HomeMy WebLinkAbout171-26 RESOLUTION Page 1 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 171-26 File Number: 2026-2264 A RESOLUTION TO INCREASE THE PROJECT CONTINGENCY FOR THE WALKER PARK IMPROVEMENTS PHASE 1 PROJECT IN THE AMOUNT OF $100,000.00 WHEREAS, on September 16, 2025, City Council passed Resolution 208-25 authorizing a contract with Kinco Constructors for Walker Park Improvements Phase I and approving a project contingency in the amount of $255,000.00; and WHEREAS, items in the deductive alternates were added back into the project and, along with other typical change order items, it has left only $18,946.76 remaining in contingency with additional items expecting to exhaust the remainder; and WHEREAS, remaining work on the project includes additional old concrete demolition and replacement at the entrance on 13th Street, additional safety fencing at the horseshoe courts, shot blasting the courts and batting cage slab for better surfacing adhesion, changes to planting beds, handrails for a ramp, mow strip for sand volleyball fence, and two bench pads and increasing the contingency will provide the funding to complete the project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves an increase to the project contingency for the Walker Park Improvements Phase I Project in the amount of $100,000.00. PASSED and APPROVED on July 21, 2026 Approved: _______________________________ Molly Rawn, Mayor Attest: ___________________________________ Courtney Spohn, Senior Deputy City Clerk Treasurer Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Mailing address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov CITY COUNCIL MEMO 2026-2264 MEETING OF JULY 21, 2026 TO: Mayor Rawn and City Council THROUGH: Keith Macedo, Chief of Staff Alison Jumper, Director of Parks, Natural Resources and Cultural Affairs FROM: Ted Jack, Park Planning Superintendent SUBJECT: Walker Park Improvements Phase 1 – Increase to Project Contingency RECOMMENDATION: Staff recommends approval of an additional $100,000 in Parks Bond funds for the Walker Park Improvements Phase 1 Project contingency, increasing the total project contingency from $255,000 to $355,000. BACKGROUND: Bid 25-43 for improvements to Walker Park, was approved at City Council September 16, 2025 exercising deductive alternates one and two (2025-1664 $4,697,184.26). The project had a $255,000.00 project contingency (5.4%). Items in the deductive alternates were added back into the project and along with other typical change order items have left only $18,946.76 remaining in contingency. Additional items are expected to exhaust the contingency. This increase is expected to be sufficient to finish the project. DISCUSSION: The project contingency was set lower than typical to help stretch limited funding. Two large items in the deductive alternates were lighting the sand volleyball courts and converting the old batting cages to three pickleball courts. These items had high recreational value and were added back into the project using $137,248.00 of the contingency. Currently $18,946.76 in contingency remains in the project. Another change order is needed for several items in the project and is expected to be approximately $60,000. These items are expected to include additional old concrete demolition at the entrance on 13th street and replacement, additional safety fencing at the horseshoe courts, shot blasting the courts and batting cage slab for better surfacing adhesion, changes to planting beds, handrails for a ramp, mow strip for sand volleyball fence, and two bench pads. Increasing the contingency will cover this amount and leave funding to complete the project. The additional funding will place the contingency at 7.5% of original project costs. Executed change orders are attached. BUDGET/STAFF IMPACT: This adds $100,000 from 2024 Parks Bond. ATTACHMENTS: 3. Staff Review Form, 4. Walker Change Orders 1 - 6 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Page 1 City of Fayetteville, Arkansas Legislation Text 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 File #: 2026-2264 A RESOLUTION TO INCREASE THE PROJECT CONTINGENCY FOR THE WALKER PARK IMPROVEMENTS PHASE 1 PROJECT IN THE AMOUNT OF $100,000.00 WHEREAS, on September 16, 2025, City Council passed Resolution 208-25 authorizing a contract with Kinco Constructors for Walker Park Improvements Phase I and approving a project contingency in the amount of $255,000.00; and WHEREAS, items in the deductive alternates were added back into the project and, along with other typical change order items, it has left only $18,946.76 remaining in contingency with additional items expecting to exhaust the remainder; and WHEREAS, remaining work on the project includes additional old concrete demolition and replacement at the entrance on 13th Street, additional safety fencing at the horseshoe courts, shot blasting the courts and batting cage slab for better surfacing adhesion, changes to planting beds, handrails for a ramp, mow strip for sand volleyball fence, and two bench pads and increasing the contingency will provide the funding to complete the project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves an increase to the project contingency for the Walker Park Improvements Phase I Project in the amount of $100,000.00. Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 City of Fayetteville Staff Review Form 2026-2264 Item ID 7/7/2026 City Council Meeting Date - Agenda Item Only N/A for Non-Agenda Item Ted Jack 6/30/2026 PARKS & RECREATION (520) Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends approval of an additional $100,000 in Parks Bond funds for the Walker Park Improvements Phase 1 Project contingency, increasing the total project contingency from $255,000 to $355,000. Budget Impact: 4805.860.7550-5911.99 4805 - Park Bonds Account Number Fund 46050.7550.2000 Walker Park Improvements, Phase One Project Number Project Title Budgeted Item?Yes Total Amended Budget $3,453,802.00 Expenses (Actual+Encum)$3,321,862.10 Available Budget $131,939.90 Does item have a direct cost?No Item Cost $- Is a Budget Amendment attached?No Budget Amendment $- Remaining Budget $131,939.90 Purchase Order Number:2025-00000907 Previous Ordinance or Resolution #2025-1664 Change Order Number:Approval Date: Original Contract Number: Comments: Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 10/17/2025 Submitted Date Yes 2,301,491.54$ 81,018.00$ V20221130 Budgeted Item? Does item have a direct cost? Is a Budget Adjustment attached? Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget 14,496,256.00$ 12,194,764.46$ Yes No -$ 2,220,473.54$ 46050.7550.2000 Project Number Budget Impact: Walker Park Improvements, Phase 1 Fund ParkDevelopment2250.520.9256-5806.00 Account Number Project Title City of Fayetteville Staff Review Form 2025-0826 Item ID n/a City Council Meeting Date - Agenda Item Only Staff recommends approving Change Order One for Walker Park Phase 1 Improvements for the contract with Kinco Constructors LLC in the amount of $81,018.00 for sport lighting for the four sand volleyball courts that are being constructed as part of the project. N/A for Non-Agenda Item Action Recommendation: Submitted By Ted Jack PARKS & RECREATION (520) Division / Department Comments: 2025-0907PurchaseOrderNumber: Change Order Number:# 1 Previous Ordinance or Resolution #208-25 Approval Date:9/16/2025 Original Contract Number:2025-00000049 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 TO: Mayor Molly Rawn THRU: Keith Macedo, Chief of Staff Alison Jumper, Director of Parks, Natural Resources and Cultural Affairs FROM: Ted Jack, Park Planning Superintendent DATE: October 21, 2025 SUBJECT: Walker Park Improvements Phase 1 – Change Order One RECOMMENDATION: Staff recommends approving Change Order One in the amount of $81,018.00 for sport lighting for the four sand volleyball courts that are being constructed as part of the project. BACKGROUND: Bid 25-43 for improvements to Walker Park, was approved at City Council September 16, 2025 2025-1664). Bids were higher than anticipated and two deductive alternates were taken to reduce the bid award. The sport lighting for the four sand volleyball courts was one of the items deducted from the contract. This change order adds the lighting back into the project at the bid line item value ($81,018) and following the project drawings and specifications. DISCUSSION: Sand Volleyball is a popular sport with a very well utilized facility on the north side of town at Lake Fayetteville – Veterans area. The courts at Walker will provide a high-quality facility for the south side of the city. Without lights the usability of the courts is diminished including reducing the possibility of league play. BUDGET/STAFF IMPACT: Funding for the change order is from the $255,000 Project Contingency. An administrative Budget Adjustment will move the funds into the project. Attachments: SRF and Change Order 1 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 10/31/2025 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Date: December 1, 2025 To: City of Fayetteville 113 W. Mountain Fayetteville, AR 72701 Re: Walker Park - CO #02 - Additional Storm Drain and Junction Box Kinco Constructors, LLC. Project No. 25.2001 Description of Proposed Change: The total cost of this proposal is as follows: 1.      Labor…………………………………….-$ 2.      Materials ………………………………..-$ 3.      Subcontracts…………………………….34,755.14$ 4.      Subtotal (add lines1, 2, & 3)……………….34,755.14$ 5.      Mark-Up Rate 8.35%.....................2,902.05$ 6.  Change Order Total…………....................37,657.19$ Should you have any questions please feel free to contact me. Sincerely, Harrison Wilson Date: ____________________________ Kinco Constructors, LLC. Mobile: 501-993-6000 Cc: File Accepted: ___________________________ Additional labor, material, and equipment to demo the existing storm drain line that was rotten, install a new 24" HDPE storm drain line, pour a new Junction Box, and demo/replace concrete at sidewalk where the old stom drain ran. All work per RFI #05. Upon your approval, we intend to make this change immediately. CHANGE ORDER #02 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Project Name: Walker Park Phase 1 Sub Contractor: Construction Solutions of NWA, Inc. Labor Breakdown # Men Hours Hourly Rate Total Pay Rate Total 3 10 $56.00 $56.00 $1,680.00 3 5 $56.00 $56.00 $840.00 2 2 $56.00 $56.00 $224.00 $2,744.00 Material Breakdown QTY Unit LF,SF, YDS, EA Material Cost Manuf & Part Number Total 1 EA $7,002.00 $7,002.00 25 TON $19.99 $499.75 110 CY $12.00 $1,320.00 1 LS $1,500.00 $1,500.00 $10,321.75 Equipment Breakdown QTY Unit Week, Month, Day Base Cost Total 1 Week 1,765.00$ $1,765.00 1 Week 1,168.00$ $1,168.00 1 Week 668.00$ $668.00 1 Week 275.00$ $275.00 1 Week 325.00$ $325.00 1 Week 150.17$ $150.17 1 Week 350.00$ $350.00 1 Week 150.00$ $150.00 $4,851.17 $17,916.92 OH&P 12%$2,443.22 Total for Change $20,360.14 Change Order Detail Reconciliation Detailed Description of Change and ASI/RFI/PR #: Change Order #1 Sawcut & Demo 620 SF Concrete Description / Task Demo 380 LF CMP & Area Inlet Labor, Material and Equipment Total Total Equipment Total Materials Total Labor 4x4 Junction Box 4'-6' (SUB) Sawcut Headwall Grout Pipe Into Headwall Description / Task 30K Excavator Description / Task / Manuf Number Class 7 Base Haul Off Subcontractor Signature: Skid Steer MISC Hand Tools Trench Roller Rotary Laser GPS Base & Rover Hot Saw Work Truck Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Kinco Extension Sheet 12/01/25 Walker Park - CO #02 - Additional Storm Drain and Junction Box Labor Material Subcontract Description Quantity Unit U/C Total U/C Total U/C Total TOTAL Construction Solutions - Demo Existing Storm Drain and Concrete, New J-Box 1 LS - - - - 20,360.14 20,360 20,360.14 Construction Solutions - 24" HDPE (Unit Cost)100 LF - - - - 76.06 7,606 7,606.00 Global Concrete - Replace Sidewalk (Unit Cost)620 SF - - - - 10.95 6,789 6,789.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Subtotal - - 34,755 34,755.14 Labor Burden @ 44.0%- - - - Sales Tax @ 9.75%- - - Subtotal - - 34,755 34,755.14 Mark-Up Rate (8.35%)2,902.05 TOTAL 37,657.19 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 UF O UF O UF O UF O UF O UF O HC HC R/W R/W R/W R/W R/W R/W R/W R/W R/W C B 10 0 - Y R 10 0 - Y R 100 - Y R 10 0 - Y R 10 0 - Y R 10 0 - Y R 10 0 - Y R 10 0 - Y R 10 0 - Y R 100 - Y R 100-YR 100- Y R 10 0 - Y R 10 0 - Y R 10 0 - Y R 10 0 - Y R 10 0 - Y R 100- Y R 10 0 - Y R 10 0 - Y R 10 0 - Y R 10 0 - Y R 121 4 12 1 5 12 1 4 12 1 6 121 7 121 7 12 1 0 121 1 121 2 121 3 12 0 9 12 0 8 12 0 7 12 0 6 120 5 12 1 5 121 6 1214 12 1 5 12 1 1 12 1 2 12 1 3 12 1 4 12 1 0 12 0 9 12 0 6 12 0 6 12 2 0 12 2 1 121 7 121 8 UG T V UG T V UG T V UG T V UGTV UGTV UG T V UG T V UG T V UG T V UG T V 1. 4 % 1. 4 % 0.9% 1.0% 3.1% 3. 2 % 1220 1220 12 1 9 1221 1222 121 6 121 7 1218 1219 FG 1215.73 FG 1215.79 FG 1216.64 FG 1215.73 FG 1215.74 FG 1213.08 FG 1213.10 FG 1212.85 FG 1212.83 FG 1214.63 FG 1214.58 FG 1215.80 BW 1217.73 BW 1216.50 BW 1216.50 BW 1217.00 BW 1218.50 FG 1219.10 FG 1219.43 FG 1214.81 FG 1216.14 FG 1215.11 FG 1216.05 FG 1216.45 FG 1216.14 BW 1216.50 BW 1216.50 BW 1219.00 BW 1219.50 BW 1220.14 BW 1217.00 BW 1216.50 BW 1216.50 BW 1216.50 BW 1216.50 BW 1218.00 BW 1219.19 BW 1216.09 BW 1217.82 FG 1219.17 BW 1220.00 BW 1219.50 BW 1216.50 BW 1215.43 BW 1217.02 SDMH-5 (12" DOME) RIM=1219.81 INV 24" IN (N)=1212.90 INV 30" OUT (W)=1212.81 SDMH-17 (12" DOME) RIM=1219.42 INV 18" IN (E)=1215.33 INV 24" OUT (W)=1215.23 SDMH-16 (12" DOME) RIM=1218.62 INV 24" IN (E)=1214.20 4' x 4' SDMH-1 RIM=1215.88 INV 18" IN (N)=1212.50 INV 30" IN (S)=1211.51 INV 36" OUT (W)=1211.41 SDMH-4 RIM=1216.35 INV 30" IN (E)=1212.38 INV 30" OUT (W)=1212.28 SDMH-3 RIM=1215.58 INV 30" IN (E)=1211.93 INV 30" OUT (N)=1211.83 SDMH-2 (12" DOME) RIM=1216.67 INV 18" OUT (S)=1212.82 51 LF - 36 " P I P E @ 0 . 8 0 % 64 L F - 1 8 " P I P E @ 0 . 5 0 % 51 LF - 30" PIPE @ 0.62% 56 LF - 30" PIPE @ 0.62% 70 LF - 30" PIPE @ 0.62% 130 LF - 24" PIPE @ 0.79% 94 L F - 2 4 " P I P E @ 2 . 1 9 % 353 LF - 4" PIPE @ 1.37% MIN. 353 LF - 4" PIPE @ 1.37% MIN. 353 LF - 4" PIPE @ 1.37% MIN. 353 LF - 4" PIPE @ 1.37% MIN. SDMH-6 (12" DOME) RIM=1220.57 INV 24" IN (N)=1215.06 INV 24" OUT (S)=1214.96 347 LF - 4" PIPE @ 1.37% FG 1213.13* TC 1215.70* G 1215.20*TC 1213.94* G 1213.44*TC 1214.13* G 1213.63* TC 1213.74* G 1213.24* TC 1213.77* G 1213.27* TC 1214.93* G 1214.43*TC 1215.04* G 1214.54* TC 1215.06* G 1214.56* FG 1213.20* TC 1213.66* G 1213.16* FG 1213.10* FG 1213.10* FG 1212.90* FG 1212.90* FG 1212.86* FG 1212.83* FG 1212.78* FG 1212.85* FG 1212.90* FG 1212.99* FG 1212.98* FG 1212.98* FG 1212.97* FG 1212.85* FG 1212.80* FG 1212.87* 321 33C 321 320 320 320 INV 36" IN (E)=1211.00 321 322 322 30G 321 320 33C 33C 33C 33C 321 SCOURSTOP FG 1214.08*FG 1214.65* 2.7%2.5% FG 1213.08* FG 1213.07* 1.0% 1.0% 0. 0 % 0.4 % FG 1214.34* FG 1213.77* 1.4% 0. 5 % 0. 5 % 1.4% 1.2 % 33C 320 11 LF - 6" PIPE @ 0.50% EXISTING WALL AND 8' FENCE TO REMAIN 1.0% EX. JBOX-1 CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING JUNCTION BOX AND OUTFLOW PIPE AND TO REPORT FINDINGS TO MCE FOR EVALUATION OF FURTHER DESIGN REFER TO SHEETS L-301, L-302 FOR TW ELEVATIONS CONTRACTOR TO DETERMINE GRADES IN FIELD FG 1215.17* FG 1212.88* FG 1212.88* 58 LF - 24" PIPE @ 5.69% BW 1218.00 0 10 20 4020 1 inch = 20ft. ( IN FEET ) PLAN SCALE X X EXISTING LEGEND SS UGT W GAS UGE UGTV OHE UFO PROPERTY LINE RIGHT OF WAY SANITARY SEWER LINE WATER LINE GAS LINE UNDERGROUND TELEPHONE UNDERGROUND ELECTRIC UNDERGROUND TELEVISION UNDERGROUND FIBER OVERHEAD ELECTRIC FENCE ROAD CENTERLINE DITCH FLOWLINE EASEMENT LINE GRAVEL LINE FIRE HYDRANT WATER METER WATER VALVE WATER FAUCET SANITARY SEWER MH CLEAN-OUT DRAINAGE MH POWER POLE GUY WIRE w/ ANCHOR GAS METER GAS RISER STREET LIGHT POLE TELEPHONE PEDESTAL CABLE TV PEDESTAL CABLE VAULT ELECTRIC VAULT FIBER VAULT GAS VAULT TELEPHONE VAULT WATER VAULT SIGN (AS NOTED) POST (AS NOTED) BENCHMARK FOUND IRON PIN (AS NOTED) CONTROL POINT RR SPIKE BUSH DECIDUOUS TREE CONIFEROUS TREE R/W PROPOSED LEGEND GRADE BREAK FLOWLINE CONTOUR ELEVATION STORM DRAIN PERFORATED PIPE CATCH BASIN SANITARY SEWER MANHOLE FLARED END SECTION FLOW ARROW SPOT ELEVATIONS FG = FINISHED GRADE G = NORMAL GUTTER INV = INVERT EG = EXISTING GRADE TW = FINISHED GRADE @THT = THROAT FS = FINISHED PAVEMENT TOP OF WALL FL = FLOW LINE ELEVATION BW = FINISHED GRADEHP = HIGH POINT FFE = FINISHED FLOOR @ BOTTOM OF WALLLP = LOW POINT ELEVATION TS = TOP OF STAIRS SW = SIDEWALK TC = TOP OF CURB BS = BOTTOM OF STAIRS XXX X XXX.XX D S D s e a l r e v i s i o n s 1447 Peachtree Street NE, Suite 850 Atlanta, Georgia 30309 404.873.6730 www.tsw-design.com c o n s u l t a n t p r o j e c t i n f o r m a t i o n n o r t h a r r o w + s c a l e checked by: project number: contact: drawn by: s h e e t n u m b e r s h e e t t i t l e d r a w i n g d a t e d r a w i n g i n f o r m a t i o n c l i e n t i n f o r m a t i o n p r o j e c t a d d r e s s Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of TSW and may not be used in any way without the written permission of this office. SOUTHWEST GRADING PLAN C-003 JCM PAD EB 24013 CITY OF FAYETTEVILLE, AR 479.444.3469 FAYETTEVILLE, AR 72701 24013 WALKER PARK PHASE 1 FAYETTEVILLE, AR 72701 113 WEST MOUNTAIN ST 10 W 15TH ST 22E PEDESTRIAN RAMP (PARALLEL) 30G RECTANGULAR JUNCTION BOX (SEE SIZE AT SYMBOL) 33B FRENCH DRAIN (NON SPORT FIELD AREAS) (SEE LENGTH AT SYMBOL) 33C FRENCH DRAIN (SPORT FIELD AREAS) (SEE LENGTH AT SYMBOL) GRADING/DRAINAGE DETAILS 320 INSERTA-TEE (OR ENGINEER APPROVED EQUAL) 321 NYLOPLAST DRAIN BASIN W/ DOME GRATE (SIZE OF STRUCTURE TO BE COORDINATED W/ ADS) (OR ENGINEER APPROVED EQUAL) 322 NYLOPLAST DRAIN BASIN W/ SOLID LID (SIZE OF STRUCTURE TO BE COORDINATED WITH ADS) (OR ENGINEER APPROVED EQUAL) GRADING/DRAINAGE KEYNOTES 100% CONSTRUCTION DOCUMENTS MAY 21, 2025 NOTE: THIS PLAN INCLUDES DEVELOPMENT IN ZONE AE AND THE REGULATORY FLOODWAY PER FIRM 05143C0216G DATED 1/25/2024. THE CITY OF FAYETTEVILLE SHALL BE RESPONSIBLE FOR ENSURING THE PROPOSED IMPROVEMENTS SHALL NOT RESULT IN AN ADVERSE IMPACT TO THE COMMUNITY AS A RESULT OF THE DEVELOPMENT WITHIN ZONE AE AND FOR ENSURING THE PROPOSED IMPROVEMENTS SHALL NOT RESULT IN ANY RISE IN BASE FLOOD ELEVATIONS AS A RESULT OF THE DEVELOPMENT WITHIN THE REGULATORY FLOODWAY. THE ENGINEER SHALL NOT BE RESPONSIBLE FOR PERFORMING SAID DETERMINATION. *DENOTES APPROXIMATE ELEVATIONS IN AREAS WITH NO TOPOGRAPHIC DATA. CONTRACTOR TO FIELD VERIFY FEASIBILITY OF PROVIDED ELEVATIONS AND CONTACT MCE IF ANY DISCREPENCIES ARISE 06/03/2025 Demo, no replace. Demo, replace to drainage ditch. 100 ' - 0 " 292 ' - 7 " Existing line to inlet Does not exist Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 TO: Mayor Molly Rawn THRU: Keith Macedo, Chief of Staff Alison Jumper, Director of Parks, Natural Resources and Cultural Affairs FROM: Ted Jack, Park Planning Superintendent DATE: January 23, 2026 SUBJECT: Walker Park Improvements Phase 1 – Change Order Three RECOMMENDATION: Staff recommends approving Change Order Three to the Walker Park Improvements Phase One contract (208-25) with Kinco Constructors in the amount of $45,862.31 for removal and replacement of the concrete floor for the Octagon Pavilion, repair to a sidewalk that has sunk, pickleball sleeves, and adding a French drain along a portion of the new retaining walls by the Horseshoe courts. The contract substantial completion date will be extended by ten days for this work. BACKGROUND: Bid 25-43 for improvements to Walker Park, was approved at City Council September 16, 2025 2025-1664 $4,697,184.26). Change Order One was for adding lighting that was part of a deductive alternate back into the project for the sand volleyball courts ($81,018.00). Change Order Two was for replacement of a dilapidated drain line and concrete walk repair 37,657.19). Total contract cost with Change Orders 1 and 2 is $4,815,859.45. DISCUSSION: The added French drain will keep the base of the new retaining walls dry reducing the likelihood of water migrating through to the plaza side. The octagon pavilion slab is cracked in multiple places, the small portion of sidewalk at the creek bridge by the batting cadges has sunk at the connection to the bridge, and the pickleball post sleeves are necessary for in ground mount versus the surface mount that was in the bid documents. The work is more clearly defined on the Change Order document. BUDGET/STAFF IMPACT: Funding for the change order is from the $136,324.81 remaining in project contingency. An administrative budget adjustment will move the funds into the project. After Change Order Three, $90,462.50 will remain in the contingency. The construction contract will increase to 4,861,721.76. Attachments: Staff Review Form and Staff Memo Budget Adjustment Change Order Three with Contractors document Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Comments: 2025-0907PurchaseOrderNumber: Change Order Number:# 3 Previous Ordinance or Resolution #208-25 Approval Date: Original Contract Number:2025-00000049 46050.7550.2000 Budget Impact: Walker Park Improvements, Phase 1 ParkDevelopment2250.520.9256-5806.00 City of Fayetteville Staff Review Form 2026-0086 N/A Staff recommends approving Change Order #3 for the Kinco Constructors LLC contract in the amount of $45,862.31 for removal and replacement of the concrete floor for the Octagon Pavilion, repair to a sidewalk that has sunk, add sleeves for pickleball court net posts and adding a French drain along a portion of the new retaining walls by the Horseshoe courts. The contract substantial completion date will be extended by ten days for this work. N/A for Non-Agenda Item Action Recommendation: Ted Jack PARKS & RECREATION (520) Division / Department 2/2/2026 Submitted Date Yes 10,381,456.00$ 45,862.31$ V20221130 Budgeted Item? Does item have a direct cost? Is a Budget Adjustment attached? Total Amended Budget Expenses (Actual+Encum) Item Cost Budget Adjustment Remaining Budget 10,381,456.00$ Yes No -$ 10,335,593.69$ Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 02/03/2026 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Date: January 23, 2026 To: City of Fayetteville 113 W. Mountain Fayetteville, AR 72701 Re: Walker Park - CO #03 - Add. Concrete, Net Posts, and Drainage Kinco Constructors, LLC. Project No. 25.2001 Description of Proposed Change: The total cost of this proposal is as follows: 1.Labor…………………………………….-$ 2.Materials ………………………………..-$ 3.Subcontracts…………………………….42,050.40$ 4.Subtotal (add lines1, 2, & 3)……………….42,050.40$ 5. Bond 0.66% …..................................277.53$ 6.Mark-Up Rate 8.35%.....................3,534.38$ 7.Change Order Total…………....................45,862.32$ Should you have any questions please feel free to contact me. Contract Days Added: 10 Days Sincerely, Harrison Wilson Date: ____________________________ Kinco Constructors, LLC. Mobile: 501-993-6000 Cc: File Accepted: ___________________________ Provide labor, materials, and equipment to demolish the existing hexagon pavilion slab, including saw cutting around columns and replacing 4" slab. Scope also includes conversion of surface-mounted pickleball nets to sleeved nets. Lastly, this CO includes adding a french drain along the concret wall of the horseshoe area. Upon your approval, we intend to make this change immediately. CHANGE ORDER #03 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Kinco Extension Sheet 01/23/26 Walker Park - CO #03 - Add. Concrete, Net Posts, and Drainage Labor Material Subcontract Description Quantity Unit U/C Total U/C Total U/C Total TOTAL Global Concrete - Demo Hexagon Pavilion Slab 2,361 LS - - - - 5.00 11,805 11,805.00 Global Concrete - Replace Hexagon Pavilion Slab (Unit Cost)2,361 LF - - - - 10.95 25,853 25,852.95 Global Concrete - Demo Sidewalk 63 SF - - - - 5.00 315 315.00 Global Concrete - Replace Sidewalk (Unit Cost)63 SF - - - - 10.95 690 689.85 ACS Playground Adventures - Sleeved Court Netting 3 EA - - - - 138.00 414 414.00 Construction Solutions - French Drain at Horseshoe Wall 120 LF - - - - 24.78 2,974 2,973.60 Subtotal - - 42,050 42,050.40 Labor Burden @ 44.0%- - - Sales Tax @ 9.75%- - Subtotal 42,050 42,050.40 Bond (0.66%)277.53 Mark-Up Rate (8.35%)3,534.38 TOTAL 45,862.32 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 TO: Mayor Molly Rawn THRU: Keith Macedo, Chief of Staff Alison Jumper, Director of Parks, Natural Resources and Cultural Affairs FROM: Ted Jack, Park Planning Superintendent DATE: January 23, 2026 SUBJECT: Walker Park Improvements Phase 1 – Change Order Three RECOMMENDATION: Staff recommends approving Change Order Three to the Walker Park Improvements Phase One contract (208-25) with Kinco Constructors in the amount of $45,862.31 for removal and replacement of the concrete floor for the Octagon Pavilion, repair to a sidewalk that has sunk, pickleball sleeves, and adding a French drain along a portion of the new retaining walls by the Horseshoe courts. The contract substantial completion date will be extended by ten days for this work. BACKGROUND: Bid 25-43 for improvements to Walker Park, was approved at City Council September 16, 2025 2025-1664 $4,697,184.26). Change Order One was for adding lighting that was part of a deductive alternate back into the project for the sand volleyball courts ($81,018.00). Change Order Two was for replacement of a dilapidated drain line and concrete walk repair 37,657.19). Total contract cost with Change Orders 1 and 2 is $4,815,859.45. DISCUSSION: The added French drain will keep the base of the new retaining walls dry reducing the likelihood of water migrating through to the plaza side. The octagon pavilion slab is cracked in multiple places, the small portion of sidewalk at the creek bridge by the batting cadges has sunk at the connection to the bridge, and the pickleball post sleeves are necessary for in ground mount versus the surface mount that was in the bid documents. The work is more clearly defined on the Change Order document. BUDGET/STAFF IMPACT: Funding for the change order is from the $136,324.81 remaining in project contingency. An administrative budget adjustment will move the funds into the project. After Change Order Three, $90,462.50 will remain in the contingency. The construction contract will increase to 4,861,721.76. Attachments: Staff Review Form and Staff Memo Budget Adjustment Change Order Three with Contractors document Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Comments: 2025-0907PurchaseOrderNumber: Change Order Number:# 3 Previous Ordinance or Resolution #208-25 Approval Date: Original Contract Number:2025-00000049 46050.7550.2000 Budget Impact: Walker Park Improvements, Phase 1 ParkDevelopment2250.520.9256-5806.00 City of Fayetteville Staff Review Form 2026-0086 N/A Staff recommends approving Change Order #3 for the Kinco Constructors LLC contract in the amount of $45,862.31 for removal and replacement of the concrete floor for the Octagon Pavilion, repair to a sidewalk that has sunk, add sleeves for pickleball court net posts and adding a French drain along a portion of the new retaining walls by the Horseshoe courts. The contract substantial completion date will be extended by ten days for this work. N/A for Non-Agenda Item Action Recommendation: Ted Jack PARKS & RECREATION (520) Division / Department 2/2/2026 Submitted Date Yes 10,381,456.00$ 45,862.31$ V20221130 Budgeted Item? Does item have a direct cost? Is a Budget Adjustment attached? Total Amended Budget Expenses (Actual+Encum) Item Cost Budget Adjustment Remaining Budget 10,381,456.00$ Yes No -$ 10,335,593.69$ Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 02/03/2026 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Date: January 23, 2026 To: City of Fayetteville 113 W. Mountain Fayetteville, AR 72701 Re: Walker Park - CO #03 - Add. Concrete, Net Posts, and Drainage Kinco Constructors, LLC. Project No. 25.2001 Description of Proposed Change: The total cost of this proposal is as follows: 1.Labor…………………………………….-$ 2.Materials ………………………………..-$ 3.Subcontracts…………………………….42,050.40$ 4.Subtotal (add lines1, 2, & 3)……………….42,050.40$ 5. Bond 0.66% …..................................277.53$ 6.Mark-Up Rate 8.35%.....................3,534.38$ 7.Change Order Total…………....................45,862.32$ Should you have any questions please feel free to contact me. Contract Days Added: 10 Days Sincerely, Harrison Wilson Date: ____________________________ Kinco Constructors, LLC. Mobile: 501-993-6000 Cc: File Accepted: ___________________________ Provide labor, materials, and equipment to demolish the existing hexagon pavilion slab, including saw cutting around columns and replacing 4" slab. Scope also includes conversion of surface-mounted pickleball nets to sleeved nets. Lastly, this CO includes adding a french drain along the concret wall of the horseshoe area. Upon your approval, we intend to make this change immediately. CHANGE ORDER #03 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Kinco Extension Sheet 01/23/26 Walker Park - CO #03 - Add. Concrete, Net Posts, and Drainage Labor Material Subcontract Description Quantity Unit U/C Total U/C Total U/C Total TOTAL Global Concrete - Demo Hexagon Pavilion Slab 2,361 LS - - - - 5.00 11,805 11,805.00 Global Concrete - Replace Hexagon Pavilion Slab (Unit Cost)2,361 LF - - - - 10.95 25,853 25,852.95 Global Concrete - Demo Sidewalk 63 SF - - - - 5.00 315 315.00 Global Concrete - Replace Sidewalk (Unit Cost)63 SF - - - - 10.95 690 689.85 ACS Playground Adventures - Sleeved Court Netting 3 EA - - - - 138.00 414 414.00 Construction Solutions - French Drain at Horseshoe Wall 120 LF - - - - 24.78 2,974 2,973.60 Subtotal - - 42,050 42,050.40 Labor Burden @ 44.0%- - - Sales Tax @ 9.75%- - Subtotal 42,050 42,050.40 Bond (0.66%)277.53 Mark-Up Rate (8.35%)3,534.38 TOTAL 45,862.32 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 06/11/2026 Docusign Envelope ID: 3524A38C-029B-8748-82CD-5F8476E029A9Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 1 Harrison Wilson From:Graham Langston <glangston@csnwar.com> Sent:Wednesday, May 20, 2026 2:18 PM To:Steven McElroy Cc:Harrison Wilson Subject:RE: Walker Park - RFI #21 Storm Drain Follow Up Flag:Follow up Flag Status:Flagged ***EXTERNAL EMAIL*** The price to change this to a 30” pedestrian grate is $2,266.00 From: Steven McElroy <smcelroy@kinco.net> Sent: Wednesday, May 20, 2026 1:29 PM To: Graham Langston <glangston@csnwar.com> Cc: Harrison Wilson <hwilson@kinco.net> Subject: Re: Walker Park - RFI #21 Storm Drain Hello Graham, Where you by chance able to get this priced up? Steven McElroy Project Coordinator | kincoconstructors.com P: | F:479-751-5659 | M:479-257-3753 • Springdale • AR • 72762 Follow us on Facebook | LinkedIn | Instagram CONFIDENTIALITY NOTICE: This e-mail message (including any attachments) is intended to be received only by persons entitled to receive the confidential information it may contain. E-mail messages to clients, subcontractors and/or vendors of Kinco Constructors, LLC presumptively contain information that is confidential and privileged; e-mail messages to non- clients are normally confidential and may also be privileged. Please do not read, copy, forward or store this message or any attachments unless you are the intended recipient. If you have received this message in error, please forward it back to the sender and delete all copies of it from your computer. From: Graham Langston <glangston@csnwar.com> Sent: Monday, May 18, 2026 2:22:14 PM To: Steven McElroy <smcelroy@kinco.net> Cc: Harrison Wilson <hwilson@kinco.net> Subject: Re: Walker Park - RFI #21 Storm Drain Docusign Envelope ID: 3524A38C-029B-8748-82CD-5F8476E029A9Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 1 Harrison Wilson From:Jacob Brewer <hdijacob@gmail.com> Sent:Monday, May 11, 2026 12:37 PM To:Harrison Wilson Subject:Re: Walker Park - Water Line Costs Follow Up Flag:Follow up Flag Status:Completed ***EXTERNAL EMAIL*** Hi Harrison, Yes Ill be interested in the UAMS project. I'm at $2,000 for the water at Walker. On Mon, May 11, 2026 at 11:43 AM Harrison Wilson <hwilson@kinco.net> wrote: Jacob, Just checking in to see how you are coming on the water line pricing out at Walker Park. I have another one I would like you to look at. We need to disconnect, add bearing pads (by others), and reconnect a large dishwasher in the kitchen at UAMS. It is hard piped in at several locations. Please let me know if you’d be interested. Harrison Wilson Project Manager | kincoconstructors.com P:479-751-8606 | F:479-751-5659 | M:501-993-6000 3803 Kelley Ave. • Springdale • AR • 72762 Follow us on Facebook | LinkedIn | Instagram CONFIDENTIALITY NOTICE: This e-mail message (including any attachments) is intended to be received only by persons entitled to receive the confidential information it may contain. E-mail messages to clients, subcontractors and/or vendors of Kinco Constructors, LLC presumptively contain information that is confidential and privileged; e-mail messages to non- clients are normally confidential and may also be privileged. Please do not read, copy, forward or store this message or any attachments unless you are the intended recipient. If you have received this message in error, please forward it back to the sender and delete all copies of it from your computer. -- Thanks, Jacob Brewer Docusign Envelope ID: 3524A38C-029B-8748-82CD-5F8476E029A9Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 N 0 105 2515 scale:1" = 10'-0" INTEGRAL COLOR CONCRETE DIAGRAM LS-303 NA VH KO 24013 CITY OF FAYETTEVILLE, AR 479.444.3469 FAYETTEVILLE, AR 72701 24013 WALKER PARK PHASE 1 MAY 21, 2025 100% CONSTRUCTION DOCUMENTS FAYETTEVILLE, AR 72701 113 WEST MOUNTAIN ST 10 W 15TH ST \\ s e r v e r N A S 2 \ P R O J E C T S \ P R O J E C T S \ 2 4 0 1 3 _ C i t y o f F a y e t t e v i l l e - W a l k e r P a r k - P h a s e 1 C D s \ C A D \ S H E E T S \ L S - 3 0 0 - D e t a i l e d P l a n s . d w g ( L S - 3 0 3 ) P l o t t e d o n : J u n 1 9 , 2 0 2 5 - 1 1 : 2 5 a m b y v h a l l s e a l r e v i s i o n s 217 E Archer Street, Unit H Tulsa, Oklahoma 74103 918.922.7620 www.tsw-design.com c o n s u l t a n t p r o j e c t i n f o r m a t i o n n o r t h a r r o w + s c a l e checked by: project number: contact: drawn by: s h e e t n u m b e r s h e e t t i t l e d r a w i n g d a t e d r a w i n g i n f o r m a t i o n c l i e n t i n f o r m a t i o n p r o j e c t a d d r e s s Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of TSW and may not be used in any way without the written permission of this office. Katy O'Meilia 712060 Ark a ns s s s a a Ar n n L L i i c c c c e e e e a d d p h t t NORTH PLAZA - GRAPHIC FOR DESIGN REFERENCE ONLY NOT TO BE USED FOR LAYOUT OF PAVING OR HARDSCAPE GREEN (TL) LIGHT BLUE BURNT ORANGE RED (TL) PURPLE KEY COLOR NAME PAVING FIELDS BURNT ORANGE LIGHT BLUE GREEN (TL) RED (TL) PURPLE NOTES: 1.SELECTED CONTRACTOR TO RECEIVE DIGITAL COPY OF LAYOUT FOR USE IN SET UP OF STAINED AREAS. 2. CONTRACTOR SHALL USE EZCHEM - ENVIRO CONCRETE STAINS OR APPROVED EQUAL, REFER HARDSCAPE SCHEDULE ON LS-500 FOR SPECIFICATIONS. FINAL PRODUCT APPROVAL AND COLOR SELECTION TO BE CHOSEN BY LANDSCAPE ARCHITECT FROM FULL RANGE OF COLORS OF THE CHOSEN PRODUCT PRIOR TO PURCHASE. 3. CONTRACTOR SHALL DEVELOP A PHYSICAL MOCK UP IN COLLABORATION WITH THE LANDSCAPE ARCHITECT TO MEET THE AESTHETIC REQUIREMENTS OF THE PROJECT. THIS WORK MAY REQUIRE MULTIPLE ITERATIONS OF THE MOCK UP. CONTRACTOR TO PROVIDE HALF PANEL MOCK-UP TO SHOW EDGE CONDITION AGAINST SECONDARY COLOR AND NON STAINED AREA. THE FINAL MOCK UP SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT AND MAINTAINED ON SITE THROUGH THE COMPLETION OF THE PUNCH WALK AS A STANDARD FOR COMPARISON. CO6 will remove the plazza staining from the contractors work. 38.57 sf 7'-0" 37.75 sf 109.68 sf 5'-0" Docusign Envelope ID: 3524A38C-029B-8748-82CD-5F8476E029A9Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 CHANGE ORDER Global Concrete Systems, LLC 3885 Elm Springs Rd Springdale, AR 72762 admin@gcsnwa.com +1 (479) 347-7521 Kinco Constructors:25038-Walker Park Phase 1 Bill to Kinco Constructors 3803 Kelley Ave Springdale, AR 72762 Ship to Kinco Constructors 3803 Kelley Ave Springdale, AR 72762 Change Order details Change Order no.: 25038-5 Change Order date: 04/22/2026 Estimate no: 25038 #Product or service Description Qty Rate Amount 1.Change Order Labor (32) hours Haul off 2 loads 1 $2,880.00 $2,880.00 Old estimate total $815,006.86 New estimate total $817,886.86 Total $2,880.00 Accepted date Accepted by to k e n = e f7 8 a 1 9 5 0 b 4 9 4 0 f6 9 e 9 e 7 d a 9 6 4 9 2 5 f6 c e 7 9 c 1 b 7 9 e 6 f7 4 2 7 1 9 9 d 8 9 3 fe 9 6 f4 6 f2 0 f8 5 d 8 4 1 d 6 2 9 8 4 c 3 5 a f8 8 5 5 d b 4 c f3 0 9 6 a Docusign Envelope ID: 3524A38C-029B-8748-82CD-5F8476E029A9Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Walker – CO6 Additional elevation/grade information for Horseshoes and added yard drain 1” Water Line Location Docusign Envelope ID: 3524A38C-029B-8748-82CD-5F8476E029A9Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2 Portion of Razorback Fencing to remain: Docusign Envelope ID: 3524A38C-029B-8748-82CD-5F8476E029A9Docusign Envelope ID: 6E0F0F5F-A88B-8A4A-83BC-3252D02B82D2