HomeMy WebLinkAbout160-26 RESOLUTIONFile Number: 2026-2045
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 160-26
A RESOLUTION TO APPROVE SUPPLEMENTAL AGREEMENT NO. 1 TO THE CONTRACT WITH
BURNS & MCDONNELL ENGINEERING COMPANY, INC. IN THE AMOUNT OF $93,785.00 FOR
ADDITIONAL ENGINEERING SERVICES ASSOCIATED WITH THE MILLSAP ROAD & COLLEGE
A VENUE INTERSECTION AND HEMLOCK A VENUE IMPROVEMENT PROJECT
WHEREAS, on July 20, 2021, the City entered into the original design Agreement with Bums & McDonnell
Engineering Company, Inc. to develop improvements to Millsap Road near the intersection with College Avenue; and
WHEREAS, this project was required to obtain a second set of land appraisals and subsequent additional land
acquisition from the same property owners; and
WHEREAS, Supplemental Agreement No. 1 will cover redrafting the legal descriptions and land acquisition exhibits,
coordinating with property owners, relocating a traffic signal pole, providing a water line relocation plan, and
additional coordination with 5 franchise utilities which was not anticipated in the original scope.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to sign
Supplemental Agreement No. 1 to the agreement with Bums & McDonnell Company, Inc. in the amount of $93,785.00
for additional engineering services associated with the Millsap Road & College A venue Intersection and Hemlock
Avenue Improvement project.
PASS ED and APPROVED on July 7, 2026
Approved: Attest:
Molly Rawn, Mayor Kara Paxton, City Clerk Treasurer
Page 1
File Number: 2026-2045
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 160-26
A RESOLUTION TO APPROVE SUPPLEMENTAL AGREEMENT NO. 1 TO THE CONTRACT WITH
BURNS & MCDONNELL ENGINEERING COMPANY, INC. IN THE AMOUNT OF $93,785.00 FOR
ADDITIONAL ENGINEERING SERVICES ASSOCIATED WITH THE MILLSAP ROAD & COLLEGE
A VENUE INTERSECTION AND HEMLOCK A VENUE IMPROVEMENT PROJECT
WHEREAS, on July 20, 2021, the City entered into the original design Agreement with Bums & McDonnell
Engineering Company, Inc. to develop improvements to Millsap Road near the intersection with College Avenue; and
WHEREAS, this project was required to obtain a second set of land appraisals and subsequent additional land
acquisition from the same property owners; and
WHEREAS, Supplemental Agreement No. 1 will cover redrafting the legal descriptions and land acquisition exhibits,
coordinating with property owners, relocating a traffic signal pole, providing a water line relocation plan, and
additional coordination with 5 franchise utilities which was not anticipated in the original scope.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to sign
Supplemental Agreement No. 1 to the agreement with Bums & McDonnell Company, Inc. in the amount of $93,785.00
for additional engineering services associated with the Millsap Road & College A venue Intersection and Hemlock
Avenue Improvement project.
PASS ED and APPROVED on July 7, 2026
Approved: Attest:
Molly Rawn, Mayor Kara Paxton, City Clerk Treasurer
Page 1
File Number: 2026-2045
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 160-26
A RESOLUTION TO APPROVE SUPPLEMENTAL AGREEMENT NO. 1 TO THE CONTRACT WITH
BURNS & MCDONNELL ENGINEERING COMPANY, INC. IN THE AMOUNT OF $93,785.00 FOR
ADDITIONAL ENGINEERING SERVICES ASSOCIATED WITH THE MILLSAP ROAD & COLLEGE
A VENUE INTERSECTION AND HEMLOCK A VENUE IMPROVEMENT PROJECT
WHEREAS, on July 20, 2021, the City entered into the original design Agreement with Bums & McDonnell
Engineering Company, Inc. to develop improvements to Millsap Road near the intersection with College Avenue; and
WHEREAS, this project was required to obtain a second set of land appraisals and subsequent additional land
acquisition from the same property owners; and
WHEREAS, Supplemental Agreement No. 1 will cover redrafting the legal descriptions and land acquisition exhibits,
coordinating with property owners, relocating a traffic signal pole, providing a water line relocation plan, and
additional coordination with 5 franchise utilities which was not anticipated in the original scope.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to sign
Supplemental Agreement No. 1 to the agreement with Bums & McDonnell Company, Inc. in the amount of $93,785.00
for additional engineering services associated with the Millsap Road & College A venue Intersection and Hemlock
Avenue Improvement project.
PASS ED and APPROVED on July 7, 2026
Approved: Attest:
Molly Rawn, Mayor Kara Paxton, City Clerk Treasurer
Page 1
>zl¦Mfl.¦#!¦
¦`k¦Jcw¦Xkk¦
=c£kkwk¦1T¦%%¦
%+¦ %
(¦
2¦U:YOI][COM¦[O¦2QQUO^:¦Y]QQI:K:M[2I¦2@U::K:M[¦MO¦¦[O¦[A:¦6OM[U26[¦aC[A¦
4]UMY¦¦K68OMM:II¦:M@CM::UCM@¦6OKQ2Mb¦CM6¦CM¦[A:¦2KO]M[¦O>¦,&)!¦ >OU¦
288C[COM2I¦:M@CM::UCM@¦Y:U^C6:Y¦2YYO6C2[:8¦aC[A¦[A:¦KCIIY2Q¦UO28¦¦6OII:@:¦
2^:M]:¦CM[:UY:6[COM¦2M8¦A:KIO6G¦2^:M]:¦CKQUO^:K:M[¦QUOE:6[¦
aA:W<2Y ¦¦F¤¦ ¦ ¦um¦7x¤¦mmmi¦x¦vm¦xsxd¦imxs¦3smm m¦¡xv¦5¦¦Lh9m¦
;sxmmxs¦7 d¤ ¦Dh
¦¦imm¦x m m¦¦Lxd¦Vdi¦md¦vm¦xmmhx¦¡xv¦7msm¦3mm0¦di¦
aA:U:2Y ¦ux¦|mh¦¡d¦mxmi¦¦gdx¦d¦mhi¦m¦o¦di¦ddxd¦di¦gmm¦diixxd¦di¦
dhxxx¦r ¦um¦d m¦m¤¦¡m0¦di¦
aA:W<2Y ¦Zm md¦3smm m¦N¦¦¡x¦hm¦midoxs¦vm¦msd¦imhxx¦di¦di¦dhxxx¦m¢uxgx ¦
hixdxs¦¡xv¦m¤¦¡m ¦mhdxs¦d¦dpq{h¦xsd¦m ¦xixs¦d¦¡dm¦xm¦mhdx¦d ¦di¦
diixxd¦hixdx¦¡xv¦"¦rdhvxm¦xyxm¦¡vxhu¦¡d¦¦dyhxdmi¦x¦vm¦xsxd¦hm¦
MOa¦[A:U:>OU:¦4:¦C[¦U:YOI^:8¦4b¦[A:¦6C[b¦6O]M6CI¦O>¦[A:¦6C[b¦O>¦>2b:[[:^CII:¦
2UG2MY2Y.¦
Zmhx¦/¦\vd¦um¦7x¤¦7hx¦o¦vm¦7y¤¦o¦?d¤mmxm ¦3~dd¦vmmg¤¦dvx¥m¦ Ld¤¦Vd¡¦¦ys¦
Zm md¦3smm m¦N¦¦¦vm¦dsmm m¦¡xv¦5¦¦Lh9m¦7 d¤ ¦Dh¦x¦vm¦d ¦o¦- '*"¦
r¦diixxd¦msxmmxs¦mxhm¦dhxdmi¦¡xv¦vm¦Lyd¦Vdi¦¦7msm¦3mm¦Dmmhx¦di¦Bm h~¦
3mm¦D m m¦}mh¦
R3ZZ;9¦di¦3RRVP_;9¦¦F¤¦' ¦$¦
2 lj.¦2l.¦
L¤¦Vd¡ ¦Ld¤¦Hdd¦Rd¢ ¦7x¤¦7m¦\mdm¦
Setn¦¦
Docusign Envelope ID: 4175B64C-BF90-82CD-83E6-AB17E6123A1E
CITY OF ~~ FAYETTEVILLE
.. ARKANSAS
MEETING OF JULY 7, 2026
TO:
THROUGH:
FROM:
Mayor Rawn and City Council
Keith Macedo, Chief of Staff
Chris Brown, Public Works Director
Justin Bland, City Engineer
Paul Libertini, Staff Engineer
CITY COUNCIL MEMO
2026-2045
SUBJECT: Millsap Rd & College Ave Intersection Improvements -Design Supplemental
Agreement No. 1 with Burns & McDonnell Engineering Company, Inc.
RECOMMENDATION:
A Resolution to approve Supplemental Design Agreement No. 1 with Burns & McDonnell Engineering
Company in the amount of $93,785.00 for additional engineering services associated with the Millsap Rd &
College Ave Intersection and Hemlock Ave Improvement project.
BACKGROUND:
The original design agreement with Burns & McDonnell Engineering Company, Inc. in the amount of $300,000
was executed on July 20, 2021. This project includes improvements to Millsap Road near the intersection with
College Avenue. The improvements to Millsap Road include an additional lane west of College Avenue to
provide additional left turning capacity, realignment of lanes on both sides of College Avenue, signalization
timing and phasing improvements and installation of crosswalks and pedestrian signals. It also includes the
design of the new 2-lane road extension of N. Hemlock Ave. from Sain St. to Millsap Rd.
DISCUSSION:
The design was finally completed in 2026, and the City held a bid opening on July 10, 2026. This has been a
very difficult project working with the Arkansas Department of Transportation (ARDOT) and reacting to the
many different levels of review comments especially in acquiring right of way. This project was required to
obtain a second set of land appraisals and subsequent additional land acquisition from the same property
owners. This supplemental design agreement covers redoing the legal descriptions, the land acquisition
exhibits, coordinating with property owners, relocating a traffic signal pole, providing a water line relocation
plan, and additional coordination with 5 franchise utilities which was not anticipated in the original scope.
BUDGET/STAFF IMPACT:
The additional professional services will be paid from the Street Projects 2024 Bonds fund.
ATTACHMENTS: 3. Staff Review Form, 4. 2026-2045 Burns McDonnell Supp Agr #1
Mailing address:
113 W. Mountain Street
Fayetteville, AR 72701
www. fayettevi I le-a r .gov
CITY OF ~~ FAYETTEVILLE
.. ARKANSAS
MEETING OF JULY 7, 2026
TO:
THROUGH:
FROM:
Mayor Rawn and City Council
Keith Macedo, Chief of Staff
Chris Brown, Public Works Director
Justin Bland, City Engineer
Paul Libertini, Staff Engineer
CITY COUNCIL MEMO
2026-2045
SUBJECT: Millsap Rd & College Ave Intersection Improvements -Design Supplemental
Agreement No. 1 with Burns & McDonnell Engineering Company, Inc.
RECOMMENDATION:
A Resolution to approve Supplemental Design Agreement No. 1 with Burns & McDonnell Engineering
Company in the amount of $93,785.00 for additional engineering services associated with the Millsap Rd &
College Ave Intersection and Hemlock Ave Improvement project.
BACKGROUND:
The original design agreement with Burns & McDonnell Engineering Company, Inc. in the amount of $300,000
was executed on July 20, 2021. This project includes improvements to Millsap Road near the intersection with
College Avenue. The improvements to Millsap Road include an additional lane west of College Avenue to
provide additional left turning capacity, realignment of lanes on both sides of College Avenue, signalization
timing and phasing improvements and installation of crosswalks and pedestrian signals. It also includes the
design of the new 2-lane road extension of N. Hemlock Ave. from Sain St. to Millsap Rd.
DISCUSSION:
The design was finally completed in 2026, and the City held a bid opening on July 10, 2026. This has been a
very difficult project working with the Arkansas Department of Transportation (ARDOT) and reacting to the
many different levels of review comments especially in acquiring right of way. This project was required to
obtain a second set of land appraisals and subsequent additional land acquisition from the same property
owners. This supplemental design agreement covers redoing the legal descriptions, the land acquisition
exhibits, coordinating with property owners, relocating a traffic signal pole, providing a water line relocation
plan, and additional coordination with 5 franchise utilities which was not anticipated in the original scope.
BUDGET/STAFF IMPACT:
The additional professional services will be paid from the Street Projects 2024 Bonds fund.
ATTACHMENTS: 3. Staff Review Form, 4. 2026-2045 Burns McDonnell Supp Agr #1
Mailing address:
113 W. Mountain Street
Fayetteville, AR 72701
www. fayettevi I le-a r .gov
"::#$:
: :
":
" #:
:
%-MADO )-K?O-@0O 7GMOAI@/7<O
#18G6O %-/10AO 6712OA2O *G-22O
6D8FO DAK@O (I.<8/O,AD;FO 7D1/GADO
"IFG8@O =-?0O 7GMO @57@11DO
(-I<O $8.1EG7@8O*G-4O @58@11DO
!#":+--4%2: ':O 1-.()(:7(:05(34(&5+10:/2317(/(054:(4+)0:!622-(/(05%-:
)3((/(05:1::8,5*:6304:O &100(..:0),0((3+0):1/2%09:0&:
":
O )1FA<IG8A@OGAO-BBDAJ1O *IBB=1>1@H-=O 1F75@O5D11>1@HO &A
O O K8G6O ID@FOO %/A@@1==O@57@11D7@5O
A>B-@MO 8@OG61O ->AI@GO A2O
O 2ADO-007G7A?-=O1@57@11D7@5O F1DJ7/1FO-FFA/7-G10OK8G6O G61O %7<=F-BO )0OO
A<=151OJ1O ?G1DF1/G8A@O -@0O 1><A/;OJ1O >BDAJ1>1?GO BDA91/GO
#
:
+61O AD757@-<O01F75@O-5D11>1@GOK8G6O ID@FOO %/A?@1=<O ?58@11D8@5O A>B-@MO @/
O 8@OG61O->AI@GO A2OO
K-FO1L1/IH10O A@O "I<MO O O +67FO BDA:1/GO7?/=I01FO 7>BDAJ1>1@HFOGAO%7<<F-BO )A-0O?1-DOG61O 7?G1DF1/G8A@OK8G6O
A<=151OJ1@I1
O+61O 8>BDAJ1>1@GFOGAO %7==F-BO )A-0O8@/<I01O -@O -007G7A?-=O <-@1OK1FGO A2OA<=151OJ1@I1OGAO
BDAJ701O-008G7A@-=O =12GOGID@8@5O /-B-/7GMOD1-<85@>1?GOA2O <-@1FOA@O .AG6OF701FOA2O A==151OJ1@I1O F75@-=7N-G7A@O
G8>7@5O -@0O B6-F8@5O7>BDAJ1>1@HFO-@0O7@FG-=<-G8A@OA2O/DAFFK-<;FO-@0O B101FGD7-@OF75@-=F
O !GO -=FAO 7?/=I01FOG61O
01F85@O A2OH61O @1KO=-@1O DA-0O1LG1@F8A@O A2O &O 1>=A/;OJ1
O2DA>O *-8@O *G
O GAO %7<=F-BO )0O
!#!!
:
+61O01F85@OK-FO27@-<=MO /A>B=1G10O 8@OO -@0OG61O 7GMO 61=0O-O .70OAB1@7@5OA@O"I<MO O
O +68FO 6-FO.11?O-O
J1DMO 08227/I=GO BDA91/GOKAD;8@5OK8G6OG61OD;-?F-FO 1B-EG>1@GOA2O+D-@FBAEG-G8A@O )'+O -?0O D1-/G7@5OGAO G61O
>-?MO0741D1@HO <1J1<FOA2OD1J81KO/A>>1@GFO1FB1/8-<<MO 7@O-/CI7D7@5O D856GOA2OK-M
O +68FO BDA91/HOK-FO D1CI8D10OGAO
A.G-7@O-O F1/A?0OF1GO A2O <-@0O-BBD-8F-<FO -@0OFI.F1CI1@GO -008G8A@-<O =-@0O-/CI8F7G8A@O2DA>O G61O F->1O BDAB1EGMO
AK?1DF
O+68FO FIBB=1>1@H-=O01F85@O -5D11>1?GO /AJ1DFO D10A7@5OG61O <15-=O01F/D7BH7A@FOG61O <-@0O-/CI7F7H7A@O
1L68.8HFO/AAE07@-H7@5OK7H6O BEAB1EGMOAK@1EFOD1<A/-G7@5O-O GE-227/OF75@-=O BA<1OBDAJ807@5O-O K-G1DO <8@1OD1<A/-G7A@O
B<-@O-?0O-008G8A@-<O/AAD08@-G8A@OK8G6O O 2D-?/68F1OIG7<7G71FOK67/6O K-FO @AGO-@G7/7B-G10O 8@OG61OAD757@-<OF/AB1
O
#"!":":
+61O -007G7A@-=O BDA21FF8A?-<OF1DJ7/1FOK7==O .1O B-70O2DA>O G61O *GE11GO (DA:1/HFO O A@0FO 3I?0O
"""!:
O *G-22O )1J71KOAD>O
O O ID@FO %/A@?1==O*IBBO 5DOO
$ $
$$
$$
#!$
$$
"""#!!$
Docusign Envelope ID: 4175B64C-BF90-82CD-83E6-AB17E6123A1E
City of Fayetteville, Arkansas
Legislation Text
File#: 2026-2045
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
A RESOLUTION TO APPROVE SUPPLEMENTAL AGREEMENT NO. 1 TO THE
CONTRACT WITH BURNS & MCDONNELL ENGINEERING COMP ANY, INC. IN THE
AMOUNT OF $93,785.00 FOR ADDITIONAL ENGINEERING SERVICES ASSOCIATED
WITH THE MILLSAP ROAD & COLLEGE A VENUE INTERSECTION AND HEMLOCK
AVENUE IMPROVEMENT PROJECT
WHEREAS, on July 20, 2021, the City entered into the original design Agreement with Bums &
McDonnell Engineering Company, Inc. to develop improvements to Millsap Road near the intersection
with College A venue; and
WHEREAS, this project was required to obtain a second set of land appraisals and subsequent
additional land acquisition from the same property owners; and
WHEREAS, Supplemental Agreement No. 1 will cover redrafting the legal descriptions and land
acquisition exhibits, coordinating with property owners, relocating a traffic signal pole, providing a
water line relocation plan, and additional coordination with 5 franchise utilities which was not
anticipated in the original scope.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to
sign Supplemental Agreement No. 1 to the agreement with Bums & McDonnell Company, Inc. in the
amount of $93,785.00 for additional engineering services associated with the Millsap Road & College
A venue Intersection and Hemlock A venue Improvement project.
Page 1
City of Fayetteville, Arkansas
Legislation Text
File#: 2026-2045
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
A RESOLUTION TO APPROVE SUPPLEMENTAL AGREEMENT NO. 1 TO THE
CONTRACT WITH BURNS & MCDONNELL ENGINEERING COMP ANY, INC. IN THE
AMOUNT OF $93,785.00 FOR ADDITIONAL ENGINEERING SERVICES ASSOCIATED
WITH THE MILLSAP ROAD & COLLEGE A VENUE INTERSECTION AND HEMLOCK
AVENUE IMPROVEMENT PROJECT
WHEREAS, on July 20, 2021, the City entered into the original design Agreement with Bums &
McDonnell Engineering Company, Inc. to develop improvements to Millsap Road near the intersection
with College A venue; and
WHEREAS, this project was required to obtain a second set of land appraisals and subsequent
additional land acquisition from the same property owners; and
WHEREAS, Supplemental Agreement No. 1 will cover redrafting the legal descriptions and land
acquisition exhibits, coordinating with property owners, relocating a traffic signal pole, providing a
water line relocation plan, and additional coordination with 5 franchise utilities which was not
anticipated in the original scope.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to
sign Supplemental Agreement No. 1 to the agreement with Bums & McDonnell Company, Inc. in the
amount of $93,785.00 for additional engineering services associated with the Millsap Road & College
A venue Intersection and Hemlock A venue Improvement project.
Page 1
""""
! """
"
"
(!"$#(#( %("$#(!#(( (#(#(
# #(&#($ "((( ('(((#(
$#((
( (#(!(" %"(""#(
&#(#("( (((%$(# "#(((
%$( %#( #(
&!"(21A ;-?A
A
A 9)$A *9?A $19$6$#A *192A 9)$A 26*(*1 .A #$8*(1A (6$$/$19A =*9)A ;08A A
"211$..A1(*1$$6*1(A 2/4 1?A 1"A92A #$<$-24A */462<$/$198A92A *.-8 4A2 #A 1$ 6A9)$A *19$68$"9*21A
=*9)A2..$($A<$1;$A 1#A
& "(9)*8A 462+$"9A = 8A 6$5;*6$#A 92A 2!9 *1A A 8$"21#A 8$9A 2%A . 1#A 446 *8 .8A 1#A 8;!8$5;$19A
##*9*21 -A. 1#A "5;*8*9*21A&72/A9)$A8 /$A4624$69?A 2=1$68A 1#A
& "(;44.$/$19 .A (6$$/$19A 2A A =*..A "2<$6A 6$#6 %9*1(A 9)$A .$( .A #$8"6*49*218A 1#A . 1#A
"5;*8*9*21A $>)*!*:8A "226#*1 9*1(A =*9)A 4624$69?A 2=1$68A 6$.2" 9*1(A A 96 '"A 8*(1 -A 42.$A 462<*#*1(A A
= 9$6A -*1$A 6$.2" 9*21A 4. 1A 1#A ##*9*21 .A "226#*1 9*21A =*9)A A &7 1")*8$A ;9*.*9*$8A =)*")A = 8A 129A
19*"*4 9$#A*1A9)$A26*(*1 .A8"24$A
&(#!!((#( "%('(#(#'($((#(#'((
'##%( ""(
$"9*21A A ) 9A9)$A *9?A 2;1"*.A2%A9)$A*9?A 2%A ?$99$<*--$A6, 18 8A)$6$!?A ;9)26*@$8A ?26A =1A92A
8*(1A ;44-$/$19 .A (6$$/$19A 2A A 92A 9)$A (6$$/$19A =*9)A ;08A A "211$-.A 2/4 1?A 1"A *1A 9)$A
/2;19A 2%A
A &36A ##*9*21 .A $1(*1$$6*1(A 8$6<*"$8A 882"* 9$#A=*9)A 9)$A *..8 4A 2 #A A 2..$($A
<$1;$A19$68$"9*21A 1#A$/.2",A<$1;$A/462<$/$19A462+$"9A
Docusign Envelope ID: 4175B64C-BF90-82CD-83E6-AB17E6123A1E
Paul Libertini
Submitted By
City of Fayetteville Staff Review Form
2026-2045
Item ID
7/7/2026
City Council Meeting Date -Agenda Item Only
N/A for Non-Agenda Item
6/16/2026
Submitted Date
Action Recommendation:
ENGINEERING (621)
Division / Department
A Resolution to approve Supplemental Design Agreement No. 1 with Burns & McDonnell Engineering Company in
the amount of $93,785.00 for additional engineering services associated with the Millsap Rd & College Ave
Intersection and Hemlock Ave Improvement project.
Budget Impact:
4802.860. 7 227-5860.02 Street Projects 2024 Bonds
Account Number Fund
46020.7227 Millsap/College Intersection Improvements
Project Number Project Title
Budgeted Item? Yes Total Amended Budget $ 584,106.00
Expenses (Actual+Encum) $ 263,491.00
Available Budget Is 320,G1s.oo I
Does item have a direct cost? Yes Item Cost $ 93,785.00
Is a Budget Adjustment attached? No Budget Adjustment
Remaining Budget Is 226,830.00 I
V20221130
Purchase Order Number: ___________ Previous Ordinance or Resolution# _1_89_-_2_1 ____ _
Change Order Number: ___________ Approval Date:
Original Contract Number:
Comments:
08VG^-C9=QUCLC^
!BT\^M>^&7\<TT<WBII<^3T7>>^1<WB<Y^&MPJ^
^
*T<J^*#^
^
^
%/(+/%%2+/(^^
^2=SNGVUCNL^UN^8OOQNX=^4VOOG=K=LU8G^$=SC@L^@Q==K=LU^/N ^^ZCUA^ VQLS^^.:$NLL=GG^%L@CL==QCL@^"NKO8L]^CL^
UA=^8KNVLU^N?^
^?NR^8;;CUCNL8G^=L@CL==QCL@^S=RXC:=S^8SSN:C8U=;^ZCUA^UA=^.CHGS8O^2;^^"NGG=@=^X=^
,LU=RS=:UCNL^8L;^)=KHN:F^X=^+KOQNX=K=LU^OQND=:U^
^4UQ==U^0QND=:US^^ NL;S^
::NVLU^/VK9=R^'VL;^
^.CGGS8O"NGG=@=^,LU=RS=:UCNL^,KOQNX=K=LUS^
0QND=:U^/VK9=R^
#!%"%6=S^
%!%$%%!% !%6=S^
%%#!%# ""%""%/N^
5NU8G^K=L;=;^ V;@=U^
%[O=LS=S^:UV8G%L:VK^
X8CG89G=^ V;@=U^
+U=K^"NSU^
V;@=U^;EVSUK=LU^
2=K8CLCL@^ V;@=U^
0QND=:U^5CUG=^
^^
^^
^
^
# %
% #
$# %
%% #!%
%
% #%$%"%
%""% #%
" %
Docusign Envelope ID: 4175B64C-BF90-82CD-83E6-AB17E6123A1E
~BURNS
'-'M ~DONNELL
AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES
AMENDMENT No. 1 Date: April 20, 2026
THIS AMENDMENT modifies the Agreement dated July 20, 2021, made by and between Burns &
McDonnell Engineering Company, Inc., (hereinafter called ENGINEER), and City of Fayetteville,
Arkansas (hereinafter called CITY OF FAYETTEVILLE) for the following Project: MILLSAP ST/COLLEGE
AVE INTERSECTION IMPROVEMENTS. For good and valuable consideration, the sufficiency of which
is acknowledged, the parties agree to make the following changes to their Agreement.
1. The parties agree that the ENGINEER's Scope of Services is amended to include the following
additions to Appendix A of the original Agreement:
WATERLINE RELOCATION DESIGN & PLANS
A. ENGINEER will develop construction documents to relocate approximately 300' of 8"
water main along Millsap Rd, east of College Avenue. Documents to include the
following:
i. Plan and Profile sheet of the new water main, detailing extents of relocation.
Services, valves, hydrants and other appurtances needed to relocate the water
main to remove conflicts with the roadway construction.
ii. Standard details relative to the scope of relocation work.
iii. Update bid documents and project manual to include water main relocation
scope of work.
iv. Update opinion of probable construction cost to include water main relocation
scope of work.
TRAFFIC SIGNAL DESIGN CHANGES
A. ENGINEER will update the construction documents to remove and replace the existing
traffic signal pole and equipment loated in the SW quadrant of the intersection between
Millsap and College. Updates will include revisions to 15 traffic signal sheets consisting
of 3 different stages of construction and the permanent signal plans as well as updating
the project manual, and opinion of probable construction cost.
PROJECT COORDINATION
The following scope items are hereby added due to coordination and project oversight by
Arkansas Department of Transportation (ARDOT) now that the project has been awarded grant
funds which will be administered by ARDOT.
A. ENGINEER will support CITY OF FAYETTEVILLE in project reviews by ARDOT,
including but not limited to:
i. Plan reviews -Revise drawings (as directed by the CITY OF FAYETTEVILLE),
and provide responses to comments received from ARDOT.
ii. Project manual updates -Revise and coordinate updates to project manual
regarding items such as: ARDOT standard forms and special regulations, DBE
goals, etc.
B. ENGINEER will support the CITY OF FAYETTEVILLE in resolution of ARDOT's
comments regarding permanent easements and right of way by:
i. Attend meetings with the CITY OF FAYETTEVILLE and ARDOT to discuss
requriements and potential options to resolve comments.
ii. Providing plan views of the project that show limits and areas of new permanent
easements and right of way.
iii. Provide cross section views of the project that support limits of new permanent
easements and right of way.
C. ENGINEER will provide updated legal descriptions and exhibits for permanent easement
and right-of-way acquisition resulting from the changes required by ARDOT. Legal
descriptions and exhibits will be provided to CITY OF FAYETTEVILLE Land Agents for
use in acquisition documents.
D. Project schedule and duration extended to accommodate Environmental Clearance
(comp, and ARDOT project reviews)
~BURNS
'-'M ~DONNELL
AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES
AMENDMENT No. 1 Date: April 20, 2026
THIS AMENDMENT modifies the Agreement dated July 20, 2021, made by and between Burns &
McDonnell Engineering Company, Inc., (hereinafter called ENGINEER), and City of Fayetteville,
Arkansas (hereinafter called CITY OF FAYETTEVILLE) for the following Project: MILLSAP ST/COLLEGE
AVE INTERSECTION IMPROVEMENTS. For good and valuable consideration, the sufficiency of which
is acknowledged, the parties agree to make the following changes to their Agreement.
1. The parties agree that the ENGINEER's Scope of Services is amended to include the following
additions to Appendix A of the original Agreement:
WATERLINE RELOCATION DESIGN & PLANS
A. ENGINEER will develop construction documents to relocate approximately 300' of 8"
water main along Millsap Rd, east of College Avenue. Documents to include the
following:
i. Plan and Profile sheet of the new water main, detailing extents of relocation.
Services, valves, hydrants and other appurtances needed to relocate the water
main to remove conflicts with the roadway construction.
ii. Standard details relative to the scope of relocation work.
iii. Update bid documents and project manual to include water main relocation
scope of work.
iv. Update opinion of probable construction cost to include water main relocation
scope of work.
TRAFFIC SIGNAL DESIGN CHANGES
A. ENGINEER will update the construction documents to remove and replace the existing
traffic signal pole and equipment loated in the SW quadrant of the intersection between
Millsap and College. Updates will include revisions to 15 traffic signal sheets consisting
of 3 different stages of construction and the permanent signal plans as well as updating
the project manual, and opinion of probable construction cost.
PROJECT COORDINATION
The following scope items are hereby added due to coordination and project oversight by
Arkansas Department of Transportation (ARDOT) now that the project has been awarded grant
funds which will be administered by ARDOT.
A. ENGINEER will support CITY OF FAYETTEVILLE in project reviews by ARDOT,
including but not limited to:
i. Plan reviews -Revise drawings (as directed by the CITY OF FAYETTEVILLE),
and provide responses to comments received from ARDOT.
ii. Project manual updates -Revise and coordinate updates to project manual
regarding items such as: ARDOT standard forms and special regulations, DBE
goals, etc.
B. ENGINEER will support the CITY OF FAYETTEVILLE in resolution of ARDOT's
comments regarding permanent easements and right of way by:
i. Attend meetings with the CITY OF FAYETTEVILLE and ARDOT to discuss
requriements and potential options to resolve comments.
ii. Providing plan views of the project that show limits and areas of new permanent
easements and right of way.
iii. Provide cross section views of the project that support limits of new permanent
easements and right of way.
C. ENGINEER will provide updated legal descriptions and exhibits for permanent easement
and right-of-way acquisition resulting from the changes required by ARDOT. Legal
descriptions and exhibits will be provided to CITY OF FAYETTEVILLE Land Agents for
use in acquisition documents.
D. Project schedule and duration extended to accommodate Environmental Clearance
(comp, and ARDOT project reviews)
..
..
..
.&..
+ .
')"#...
.
.AC5;7;6GO H:6O 9F66A6BHO 52H65O %I?MO O O A256O 3NO 2B5O 36HK66BO ,)%*.O
&%% ##.%!"% )"%!.&$(%-.%.:6F6;B28H6FO 42@@65O !(#$(!!+ O 2B5O ;HNO C7O "2N6HH6J;@?6
O
F>2BG2GO :6F6;B28H6FO 42??65O $-1O)"O "1!--!/$&&!O7CFO H:6O 7C@?CK;B9O *FC<64HO '$&&,*O,-)&&!#!O
/!O $(-!+,!-$)(O $'*+)/!'!(-,O "CFO9CC5O2B5O J2?I23@6O 4CBG;56F2H;CB O H:6O GI87;4;6B4NO C7O K:;4:O
;GO24>BCK@65965 O H:6O D2FH;6GO29F66OHCO A2>6OH:6O7C@@CK;B9O4:2B96GOHCO H:6;FO9F66A6BHO
O -:6O D2FH;6GO 29F66O H:2HO H:6O !(#$(!!+GO ,4CD6O C7O ,6FJ;46GO ;GO 2A6B565O HCO ;B4@I56O H:6O 7C??CK;B9O
255;H;CBGOHCO DD6B5;LOO C7OH:6O CF;9;B2@O9F66A6BHO
.
.
..
.
O !(#$(!!+O K;@@O 56J6?CDO 4CBGHFI4H;CBO 5C4IA6BHGO HCO F6?C42H6O 2DDFCL;A2H6?NO O C7O O
K2H6FO A2;BO 2?CB9O ';@@G2DO +5O 62GHO C7O C??696O J6BI6O C4IA6BHGO HCO ;B4@I56O H:6O
7C@?CK;B9O
;O *@2BO 2B5O *FC7;?6O G:66HO C7O H:6O B6KO K2H6FO A2;B
O 56H2;?;B9O 6LH6BHGO C7O F6?C42H;CBO
,6FJ;46G O J2@J6G O :N5F2BHGO 2B5O CH:6FO 2DDIFH2B46GO B66565O HCO F6@C42H6O H:6O K2H6FO
A2;BOHCO F6ACJ6O4CB7@;4HGOK;H:OH:6O FC25K2NO4CBGHFI4H;CBO
;;O ,H2B52F5O56H2;?GOF6@2H;J6OHCO H:6OG4CD6OC7O F6@C42H;CBOKCF>O
;;;O .D52H6O 3;5O 5C4IA6BHGO 2B5O DFC<64HO A2BI2@O HCO ;B4?I56O K2H6FO A2;BO F6@C42H;CBO
G4CD6OC7OKCF>O
;JO .D52H6O CD;B;CBO C7O DFC323?6O 4CBGHFI4H;CBO 4CGHO HCO ;B4?I56O K2H6FO A2;BO F6?C42H;CBO
G4CD6OC7OKCF>O
.
.
.
.
O !(#$(!!+O K;@@O ID52H6O H:6O 4CBGHFI4H;CBO 5C4IA6BHGO HCO F6ACJ6O 2B5O F6D?246O H:6O 6L;GH;B9O
HF287;4O G;9B2@O DC@6O 2B5O 6EI;DA6BHO @C2H65O ;BO H:6O ,0O EI25F2BHO C7O H:6O ;BH6FG64H;CBO 36HK66BO
';@?G2DO2B5O C?@696O .D52H6GO K;@?O ;B4?I56O F6J;G;CBGO HCO OHF287;4O G;9B2?O G:66HGO 4CBG;GH;B9O
C7O O 5;876F6BHO GH296GO C7O 4CBGHFI4H;CBO 2B5O H:6O D6FA2B6BHO G;9B2?O D@2BGO2GO K6?@O 2GO ID52H;B9O
H:6O DFC=64HOA2BI2@ O 2B5O CD;B;CBOC7O DFC323@6O4CBGHFI4H;CBO 4CGHO
.
.
-:6O 7C@@CK;B9O G4CD6O ;H6AGO 2F6O :6F63NO 25565O 5I6O HCO 4CCF5;B2H;CBO 2B5O DFC<64HO CJ6FG;9:HO 3NO
F>2BG2GO 6D2FHA6BHO C7O -F2BGDCFH2H;CBO + )-O BCKO H:2HO H:6O DFC<64HO :2GO 366BO 2K2F565O 9F2BHO
7IB5GOK:;4:OK;@?O 36O25A;B;GH6F65O 3NO+ )-O
O !(#$(!!+O K;??O GIDDCFHO $-1O )"O "1!--!/$&&!O ;BO DFC<64HO F6J;6KGO 3NO + )-O
;B4?I5;B9O 3IHOBCHO?;A;H65OHCO
;O *@2BO F6J;6KGO +6J;G6O 5F2K;B9GO 2GO 5;F64H65O 3NO H:6O $-1O )"O "1!--!/$&&!
O
2B5O DFCJ;56OF6GDCBG6GOHCO 4CAA6BHGOF646;J65O7FCAO + )-O
;;O *FC<64HO A2BI2@O ID52H6GO +6J;G6O 2B5O 4CCF5;B2H6O ID52H6GO HCO DFC<64HO A2BI2@O
F692F5;B9O ;H6AGOGI4:O2GO+ )-O GH2B52F5O7CFAGO 2B5O GD64;2@O F69I@2H;CBG
O !O
9C2?G
O 6H4O
O !(#$(!!+O K;??O GIDDCFHO H:6O $-1O )"O "1!--!/$&&!O ;BO F6GC?IH;CBO C7O + )-GO
4CAA6BHGO F692F5;B9OD6FA2B6BHO62G6A6BHGO2B5O F;9:HOC7OK2NO 3NO
;O HH6B5O A66H;B9GO K;H:O H:6O $-1O )"O "1!--!/$&&!O 2B5O + )-O HCO 5;G4IGGO
F6EIF;6A6BHGO2B5O DCH6BH;2@OCDH;CBGOHCO F6GC@J6O4CAA6BHGO
;;O *FCJ;5;B9OD@2BO J;6KGO C7O H:6O DFC<64HOH:2HO G:CKO @;A;HGO2B5O 2F62GO C7O B6KOD6FA2B6BHO
62G6A6BHGO2B5O F;9:HOC7OK2NO
;;;O *FCJ;56O4FCGGOG64H;CBO J;6KGO C7O H:6O DFC=64HOH:2HOGIDDCFHO ?;A;HGO C7O B6KO D6FA2B6BHO
62G6A6BHGO2B5O F;9:HOC7OK2NO
O !(#$(!!+OK;@@O DFCJ;56O ID52H65O @692@O56G4F;DH;CBGO2B5O 6L:;3;HGO 7CFO D6FA2B6BHO62G6A6BHO
2B5O F;9:H
C7
K2NO 24EI;G;H;CBO F6GI?H;B9O 7FCAO H:6O 4:2B96GO F6EI;F65O 3NO + )-O &692@O
56G4F;DH;CBGO 2B5O 6L:;3;HGO K;@?O 36O DFCJ;565O HCO $-1O )"O "1!--!/$&&!O &2B5O 96BHGO 7CFO
IG6O;BO24EI;G;H;CBO5C4IA6BHGO
O *FC<64HO G4:65I?6O 2B5O 5IF2H;CBO 6LH6B565O HCO 244CAAC52H6O !BJ;FCBA6BH2@O ?62F2B46O
4CADO2B5O+ )-O DFC=64HOF6J;6KGO
Docusign Envelope ID: 4175B64C-BF90-82CD-83E6-AB17E6123A1E
FRANCHISE UTILITY RELOCATION -ADMINISTRATION ASSISTANCE
The following scope items are hereby added at the request of CITY OF FAYETTEVILLE.
A. ENGINEER will assist the CITY OF FAYETTEVILLE in administration of franchise utility
relocations associated with this project by performing the following tasks:
i. ENGINEER will communicate with 5 (five) franchise utility providers {AT&T, Cox
Communications, Ritter Communications, AEP/SWEPCO, and Black Hills
Energy), which have facilities that, based on what is readily visible at the
ground surface, may require relcoation associated with this project.
ii. ENGINEER will provide each franchise utility provider with a copy of the plans
and DWG files for the project for use by the franchise utility provider to review
and determine whether relocation of its facilities are necessary. ENGINEER is
not responsible for a franchise utility provider failing to notify ENGINEER of a
need for its facilities to be relocated.
iii. ENGINEER will review relocation plans prepared by the franchise utility providers
for general conformance with the project. ENGINEER will not perform a
detailed review nor exhaustive conflict detection of the franchise utility
provider's plans. CITY OF FAYETTEVILLE agrees that each franchise utility
provider is solely responsible to design the relocation of their facilities in order
to fully accommodate the project and ENGINEER is not liable for any conflicts
discovered during construction.
iv. ENGINEER will collect information from franchise utility providers regarding cost
of relocations, reimbursement amounts, and schedules for work. ENGINEER
assumes no liability for the accuracy of the cost estimates or schedules
provided.
v. ENGINEER will communicate with franchise utility providers to develop relocation
agreements, and utility relocation work orders for the CITY OF FAYETTEVILLE
review and authorization.
vi. ENGINEER will perform monthly check-in with each franchise utility
representative to determine status/progress of utility relocations for up to 6 (six)
months, following issuance of work orders and Notice to Proceed by the CITY
OF FAYETTEVILLE.
2. The following adjustments are made to the ENGINEER's compensation. The Lump Sum amount
shall be increased by $93,785, to a total of $393,785.
3. The period of service and project schedule shall be extended to July 31, 2026, to accommodate
project delays associated with project funding changes, ARDOT oversight, and additional services
performed. It is anticipated that all scope of work, including project procurement, will be completed within
this timeframe.
4. The terms of this AMENDMENT supersede any contrary terms of the Agreement. This
AMENDMENT will be deemed a part of, and be subject to, all other terms and conditions of the
Agreement. Except as modified above, the Agreement will remain in full force and effect.
IN WITNESS WHEREOF, the parties have executed this AMENDMENT on the day and year first written
above.
OWNER: City of Fayetteville, Arkansas
By:
Name: Molly Rawn
Title: _M_a~yo_r __________ _
2
ENGINEER: Burns & McDonnell Engineering
Company, Inc.
By: ~
Name: Steven Beam, P.E.
Title: Director
Digitally signed by Steven Beam
Date: 2026.04.30 13:52:34-05'00'
44
4
4
4
)62R3@;;@K7>5R G0@B2R 7H2=GR-D2R 62D2/MR-1121R-HRH62R D2CI2GHR@3R),R%R ,))*!! R
R $$'R K7;;R -GG7GHR H62R ),R %R ,))*!!R 7?R -1=7?7GHD-H7@?R @3R 3D-?067G2R IH7;7HMR
D2;@0-H7@>GR-GG@07-H21RK7H6RH67GR BD@820HR/MRB2D3@D=7?5RH62R3@;;@K7?5RH-G:GR
7R $$'RK7<<R 0@==I>70-H2R K7H6R R 37J2R 3D->067G2R IH7;7HMR BD@J712DGR Q))R @LR
@==I>70-H7@?GR '7HH2DR @==I?70-H7@?GR &
(+&%R -?1R ;-0:R 7;<GR
>2D5MR K6706R 6-J2R 3-07;7H72GR H6-HR /-G21R @>R K6-HR 7GR D2-17<MRJ7G7/<2R -HR H62R
5D@I?1RGIE3-02R =-MRD2CI7D2RD2;0@-H7@?R-GG@07-H21RK7H6R H67GR BD@920HR
77 R $$'RK7<<R BD@J712R2-06R3D-?067G2R IH7<7HMR BD@J712DRK7H6R -R 0@BMR@3RH62R B<-?GR
-?1R +R37<2GR3@DR H62R BD@920HR3@DR IG2R /MRH62R3D-?067G2R IH7<7HMRBD@J712DRH@R D2J72KR
-?1R 12H2D=7>2RK62H62DR D2;@0-H7@?R@3R 7HGR3-07;7H72GR -D2R ?202GG-EM R $$'R7GR
?@HRD2GB@>G7/<2R3@DR -R 3D->067G2R IH7;7HMRBD@J712DR3-7<7>5RH@R >@H74MR$$'R@3R-R
?221R3@DR 7HGR3-07;7H72GRH@R /2R D2;@0-H21
R
777 R $$'RK7<;R D2J72KRD2<@0-H7@>R B<->GR BD2B-D21R /MRH62R3D-?067G2R IH7;7HMRBD@J712DGR
3@DR 52>2D-<R 0@>3@D=->02R K7H6R H62R BD@920HR $$'R K7<;R ?@HR B2E3@D=R -R
12H-7<21R D2J72KR >@DR 2L6-IGH7J2R 0@>3<70HR 12H20H7@?R @3R H62R 3D->067G2R IH7;7HMR
BD@J712DGR B;-?GR ),R %R ,))*!!R -5D22GR H6-HR 2-06R 3D-?067G2R IH7;7HMR
BD@J712DR 7GR G@<2;MR D2GB@?G7/<2RH@R 12G75?R H62R D2<@0-H7@>R @3R H627DR 3-07;7H72GR 7>R @D12DR
H@R 3I;;MR -00@==@1-H2R H62R BD@920HR->1R $$'R 7GR ?@HR <7-/<2R3@DR ->MR 0@?3;70HGR
17G0@J2D21R1ID7?5R0@?GHDI0H7@>R
7J
R $$'RK7;<R 0@;;20HR 7?3@D=-H7@?R3D@=R 3D-?067G2R IH7;7HMR BD@J712DGR D25-D17>5R 0@GHR
@3R D2;@0-H7@?GR D27=/IDG2=2>HR -=@I>HGR ->1R G0621I;2GR 3@DR K@D:
R $$'R
-GGI=2GR ?@R ;7-/7;7HMR 3@DR H62R -00ID-0MR @3R H62R 0@GHR 2GH7=-H2GR @DR G0621I<2GR
BD@J7121
R
J
R $$'RK7<;R0@==I?70-H2RK7H6R3D->067G2R IH7;7HMRBD@J712DGRH@R 12J2;@BR D2<@0-H7@>R
-5D22=2?HGR ->1R IH7<7HMRD2;@0-H7@?RK@D:R@D12DGR3@DR H62R ),R%R ,))*!!R
D2J72KR-?1R-IH6@D7P-H7@?R
J7R $$'R K7<;R B2E3@D=R =@?H6<MR 0620:7?R K7H6R 2-06R 3D-?067G2R IH7;7HMR
D2BD2G2?H-H7J2RH@R 12H2D=7?2R GH-HIG
BD@5D2GGR@3R IH7<7HMRD2<@0-H7@>GR3@DR IBRH@R R G7LR
=@>H6GR 3@<;@K7?5R 7GGI-?02R @3R K@D:R @D12DGR -?1R $@H702R H@R &E@0221R /MRH62R ),R
%R ,))*!!R
R )62R 3@;<@K7>5R -18IGH=2>HGR -D2R =-12RH@R H62R $$'GR0@=B2>G-H7@? R )62R !I=BR (I=R -=@I>HR
G6-;;R /2R &*!-# .#"4/MR
4H@R-R H@H-;R@3R
4
R )62R B2D7@1R@3RG2EJ702R ->1R BD@920HRG0621I<2R G6-<;R /2R#2/#*"#"4H@R I;MR R R H@R -00@==@1-H2R
BD@920HR 12;-MGR -GG@07-H21R K7H6R BD@920HR 3I?17>5R 06->52GR '%)R @J2DG756HR ->1R -117H7@>-<R G2EJ702GR
B2E3@E=21R HR7GR->H707B-H21RH6-HR -<;RG0@B2R@3RK@E:R 7?0;I17?5RBE@820HRBE@0IE2=2?HR K7;;R /2R 0@=B;2H21RK7H67?R
H67GRH7=23E-=2R
R )62R H2E=GR @3R H67GR "$"$)R GIB2EG212R ->MR 0@>HE-EMR H2E=GR @3R H62R 5E22=2>HR )67GR
"$"$)R K7;<R /2R 122=21R -R B-EHR @3R -?1R /2R GI/920HR H@R -<<R @H62ER H2E=GR ->1R 0@?17H7@?GR @3R H62R
5E22=2>H R L02BHR-GR =@173721R-/@J2R H62R5D22=2?HRK7;<R D2=-7?R7?R3I;;R3@E02R-?1R 24320H
R
$R+)$((R+'%RH62R B-EH72GR 6-J2R2L20IH21R H67GR "$"$)R @?R H62R 1-MR -?1R M2-ER 37DGHR KE7HH2>R
-/@J2
R
4&/34+$4 3#//#1&((#4
-' *. .4
MR
$-=2R "@;<NR'-K?R
)7H;2R #.OAFR
40-*.44!+**#((4*%&*##-&*%4
+), *34*!4
MR
$-=2R (H2J2?R 2-=R &
R
)7H;2R 7E20H@DR
!""!" "
"
" "
"
Docusign Envelope ID: 4175B64C-BF90-82CD-83E6-AB17E6123A1E
Attachment A-2A -Justification of Costs and Fees
April 20, 2026
Millsap St/ College Ave Intersection Improvements
DESIGN CHANGES and ADDITIONAL TITLE I SCOPE
MANHOURS
TASK PD
#1 -Design, Relocation of 8" Water main on Millsap (east of College Ave) (Approx. 300 LF)
#2 -Design change to remove and replace existing traffic signal pole @ SW Quadrant of Intersection
!After completion of 90% design, changes were requested to remove and replace the existing signal pole located in the
SW corner of the intersection where previous design direction was to prese,ve it. This includes updates to 15 traffic
signal sheets, consisting of 3 different stages, and permanent signal plans. Updating project manual, and opinion of
!probable construction cost.
#2 -ARDOT Coordination and Project Oversight (Reviews, Comments, Responses, Design Changes, Project Manual, etc)
When the project was awarded grant funds, the project requirements were also changed. In supporl of this
coordination with CITY OF FAYETTEVILLE, and ARDOT, ENGINEER performed muffiple design updates and
reviews, and produced supporling documents, etc.
#3 -ARDOT Additional Right of Way and Permanent Easement Coordination (Responses, markups, meetings)
IAfter ROW documents were approved, and acquisition was complete, ARDOT required acquisition of permanent
grading easements along the corridor. This is the scope of work associated with supporling the city in these
discussions regarding the new right of way requirements and permanent easements for the project. Multiple meetings,
emails, phone calls, markups, responses, etc.
#4 -ARDOT Additional Right of Way and Permanent Easement Legals and Esmt Exhibits)
This scope of work is associated with producing new easement exhibits and some new legal descriptions for areas
where there was originally no TCE planned, such as the area along frontage of Raising Canes.
#5 -Extended Schedule and project duration (original Project Duration 10 months)
The original project schedule was 10 months. The receipt of grant funds for the project, then subsequent
environmental clearance and additional project reviews caused significant delays for the project, resulting in a current
!Project duration of 4 years. This scope of work represents the additional project management and project
administration needed to maintain and coordinate the project over that extended duration.
#6 -Franchise Utility Relocation -Admin Assistance (5 Utility companies required to relocate)
Review Relocation Plans, Adapt ARDOT standard forms for use by CITY OF FAYETTEVILLE for Reimbursement.
Reimbursement Breakdown, Relocation Agreement, Relocation Permit/Work Order (estimating 25 hours per utility)
TOTAL MH -DESIGN CHANGES and ADDITIONAL TITLE I SCOPE 0
LABOR COSTS
Category -Description
PD -Project Director
PM -Project Manager
SE -Senior Civil Engineer
STFE -Staff Civil Engineer
DES -Designer
IA.SST -Project Assistant
EXPENSES
ITEM
PM SE STFE DES ASST
8 12 40
24 48 24
12 12 48
16 24
8 40
20 20
75 50
163 48 74 176 20
Rate MH
$275.00 0
$245.00 163
$205.00 48
$175.00 74
$160.00 176
$145.00 20
Subtotal Labor Costs
Quantity Unit Rate
Subtotal Expenses
TOTAL COSTS -DESIGN CHANGES and ADDITIONAL TITLE I SCOPE
,~~ BASIS OF ESTIMATE
A2-1
TOTAL
60
96
72
40
48
40
125
481
Amount
$0
$39,935
$9,840
$12,950
$28,160
$2,900
$93,785
Amount
$0
$93,785
I
$##' '
%!##''
!#!''!'
'''
!'#'
' &'# !#' &#"'
:,x
x,PoXUax>P]eLFpYebxeRx#xEFpPjx _FXaxeax7Y]]oFgxPFopxeSx+e]]PUPx)tPx)ggjfvxx51x
x,PoXUaxLVFcUPxpexkP_etPxFbNxjPh]FLPxPvYopYbUxpkFRTXLxoYUbF^xhe^Px(x ?Ex<rFNkFcpxeSx3dqPkoPLpYfbx
6G?a:YV]R?rKYXYA=?qKHX:I7XH?pz?a?a?`v?pr?=rYa?VYx?7X=a?^R7:?rI??{KprKXHpKHX7R]YR?RY:7r?=KXrI?
*2:Ym?aYArI?KXr?ap?:sKYXzI?h^a?xKYvp=?pKHX=Kh:rKYXz7prY]hp?o?Ks+JKpKX:Rv=?pv]=7r?prZrc8E:
qKHX7RpJ??rp:YXpKprKXHYAx=KD?hXrpr7H?p7X=^?cW7X?XrpKHX7R^R7Xp0^=7rKXH^dYP?:rV7Xv7R7X=Y^KXKYXYA
4_aY979R?:YXprcw:rKZX:Ypr
x)>,8@x+eejNYdFpYfbxFbNx:jeZPLqx8tPkoXUVqx>PtXPuox+e__Qapox>QoheaoQox,PoXUax+WFbUQo x:keZPLpx7FasF^ xQpLx
2I?XrJ?^c\P?:rz7p7z7a=?=Ha7XrAvX=prI?^dYP?:ra?`vKa?V?Xrpz?a?7RpY:I7XH?= Xpv^^YcUZArJKp
:YZa=KX7sLYXzKrJ /&3-+1!##7X=(&+%!%(^?iZcW?=VvSrK^R?=?pKHXv^=7r?p7X=
a?xK?zq7X=]dY=v;?=pv^^YcUKXH=Y;vV?Xrp?r:
x)>,8@x)NNXpYecF]x>XUWqxeRxEFwxFaNx:Qj_FaPbpx.FoP`Pbpx+eejNYbGpYfbx>PogeaoPo x_Fj\sgo x_PPpXcUox
"G?a(&2=Z:vV?Xrpz?a?7]]aYx?>7X>7:`vKqKrKZXz7p:YV^R?r?(&+a?`vKa?>7:`vKqKrKZXZA]?aV7X?Xr
Ha7=KXH?7p?V?Xrp7RYXHrJ?:Ybj=Yb+JKpKprJ?p;Z^?YAzZk7ppY:K7r?=zKrJpv^^YcUKXHrJ?;Kr~KXrJ?p?
>Kq:vqqKYXqhH7gKXHrJ?X?zcMHJrYAz7~d@`vKhV?Xrp7X=^?cW7X?Xr?7p?V?XrpAYarJ?^c\P?;s$vRrK^R?V??sLXHp
?V7LRq^JYX?;7SSpV7kv^php^YXp?p?r;
x
)>,9@x)NNXpYfbH]x>XUWqxfRxEHwxHaNx:Qm_HdPbpx/HoP`Pbpx6PUH^oxHdOx/o`qx/vVXIXpox
,JKqp<Y^?YAzYlKq7qqY<K7r?>zKrI]e[>v<KXHX?z?7q?V?Xr?|IK9Krq7X>qYV?X?zR?H7R>?q<dN]rKYXqAYa7a?7q
zI?a?rI?d@z7qYcMHKX7TR~XY+]R7XX?=qv;J7qrJ?7d@77RYXHBc\Xr7H?YC)7KpKXH7X?p
x
/vpQaNPNx?LVQNs]PxHdNxhleZPMpxNslHpYfbxfmYUYbH^x;mf[PMqx-smHpXfdxx_eaqWox
,J?YcMHKX7R]dYP?;rq<J?=vR?z7qVYXrJq,J?a?<?K^rYAHc7XrAvX=qFarI?^dYP?<rrI?Xqv9q?`v?Xr
?XyKd[XV?Xr7R:R?7c8X<?7X=7==KsLYX7R]dYP?;rd@yK?zq<7vq?=qKHXO;7Xr=?R7~qAYarJ?^c\P?<rd@qvRsKXHKX7<vcf@Xr
5]nP?<r=vd7rKYXYC~?7dq+JKqq<Y^?YAzYka?]a?q?XrqrI?7==KsLYX7R^dYP?;rV7X7H?V?Xr7X=^dYP?<r
7>VKXKqra7rKYXX??=?=rYV7KXr7KX7X=<YYd=KX7r?rJ?]dYP?;rYx?arJ7r?}r?X=?==va7rKYX
x1jFbLWYoQxCpY]Yqwx>P]eLFqXeax)N`Ybx)ooXoqFdLQxxDqX^XqwxLe_gFdYPoxjPirXkQNxpexkP^eLFpPx
(?xK?z(?RZ:7sLYX'R7Xq=7]r(&+qr7X>7a=AYaVqAYavq?9 +3&3-.1 ##AYa(?KV9vaq?V?Xr
(?KV9vaq?V?Xrh7Q=YzX)?RY;7rKYXHd@?V?Xr(?RY;7rKYX'?cWKtYbQ&g?b?prKV7sLXHxJYvap^?bvuSKs
x
+HpPUfnwx
,PoMnYgpXfax
:,x:jeZPLqx,XjPLpejx
:7x
:leZPMpx7HaHUPmx
?.x?PbXfjx+YtY]x.cUXaPPjx
?A2/x
?qHRRx+YtX^x/cUYaPPmx
,0?x-PoYUbPjx
*??Bx
;mf[PMqx)ooXoqHbqx
4B/7x
?.x ?@1.x ,.?x )??@x
#x x
x #x x
#x
x x
#x x
x x
x #x x x x
>HpPx
x x
x x
x #x
x x
x "x
x x
?sJqfqF^x5FKfkx+eoqox
=sHdpYpwx CdYqx >HpPx
?sJqfqH]x/vgQdoPox
'
@8@)5x
x
&x
x
x
$x
x
#x
)`frapx
x
& &x
&#x
&x
$ x
&x
)`frapx
x
'!%x
Docusign Envelope ID: 4175B64C-BF90-82CD-83E6-AB17E6123A1E