(8" THICK) (SP #10)534 SY $165.00 $88,110.00 $177.29 $94,672.86 $168.60 $90,032.40 $151.00 $80,634.00 Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 3 3.1 BLACK WOVEN WIRE FENCE (SP #8)2105 LF $19.50 $41,047.50 $16.02 $33,722.10 $18.02 $37,932.10 $47.25 $99,461.25 3.2 BLACK 5-STRAND CABLE FENCE (SP #8)2530 LF $43.00 $108,790.00 $34.70 $87,791.00 $39.05 $98,796.50 $26.25 $66,412.50 3.3 RELOCATE ORNAMENTAL WROUGHT IRON FENCE (SP #8)250 LF $63.00 $15,750.00 $34.17 $8,542.50 $38.45 $9,612.50 $105.00 $26,250.00 3.4 RELOCATE GATE (SP #8)2 EA $1,780.00 $3,560.00 $266.95 $533.90 $300.37 $600.74 $2,625.00 $5,250.00 3.5 RELOCATE 5' TALL CHAINLINK FENCE (SP #8)2797 LF $44.00 $123,068.00 $32.03 $89,587.91 $36.04 $100,803.88 $42.00 $117,474.00 3.6 TEMPORARY FENCING (TYPE B)(IF AND WHERE DIRECTED) (SP #8 & ARDOT 619)500 LF $8.00 $4,000.00 $11.75 $5,875.00 $13.22 $6,610.00 $15.75 $7,875.00 3.7 MONUMENT SIGN RELOCATION - THE VINEYARDS ON GARLAND (SP #12)1 LS $5,425.00 $5,425.00 $3,500.00 $3,500.00 $2,553.13 $2,553.13 $18,000.00 $18,000.00 3.8 RELOCATE "WATERSHED RESEARCH & EDUCATION CENTER" SIGN (SP #9)1 LS $3,030.00 $3,030.00 $3,500.00 $3,500.00 $2,553.13 $2,553.13 $18,000.00 $18,000.00 3.9 MONUMENT SIGN RELOCATION - DOROTHY E. KING EQUINE PAVILION (SP #12)1 LS $26,500.00 $26,500.00 $3,500.00 $3,500.00 $2,553.13 $2,553.13 $18,000.00 $18,000.00 3.10 RELOCATE "FOOD SCIENCE DEPARTMENT" SIGN (SP #9)1 LS $5,425.00 $5,425.00 $3,500.00 $3,500.00 $2,553.13 $2,553.13 $18,000.00 $18,000.00 3.11 RELOCATE " CROP, SOIL, AND ENVIRONMENTAL ALTHIEMER LAB" SIGN (SP #9)1 LS $5,425.00 $5,425.00 $3,500.00 $3,500.00 $2,553.13 $2,553.13 $18,000.00 $18,000.00 3.12 RELOCATE "POULTRY SCIENCE POULTRY HEALTH RESEARCH" SIGN (SP #9)1 LS $3,030.00 $3,030.00 $3,500.00 $3,500.00 $2,553.13 $2,553.13 $18,000.00 $18,000.00 4 4.1 CONSTRUCTION CONTROL AND LAYOUT 1 LS $43,175.00 $43,175.00 $35,000.00 $35,000.00 $41,917.01 $41,917.01 $18,000.00 $18,000.00 4.2 4" SEWER SERVICE LATERAL PIPE (PVC)26 LF $112.00 $2,912.00 $55.93 $1,454.18 $52.41 $1,362.66 $84.00 $2,184.00 4.3 8" X 4" SEWER SERVICE WYE 2 EA $200.00 $400.00 $723.10 $1,446.20 $678.12 $1,356.24 $525.00 $1,050.00 4.4 8" GRAVITY SEWER (PVC SDR-26)1100 LF $73.00 $80,300.00 $100.89 $110,979.00 $94.68 $104,148.00 $175.00 $192,500.00 4.5 8" DIA. - REMOVE CLAY PIPE, REPLACE WITH PVC (DETAIL S25)3 EA $1,010.00 $3,030.00 $2,935.84 $8,807.52 $2,752.93 $8,258.79 $15,750.00 $47,250.00 4.6 4’ ID SANITARY SEWER MANHOLE, 0’-6’ DEPTH 6 EA $8,985.00 $53,910.00 $9,298.86 $55,793.16 $8,709.12 $52,254.72 $8,400.00 $50,400.00 4.7 4’ ID SANITARY SEWER MANHOLE, ADDITIONAL DEPTH OVER 6’8 VF $375.00 $3,000.00 $450.38 $3,603.04 $420.52 $3,364.16 $525.00 $4,200.00 4.8 CORE INTO EXISTING SS MANHOLE, RESHAPE INVERT 1 EA $1,900.00 $1,900.00 $2,927.33 $2,927.33 $2,737.10 $2,737.10 $4,725.00 $4,725.00 4.9 PLUG, ABANDON AND FILL EXISTING GRAVITY SS 1133 LF $16.50 $18,694.50 $28.60 $32,403.80 $26.77 $30,330.41 $18.90 $21,413.70 4.10 DISCONNECT AND SEAL EXISTING SS MANHOLE 5 EA $860.00 $4,300.00 $2,034.29 $10,171.45 $1,902.27 $9,511.35 $2,625.00 $13,125.00 4.11 ABANDON EXISTING SS MANHOLE 3 EA $1,260.00 $3,780.00 $2,539.65 $7,618.95 $2,393.01 $7,179.03 $4,200.00 $12,600.00 4.12 REMOVE AND DISPOSE EXISTING SS MANHOLE 2 EA $1,680.00 $3,360.00 $7,068.31 $14,136.62 $6,600.79 $13,201.58 $4,200.00 $8,400.00 4.13 16" DIAMETER STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY)15 LF $1,960.00 $29,400.00 $639.54 $9,593.10 $602.82 $9,042.30 $525.00 $7,875.00 5 5.1 CONSTRUCTION CONTROL AND LAYOUT 1 LS $1,000.00 $1,000.00 $45,000.00 $45,000.00 $38,274.82 $38,274.82 $32,550.00 $32,550.00 5.2 8" DIA. WATER LINE (AWWA C900 DR14)1176 LF $75.00 $88,200.00 $87.60 $103,017.60 $82.35 $96,843.60 $100.00 $117,600.00 5.3 12" DIA. WATER LINE (AWWA C900 DR14)4534 LF $105.00 $476,070.00 $115.14 $522,044.76 $108.54 $492,120.36 $145.00 $657,430.00 5.4 16" DIA. STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY)268 LF $410.00 $109,880.00 $426.51 $114,304.68 $402.77 $107,942.36 $290.00 $77,720.00 5.5 24" DIA. STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY)112 LF $520.00 $58,240.00 $606.75 $67,956.00 $573.37 $64,217.44 $450.00 $50,400.00 5.6 DUCTILE IRON FITTINGS FOR WATER LINE 7956 LB $13.50 $107,406.00 $17.47 $138,991.32 $16.54 $131,592.24 $18.90 $150,368.40 5.7 TAPPING SLEEVE AND VALVE (8"X8")9 EA $8,230.00 $74,070.00 $11,498.29 $103,484.61 $10,846.12 $97,615.08 $9,975.00 $89,775.00 5.8 8" GATE VALVE 9 EA $3,020.00 $27,180.00 $3,816.19 $34,345.71 $3,615.21 $32,536.89 $4,725.00 $42,525.00 5.9 12" BUTTERFLY VALVE 13 EA $8,850.00 $115,050.00 $10,648.03 $138,424.39 $10,092.12 $131,197.56 $8,925.00 $116,025.00 5.10 CUT, CAP AND ABANDON EXISTING WATER LINE (8")9 EA $1,250.00 $11,250.00 $6,494.07 $58,446.63 $6,095.34 $54,858.06 $4,725.00 $42,525.00 5.11 FLOWABLE FILL ABANDON 8" WATER LINE UNDER ROADWAY 2450 LF $16.50 $40,425.00 $13.90 $34,055.00 $13.03 $31,923.50 $18.90 $46,305.00 5.12 FIRE HYDRANT ASSEMBLY INSTALLED COMPLETE (INCLUDING TEE & VALVE)15 EA $10,020.00 $150,300.00 $9,947.55 $149,213.25 $9,425.42 $141,381.30 $10,815.00 $162,225.00 5.13 FIRE HYDRANT ASSEMBLY REMOVAL 5 EA $735.00 $3,675.00 $1,403.16 $7,015.80 $1,320.00 $6,600.00 $1,575.00 $7,875.00 5.14 CONCRETE ANCHOR COLLAR 2 EA $4,125.00 $8,250.00 $3,696.88 $7,393.76 $3,462.62 $6,925.24 $2,625.00 $5,250.00 5.15 5/8" WATER METER INSTALLED COMPLETE 1 EA $6,900.00 $6,900.00 $4,829.08 $4,829.08 $4,566.01 $4,566.01 $3,150.00 $3,150.00 5.16 3/4" WATER METER INSTALLED COMPLETE 5 EA $6,900.00 $34,500.00 $4,829.08 $24,145.40 $4,566.01 $22,830.05 $3,675.00 $18,375.00 5.17 1" WATER METER INSTALLED COMPLETE 2 EA $8,420.00 $16,840.00 $4,710.49 $9,420.98 $4,438.55 $8,877.10 $3,990.00 $7,980.00 5.18 1-1/2" WATER METER INSTALLED COMPLETE 1 EA $16,650.00 $16,650.00 $10,671.71 $10,671.71 $10,103.49 $10,103.49 $7,350.00 $7,350.00 5.19 2" WATER METER INSTALLED COMPLETE 2 EA $16,650.00 $33,300.00 $10,942.21 $21,884.42 $10,356.10 $20,712.20 $11,025.00 $22,050.00 5.20 SDR9 POLYETHYLENE SLEEVE FOR WATER SERVICE LINE 580 LF $5.50 $3,190.00 $32.15 $18,647.00 $30.19 $17,510.20 $48.00 $27,840.00 5.21 1" DIA. COATED COPPER SERVICE LINE 410 LF $41.00 $16,810.00 $63.66 $26,100.60 $60.02 $24,608.20 $48.00 $19,680.00 5.22 2" DIA. COATED COPPER SERVICE LINE 675 LF $100.00 $67,500.00 $119.40 $80,595.00 $112.83 $76,160.25 $82.00 $55,350.00 6 6.1 CONSTRUCTION CONTROL AND LAYOUT 1 LS $1,000.00 $1,000.00 $35,948.77 $35,948.77 $32,418.05 $32,418.05 $5,775.00 $5,775.00 6.2 6" DIA. WATER LINE (AWWA C900 DR14)770 LF $58.00 $44,660.00 $61.56 $47,401.20 $57.85 $44,544.50 $90.00 $69,300.00 6.3 12" DIA. STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY)259 LF $270.00 $69,930.00 $254.32 $65,868.88 $239.57 $62,048.63 $265.00 $68,635.00 6.4 DUCTILE IRON FITTINGS FOR WATER LINE 350 LB $16.00 $5,600.00 $18.95 $6,632.50 $17.90 $6,265.00 $18.90 $6,615.00 6.5 TAPPING SLEEVE AND VALVE (6"X6")2 EA $6,880.00 $13,760.00 $9,719.51 $19,439.02 $9,160.87 $18,321.74 $10,500.00 $21,000.00 6.6 CUT, CAP AND ABANDON EXISTING WATER LINE (6")2 EA $1,050.00 $2,100.00 $13,614.90 $27,229.80 $12,775.43 $25,550.86 $3,675.00 $7,350.00 6.7 FLOWABLE FILL ABANDONED 8" WATER LINE UNDER ROADWAY 600 LF $16.00 $9,600.00 $13.69 $8,214.00 $12.82 $7,692.00 $18.90 $11,340.00 6.8 1" WATER METER INSTALLED COMPLETE 2 EA $4,200.00 $8,400.00 $8,098.24 $16,196.48 $7,667.21 $15,334.42 $3,990.00 $7,980.00 6.9 2" DIA. COATED COPPER SERVICE LINE 200 LF $179.00 $35,800.00 $115.99 $23,198.00 $109.65 $21,930.00 $82.00 $16,400.00 Kenny Fitch, Sr Procurement Agent $430,722.75$269,674.50$247,052.41$345,050.50PACKAGE C - RIGHT OF WAY APPURTENANCES ______________________________________________________________________________ Trevel Young, Procurement Agent ______________________________________________________________________________ * NOTICE: Bid award is contingent upon supplier meeting minimum specifications and formal authorization by City Officials. $383,722.70$284,663.35$293,934.35$248,161.50PACKAGE D - CITY OF FAYETTEVILLE SANITARY SEWER RELOCATIONS $1,760,348.40$1,619,395.95$1,719,987.70$1,466,686.00PACKAGE E - CITY OF FAYETTEVILLE WATER RELOCATIONS PACKAGE F - UNIVERSITY OF ARKANSAS WATER RELOCATIONS $190,850.00 $250,128.65 $234,105.20 $214,395.00 Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Bid 26-43 Addendum 5 Crossland Heavy Contractors, Inc. Supplier Response Event Information Number:Bid 26-43 Addendum 5 Title:Construction - Highway 112 Widening Type:Invitation to Bid Issue Date:6/14/2026 Deadline:7/14/2026 02:00 PM (CT) Notes:The City of Fayetteville is accepting sealed bids from contractors to improve approximately 5,650 linear feet of Hwy 112 (Garland Ave) from Poplar St to Drake St. Construction will consist of, but is not limited to, street widening, traffic signal modifications, utility relocations, storm drainage, sidewalk, a curbed median, and a roundabout. Questions regarding this bid should be addressed to Kenny Fitch, Sr. Procurement Agent at kfitch@fayetteville-ar.gov. Contact Information Contact:Kenny Fitch - Sr Procurement Agent Address:Procurement City Hall Room 306 113 W. Mountain St. Fayetteville, AR 72701 Phone:(479) 575-8258 Email:kfitch@fayetteville-ar.gov Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 1 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Crossland Heavy Contractors, Inc. Information Contact:Amy Harlos Address:501 S. East Ave Columbus, KS 66725 Phone:(620) 429-1410 Email:aharlos@heavycontractors.com By submitting your response, you certify that you are authorized to represent and bind your company. Ron Edmond redmond@heavycontractors.com Signature Email Submitted at 7/14/2026 01:43:55 PM (CT) Requested Attachments Signature Forms for Bid 26-43 Signature Forms - HWY 112.pdf Please attach your completed forms. These documents can be found in FILE #01 - PROJECT MANUAL in the Attachments tab. Please be sure to include ALL required information stated in the Project Manual. Bid Bond for Bid 26-43 Bid Bond - HWY 112.pdf Please attach a signed and completed copy of your bid bond. The Bid Bond must be signed by both the bidder and the surety company to be considered valid. An invalid Bid Bond shall be grounds for bid rejection. Bid bonds in the form of a cashier's check shall be delivered to City Hall, Procurement Division before bid deadline and have a copy of the cashier's check uploaded with submittal. Response Attachments Corporate Resolution 2026-2027.pdf Corporate Resolution CHC AR Contractor License 2026.pdf AR License COI.pdf Certificate of Insurance Bid Attributes 1 Arkansas Secretary of State Filing Number: 100205582 2 Arkansas Contractor License Number: Contractor's License must have a classification relating to the scope of this project. 0067301126 3 System for Award Management (SAM.gov) Registration Number XLWJNERE6ER3 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 2 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 4 Check Yes or No: Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently boycott Israel and will not boycott Israel during any time in which they are entering into, or while in contract, with any public entity as defined in §25-1-503. If at any time during contract the contractor decides to boycott Israel, the contractor must notify the contracted public entity in writing. Yes, I agree No, I don't agree 5 Check Yes or No: Pursuant Arkansas Code Annotated §25-1-1002, the Contractor agrees and certifies that they do not currently boycott Energy, Fossil Fuel, Firearms, and Ammunition Industries during any time in which they are entering into, or while in contract, with any public entity as defined in §25-1-1002. If at any time during the contract the contractor decides to boycott Energy, Fossil Fuel, Firearms, and/or Ammunition Industries, the contractor must notify the contracted public entity in writing. Yes, I agree No, I don't agree 6 Addendum Acknowledgement: By selecting "I agree", you acknowledge that you have read and understand any addendums that have been issued for this bid. I agree Bid Lines 1 Package Header PACKAGE A - BASE BID ITEMS Quantity:1 UOM:EA Total:$537,788.00 Package Items 1.1 MOBILIZATION (SHALL NOT EXCEED 5% OF TOTAL BID PRICE, EXCLUDING BONDS & INSURANCE AND TRENCH & EXCAVATION SAFETY) Quantity:1 UOM:LS Price:$300,000.00 Total:$300,000.00 1.2 BONDS & INSURANCE Quantity:1 UOM:LS Price:$180,138.00 Total:$180,138.00 1.3 TRENCH & EXCAVATION SAFETY Quantity:1 UOM:LS Price:$57,650.00 Total:$57,650.00 2 Package Header PACKAGE B - ROADWAY AND DRAINAGE Quantity:1 UOM:EA Total:$12,134,496.90 Package Items 2.1 ROADWAY CONSTRUCTION CONTROL Quantity:1 UOM:LS Price:$34,600.00 Total:$34,600.00 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 3 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 2.2 CLEARING, GRUBBING, AND DEMOLITION Quantity:1 UOM:LS Price:$225,500.00 Total:$225,500.00 2.3 UNCLASSIFIED EXCAVATION (PLAN QUANTITY) Quantity:26537 UOM:CY Price:$25.00 Total:$663,425.00 2.4 SELECT EMBANKMENT (PLAN QUANTITY) Quantity:18823 UOM:CY Price:$32.50 Total:$611,747.50 2.5 EMBANKMENT (PLAN QUANTITY) Quantity:16007 UOM:CY Price:$21.50 Total:$344,150.50 2.6 UNDERCUT AND BACKFILL Quantity:6750 UOM:CY Price:$42.00 Total:$283,500.00 2.7 ROCK EXCAVATION Quantity:150 UOM:CY Price:$280.00 Total:$42,000.00 2.8 TRAIL UNDERCUT AND BACKFILL (SP #6) Quantity:1073 UOM:CY Price:$41.00 Total:$43,993.00 2.9 SUBGRADE PREPARATION Quantity:40619 UOM:SY Price:$3.00 Total:$121,857.00 2.10 4" TOPSOIL PLACEMENT (SOD + SEEDING AREAS) Quantity:37440 UOM:SY Price:$6.50 Total:$243,360.00 2.11 18" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT Quantity:483 UOM:LF Price:$105.00 Total:$50,715.00 2.12 24" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT Quantity:396 UOM:LF Price:$113.00 Total:$44,748.00 2.13 30" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT Quantity:124 UOM:LF Price:$163.00 Total:$20,212.00 2.14 36" REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT Quantity:92 UOM:LF Price:$205.00 Total:$18,860.00 2.15 23"X14" H.E. REINFORCED CONCRETE PIPE (CLASS III) UNDER PAVEMENT Quantity:47 UOM:LF Price:$132.00 Total:$6,204.00 2.16 18" REINFORCED CONCRETE PIPE (CLASS III) Quantity:3275 UOM:LF Price:$57.00 Total:$186,675.00 2.17 24" REINFORCED CONCRETE PIPE (CLASS III) Quantity:1780 UOM:LF Price:$80.00 Total:$142,400.00 2.18 30" REINFORCED CONCRETE PIPE (CLASS III) Quantity:762 UOM:LF Price:$117.00 Total:$89,154.00 2.19 36" REINFORCED CONCRETE PIPE (CLASS III) Quantity:940 UOM:LF Price:$195.00 Total:$183,300.00 2.20 60"X38" H.E. REINFORCED CONCRETE PIPE (CLASS III) Quantity:13 UOM:LF Price:$332.00 Total:$4,316.00 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 4 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 2.21 18" R.C. FLARED END SECTION Quantity:7 UOM:EA Price:$1,030.00 Total:$7,210.00 2.22 24" R.C. FLARED END SECTION Quantity:4 UOM:EA Price:$1,160.00 Total:$4,640.00 2.23 36" R.C. FLARED END SECTION Quantity:1 UOM:EA Price:$2,100.00 Total:$2,100.00 2.24 60"X38" ELLIPTICAL R.C. FLARED END SECTION Quantity:1 UOM:EA Price:$7,030.00 Total:$7,030.00 2.25 23"X14" ELLIPTICAL R.C. FLARED END SECTION Quantity:2 UOM:EA Price:$1,030.00 Total:$2,060.00 2.26 4'X4' DROP INLETS (TYPE C) Quantity:15 UOM:EA Price:$5,650.00 Total:$84,750.00 2.27 4'X5' DROP INLETS (TYPE C) Quantity:14 UOM:EA Price:$6,940.00 Total:$97,160.00 2.28 4'X6' DROP INLETS (TYPE C) Quantity:5 UOM:EA Price:$7,800.00 Total:$39,000.00 2.29 4'X7' DROP INLETS (TYPE C) Quantity:3 UOM:EA Price:$9,100.00 Total:$27,300.00 2.30 4'X8' DROP INLETS (TYPE C) Quantity:3 UOM:EA Price:$15,400.00 Total:$46,200.00 2.31 5'X5' DROP INLETS (TYPE C) Quantity:5 UOM:EA Price:$8,560.00 Total:$42,800.00 2.32 5'X6' DROP INLETS (TYPE C) Quantity:1 UOM:EA Price:$8,855.00 Total:$8,855.00 2.33 5'X8' DROP INLETS (TYPE C) Quantity:2 UOM:EA Price:$10,150.00 Total:$20,300.00 2.34 8'X5' DROP INLETS (TYPE C) Quantity:2 UOM:EA Price:$10,800.00 Total:$21,600.00 2.35 9'X8' DROP INLETS (TYPE C) Quantity:1 UOM:EA Price:$17,090.00 Total:$17,090.00 2.36 4' DROP INLETS (TYPE MO) Quantity:2 UOM:EA Price:$5,654.00 Total:$11,308.00 2.37 5' DROP INLETS (TYPE MO) Quantity:4 UOM:EA Price:$7,000.00 Total:$28,000.00 2.38 6' DROP INLETS (TYPE MO) Quantity:5 UOM:EA Price:$9,600.00 Total:$48,000.00 2.39 4'X4' JUNCTION BOXES (TYPE C) Quantity:7 UOM:EA Price:$5,735.00 Total:$40,145.00 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 5 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 2.40 5'X4' JUNCTION BOXES (TYPE C) Quantity:1 UOM:EA Price:$6,200.00 Total:$6,200.00 2.41 5' JUNCTION BOXES (TYPE MO) Quantity:3 UOM:EA Price:$7,020.00 Total:$21,060.00 2.42 4'X4' GRATED INLETS (TYPE C) Quantity:1 UOM:EA Price:$7,700.00 Total:$7,700.00 2.43 4' DROP INLET EXTENSION Quantity:41 UOM:EA Price:$1,235.00 Total:$50,635.00 2.44 8' DROP INLET EXTENSION Quantity:6 UOM:EA Price:$2,570.00 Total:$15,420.00 2.45 SIDEWALK UNDERDRAIN (SP #29) Quantity:2 UOM:EA Price:$1,225.00 Total:$2,450.00 2.46 DRAINAGE STRUCTURE BACK OPENING (SP #29) Quantity:4 UOM:EA Price:$1,235.00 Total:$4,940.00 2.47 CORE & GROUT EXISTING INLET (SP #37) Quantity:4 UOM:EA Price:$1,235.00 Total:$4,940.00 2.48 REMOVE TOP AND CONVERT TO JUNCTION BOX (SP #37) Quantity:2 UOM:EA Price:$2,870.00 Total:$5,740.00 2.49 REMOVE TOP AND RECONSTRUCT AT PROPOSED GRADE (SP #37) Quantity:1 UOM:EA Price:$2,980.00 Total:$2,980.00 2.50 4'X3' PRECAST CONCRETE BOX CULVERT Quantity:766 UOM:LF Price:$435.00 Total:$333,210.00 2.51 5'X3' PRECAST CONCRETE BOX CULVERT Quantity:224 UOM:LF Price:$620.00 Total:$138,880.00 2.52 6'X3' PRECAST CONCRETE BOX CULVERT Quantity:5 UOM:LF Price:$823.00 Total:$4,115.00 2.53 6'X3' WINGWALLS & APPURTENANCES Quantity:1 UOM:LS Price:$4,840.00 Total:$4,840.00 2.54 RIP RAP Quantity:53 UOM:SY Price:$135.00 Total:$7,155.00 2.55 FLOWABLE SELECT MATERIAL Quantity:70 UOM:CY Price:$197.00 Total:$13,790.00 2.56 SELECT PIPE BACKFILL (CLASS 67)(IF AND WHERE DIRECTED) (SP #28) Quantity:500 UOM:CY Price:$78.00 Total:$39,000.00 2.57 8" DEPTH AGGREGATE BASE COURSE Quantity:2756 UOM:SY Price:$19.00 Total:$52,364.00 2.58 PRIME COAT Quantity:2149 UOM:SY Price:$7.00 Total:$15,043.00 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 6 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 2.59 ASPHALT CONCRETE HOT MIX BINDER COURSE (ACHMBC) Quantity:7143 UOM:TON Price:$126.00 Total:$900,018.00 2.60 ASPHALT CONCRETE HOT MIX SURFACE COURSE (ACHMSC) Quantity:7720 UOM:TON Price:$150.00 Total:$1,158,000.00 2.61 ASPHALT CONCRETE HOT MIX BASE COURSE Quantity:8843 UOM:TON Price:$120.00 Total:$1,061,160.00 2.62 PORTLAND CEMENT CONCRETE BASE (5" UNIFORM THICKNESS) (ARDOT 309) Quantity:2044 UOM:SY Price:$60.00 Total:$122,640.00 2.63 PORTLAND CEMENT CONCRETE BASE (6" UNIFORM THICKNESS) (ARDOT 309) Quantity:856 UOM:SY Price:$69.00 Total:$59,064.00 2.64 ASPHALT CONCRETE PATCHING FOR MAINTENANCE OF TRAFFIC Quantity:200 UOM:TON Price:$288.00 Total:$57,600.00 2.65 CONCRETE CURB AND GUTTER (TYPE A) Quantity:23058 UOM:LF Price:$23.00 Total:$530,334.00 2.66 CONCRETE CURB AND GUTTER (TYPE E-1) Quantity:460 UOM:LF Price:$32.50 Total:$14,950.00 2.67 CONCRETE CURB (TYPE E) Quantity:352 UOM:LF Price:$32.50 Total:$11,440.00 2.68 4" THICK CONCRETE SIDEWALK Quantity:3920 UOM:SY Price:$71.50 Total:$280,280.00 2.69 CONCRETE TRAIL W/FIBER (INCLUDING AGG. BASE) (SP #6) Quantity:7270 UOM:SY Price:$87.00 Total:$632,490.00 2.70 CONCRETE DRIVEWAY APRONS Quantity:270 UOM:SY Price:$84.50 Total:$22,815.00 2.71 CONCRETE DRIVEWAY Quantity:759 UOM:SY Price:$79.00 Total:$59,961.00 2.72 AGGREGATE BASE COURSE DRIVEWAY Quantity:1030 UOM:SY Price:$26.00 Total:$26,780.00 2.73 SEEDING AND MULCHING Quantity:4.54 UOM:ACRE Price:$7,725.00 Total:$35,071.50 2.74 SOLID SOD Quantity:15470 UOM:SY Price:$4.75 Total:$73,482.50 2.75 ADDITIONAL WATERING Quantity:387.6 UOM:MG Price:$9.00 Total:$3,488.40 2.76 REMOVE AND REPLACE MAILBOXES Quantity:2 UOM:EA Price:$460.00 Total:$920.00 2.77 4" PAVEMENT MARKING (THERMOPLASTIC) Quantity:2391 UOM:LF Price:$1.00 Total:$2,391.00 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 7 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 2.78 6" PAVEMENT MARKING (THERMOPLASTIC) Quantity:9842 UOM:LF Price:$1.00 Total:$9,842.00 2.79 10" PAVEMENT MARKING (THERMOPLASTIC) Quantity:747 UOM:LF Price:$3.50 Total:$2,614.50 2.80 12" PAVEMENT MARKING (THERMOPLASTIC) Quantity:634 UOM:LF Price:$6.00 Total:$3,804.00 2.81 24" PAVEMENT MARKING (THERMOPLASTIC) Quantity:817 UOM:LF Price:$12.00 Total:$9,804.00 2.82 PAVEMENT SYMBOLS (THERMOPLASTIC) Quantity:76 UOM:EA Price:$260.00 Total:$19,760.00 2.83 RAISED PAVEMENT MARKER (TYPE 2, RED/CLEAR) (SP #30) Quantity:144 UOM:EA Price:$23.50 Total:$3,384.00 2.84 PAVEMENT MARKING REMOVAL Quantity:530 UOM:SF Price:$3.50 Total:$1,855.00 2.85 D3-1 SIGN (SP #31) Quantity:21 UOM:EA Price:$375.00 Total:$7,875.00 2.86 D1-1d SIGN (SP #31) Quantity:4 UOM:EA Price:$480.00 Total:$1,920.00 2.87 REGULATORY SIGNS AND WARNING SIGNS (DESIGNATED BY R OR W) (SP #31) Quantity:683 UOM:SF Price:$23.00 Total:$15,709.00 2.88 SIGN SUPPORTS (SP #31) Quantity:109 UOM:EA Price:$105.00 Total:$11,445.00 2.89 EROSION CONTROL Quantity:1 UOM:LS Price:$68,525.00 Total:$68,525.00 2.90 TRAFFIC CONTROL AND MAINTENANCE Quantity:1 UOM:LS Price:$65,760.00 Total:$65,760.00 2.91 AGGREGATE BASE FOR ROADWAY MAINTENANCE Quantity:200 UOM:TON Price:$41.00 Total:$8,200.00 2.92 PORTABLE CHANGEABLE MESSAGE SIGN Quantity:1000 UOM:DAY Price:$35.00 Total:$35,000.00 2.93 CAST-IN-PLACE DETECTABLE WARNING PANEL Quantity:803 UOM:SF Price:$39.00 Total:$31,317.00 2.94 HANDICAP ACCESS RAMP Quantity:377 UOM:SY Price:$88.00 Total:$33,176.00 2.95 PROJECT SIGNS Quantity:2 UOM:EA Price:$1,100.00 Total:$2,200.00 2.96 COLD MILLING PAVEMENT Quantity:9500 UOM:SY Price:$5.00 Total:$47,500.00 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 8 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 2.97 TREE PROTECTION FENCING Quantity:2973 UOM:LF Price:$7.00 Total:$20,811.00 2.98 TRAFFIC SIGNAL CONTROLLER (MODIFICATION) (SP #32) Quantity:1 UOM:EA Price:$7,545.00 Total:$7,545.00 2.99 LED BLANK OUT SIGN (SP #19) Quantity:1 UOM:EA Price:$9,800.00 Total:$9,800.00 2.100 TRAFFIC SIGNAL HEAD, LED, (3 SECTION, 1 WAY) (SP #21 & ARDOT 706) Quantity:1 UOM:EA Price:$1,150.00 Total:$1,150.00 2.101 TRAFFIC SIGNAL HEAD, LED, (4 SECTION, 1 WAY) (SP #21 & ARDOT 706) Quantity:3 UOM:EA Price:$1,270.00 Total:$3,810.00 2.102 RELOCATION OF TRAFFIC SIGNAL HEAD (SP #23) Quantity:5 UOM:EA Price:$635.00 Total:$3,175.00 2.103 COUNTDOWN PEDESTRIAN SIGNAL HEAD, LED (SP #20 & ARDOT 707) Quantity:8 UOM:EA Price:$880.00 Total:$7,040.00 2.104 AUDIBLE PEDESTRIAN WARNING SIGNALS (SP #36) Quantity:8 UOM:EA Price:$980.00 Total:$7,840.00 2.105 TRAFFIC SIGNAL CABLE (5C/12 A.W.G.) (ARDOT 708) Quantity:1895 UOM:LF Price:$3.00 Total:$5,685.00 2.106 TRAFFIC SIGNAL CABLE (5C/14 A.W.G.) (ARDOT 708) Quantity:2360 UOM:LF Price:$2.50 Total:$5,900.00 2.107 TRAFFIC SIGNAL CABLE (7C/14 A.W.G.) (ARDOT 708) Quantity:450 UOM:LF Price:$3.50 Total:$1,575.00 2.108 ELECTRICAL CONDUCTORS-IN-CONDUIT (1C/8 A.W.G., E.G.C.) (SP #18) Quantity:495 UOM:LF Price:$2.00 Total:$990.00 2.109 NON-METALLIC CONDUIT (2") (ARDOT 710) Quantity:65 UOM:LF Price:$10.00 Total:$650.00 2.110 NON-METALLIC CONDUIT (3") (ARDOT 710) Quantity:460 UOM:LF Price:$34.50 Total:$15,870.00 2.111 CONCRETE PULL BOX (TYPE 2) (ARDOT 711) Quantity:2 UOM:EA Price:$1,210.00 Total:$2,420.00 2.112 CONCRETE PULL BOX (TYPE 2 HD) (ARDOT 711) Quantity:4 UOM:EA Price:$1,730.00 Total:$6,920.00 2.113 TRAFFIC SIGNAL PEDESTAL POLE WITH FOUNDATION (SS & ARDOT 715) Quantity:8 UOM:EA Price:$2,880.00 Total:$23,040.00 2.114 REMOVAL OF TRAFFIC SIGNAL EQUIPMENT (SP #22) Quantity:1 UOM:LS Price:$1,730.00 Total:$1,730.00 2.115 VIDEO DETECTOR RELOCATION (ARDOT 733) Quantity:4 UOM:EA Price:$635.00 Total:$2,540.00 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 9 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 2.116 VIDEO DETECTOR ROTATION (SP #27) Quantity:2 UOM:EA Price:$635.00 Total:$1,270.00 2.117 VIDEO CABLE (ARDOT 733) Quantity:850 UOM:LF Price:$3.00 Total:$2,550.00 2.118 4" SCHEDULE 40 PVC CONDUIT WITH CAPS (FOR FUTURE) (SP #11) Quantity:1249 UOM:LF Price:$27.00 Total:$33,723.00 2.119 Line deleted as part of an Addendum 2.120 Line deleted as part of an Addendum 2.121 SINGLE ROADWAY LUMINAIRE ASSEMBLY WITH FOUNDATION (TYPE S1 & TYPE S3) (SP #13) Quantity:28 UOM:EA Price:$15,065.00 Total:$421,820.00 2.122 DOUBLE ROADWAY LUMINAIRE ASSEMBLY WITH FOUNDATION (TYPE S2) (SP #13) Quantity:37 UOM:EA Price:$18,180.00 Total:$672,660.00 2.123 SHARED USE PATH LUMINAIRE ASSEMBLY (TYPE S4) (SP #13) Quantity:18 UOM:EA Price:$13,335.00 Total:$240,030.00 2.124 DECORATIVE CONCRETE PAVING (8" UNIFORM THICKNESS) (SP #7) Quantity:1526 UOM:SY Price:$205.00 Total:$312,830.00 2.125 TRANSIT STOP (HARDSCAPE ONLY, SHELTER BY OTHERS) (SP #15) Quantity:2 UOM:EA Price:$8,275.00 Total:$16,550.00 2.126 RRFB (RECTANGULAR RAPID FLASHING BEACON), INSTALLED COMPLETE (SP #14) Quantity:8 UOM:EA Price:$14,995.00 Total:$119,960.00 2.127 TEMPORARY FENCING (TYPE B) (SP #8) Quantity:2150 UOM:LF Price:$8.00 Total:$17,200.00 2.128 RED COLORED CONCRETE (TR1 TRAIL DETAIL)(8" THICK) (SP #10) Quantity:534 UOM:SY Price:$165.00 Total:$88,110.00 3 Package Header PACKAGE C - RIGHT OF WAY APPURTENANCES Quantity:1 UOM:EA Total:$345,050.50 Package Items 3.1 BLACK WOVEN WIRE FENCE (SP #8) Quantity:2105 UOM:LF Price:$19.50 Total:$41,047.50 3.2 BLACK 5-STRAND CABLE FENCE (SP #8) Quantity:2530 UOM:LF Price:$43.00 Total:$108,790.00 3.3 RELOCATE ORNAMENTAL WROUGHT IRON FENCE (SP #8) Quantity:250 UOM:LF Price:$63.00 Total:$15,750.00 3.4 RELOCATE GATE (SP #8) Quantity:2 UOM:EA Price:$1,780.00 Total:$3,560.00 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 10 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 3.5 RELOCATE 5' TALL CHAINLINK FENCE (SP #8) Quantity:2797 UOM:LF Price:$44.00 Total:$123,068.00 3.6 TEMPORARY FENCING (TYPE B)(IF AND WHERE DIRECTED) (SP #8 & ARDOT 619) Quantity:500 UOM:LF Price:$8.00 Total:$4,000.00 3.7 MONUMENT SIGN RELOCATION - THE VINEYARDS ON GARLAND (SP #12) Quantity:1 UOM:LS Price:$5,425.00 Total:$5,425.00 3.8 RELOCATE "WATERSHED RESEARCH & EDUCATION CENTER" SIGN (SP #9) Quantity:1 UOM:LS Price:$3,030.00 Total:$3,030.00 3.9 MONUMENT SIGN RELOCATION - DOROTHY E. KING EQUINE PAVILION (SP #12) Quantity:1 UOM:LS Price:$26,500.00 Total:$26,500.00 3.10 RELOCATE "FOOD SCIENCE DEPARTMENT" SIGN (SP #9) Quantity:1 UOM:LS Price:$5,425.00 Total:$5,425.00 3.11 RELOCATE " CROP, SOIL, AND ENVIRONMENTAL ALTHIEMER LAB" SIGN (SP #9) Quantity:1 UOM:LS Price:$5,425.00 Total:$5,425.00 3.12 RELOCATE "POULTRY SCIENCE POULTRY HEALTH RESEARCH" SIGN (SP #9) Quantity:1 UOM:LS Price:$3,030.00 Total:$3,030.00 4 Package Header PACKAGE D - CITY OF FAYETTEVILLE SANITARY SEWER RELOCATIONS Quantity:1 UOM:EA Total:$248,161.50 Package Items 4.1 CONSTRUCTION CONTROL AND LAYOUT Quantity:1 UOM:LS Price:$43,175.00 Total:$43,175.00 4.2 4" SEWER SERVICE LATERAL PIPE (PVC) Quantity:26 UOM:LF Price:$112.00 Total:$2,912.00 4.3 8" X 4" SEWER SERVICE WYE Quantity:2 UOM:EA Price:$200.00 Total:$400.00 4.4 8" GRAVITY SEWER (PVC SDR-26) Quantity:1100 UOM:LF Price:$73.00 Total:$80,300.00 4.5 8" DIA. - REMOVE CLAY PIPE, REPLACE WITH PVC (DETAIL S25) Quantity:3 UOM:EA Price:$1,010.00 Total:$3,030.00 4.6 4’ ID SANITARY SEWER MANHOLE, 0’-6’ DEPTH Quantity:6 UOM:EA Price:$8,985.00 Total:$53,910.00 4.7 4’ ID SANITARY SEWER MANHOLE, ADDITIONAL DEPTH OVER 6’ Quantity:8 UOM:VF Price:$375.00 Total:$3,000.00 4.8 CORE INTO EXISTING SS MANHOLE, RESHAPE INVERT Quantity:1 UOM:EA Price:$1,900.00 Total:$1,900.00 4.9 PLUG, ABANDON AND FILL EXISTING GRAVITY SS Quantity:1133 UOM:LF Price:$16.50 Total:$18,694.50 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 11 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 4.10 DISCONNECT AND SEAL EXISTING SS MANHOLE Quantity:5 UOM:EA Price:$860.00 Total:$4,300.00 4.11 ABANDON EXISTING SS MANHOLE Quantity:3 UOM:EA Price:$1,260.00 Total:$3,780.00 4.12 REMOVE AND DISPOSE EXISTING SS MANHOLE Quantity:2 UOM:EA Price:$1,680.00 Total:$3,360.00 4.13 16" DIAMETER STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY) Quantity:15 UOM:LF Price:$1,960.00 Total:$29,400.00 5 Package Header PACKAGE E - CITY OF FAYETTEVILLE WATER RELOCATIONS Quantity:1 UOM:EA Total:$1,466,686.00 Package Items 5.1 CONSTRUCTION CONTROL AND LAYOUT Quantity:1 UOM:LS Price:$1,000.00 Total:$1,000.00 5.2 8" DIA. WATER LINE (AWWA C900 DR14) Quantity:1176 UOM:LF Price:$75.00 Total:$88,200.00 5.3 12" DIA. WATER LINE (AWWA C900 DR14) Quantity:4534 UOM:LF Price:$105.00 Total:$476,070.00 5.4 16" DIA. STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY) Quantity:268 UOM:LF Price:$410.00 Total:$109,880.00 5.5 24" DIA. STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY) Quantity:112 UOM:LF Price:$520.00 Total:$58,240.00 5.6 DUCTILE IRON FITTINGS FOR WATER LINE Quantity:7956 UOM:LB Price:$13.50 Total:$107,406.00 5.7 TAPPING SLEEVE AND VALVE (8"X8") Quantity:9 UOM:EA Price:$8,230.00 Total:$74,070.00 5.8 8" GATE VALVE Quantity:9 UOM:EA Price:$3,020.00 Total:$27,180.00 5.9 12" BUTTERFLY VALVE Quantity:13 UOM:EA Price:$8,850.00 Total:$115,050.00 5.10 CUT, CAP AND ABANDON EXISTING WATER LINE (8") Quantity:9 UOM:EA Price:$1,250.00 Total:$11,250.00 5.11 FLOWABLE FILL ABANDON 8" WATER LINE UNDER ROADWAY Quantity:2450 UOM:LF Price:$16.50 Total:$40,425.00 5.12 FIRE HYDRANT ASSEMBLY INSTALLED COMPLETE (INCLUDING TEE & VALVE) Quantity:15 UOM:EA Price:$10,020.00 Total:$150,300.00 5.13 FIRE HYDRANT ASSEMBLY REMOVAL Quantity:5 UOM:EA Price:$735.00 Total:$3,675.00 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 12 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 5.14 CONCRETE ANCHOR COLLAR Quantity:2 UOM:EA Price:$4,125.00 Total:$8,250.00 5.15 5/8" WATER METER INSTALLED COMPLETE Quantity:1 UOM:EA Price:$6,900.00 Total:$6,900.00 5.16 3/4" WATER METER INSTALLED COMPLETE Quantity:5 UOM:EA Price:$6,900.00 Total:$34,500.00 5.17 1" WATER METER INSTALLED COMPLETE Quantity:2 UOM:EA Price:$8,420.00 Total:$16,840.00 5.18 1-1/2" WATER METER INSTALLED COMPLETE Quantity:1 UOM:EA Price:$16,650.00 Total:$16,650.00 5.19 2" WATER METER INSTALLED COMPLETE Quantity:2 UOM:EA Price:$16,650.00 Total:$33,300.00 5.20 SDR9 POLYETHYLENE SLEEVE FOR WATER SERVICE LINE Quantity:580 UOM:LF Price:$5.50 Total:$3,190.00 5.21 1" DIA. COATED COPPER SERVICE LINE Quantity:410 UOM:LF Price:$41.00 Total:$16,810.00 5.22 2" DIA. COATED COPPER SERVICE LINE Quantity:675 UOM:LF Price:$100.00 Total:$67,500.00 6 Package Header PACKAGE F - UNIVERSITY OF ARKANSAS WATER RELOCATIONS Quantity:1 UOM:EA Total:$190,850.00 Package Items 6.1 CONSTRUCTION CONTROL AND LAYOUT Quantity:1 UOM:LS Price:$1,000.00 Total:$1,000.00 6.2 6" DIA. WATER LINE (AWWA C900 DR14) Quantity:770 UOM:LF Price:$58.00 Total:$44,660.00 6.3 12" DIA. STEEL CASING W/MECHANICAL LINK END SEALS & SPACERS (DIRECT BURY) Quantity:259 UOM:LF Price:$270.00 Total:$69,930.00 6.4 DUCTILE IRON FITTINGS FOR WATER LINE Quantity:350 UOM:LB Price:$16.00 Total:$5,600.00 6.5 TAPPING SLEEVE AND VALVE (6"X6") Quantity:2 UOM:EA Price:$6,880.00 Total:$13,760.00 6.6 CUT, CAP AND ABANDON EXISTING WATER LINE (6") Quantity:2 UOM:EA Price:$1,050.00 Total:$2,100.00 6.7 FLOWABLE FILL ABANDONED 8" WATER LINE UNDER ROADWAY Quantity:600 UOM:LF Price:$16.00 Total:$9,600.00 6.8 1" WATER METER INSTALLED COMPLETE Quantity:2 UOM:EA Price:$4,200.00 Total:$8,400.00 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 13 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A 6.9 2" DIA. COATED COPPER SERVICE LINE Quantity:200 UOM:LF Price:$179.00 Total:$35,800.00 Response Total: $14,923,032.90 Vendor: Crossland Heavy Contractors, Inc.Bid 26-43 Addendum 5Page 14 of 14 pages Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Run Date:05/14/2026 U.S. DEPARTMENT OF TRANSPORTATION Report: FMISD06A Run Time:13:46:02 FEDERAL HIGHWAY ADMINISTRATION Page 37 of 46 FEDERAL-AID PROJECT MODIFICATION RECIPIENT:5-Arkansas FEDERAL PROJECT NO:9142041 NO:12 RECIPIENT PROJ. NO(S):040720 PROJECT TITLE:Poplar St. - Drake St. (Fayetteville) PROJECT DESCRIPTION:Major Widening UEI (SAM):U9GQWG2L9ZQ3 SUBRECIPIENT PROJECT:No SUBRECIPIENT UEI(SAM): SUBRECIPIENT NAME: PROJECT END DATE:09/30/2028 CLASSIFICATION OF PHASE OF WORK:CONSTR THE PROJECT AGREEMENT FOR THE ABOVE REFERENCED PROJECT ENTERED INTO BETWEEN THE UNDERSIGNED PARTIES AND EXECUTED BY THE FHWA ADMINISTRATOR ON 12/06/2016 IS HEREBY MODIFIED AS FOLLOWS: PROGRAM CODE FAIN URBAN / WITH FORMER AMOUNT REVISED AMOUNT Y306 693JJ22630000Y306AR9142041 ESTIMATED TOTAL OF THE PROJECT $180,000.00 $180,000.00 FEDERAL FUNDS $144,000.00 $144,000.00 ADV CONSTRUCTION FUNDS $0.00 $0.00 PERCENT FEDERAL SHARE 80%80% Y240 693JJ22630000Y240AR9142041 ESTIMATED TOTAL OF THE PROJECT $0.00 $10,000.00 FEDERAL FUNDS $0.00 $8,000.00 ADV CONSTRUCTION FUNDS $0.00 $0.00 PERCENT FEDERAL SHARE 0%80% Z400 059142041Z400 ESTIMATED TOTAL OF THE PROJECT $11,004,145.11 $11,004,145.11 FEDERAL FUNDS $146,486.00 $146,486.00 ADV CONSTRUCTION FUNDS $8,656,830.09 $8,656,830.09 PERCENT FEDERAL SHARE 80%80% Y230 693JJ22630000Y230AR9142041 29494 ESTIMATED TOTAL OF THE PROJECT $712,160.55 $712,160.55 FEDERAL FUNDS $500,000.00 $500,000.00 ADV CONSTRUCTION FUNDS $0.00 $0.00 PERCENT FEDERAL SHARE 80%80% Y236 693JJ22630000Y236AR9142041 ESTIMATED TOTAL OF THE PROJECT $10,000,000.00 $10,000,000.00 FEDERAL FUNDS $8,000,000.00 $8,000,000.00 ADV CONSTRUCTION FUNDS $0.00 $0.00 PERCENT FEDERAL SHARE 80%80% RECIPIENT REMARKS: Mod. #12 - Based on current state PE costs. Mod. #11 - Based on estimated construction costs, current ROW consult and to extend the period of performance. Mod. #10 - Based on estimated consultant right of way costs and to extend the period of performance. Mod. #9 - Based on estimated right of way costs and to extend the period of performance. Mod. #8 - Based on estimated utilities costs. Utility funds are authorized for planning purposes only. No work will begin on the project until the supporting NEPA documentation is complete. Also, to extend the period of performance. Mod. #7 - To extend the period of performance to allow time for job completion. Mod. #6 - Based on estimated PE costs. Mod. #5 - Based on estimated PE costs. Mod. #4 - Based on estimated PE costs. Mod. #3 - Based on estimated PE costs. Mod. #2 - Based on Task Order No. P164 with Crafton, Tull & Associates. Mod. #1 - Based on estimated PE costs. Based on requested PE funds. This agreement is subject to the following award terms: http://edocket.access.gpo.gov/2010/pdf/2010-22705.pdf and http://edocket.access.gpo.gov/2010/pdf/2010-22706.pdf. FHWA REMARKS: ALL OTHER TERMS AND CONDITIONS OF THE PROJECT AGREEMENT WILL REMAIN IN FULL FORCE AND EFFECT. Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Run Date:05/14/2026 U.S. DEPARTMENT OF TRANSPORTATION Report: FMISD06A Run Time:13:46:02 FEDERAL HIGHWAY ADMINISTRATION Page 38 of 46 FEDERAL-AID PROJECT MODIFICATION ARKANSAS DEPARTMENT OF TRANSPORTATION AVAILABLE FUNDS CERTIFIED BY:Lindsay Atkinson DATE:05/12/2026 APPROVAL RECOMMENDED BY:Douglas Meleney DATE:05/12/2026 APPROVED AND AUTHORIZED BY:Daniel Siskowski DATE:05/12/2026 FEDERAL HIGHWAY ADMINISTRATION APPROVAL RECOMMENDED BY:Jessica Gordon DATE:05/13/2026 APPROVED AND AUTHORIZED BY:Jesse Ward DATE:05/13/2026 MODIFICATION APPROVED BY:Jessica Gordon DATE:05/14/2026 Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A FEDERAL-AID PROJECT AGREEMENT PoDi/State Admin. PoDi/Locally Admin. Assumed/State Admin. X Assumed/Locally Admin. Program Code :Z400, Z400(AC), Y306, Y230, Y236 & Y240 Other F.A.P. :CMF-STPLC-STPU-TAPLC-STPF-9142(41) State Job : Project Description :Poplar St. - Drake St. (Fayetteville) (S) County(ies) :Washington Est. Letting Date : TBD (Month / Year) Inventory Rt. # :7x112x1xA Project Type : C "STIP" Item No. : 040720 Est. Constr. Date : NA (Demo Projects Only)(Month / Year) Beginning Milept. :0000.793 Ending Milept : Demo. ID No. : NA (Demo Projects Only) Original Agreement : Description : Major Widening Project End Date:CFDA # FOR FHWA Improvement Type : BRIDGES Feature Str. #Type USE ONLY Urbanized Area : NARTS Rural or Urban : U Functional System : M Fed-Aid System : O LPA : N FUNDING:F e d e r a l F u n d s Previously Now Total Other Other Total F.F. Improvement Type Authorized Requested Federal [STATE ][CITY ] Cost % CMAQ - Z400 State PE - 15 132,000.00 0.00 132,000.00 33,000.00 165,000.00 80 Consult Title I - 15 14,486.00 0.00 14,486.00 3,621.50 18,107.50 80 Total - Z400 146,486.00 0.00 146,486.00 36,621.50 183,107.50 STPF - Y240 State PE - 15 0.00 8,000.00 8,000.00 2,000.00 10,000.00 80 TAPLC - Y306 Sidewalk - 28 144,000.00 0.00 144,000.00 0.00 36,000.00 180,000.00 80 Total - Y306 144,000.00 0.00 144,000.00 0.00 180,000.00 STPU - Y230 Sidewalk - 28 500,000.00 0.00 500,000.00 0.00 125,000.00 625,000.00 80 Total - Y230 500,000.00 0.00 500,000.00 0.00 625,000.00 Non-Participating - 9030 Sidewalk - 28 0.00 0.00 0.00 0.00 87,160.55 87,160.55 80 Total - 9030 0.00 0.00 0.00 0.00 87,160.55 STPLC - Y236 Roadway - 03 8,000,000.00 0.00 8,000,000.00 2,000,000.00 0.00 10,000,000.00 80 Total - Y236 8,000,000.00 0.00 8,000,000.00 2,000,000.00 10,000,000.00 CMAQ - Z400(AC) Utilities - 43 396,525.96 0.00 396,525.96 99,131.49 495,657.45 80 Roadway - 03 6,657,396.13 (0.00) 6,657,396.13 1,664,349.03 8,321,745.16 80 R/W - 16 1,558,908.00 0.00 1,558,908.00 389,727.00 1,948,635.00 80 ROW Consult - 16 44,000.00 0.00 44,000.00 11,000.00 55,000.00 80 Total - Z400(AC)8,656,830.09 (0.00)8,656,830.09 2,164,207.52 10,821,037.61 TOTAL 17,447,316.09 8,000.00 17,455,316.09 4,202,829.02 248,160.55 21,906,305.66 Comments: Mod. #12 - Based on current state PE costs. State PE Auth: 12/6/16, Rev: 06/19/2017, 07/05/17, 8/29/17, 9/18/17, 08/15/18, 01/29/19 Utilities Auth 12/10/21 ROW Consult Auth 05/13/24 ROW Auth 4/7/23 Max NWARPC STBGP-A $500,000 (2026) Constr. Auth 4/27/26 FHWA will be billed 100% of the 80% for Utilities, ROW, ROW consult & const. T3CE apprvd 3/1/23 The State agrees that as a condition to payment of Federal funds obligated, it accepts and will comply with the agreement Original Agreement provisions set forth in 23 CFR, Parts 630.106 and 630.112; and its signature constitutes the making of the certifications. Modified Agreement X Date: Federal Programs Coordinator Approved in FMIS by Electronic Signature:Date: Section Head - Program Funding Date: Division Engineer - Program Management Federal-Aid Project Agreement was approved and authorized by electronic signature on ___________________ by FHWA The Arkansas Department of Transportation hereby requests authorization to proceed with the following project. 0001.785 20.205 This agreement is subject to the following award terms: http://edocket.access.gpo.gov/2010/pdf/2010-22705.pdf and September 30, 2028 Note a copy of Form FMISD06A has been printed and sent to the Master Files which shows the above date. http://edocket.access.gpo.gov/2010/pdf/2010-22706.pdf. Approved for Submission : Agreement/ Modification Requested in FMIS by Electronic Signature: 040720 December 6, 2016 5/12/2026 For 5/12/2026 Damil Sisbousbi S -12 -26 5/14/26 Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A Docusign Envelope ID: 66505472-DB52-8DA2-81F6-E61308508C1A