Loading...
HomeMy WebLinkAbout148-26 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 148-26 File Number: 2026-1681 A RESOLUTION TO AWARD RFQ #26-01 SELECTION #6 AND AUTHORIZE A CONTRACT WITH GARVER, LLC IN AN AMOUNT NOT TO EXCEED $373,000.00 TO PROVIDE DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES FOR KESSLER MOUNTAIN REGIONAL PARK PHASE 3 IMPROVEMENTS, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $27,000.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFQ #26-01 Selection #6 and authorizes a contract with Garver, LLC in an amount not to exceed $373,000.00 to provide design and construction administration services for Kessler Mountain Regional Park Phase 3 Improvements, and further approves a project contingency in the amount of $27,000.00. PASSED and APPROVED on June 16, 2026 Approved: Attest: Molly Rawn, Mayor Kara Paxton, City Clerk Treasurer Page 1 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Mailing address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov CITY COUNCIL MEMO 2026-1681 MEETING OF JUNE 16, 2026 TO: Mayor Rawn and City Council THROUGH: Ted Jack, Park Planning Superintendent Alison Jumper, Director of Parks, Natural Resources and Cultural Affairs Keith Macedo, Chief of Staff FROM: Ted Jack, Park Planning Superintendent SUBJECT: Kessler Phase 3 Improvements - Design Contract RECOMMENDATION: Staff recommends entering into a contract with Garver LLC to provide design and construction administration services, pursuant to RFQ 26-01, Selection #6, for Kessler Phase 3 Improvements including: soccer field and other improvements at Kessler Mountain Regional Park for a fee not to exceed $373,000.00, plus a $27,000 project contingency. BACKGROUND: Kessler Mountain Regional Park is the primary location to host soccer games and tournaments. Kessler currently has seven full-sized soccer fields which can be divided into smaller, age-appropriate fields. Six of the seven soccer fields are lighted. All soccer fields are natural turf. An onsite sewer treatment facility that has served the park will soon be removed and the park will be connected to the city sewer system allowing the area to be converted to additional field space. Garver LLC was selected as a contractor through RFQ 26-01, Selection #6. DISCUSSION: The work includes designing an additional full-sized lighted artificial turf soccer field, improvements to an existing field including lighting, drainage improvements, shaded bleachers for the artificial turf field, sidewalk improvements, landscaping, parking improvements and any necessary environmental permitting. Garver has worked on all previous phases of construction for Kessler with good results. This continues their work creating bid documents for improvements and includes bidding and construction administration services. BUDGET/STAFF IMPACT: Funding for this project is through the 2024 Bond funds and Parkland Dedication funds. SOURCE GL ACCOUNT PROJECT AMOUNT 2024 Bond 4805.860.7502-5860.02 46050.7502.4000 $273,000.00 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Mailing address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov Parkland Dedication (PLD) 2250.520.9256-5860.02 46050.7502.4000 $100,000.00 Contingency (PLD) 2250.520.9256-5911.99 46050.7502.4000 $27,000.00 ATTACHMENTS: 3. Staff Review Form, 4. Kessler Soccer Improvements City Council Presentation, 5. Garver Contract and Scope of Services, 6. RFQ 26-01, Selection 6 - Final Vote, 7. RFQ 26-01, Submittal - Garver, LLC - E Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 City of Fayetteville, Arkansas Legislation Text 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 File#: 2026-1681 A RESOLUTION TO AWARD RFQ #26-01 SELECTION #6 AND AUTHORIZE A CONTRACT WITH GARVER, LLC IN AN AMOUNT NOT TO EXCEED $373,000.00 TO PROVIDE DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES FOR KESSLER MOUNTAIN REGIONAL PARK PHASE 3 IMPROVEMENTS, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $27,000.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFQ #26-01 Selection #6 and authorizes a contract with Garver, LLC in an amount not to exceed $373,000.00 to provide design and construction administration services for Kessler Mountain Regional Park Phase 3 Improvements, and further approves a project contingency in the amount of $27,000.00. Page 1 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 5/19/2026 Submitted Date Yes 1,956,190.59$ 373,000.00$ V20221130 Budgeted Item? Does item have a direct cost? Is a Budget Adjustment attached? Total Amended Budget Expenses (Actual+Encum) Available Budget Item Cost Budget Adjustment Remaining Budget 9,216,776.00$ 7,260,585.41$ Yes No -$ 1,583,190.59$ 46050.7502.4000 Project Number Budget Impact: Kessler Phase 3 Improvements Fund Parks Projects 2024 Bonds Parks Development 4805.860.7502-5860.02 2250.520.9256-5860.02 Account Number Project Title City of Fayetteville Staff Review Form 2026-1681 Item ID 6/16/2026 City Council Meeting Date - Agenda Item Only Staff recommends entering into a contract with Garver LLC to provide design and construction administration services for Kessler Phase 3 Improvements including: soccer field and other improvements at Kessler Mountain Regional Park for a fee not to exceed $373,000.00, plus a $27,000 project contingency. N/A for Non-Agenda Item Action Recommendation: Submitted By Zach Foster PARKS & RECREATION (520) Division / Department Comments: Purchase Order Number: Change Order Number: Previous Ordinance or Resolution # Approval Date: Original Contract Number: Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Existing Conditions Fields Soccer .. Fields Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Existing Conditions Existing Soccer Fields w/ Field Numbers Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 PROPOSED IMPROVEMENTS Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Possible Small Soccer Field Proposed Improvements • FuII-sized soccer field w/ artificiaI turf • Possible small soccer field (natural turf) • Lighting for two fields • Bleachers w/ shade • Sidewalks • Drainage • Landscaping • Parking Benefits • Additional field space • Championship Field • Lighting additional hours of play • Artificial turf for play after inclement weather • More Parking Bleachers w/ Shade New Large Artifical Turf Field Existing Field Lighting for both fields Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Kessler Proposed Improvements Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Work will include adding some parking Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 AGREEMENT For PROFESSIONAL ENGINEERING SERVICES Between CITY OF FAYETTEVILLE, ARKANSAS And GARVER,LLC THIS AGREEMENT is made as of ,2026, by and between City of Fayetteville, Arkansas, acting by and through its Mayor (hereinafter called CITY OF FAYETTEVILLE) and GARVER, LLC (hereinafter called ENGINEER). CITY OF FAYETTEVILLE from time to time requires professional engineering services in connection with the evaluation, design, and/or construction supervision of capital improvement projects. Therefore, CITY OF FAYETTEVILLE and ENGINEER in consideration of their mutual covenants agree as follows: ENGINEER shall serve as CITY OF FAYETTEVILLE's professional engineering consultant in those assignments to which this Agreement applies, and shall give consultation and advice to CITY OF FAYETTEVILLE during the performance ofENGINEER's services. All services shall be performed under the direction of a professional engineer registered in the State of Arkansas and qualified in the particular field. SECTION 1 - AUTHORIZATION OF SERVICES 1.1 Services on any assignment shall be undertaken only upon written Authorization of CITY OF FAYETTEVILLE and agreement of ENGINEER 1.2 Assignments may include services described hereafter as Basic Services or as Additional Services of ENGINEER. 1.3 Changes, modifications or amendments in scope, price or fees to this contract shall not be allowed without a formal contract amendment approved by the Mayor and if needed, the City Council in advance of the change in scope, costs, fees, or delivery schedule. SECTION 2 - BASIC SERVICES OF ENGINEER 2.1 Perform professional services in connection with the Project as hereinafter stated. 2.1.1 The Scope of Services to be furnished by ENGINEER during the Project is included in Appendix A attached hereto and made part of this Agreement. 2.2 ENGINEER shall coordinate their activities and services with the CITY OF FAYETTEVILLE. ENGINEER and CITY OF FAYETTEVILLE agree that ENGINEER has full responsibility for the engineering services. SECTION 3 - RESPONSIBILITIES OF CITY OF FAYETTEVILLE 3.1 CITY OF FAYETTEVILLE shall, within a reasonable time, so as not to delay the services of ENGINEER: Garver Contract- Professional Engineering Services 6/13/2025 June 16 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 2 Garver Contract- Professional Engineering Services 6/13/2025 3.1.1 Provide full information as to CITY OF FAYETTEVILLE' s requirements for the Project. 3.1.2 Assist ENGINEER by placing at ENGINEER's disposal all available information pertinent to the assignment including previous reports and any other data relative thereto. 3.1.3 Assist ENGINEER in obtaining access to property reasonably necessary for ENGINEER to perform his services under this Agreement. 3.1.4 Examine all studies, reports, sketches, cost opinions, proposals, and other documents presented by ENGINEER and render in writing decisions pertaining thereto. 3.1.5 Provide such professional legal, accounting, financial, and insurance counseling services as may be required for the Project. 3.1.6 The Park Planning Superintendent is the CITY OF FAYETTEVILLE's project representative with respect to the services to be performed under this Agreement. The Park Planning Superintendent shall have complete authority to transmit instructions, receive information, interpret and define CITY OF FAYETTEVILLE's policies and decisions with respect to materials, equipment, elements and systems to be used in the Project, and other matters pertinent to the services covered by this Agreement. 3.1.7 CITY OF FAYETTEVILLE and/or its representative will review all documents and provide written comments to ENGINEER in a timely manner. SECTION 4 - PERIOD OF SERVICE 4.1 This Agreement will become effective upon the first written notice by CITY OF FAYETTEVILLE authorizing services hereunder. 4.2 The provisions of this Agreement have been agreed to in anticipation of the orderly progress of the Project through completion of the services stated in the Agreement. ENGINEER will proceed with providing the authorized services immediately upon receipt of written authorization from CITY OF FAYETTEVILLE. Said authorization shall include the scope of the services authorized and the time in which the services are to be completed. The anticipated schedule for this project is included as Appendix A. SECTION 5 - PAYMENTS TO ENGINEER 5.1 The maximum not-to-exceed amount authorized for this Agreement shall be based upon on an Hourly basis as described in Appendix B. 5.2 Statements 5.2.1 Monthly statements for each calendar month shall be submitted to CITY OF FAYETTEVILLE or such parties as CITY OF FAYETTEVILLE may designate for professional services consistent with ENGINEER'S normal billing schedule. Once established, the billing schedule shall be maintained throughout the duration of the Project. Applications for payment shall be made in accordance with a format to be developed by ENGINEER and as approved by CITY OF FAYETTEVILLE. Applications for payment Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 3 Garver Contract- Professional Engineering Services 6/13/2025 shall be accompanied each month by the updated project schedule as the basis for determining the value earned as the work is accomplished. Final payment for professional services shall be made upon CITY OF FAYETTEVILLE's approval and acceptance with the satisfactory completion of the study and report for the Project. 5.3 Payments 5.3.1 All statements are payable upon receipt and due within thirty (30) days. If a portion of ENGINEER's statement is disputed by CITY OF FAYETTEVILLE, the undisputed portion shall be paid by CITY OF FAYETTEVILLE by the due date. CITY OF FAYETTEVILLE shall advise ENGINEER in writing of the basis for any disputed portion of any statement. CITY OF FAYETTEVILLE will make reasonable effort to pay invoices within 30 days of date the invoice is approved, however, payment within 30 days is not guaranteed. 5.4 Final Payment 5.4.1 Upon satisfactory completion of the work performed under this Agreement, as a condition before final payment under this Agreement, or as a termination settlement under this Agreement, ENGINEER shall execute and deliver to CITY OF FAYETTEVILLE a release of all claims against CITY OF FAYETTEVILLE arising under or by virtue of this Agreement, except claims which are specifically exempted by ENGINEER to be set forth therein. Unless otherwise provided in this Agreement or by State law or otherwise expressly agreed to by the parties to this Agreement, final payment under this Agreement or settlement upon termination of this Agreement shall not constitute a waiver of CITY OF FAYETTEVILLE' s claims against ENGINEER or his sureties under this Agreement or applicable performance and payment bonds, if any. SECTION 6 - GENERAL CONSIDERATIONS 6.1 Insurance 6.1.1 During the course of performance of these services, ENGINEER will maintain (in United States Dollars) the following insurance coverages: Type of Coverage Workers' Compensation Employers' Liability Commercial General Liability Bodily Injury and Property Damage Automobile Liability: Bodily Injury and Property Damage Professional Liability Insurance Limits of Liability Statutory $500,000 Each Accident $1,000,000 Combined Single Limit $1,000,000 Combined Single Limit $1,000,000 Each Claim ENGINEER will provide to CITY OF FAYETTEVILLE certificates as evidence of the specified insurance within ten days of the date of this Agreement and upon each renewal of coverage. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 4 Garver Contract- Professional Engineering Services 6/13/2025 6.1.2 CITY OFF AYETTEVILLE and ENGINEER waive all rights against each other and their officers, directors, agents, or employees for damage covered by property insurance during and after the completion of ENGINEER's services. 6.2 Professional Responsibility 6.2.1 ENGINEER will exercise reasonable skill, care, and diligence in the performance of ENGINEER's services and will carry out its responsibilities in accordance with customarily accepted professional engineering practices. CITY OF FAYETTEVILLE will promptly report to ENGINEER any defects or suspected defects in ENGINEER's services of which CITY OF FAYETTEVILLE becomes aware, so that ENGINEER can take measures to minimize the consequences of such a defect. CITY OF FAYETTEVILLE retains all remedies to recover for its damages caused by any negligence of ENGINEER. 6.3 Cost Opinions and Projections 6.3.1 Cost opinions and projections prepared by ENGINEER relating to construction costs and schedules, operation and maintenance costs, equipment characteristics and performance, and operating results are based on ENGINEER's experience, qualifications, and judgment as a design professional. Since ENGINEER has no control over weather, cost and availability of labor, material and equipment, labor productivity, construction Contractors' procedures and methods, unavoidable delays, construction Contractors' methods of determining prices, economic conditions, competitive bidding or market conditions, and other factors affecting such cost opinions or projections, ENGINEER does not guarantee that actual rates, costs, performance, schedules, and related items will not vary from cost opinions and projections prepared by ENGINEER. 6.4 Changes 6.4.1 CITY OF FAYETTEVILLE shall have the right to make changes within the general scope ofENGINEER's services, with an appropriate change in compensation and schedule only after the Mayor or Fayetteville City Council, if needed, approves proposed changes and, upon execution of a mutually acceptable amendment or change order signed by the Mayor of the CITY OF FAYETTEVILLE and the duly authorized officer of ENGINEER. 6.5 Termination 6.5.1 This Agreement may be terminated in whole or in part in writing by either party in the event of substantial failure by the other party to fulfill its obligations under this Agreement through no fault of the terminating party, provided that no termination may be effected unless the other party is given: 6.5.1.1 Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt requested) of intent to terminate, 6.5.1.2 An opportunity for consultation with the terminating party prior to termination. 6.5.2 This Agreement may be terminated in whole or in part in writing by CITY OF FAYETTEVILLE for its convenience, provided that ENGINEER is given: Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 5 Garver Contract- Professional Engineering Services 6/13/2025 6.5.2.1 Not less than ten (10) calendar days written notice (delivered by certified mail, return receipt requested) of intent to terminate, 6.5.2.2 An opportunity for consultation with the terminating party prior to termination. 6.5.3 If termination for default is effected by CITY OF FAYETTEVILLE, an equitable adjustment in the price provided for in this Agreement shall be made, but 6.5.3.1 No amount shall be allowed for anticipated profit on unperformed services or other work, 6.5.3.2 Any payment due to ENGINEER at the time of termination may be adjusted to cover any additional costs to CITY OF FAYETTEVILLE because ofENGINEER's default. 6.5.4 If termination for default is effected by ENGINEER, or if termination for convenience is effected by CITY OF FAYETTEVILLE, the equitable adjustment shall include a reasonable profit for services or other work performed. The equitable adjustment for any termination shall provide for payment to ENGINEER for services rendered and expenses incurred prior to the termination, in addition to termination settlement costs reasonably incurred by ENGINEER relating to commitments which had become firm prior to the termination. 6.5.5 Upon receipt of a termination action under Paragraphs 6.5.1 or 6.5.2 above, ENGINEER shall: 6.5.5.1 Promptly discontinue all affected work (unless the notice directs otherwise), 6.5.5.2 Deliver or otherwise make available to CITY OFF AYETTEVILLE all data, drawings, specifications, reports, estimates, summaries and such other information and materials as may have been accumulated by ENGINEER in performing this Agreement, whether completed or in process. 6.5.6 Upon termination under Paragraphs 6.5.1 or 6.5.2 above CITY OF FAYETTEVILLE may take over the work and may award another party an agreement to complete the work under this Agreement. 6.6 Delays 6.6.1 In the event the services of ENGINEER are suspended or delayed by CITY OF FAYETTEVILLE or by other events beyond ENGINEER's reasonable control, ENGINEER shall be entitled to additional compensation and time for reasonable costs incurred by ENGINEER in temporarily closing down or delaying the Project. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 6 Garver Contract- Professional Engineering Services 6/13/2025 6.7 Rights and Benefits 6.7.1 ENGINEER's services will be performed solely for the benefit of CITY OF FAYETTEVILLE and not for the benefit of any other persons or entities. 6.8 Dispute Resolution 6.8.1 Scope of Paragraph: The procedures of this Paragraph shall apply to any and all disputes between CITY OFF AYETTEVILLE and ENGINEER which arise from, or in any way are related to, this Agreement, including, but not limited to the interpretation of this Agreement, the enforcement of its terms, any acts, errors, or omissions of CITY OF FAYETTEVILLE or ENGINEER in the performance of this Agreement, and disputes concerning payment. 6.8.2 Exhaustion of Remedies Required: No action may be filed unless the parties first negotiate. If timely Notice is given under Paragraph 6.8.3, but an action is initiated prior to exhaustion of these procedures, such action shall be stayed, upon application by either party to a court of proper jurisdiction, until the procedures in Paragraphs 6.8.3 and 6.8.4 have been complied with. 6.8.3 Notice of Dispute 6.8.3.1 For disputes arising prior to the making of final payment promptly after the occurrence of any incident, action, or failure to act upon which a claim is based, the party seeking relief shall serve the other party with a written Notice; 6.8.3.2 For disputes arising within one year after the making of final payment, CITY OF FAYETTEVILLE shall give ENGINEER written Notice at the address listed in Paragraph 6.14 within thirty (30) days after occurrence of any incident, accident, or first observance of defect or damage. In both instances, the Notice shall specify the nature and amount of relief sought, the reason relief should be granted, and the appropriate portions of this Agreement that authorize the relief requested. 6.8.4 Negotiation: Within seven days of receipt of the Notice, the Project Managers for CITY OF FAYETTEVILLE and ENGINEER shall confer in an effort to resolve the dispute. If the dispute cannot be resolved at that level, then, upon written request of either side, the matter shall be referred to the President of ENGINEER and the Mayor of CITY OF FAYETTEVILLE or his designee. These officers shall meet at the Project Site or such other location as is agreed upon within 30 days of the written request to resolve the dispute. 6.9 CITY OF FAYETTEVILLE represents that it has sufficient funds or the means of obtaining funds to remit payment to ENGINEER for services rendered by ENGINEER. 6.10 Publications 6.10.1 Recognizing the importance of professional development on the part of ENGINEER's employees and the importance ofENGINEER's public relations, ENGINEER may prepare publications, such as technical papers, articles for periodicals, and press releases, pertaining to ENGINEER's services for the Project. Such publications will be provided to CITY OF FAYETTEVILLE in draft form for CITY OF FAYETTEVILLE' s advance review. CITY OF FAYETTEVILLE shall review such drafts promptly and provide CITY OF FAYETTEVILLE's comments to ENGINEER. CITY OF FAYETTEVILLE Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 7 Garver Contract- Professional Engineering Services 6/13/2025 may require deletion of proprietary data or confidential information from such publications, but otherwise CITY OF FAYETTEVILLE will not unreasonably withhold approval. The cost of ENGINEER's activities pertaining to any such publication shall be for ENGINEER's account. 6.11 Indemnification 6.11.1 CITY OF FAYETTEVILLE agrees that it will require all construction Contractors to indemnify, defend, and hold harmless CITY OF FAYETTEVILLE and ENGINEER from and against any and all loss where loss is caused or incurred or alleged to be caused or incurred in whole or in part as a result of the negligence or other actionable fault of the Contractors, or their employees, agents, Subcontractors, and Suppliers. 6.12 Ownership of Documents 6.12.1 All documents provided by CITY OF FAYETTEVILLE including original drawings, disks of CADD drawings and cross sections, estimates, specification field notes, and data are and remain the property of CITY OF FAYETTEVILLE. ENGINEER may retain reproduced copies of drawings and copies of other documents. 6.12.2 Engineering documents, drawings, and specifications prepared by ENGINEER as part of the Services shall become the property of CITY OF FAYETTEVILLE when ENGINEER has been compensated for all Services rendered, provided, however, that ENGINEER shall have the unrestricted right to their use. ENGINEER shall, however, retain its rights in its standard drawings details, specifications, databases, computer software, and other proprietary property. Rights to intellectual property developed, utilized, or modified in the performance of the Services shall remain the property of ENGINEER. 6.12.3 Any files delivered in electronic medium may not work on systems and software different than those with which they were originally produced. ENGINEER makes no warranty as to the compatibility of these files with any other system or software. Because of the potential degradation of electronic medium over time, in the event of a conflict between the sealed original drawings/hard copies and the electronic files, the sealed drawings/hard copies will govern. 6.13 Notices 6.13.1 Any Notice required under this Agreement will be in writing, addressed to the appropriate party at the following addresses: CITY OF FAYETTEVILLE's address: 125 West Mountain Street Fayetteville, Arkansas 72701 ENGINEER's address: 2049 E. Joyce Blvd, Suite 400 Fayetteville, Arkansas 72703 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 8 Garver Contract- Professional Engineering Services 6/13/2025 6.14 Successor and Assigns 6.14.1 CITY OF FAYETTEVILLE and ENGINEER each binds himself and his successors, executors, administrators, and assigns to the other party of this Agreement and to the successors, executors, administrators, and assigns of such other party, in respect to all covenants of this Agreement; except as above, neither CITY OF FAYETTEVILLE nor ENGINEER shall assign, sublet, or transfer his interest in the Agreement without the written consent of the other. 6.15 Controlling Law 6.15.1 This Agreement shall be subject to, interpreted and enforced according to the laws of the State of Arkansas without regard to any conflicts of law provisions. 6.16 Entire Agreement 6.16.1 This Agreement represents the entire Agreement between ENGINEER and CITY OF FAYETTEVILLE relative to the Scope of Services herein. Since terms contained in purchase orders do not generally apply to professional services, in the event CITY OF FAYETTEVILLE issues to ENGINEER a purchase order, no preprinted terms thereon shall become a part of this Agreement. Said purchase order document, whether or not signed by ENGINEER, shall be considered as a document for CITY OF FAYETTEVILLE' s internal management of its operations. SECTION 7 - SPECIAL CONDITIONS 7.1 Additional Responsibilities of ENGINEER 7.1.1 CITY OF FAYETTEVILLE's review, approval, or acceptance of design drawings, specifications, reports and other services furnished hereunder shall not in any way relieve ENGINEER of responsibility for the technical adequacy of the work. Neither CITY OF FAYETTEVILLE' s review, approval or acceptance of, nor payment for any of the services shall be construed as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement. 7.1.2 ENGINEER shall be and shall remain liable, in accordance with applicable law, for all damages to CITY OFF AYETTEVILLE caused by ENGINEER's negligent performance of any of the services furnished under this Agreement except for errors, omissions or other deficiencies to the extent attributable to CITY OF FAYETTEVILLE or CITY OF FAYETTEVILLE-fumished data. 7.1.3 ENGINEER's obligations under this clause are in addition to ENGINEER's other express or implied assurances under this Agreement or State law and in no way diminish any other rights that CITY OFF AYETTEVILLE may have against ENGINEER for faulty materials, equipment, or work. 7.2 Remedies 7.2.1 Except as may be otherwise provided in this Agreement, all claims, counter-claims, disputes and other matters in question between CITY OF FAYETTEVILLE and ENGINEER arising out of or relating to this Agreement or the breach thereof will be Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 decided in a court of competent jurisdiction within Arkansas. 7.3 Audit: Access to Records 7.3.1 ENGINEER shall maintain books, records, documents and other evidence directly pertinent to performance on work under this Agreement in accordance with generally accepted accounting principles and practices consistently applied in effect on the date of execution of this Agreement. ENGINEER shall also maintain the financial information and data used by ENGINEER in the preparation of support of the cost submission required for any negotiated agreement or change order and send to CITY OF FAYETTEVILLE a copy of the cost summary submitted. CITY OF FAYETTEVILLE, the State or any of their authorized representatives shall have access to all such books, records, documents and other evidence for the purpose of inspection, audit and copying during normal business hours. ENGINEER will provide proper facilities for such access and inspection. Notwithstanding anything to the contrary herein, ENGINEER's proprietary, financial information is not subject to audit. 7.3.2 Records under Paragraph 7.3.1 above shall be maintained and made available during performance on assisted work under this Agreement and until three years from the date of final payment for the project. In addition, those records which relate to any controversy arising out of such performance, or to costs or items to which an audit exception has been taken, shall be maintained and made available until three years after the date of resolution of such appeal, litigation, claim or exception. 7.3.3 This right of access clause (with respect to financial records) applies to: 7.3.3.1 Negotiated prime agreements: 7.3.3.2 Negotiated change orders or agreement amendments in excess of$10,000 affecting the price of any formally advertised, competitively awarded, fixed price agreement: 7.3.3.3 Agreements or purchase orders under any agreement other than a formally advertised, competitively awarded, fixed price agreement. However, this right of access does not apply to a prime agreement, lower tier subagreement or purchase order awarded after effective price competition, except: 7.3.3.3.1 With respect to record pertaining directly to subagreement performance, excluding any financial records of ENGINEER; 7.3.3.3.2 If there is any indication that fraud, gross abuse or corrupt practices may be involved; 7.3.3.3.3 If the subagreement is terminated for default or for convenience. 7.4 Covenant Against Contingent Fees 7.4.1 ENGINEER warrants that no person or selling agency has been employed or retained to solicit or secure this Agreement upon an agreement of understanding for a commission, percentage, brokerage or continent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by ENGINEER for the purpose of securing business. For breach or violation of this warranty, CITY OF FAYETTEVILLE shall have the right to annul this Agreement without liability or at its discretion, to deduct from the contract price or consideration, or otherwise recover, the full amount of such commission, percentage, brokerage, or contingent fee. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816  *UDWXLWLHV  ,I&,7<2))$<(77(9,//(ILQGVDIWHUDQRWLFHDQGKHDULQJWKDW(1*,1((5RUDQ\RI (1*,1((5¶V DJHQWV RU UHSUHVHQWDWLYHV RIIHUHG RU JDYH JUDWXLWLHV LQ WKH IRUP RI HQWHUWDLQPHQW JLIWV RU RWKHUZLVH  WR DQ\ RIILFLDO HPSOR\HH RUDJHQWRI&,7<2) )$<(77(9,//( LQ DQ DWWHPSW WR VHFXUH DQ DJUHHPHQW RU IDYRUDEOHWUHDWPHQWLQ DZDUGLQJDPHQGLQJRUPDNLQJDQ\GHWHUPLQDWLRQVUHODWHGWRWKHSHUIRUPDQFHRIWKLV $JUHHPHQW&,7<2))$<(77(9,//(PD\E\ZULWWHQQRWLFHWR(1*,1((5WHUPLQDWH WKLV$JUHHPHQW&,7<2))$<(77(9,//(PD\DOVRSXUVXHRWKHUULJKWVDQGUHPHGLHV WKDWWKHODZRUWKLV$JUHHPHQWSURYLGHV +RZHYHUWKHH[LVWHQFHRIWKHIDFWVRQZKLFK &,7<2))$<(77(9,//(EDVHVVXFKILQGLQJVKDOOEHLQLVVXHDQGPD\EHUHYLHZHGLQ SURFHHGLQJVXQGHUWKH5HPHGLHVFODXVHRIWKLV$JUHHPHQW  ,Q WKHHYHQWWKLV $JUHHPHQWLVWHUPLQDWHG DVSURYLGHG LQ 3DUDJUDSK &,7< 2) )$<(77(9,//(PD\SXUVXHWKHVDPHUHPHGLHVDJDLQVW(1*,1((5DVLWFRXOGSXUVXH LQWKHHYHQWRIDEUHDFKRIWKH$JUHHPHQWE\(1*,1((5 $VDSHQDOW\LQDGGLWLRQWRDQ\ RWKHUGDPDJHVWRZKLFKLWPD\EHHQWLWOHGE\ODZ&,7<2))$<(77(9,//(PD\SXUVXH GDPDJHVLQDQDPRXQWXSWRWKHOLPLWVVHWIRUWKLQ6HFWLRQEHORZ  $UNDQVDV)UHHGRPRI,QIRUPDWLRQ$FW  &LW\ FRQWUDFWV DQG GRFXPHQWV LQFOXGLQJ LQWHUQDO GRFXPHQWVDQGGRFXPHQWVRI VXEFRQWUDFWRUVDQGVXEFRQVXOWDQWVSUHSDUHGZKLOHSHUIRUPLQJ&LW\FRQWUDFWXDOZRUNDUH VXEMHFWWRWKH$UNDQVDV)UHHGRPRI,QIRUPDWLRQ$FW )2,$  ,ID)UHHGRPRI,QIRUPDWLRQ $FW UHTXHVW LV SUHVHQWHG WR WKH &,7< 2) )$<(77(9,//( (1*,1((5ZLOO GR HYHU\WKLQJSRVVLEOHWRSURYLGHWKHGRFXPHQWVLQDSURPSWDQGWLPHO\PDQQHUDVSUHVFULEHG LQWKH$UNDQVDV)UHHGRPRI,QIRUPDWLRQ$FW $&$†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±3URIHVVLRQDO(QJLQHHULQJ6HUYLFHV Digitally Signed 04/07/2026            [WRQ Appendix A - Scope of Services Kessler Mountain Regional Park, Phase 3 1 of 6 2503052 APPENDIX A - SCOPE OF SERVICES 1. General Generally, the scope of services includes environmental permitting, design, bidding, and construction phase services for design of Phase 3 of the Kessler Mountain Regional Park. Improvements will consist primarily of the design of two new soccer fields along with bleachers with overhead canopy, entrance traffic circle revisions, addition of on-street and site parking, drainage improvements, landscaping, artificial turf, and sports lighting,. 2. Surveys 2.1. Design Surveys Garver will utilize a topographic survey to be provided by the Owner.. 2.2. Property Surveys Garver will utilize the existing site boundary survey previously prepared by the Owner. 3. Geotechnical Services The Scope of Services excludes Geotechnical services. 4. Coordination Garver will furnish plans to all known utility owners potentially affected by the project through the Large Scale Development process. Garver shall provide coordination among all known affected utility owners to enable them to coordinate efforts for any necessary utility service & potential relocations. Garver will include the surveyed locations of the observable and marked utilities in the construction plans. Garver will distribute notification letters through mailings to adjacent property owners as required by the Large Scale Development process. Garver will also attend coordination meetings with the Owner and other agencies as required including a Pre-LSD Concept meeting with the City's Planning Department. Garver will prepare exhibits for these meetings when appropriate. 5. Environmental Services Wetland Delineation Surveys Garver will conduct a wetland delineation to determine the limits of potentially jurisdictional Waters of the United States, including streams, within the project limits. Each potentially jurisdictional feature will be mapped with a sub-meter GPS. ArcGIS Pro software will be utilized to create shapefiles for use in determining avoidance and minimization of impacts and permitting. The delineation will utilize methodologies outlined in the appropriate Regional Supplement to the U.S. Army Corps of Engineers (USAGE) Wetlands Delineation Manual. Garver will accomplish the following as part of the wetland delineation: • Review pertinent resources related to the project site's hydrology and soils, and review of historical topographic maps, aerial photographs, previously completed delineations, and original design plans. • Field survey of wetlands and streams within the project boundary. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Appendix A - Scope of Services Kessler Mountain Regional Park, Phase 3 2 of 6 2503052 • Create shapefiles from field-collected data to be utilized in wetland report exhibits and for quantification of wetland acreages and stream lengths within the project. • Completion of field data forms for wetlands and streams. Complete a wetland delineation report of findings that includes necessary documentation for submittal to the USAGE requesting concurrence with the delineation and appropriate Section 404 permit application. A Section 404 Nationwide permit is anticipated for this project and will be coordinated with the USAGE. Garver will estimate wetland impacts and complete a functional value assessment to determine mitigation credit needs. We will assist with locating an appropriate USAGE-approved mitigation bank and mitigation credit purchase. Garver will provide initial coordination with the following environmental agencies in support of the Section 404 NWP: • US Fish and Wildlife Service (USFWS) • Arkansas Historic Preservation Office (SHPO) • US Army Corps of Engineers (USAGE) Garver will complete a large site stormwater pollution prevention plan (SWPPP) and Notice of Intent (NOi) for DEQ approval. We will complete the written SWPPP and review the design for implementation of best management practices (BMPs). Garver will pay the initial SWPPP permitting fee and seek reimbursement. Additional, recurring annual fees for maintenance of the SWPPP will be paid by the City. Garver will coordinate the issuance of one Short Term Activity Authorization (STAA). The STAA fee will be paid by Garver for reimbursement. Section 401 and 404 Individual permitting and any mitigation planning beyond what is listed in this scope is considered extra work and can be completed upon receipt of a written amendment. 6. Traffic Study The Scope of Services excludes the preparation of a traffic study. 7. On-site Sewer Plant Close Out Garver will provide services for the removal of the existing on-site sewer plant. Included in this work is providing exhibits of infrastructure to demolish, specifying proper handling of residual sludges and biosolids within the existing system, details on plugging or removing pipes and leach fields, listing equipment to be salvaged and provided back to the city for handling, and submitting a Notice of Termination for the on-site treatment system with the Arkansas Department of Environmental Quality (ADEQ). Garver will conduct two site visits including a termination inspection with ADEQ to close out the wastewater permit. Connection to the existing Fayetteville sewer system has to be made prior to closeout of the wastewater permit. Deliverables will include: • Equipment salvage exhibit • ADEQ Notice of Termination forms for signature • ADEQ Notice of Termination approval letter Excluded from the scope is design of any connection of the existing sewer lines at Kessler Park to the City of Fayetteville's wastewater collection system or design of any new restroom facilities or sewer lines on the property. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Appendix A - Scope of Services Kessler Mountain Regional Park, Phase 3 3 of 6 2503052 8. Large Scale Development/Conceptual Design This conceptual submittal will be for the purpose of coordinating the proposed improvements with the Owner and the utility companies through the Large Scale Development process and developing an order of magnitude cost estimate for the project. More specifically, the scope includes: • Cover and Index Sheet • General Notes, Legend and Survey Control • Vicinity Map • Adjacent Parcel Index • Parcel Map • Tract Survey Sheet o Utilizing Tract Survey information as prepared by the City on April 22, 2014. • Site Layout Plan Sheets o Soccer Field/Park Area o Entrance Road Revisions at Traffic Circle o Entrance Road Typical Section o On-Street/Expanded Parking • Grading and Drainage Sheets o Soccer Field/Park Area o Entrance Road Revisions at Traffic Circle o On-Street/Expanded Parking o Detention Pond Revisions • Site Details • Concept Planting Plan • Update Existing Tree Preservation Plan o Utilizing the previously prepared Tree Preservation Plan from Phase 1 • Conceptual Electrical Layout • Quantities • Opinion of Probable Construction Costs • Preliminary Drainage Report • Attend Subdivision Committee meetings • Comment response form from Subdivision Committee review • Attend Planning Commission Meetings • Comment response form from Planning Commission review Garver will incorporate comments from the Owner in the Preliminary Design. Garver will proceed with Preliminary Design after the Conceptual Design and Large Scale Development is approved by the Owner in writing. 9. Preliminary Design Once Garver receives written approval from Owner on Conceptual Design, Garver will begin Preliminary Design. The Preliminary Design phase submittal will include: • All plan sheets from the Conceptual Design progressed to 60% design. • Erosion Control Plans • Cut Sheets for Major Products (Bleachers, shade structures, synthetic turf, etc.) • Opinion of Probable Construction Cost Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Appendix A - Scope of Services Kessler Mountain Regional Park, Phase 3 4 of 6 2503052 The preliminary design phase will represent approximately 60 percent of final construction contract plans. This submittal will not include technical specifications or "front end" contract documents. Garver will incorporate comments from the Owner on the Preliminary Design in the Final Design. Garver will proceed with Final Design after the Preliminary Design is approved by the Owner in writing. 10. Final Design Once Garver receives written approval from Owner on Preliminary Design, Garver will begin Final Design. During the final design phase of the project, Garver will conduct final designs to prepare construction plans and specifications, for one construction contract, including Construction Documents for the Building Plans, final site development plans, construction details and quantities, special provisions, and opinion of probable construction cost. Garver will also make any needed plan changes as a result of the final plan reviews and prepare the construction documents as required to advertise for bids. The Final Design phase submittal will include: • All plan sheets from the Preliminary Design progressed to 90% design. • Maintenance of Traffic Plans for traffic circle revisions • Demolition Plans • Final Drainage Report • Project Manual and Technical Specifications • Opinion of Probable Construction Cost structured to match bid form with up to three (3) deductive alternates. 11. Property Acquisition Documents The preparation of Property Acquisition Documents are not anticipated for this project. 12. Bidding Services During the bidding phase of the project, Garver will: A. Support the contract documents by preparing addenda and responding to RFls as appropriate. B. Participate in a pre-bid meeting. C. Attend the bid opening. D. Evaluate bids and recommend award. 13. Construction Phase Services During the construction phase of work, Garver will accomplish the following: A. Issue a Notice to Proceed letter to the Contractor and attend preconstruction meeting. B. Evaluate and respond to construction material submittals and shop drawings. Corrections or comments made by Garver on the shop drawings during this review will not relieve Contractor from compliance with requirements of the drawings and specifications. The check will only be for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The Contractor will be responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of all other trades, and performing his work in a safe and satisfactory manner. Garver's review shall not constitute approval of safety precautions or constitute approval of construction means, methods, techniques, sequences, procedures, or assembly of various components. When certification of performance characteristics of materials, systems or equipment is required by the Contract Documents, either directly or implied for a complete and workable system, Garver shall be entitled to rely upon such Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Appendix A - Scope of Services Kessler Mountain Regional Park, Phase 3 5 of 6 2503052 submittal or implied certification to establish that the materials, systems or equipment will meet the performance criteria required by the Contract Documents. C. Issue instructions to the Contractor on behalf of the Owner and issue necessary clarifications (respond to RFls) regarding the construction contract documents. D. Review the Contractor's progress payment requests based on the quantities provided by the Contractor of contract items completed and accepted by the Owner and make a recommendation to the Owner regarding payment. Garver's recommendation for payment will not be a representation that Garver has made inspections to (1) check the quality or exact quantities of the Work; (2) to review billings from Subcontractors and material suppliers to substantiate the Contractor's right to payment; or (3) to ascertain how the Contractor has used money previously paid to the Contractor. E. Provide limited onsite observation services for the 300-calendar-day construction contract performance time. The proposed fee is based on an average of 2 hours per week during the 300-calendar-day construction contract performance time. If the construction time extends beyond the time established in this agreement or if the Owner wishes to increase the time or frequency of the observation, the Owner will pay Garver an additional fee agreed to by the Owner and Garver. F. When authorized by the Owner, prepare change orders for changes in the work from that originally provided for in the construction contract documents. If redesign or substantial engineering or surveying is required in the preparation of these change order documents, the Owner will pay Garver an additional fee to be agreed upon by the Owner and Garver. G. Participate in final project inspection, prepare punch list, review final project closing documents, and submit final pay request. Onsite construction observation will be provided by Garver's Project Manager or representative who will provide or accomplish the following: A. Consult with and advise the Owner during the construction period. B. Coordinate with the firm providing construction materials quality assurance testing under separate contract with the Owner. C. Maintain a project diary which will contain information pertinent to each site visit. The proposed fee for Construction Phase Services is based on a 300-calendar-day construction contract performance time. If the construction time extends beyond the time established in this agreement, and the Owner wants Garver to continue the applicable Construction Phase Services, the Owner will pay Garver an additional fee agreed to by the Owner and Garver. In performing onsite observation, Garver will endeavor to protect the Owner against defects and deficiencies in the work of the Contractor(s); but Garver cannot guarantee the performance of the Contractor(s), nor be responsible for the actual supervision of construction operations or for the safety measures that the Contractor(s) takes or should take. However, if at any time during construction Garver observes that the Contractor's work does not comply with the construction contract documents, Garver will notify the Contractor of such non-compliance and instruct him to correct the deficiency and/or stop work, as appropriate for the situation. Garver will also record the observance, the discussion, and the actions taken. If the Contractor continues without satisfactory corrective action, Garver will notify the Owner immediately, so that appropriate action under the Owner's contract with the Contractor can be taken. 14. Project Deliverables The following will be submitted to the Owner, or others as indicated, by Garver: D. Digital copies of the Conceptual Design/Large Scale Development Plans with opinion of probable construction cost. E. Digital copies of the Preliminary Design with opinion of probable construction cost. F. One digital copy of the Preliminary Plans to each potentially affected utility company. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Appendix A - Scope of Services Kessler Mountain Regional Park, Phase 3 6 of 6 2503052 G. Digital copies of the Final Design with opinion of probable construction cost. H. Digital copies of the revised Final Design with opinion of probable construction cost. I. One digital copy of the revised Final Plans to each potentially affected utility company. J. Three copies of the Final Plans (1 Full Size, 2 half size) and Specifications to the Contractor. K. Electronic files as requested including CAD drawings in AutoCad file format. 15. Extra Work The following items are not included under this agreement but will be considered as extra work: L. Redesign for the Owner's convenience or due to changed conditions after previous alternate direction and/or approval. M. Submittals or deliverables in addition to those listed herein. N. Pavement Design. The intent is to utilize pavement design from previous phases. 0. Design of any utility extensions or relocations other than private electrical. P. Topographic and Boundary Survey. Q. Significant structural design. R. Environmental Handling and Documentation, including other work related to environmentally or historically (culturally) significant items. S. Coordination with FEMA and preparation/submittal of a CLOMR and/or LOMR. T. Section 401 and 404 Individual permitting and mitigation planning beyond what is listed herein. U. Section 106 consultation and Phase I, 11, and Ill cultural resources surveys. V. Section 7 consultation beyond what is listed herein, including any presence/absence surveys. W. Water and Sewer design and associated ADH permitting outside on-site sewer plant closeout as provided herein. X. Record Drawings Extra Work will be as directed by the Owner in writing for an additional fee as agreed upon by the Owner and Garver. 16. Schedule Garver shall begin work under this Agreement within ten (10) days of a Notice to Proceed and shall complete the work in accordance with the schedule below: Phase Description Calendar Days Conceptual Design Parks Dept. Review of Conceptual City LSD Process Preliminary Design Parks Dept. Review of Preliminary Final Design Parks Dept. Review of Final 45 days from Notice to Proceed Estimated 14 Days 45 days from Owner Approval of Conceptual Design 60 days from approval of Large Scale Development Plans Estimated 14 Days 60 days from approval of Preliminary Design Estimated 14 Days Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX B City of Fayetteville Kessler Mountain Regional Park Phase 3 FEE SUMMARY Title I Service Estimated Fees Environmental $ 15,850.00 On-Site Sewer Plant Closeout $ 15,150.00 Large Scale DevelopmenUConceptual Plans $ 89,250.00 Preliminary Design $ 101,150.00 Final Design $ 93,600.00 Bidding Services $ 8,000.00 Subtotal for Title I Service $ 323,000.00 Title II Services Construction Materials Testing $ Construction Phase Services $ 50,000.00 Subtotal for Title II Services $ 50,000.00 FEE TOTAL $373,000.00 https://garverengineers.sharepoint.com/sites/KesslerPhase3-Transportation/Shared Documents/Kessler Phase 3/Exhibit B - Garver Fee Spreadsheet - Kessler Phase 3 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX B City of Fayetteville Kessler Mountain Regional Park Phase 3 ENVIRONMENTAL WORK TASK DESCRIPTION ES-5 ES-4 ES-3 ES-2 ES-1 T14 - Trans RC Planning & Envir T14 - Trans RC Planning & Envir T14 - Trans RC Planning & Envir T14 - Trans RC Planning & Envir T14 - Trans RC Planning & Envir $277.00 $219.00 $194.00 $151.00 $119.00 hr hr hr hr hr 1. Wetland Delineation and Permitting Wetland Delineation, Report, GIS 12 32 Section 404 Nationwide Permitting 1 12 8 Agency Coordination 4 SWPPP and STAA (1) 1 10 8 QC Reviews and Project Management 6 2 Permitting 8 0 40 0 48 Hours 8 0 40 0 48 Salary Costs $2,216.00 $0.00 $7,760.00 $0.00 $5,712.00 SUBTOTAL - SALARIES: $15,688.00 DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly $22.00 GPS Equipment $40.00 Travel Costs $100.00 SUBTOTAL - DIRECT NON-LABOR EXPENSES: $162.00 SUBTOTAL: $15,850.00 SUBCONSULTANTS FEE: $0.00 TOTAL FEE: $15,850.00 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX B City of Fayetteville Kessler Mountain Regional Park Phase 3 ON-SITE SEWER PLANT CLOSEOUT WORK TASK DESCRIPTION E-5 E-2 E-5 E-2 W01 - Water Arkansas W01 - Water Arkansas T21 - Trans NW AR Muni T21 - Trans NW AR Muni $272.00 $171.00 $272.00 $171.00 hr hr hr hr 1. Project Management Administration and Coordination 4 1 Quality Control Review 4 1 Coordination Meetings with ADEQ 2 2 Subtotal - Project Management 10 2 1 1 2. Civil Engineering Salvage Exhibit 6 8 Site Visits 8 8 Notification Letter to ADEQ 2 8 ADEQ NOT Form & Closure Plan 4 12 Subtotal - Civil Engineering 20 36 0 0 Hours 30 38 Salary Costs $8,160.00 $6,498.00 $272.00 $171.00 SUBTOTAL - SALARIES: $15,101.00 DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly $20.00 Travel Costs $29.00 SUBTOTAL - DIRECT NON-LABOR EXPENSES: $49.00 SUBTOTAL: $15,150.00 SUBCONSULTANTS FEE: $0.00 TOTAL FEE: $15,150.00 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX 8 City of Fayetteville Kessler Mountain Regional Park Phase 3 LARGE SCALE DEVELOPMENT/CONCEPTUAL PLANS WORK TASK DESCRIPTION E-5 E-2 E-1 E-4 E-1 T-2 E-4 E-2 T21 -Trans NWAR Muni T21 - Trans NW AR Muni T21 - Trans NW AR Muni F02- Federal Landscane F02- Federal Landscane T21 -Trans NWAR Muni B16 - Buildings MEP Design B16 B16 - Buildings MEP Design B16 $272.00 $171.00 $146.00 $223.00 $146.00 $127.00 $223.00 $171.00 hr hr hr hr hr hr hr hr 1. Project Management/LSD Coordination Administration/Invoicing 4 Quality Control Review 16 4 1 Coordination Meetings w/Parks 8 8 4 Pre- LSD Concept Meeting w/Planning Department 4 4 4 Subdivision Committee Submittal/Meeting 4 4 Planning Commission Submittal/Meeting 4 4 Franchise Utility Coordination 4 Notification Letters to Adjacent Property Owners 4 4 Subtotal - Project Management/LSD Coordination 40 24 4 12 0 4 1 0 2. Civil Engineering Design PreliminaCi La�out Design Soccer Field/Park Area 4 12 4 16 Entrance Road Revisions at Traffic Circle 4 8 On-Street/Expanded Parking 4 8 PreliminaQL Grading Design Soccer Field/Park Area 8 32 Entrance Road Revisions at Traffic Circle 4 16 On-Street/Expanded Parking 6 16 Prelimina[Y Drainage/Detention Design Update Hydrologic Model 4 12 Update Hydraulic Model (Design Pipe/Ditch systems) 8 24 Update Hydraulic Model (Design Detention Pond(s)) 6 24 Subtotal - Civil Engineering Design 0 48 152 4 16 0 0 0 3. Civil Plans and Reports Cover and Index Sheet 1 2 4 General Notes, Legend and Survey Control 1 2 4 Vicinity Map 1 2 2 Adjacent Parcel Index 1 2 2 Parcel Map 1 2 2 Tract Survey Sheet 1 2 4 Site Layout Plan Sheets Soccer Field/Park Area 2 8 8 Entrance Road Revisions at Traffic Circle 2 8 8 Entrance Road Typical Section 1 2 4 On-Street/Expanded Parking 2 4 8 Grading and Drainage Sheets Soccer Field/Park Area 1 8 8 Entrance Road Revisions at Traffic Circle 1 6 8 On-Street/Expanded Parking 1 6 8 Detention Pond Revisions 1 6 4 Site Details 1 4 8 Quantities 4 8 4 Opinion of Probable Construction Cost 2 4 Preliminary Drainage Report for LSD submittal 4 12 8 Subtotal - Civil Plans and Reports 0 28 88 0 0 94 0 0 4. Landscape Architecture Prepare Concept Planting Plan 2 16 Update Existing Tree Preservation Plan 2 4 2 Subtotal - Landscape Architecture 0 0 0 4 20 2 0 0 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX 8 City of Fayetteville Kessler Mountain Regional Park Phase 3 LARGE SCALE DEVELOPMENT/CONCEPTUAL PLANS WORK TASK DESCRIPTION E-5 E-2 E-1 E-4 E-1 T-2 E-4 E-2 T21 -Trans NWAR Muni T21 - Trans NW AR Muni T21 - Trans NW AR Muni F02- Federal Landscane F02- Federal Landscane T21 -Trans NWAR Muni B16 - Buildings MEP Design B16 B16 - Buildings MEP Design B16 $272.00 $171.00 $146.00 $223.00 $146.00 $127.00 $223.00 $171.00 hr hr hr hr hr hr hr hr 5. Conceptual Electrical Concept Layouts 2 2 Code Analysis 1 Initial Utility Coordination/ Meeting 3 2 Specifications 2 Opinion of Probable Construction Cost 2 Internal Coordination Subtotal - Conceptual Electrical 0 0 0 0 0 0 8 6 Hours 40 100 244 20 36 100 9 6 Salary Costs $10,880.00 $17,100.00 $35,624.00 $4,460.00 $5,256.00 $12,700.00 $2,007.00 $1,026.00 SUBTOTAL· SALARIES: $89,053.00 DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly $50.00 Postage/Freight/Courier $78.00 Travel Costs $69.00 SUBTOTAL· DIRECT NON-LABOR EXPENSES: $197.00 SUBTOTAL: SUBCONSULTANTS FEE: $89,250.00 $0.00 TOTAL FEE: $89,250.00 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX B City of Fayetteville Kessler Mountain Regional Park Phase 3 PRELIMINARY DESIGN WORK TASK DESCRIPTION E-5 E-2 E-4 E-1 E-1 T-2 E-4 E-2 T21 - Trans NW AR Muni T21 - Trans NWAR Muni F02 - Federal Landscape F02 - Federal Landscape T21 - Trans NW AR Muni T21 - Trans NWAR Muni B16 - Buildings MEP Design B16 B16 - Buildings MEP Design B16 $272.00 $171.00 $223.00 $146.00 $146.00 $127.00 $223.00 $171.00 hr hr hr hr hr hr hr hr 1. Project Management Administration/Invoicing 4 Quality Control Review 24 1 Coordination Meetings w/Parks 8 8 2 1 8 Franchise Utility Coordination 4 2 Subtotal - Project Management 36 12 2 1 0 0 11 0 2. 60% Civil Engineering Design 60% Layout Design Soccer Field/Park Area 4 2 16 8 Entrance Road Revisions at Traffic Circle 4 8 On-StreeUExpanded Parking 4 8 60% Grading Design Soccer Field/Park Area 8 24 Entrance Road Revisions at Traffic Circle 8 24 On-StreeUExpanded Parking 8 24 60% Drainage/Detention Design Update Hydrologic Model 2 4 Update Hydraulic Model (Design Pipe/Ditch systems) 4 24 Update Hydraulic Model (Design Detention Pond(s)) 4 24 60% Erosion Control/BMP Design Soccer Field/Park Area 4 4 Entrance Road Revisions at Traffic Circle 4 4 On-StreeUExpanded Parking 4 4 60% Misc. Detail DeveloQment Fencing/Catch Netting 1 4 Bleachers/Shade Structure 1 4 BenchesfTrash Cans/Goals 1 4 LID Features 4 4 Turf Subgrade/Drainage 2 4 2 Special Signage 1 1 1 1 Subtotal - 60% Civil Engineering Design 0 51 8 33 167 12 0 0 3. Civil Plans and Reports Cover and Index Sheet 1 General Notes, Legend and Survey Control 1 Vicinity Map 0.5 Adjacent Parcel Index 0.5 Parcel Map 0.5 Tract Survey Sheet 0.5 Site Layout Plan Sheets Soccer Field/Park Area 2 2 8 8 8 Entrance Road Revisions at Traffic Circle 2 8 8 Entrance Road Typical Section 2 2 4 On-StreeUExpanded Parking 2 4 8 Grading and Drainage Sheets Soccer Field/Park Area 2 8 12 Entrance Road Revisions at Traffic Circle 2 6 12 On-StreeUExpanded Parking 2 6 12 Detention Pond Revisions 2 4 4 Miscellaneous Details 2 2 4 4 16 Cut Sheets for Major Products (Bleachers, shade structures, synthetic turf, etc.) 2 4 4 2 8 Erosion Control Plans Soccer Field/Park Area 1 2 4 Entrance Road Revisions at Traffic Circle 1 2 2 On-StreeUExpanded Parking 1 2 4 Quantities 4 8 4 Opinion of Probable Construction Cost 2 4 Subtotal - Civil Plans and Reports 0 29 8 16 70 110 0 0 4. Landscape Architecture Develop Turf Plan for North Field 2 8 Develop Landscape Plans 4 Prepare Preliminary Specifications 2 2 Opinion of Probable Construction Cost 1 1 Subtotal - Landscape Architecture 0 0 5 15 0 0 0 0 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX B City of Fayetteville Kessler Mountain Regional Park Phase 3 PRELIMINARY DESIGN WORK TASK DESCRIPTION E-5 E-2 E-4 E-1 E-1 T-2 E-4 E-2 T21 - Trans NW AR Muni T21 - Trans NWAR Muni F02 - Federal Landscape F02 - Federal Landscape T21 - Trans NW AR Muni T21 - Trans NWAR Muni B16 - Buildings MEP Design B16 B16 - Buildings MEP Design B16 $272.00 $171.00 $223.00 $146.00 $146.00 $127.00 $223.00 $171.00 hr hr hr hr hr hr hr hr 15. 60% Electrical Preliminary Plans 2 4 30 Preliminary Details 2 3 Specifications 4 Opinion of Probable Construction Cost 2 Subtotal • 60% Electrical 0 0 0 0 0 4 10 33 Hours 36 92 23 65 237 126 21 33 Salary Costs $9,792.00 $15,732.00 $5,129.00 $9,490.00 $34,602.00 $16,002.00 $4,683.00 $5,643.00 SUBTOTAL - SALARIES: $101,073.00 DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly $55.00 Travel Costs $22.00 SUBTOTAL - DIRECT NON-LABOR EXPENSES: $77.00 SUBTOTAL: $101,150.00 SUBCONSULTANTS FEE: $0.00 TOTAL FEE: $101,150.00 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIXB City of Fayetteville Kessler Mountain Regional Park Phase 3 FINAL DESIGN WORK TASK DESCRIPTION E-5 E-2 E-1 T-2 E-4 E-2 E-4 E-1 T21 • Trans NW AR Muni T21 • Trans NW AR Muni T21 • Trans NW AR Muni T21 • Trans NW AR Muni c ,o • cuuu,.,�s MEP Design C ,a o 10 - 0UIIUl11�,e, MEP Design �•e v,. Federal F02 • Federal Landscape $272.00 $171.00 $146.00 $127.00 $223.00 $171.00 $223.00 $146.00 hr hr hr hr hr hr hr hr 1. Project Management Administration/Invoicing 4 Quality Control Review 24 2 Coordination Meetings w/Parks 4 4 1 4 Franchise Utility Coordination 4 2 Stamp Plans/Issue IFC Plans and Specs 2 2 Subtotal - Project Management 32 10 0 0 5 0 6 0 2. 90% Civil Engineering Design 90% Layout Design Soccer Field/Park Area 2 8 2 2 Entrance Road Revisions at Traffic Circle 2 8 On-StreeVExpanded Parking 2 8 90% Grading Design Soccer Field/Park Area 8 24 Entrance Road Revisions at Traffic Circle 6 16 On-StreeVExpanded Parking 6 16 90% Drainage/Detention Design Update Hydrologic Model 2 4 Update Hydraulic Model (Design Pipe/Ditch systems) 6 16 Update Hydraulic Model (Design Detention Pond(s)) 6 16 90% Erosion Control/BMP Design Soccer Field/Park Area 2 4 Entrance Road Revisions at Traffic Circle 2 4 On-StreeVExpanded Parking 2 4 90% Misc. Detail Develo12ment Fencing/Catch Netting 1 2 Bleachers/Shade Structure 1 2 Benches/Trash Cans/Goals 1 2 LID Features 4 6 Turf Subgrade/Drainage 2 2 4 Special Signage 1 1 1 Maintenance of Traffic Design for Entrance Road 2 4 Subtotal - 90% Civil Engineering Design 0 52 141 0 0 0 8 13 3. Civil Plans and Reports Cover and Index Sheet 1 General Notes, Legend and Survey Control 1 Vicinity Map 0.5 Adjacent Parcel Index 0.5 Parcel Map 0.5 Tract Survey Sheet 0.5 Site La�out Plan Sheets Soccer Field/Park Area 2 4 4 2 6 Entrance Road Revisions at Traffic Circle 2 4 4 Entrance Road Typical Section 1 1 2 On-StreeVExpanded Parking 2 4 4 Grading and Drainage Sheets Soccer Field/Park Area 2 6 8 Entrance Road Revisions at Traffic Circle 2 4 6 On-StreeVExpanded Parking 2 4 4 Detention Pond Revisions 2 4 4 Miscellaneous Details 2 4 8 2 4 Erosion Control Plans Soccer Field/Park Area 1 2 2 Entrance Road Revisions at Traffic Circle 1 2 2 On-StreeVExpanded Parking 1 2 2 Maintenance of Traffic Plans 2 4 4 Demolition Plans 2 4 4 Quantities 4 8 4 Opinion of Probable Construction Cost 2 4 Final Drainage Report 8 16 8 Project Specifications/Manual 4 16 Address Owner Comments on 90% Submittal 2 8 8 2 8 Subtotal - Civil Plans and Reports 0 44 101 82 0 0 6 18 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX B City of Fayetteville Kessler Mountain Regional Park Phase 3 FINAL DESIGN WORK TASK DESCRIPTION E-5 E-2 E-1 T-2 E-4 E-2 E-4 E-1 T21 • Trans NW AR Muni T21 • Trans NW AR Muni T21 • Trans NW AR Muni T21 • Trans NW AR Muni c , o • cuuu,.,�s MEP Design C ,a o 10 - 0UIIUl11�,e, MEP Design �•e v,. Federal F02 • Federal Landscape $272.00 $171.00 $146.00 $127.00 $223.00 $171.00 $223.00 $146.00 hr hr hr hr hr hr hr hr 4. Landscape Architecture Finalize landscape plans 4 Finalize landscape details 1 Finalize specifications 2 2 Opinion of Probable Const. Cost/ Final Quantities 1 1 Subtotal - Landscape Architecture 0 0 0 0 0 0 3 8 5. 90% Electrical Final Electrical Plans 4 20 Final Electrical Details 16 Final Electrical Specifications 8 Opinion of Probable Construction Cost 1 Subtotal • 90% Electrical 0 0 0 0 13 36 0 0 Hours 32 106 242 82 18 36 23 39 Salary Costs $8,704.00 $18,126.00 $35,332.00 $10,414.00 $4,014.00 $6,156.00 $5,129.00 $5,694.00 SUBTOTAL· SALARIES: $93,569.00 DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly $15.00 Travel Costs $16.00 SUBTOTAL· DIRECT NON-LABOR EXPENSES: $31.00 SUBTOTAL: $93,600.00 SUBCONSULTANTS FEE: $0.00 TOTAL FEE: $93,600.00 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIXB City of Fayetteville Kessler Mountain Regional Park Phase 3 BIDDING SERVICES WORK TASK DESCRIPTION E-5 E-2 E-1 E-4 E-2 E-4 E-1 T21 - Trans NW AR Muni T21 - Trans NW AR Muni T21 -Trans NWAR Muni U U - UUIIUll 1�-" MEP_Design U U - UUIIUll 1�-" MEP_Design F02 - Federal Landscape F02 - Federal Landscape $272.00 $171.00 $146.00 $223.00 $171.00 $223.00 $146.00 hr hr hr hr hr hr hr 1. Civil Engineering Dispense plans and specs to prospective bidders - N/A Addendums/lnquiries 16 4 12 Pre-Bid Meeting Assistance 1 2 1 Bid Opening 1 1 Prepare bid tabulation - N/A Evaluate bids and recommend award Prepare construction contracts - N/A Notice to Proceed - N/A Subtotal - Civil Engineering 2 19 0 4 0 13 0 Hours 2 19 0 4 0 13 0 Salary Costs $544.00 $3,249.00 $0.00 $892.00 $0.00 $2,899.00 $0.00 SUBTOTAL - SALARIES: $7,584.00 DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly $416.00 Travel Costs $0.00 SUBTOTAL - DIRECT NON-LABOR EXPENSES: SUBTOTAL: SUBCONSULTANTS FEE: TOTAL FEE: $416.00 $8,000.00 $0.00 $8,000.00 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX B City of Fayetteville Kessler Mountain Regional Park Phase 3 CONSTRUCTION PHASE SERVICES WORK TASK DESCRIPTION E-5 E-2 E-1 E-4 E-2 E-4 E-1 T21 - Trans NWAR Muni T21 - Trans NW AR Muni T21 - Trans NWAR Muni L, , v - cu11umgs MEP Design n•e B16 - Buildings MEP Design B16 F02 - Federal Landscape F02 - Federal Landscape $272.00 $171.00 $146.00 $223.00 $171.00 $223.00 $146.00 hr hr hr hr hr hr hr 1. Project Management Preconstruction Meeting 2 2 2 2 Monthly Pay Requests (10 pay requests) 4 20 Shop Drawings/Material Submittals/RFls 4 16 24 2 4 12 24 On-Site Progress Observation (2 hrs per week - 10 months) 10 30 Prepare Change/Field Orders 16 16 2 4 8 8 Final Project Inspection and Punchlist 4 4 4 4 Construction Progress Meetings (1 per month for 10 months) 8 12 8 Contractor Coordination 3 8 Subtotal - Project Management 35 108 40 10 8 34 32 Hours 35 108 40 10 34 32 Salary Costs $9.520.00 $18.468.00 $5.840.00 $2.230.00 $1.368.00 $7.582.00 $4.672.00 SUBTOTAL - SALARIES: $49,680.00 DIRECT NON-LABOR EXPENSES Document Printing/Reproduction/Assembly $0.00 Travel Costs SUBTOTAL - DIRECT NON-LABOR EXPENSES: $320.00 $320.00 SUBTOTAL: $50,000.00 SUBCONSULTANTS FEE: $0.00 TOTAL FEE: $50,000.00 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 SELECTION COMMITTEE - VOTING RESULTS CITY OF FAYETTEVILLE Selection Description: RFQ 26-01, Selection 6 - ARKANSAS Kessler Park Design - Phases 3 & 4 Selection Committee Date/Time: 5/12/2026 at 11:00 AM via Zoom Firms are listed in alphabetical order Overall RANK 2 3 Crafton, Tull & Associates, Inc Garver, LLC Halff Associates, Inc 1st 2nd \\\\ \ 3rd \ \l \ \ OVERALL RANK SUMMARY SCORING 1st ranked firm: 2nd ranked firm: 3rd ranked firm: Tallied by: Kenn Treve1Young,Pcurement Agent Date: --- l°I z.to Date: _5_--'/ '\ 9 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Page 1 of 3 pages Vendor: Garver, LLC RFQ 26-01 Addendum 1 CI TY OF FAYETTEVILL ARKANSAS Event Information Number: Title: Type: Issue Date: Deadline: Notes: RFQ 26-01 Addendum 1 Engineering and Architectural Services Request for Qualifications 11/23/2025 12/18/2025 02:00 PM (CT) The City of Fayetteville, Arkansas, is requesting statements of qualifications from firms interested in providing engineering, architectural, & land surveying services for 2026 street, drainage, bridge, water & sewer, trails, parks, and other projects. All questions regarding the process shall be directed to Kenny Fitch at kfitch@fayetteville-ar.gov. Contact Information Contact: Kenny Fitch Address: Procurement Room 306 City Hall 113 West Mountain Street - Room 306 Fayetteville, AR 72701 Email: kfitch@fayetteville-ar.gov Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Page 2 of 3 pages Vendor: Garver, LLC RFQ 26-01 Addendum 1 By submitting your response, you certify that you are authorized to represent and bind your company. Krysten Marshall KSMarshall@GarverUSA.com Signature Submitted at 12/18/2025 11:43:16 AM (CT) Email Requested Attachments Garver Response_RFQ 26-01, RFQ 26-01, Engineering and Architectural Services Engineering & Architectural Services.pdf Please attach the signed and completed RFQ form, located in the 'Attachments' tab, along with statement of qualifications. Response Attachments Section D_RFQ 26-01, Engineering & Architectural Services.pdf Section D form, acknowledging Addendum 1 Bid Attributes 1 Check Yes or No: Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently boycott Israel and will not boycott Israel during any time in which they are entering into, or while in contract, with any public entity as defined in §25-1-503. If at any time during contract the contractor decides to boycott Israel, the contractor must notify the contracted public entity in writing. � Yes, I agree D No, I don't agree 2 Check Yes or No: Pursuant Arkansas Code Annotated §25-1-1002, the Contractor agrees and certifies that they do not currently boycott Energy, Fossil Fuel, Firearms, and Ammunition Industries during any time in which they are entering into, or while in contract, with any public entity as defined in §25-1-1002. If at any time during the contract the contractor decides to boycott Energy, Fossil Fuel, Firearms, and/or Ammunition Industries, the contractor must notify the contracted public entity in writing. � Yes, I agree D No, I don't agree Garver, LLC Information Contact: Jeff Webb Address: 2049 E. Joyce Blvd. Suite 105 Fayetteville, AR 72703 Phone: (479)527-9100 Email: djwebb@garverusa.com Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Page 3 of 3 pages Vendor: Garver, LLC RFQ 26-01 Addendum 1 3 Addendum Acknowledgement By selecting "I agree", you acknowledge that you have read all addendum(s) that have been issued for this solicitation, if applicable. � I agree Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 CITY OF FAYETTEVILLE ARKANSAS STATEMENT OF QUALIFICATIONS RFQ 26-01, Engineering & Architectural Services December18,2025 _!jGARVER Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 2049 E. Joyce Blvd., Suite 105 Fayetteville, AR 72703 TEL 479-527-9100 FAX 479-527-9101 www.GarverUSA.com December 18, 2025 Kenny Fitch, Senior Procurement Agent City of Fayetteville 113 W. Mountain Street, Room 306 Fayetteville, AR 72701 Re: RFQ 26-01, Engineering & Architectural Services Dear Mr. Fitch, As the population of Fayetteville and Northwest Arkansas continues to swell, sustainable infrastructure projects are vital for progress and to maintain the good quality of life that draws people here. Those projects require strategic coordination with a qualified, experienced team of professionals who understand your municipal footprint, your challenges, and your goals, and who have a proven track record of delivering solutions that fit your needs. We're committed to being that team, and we have the capabilities and resources ready to continue providing service you can count on. We're the go-to team for responsive service. Our Northwest Arkansas office locations are convenient, but we never rely on proximity alone. We communicate proactively to make your job easier and to get ahead of any potential issues. Whether through phone calls or emails, in-person and virtual meetings, or site visits, we communicate effectively and efficiently to keep projects on track, address concerns, answer questions, and offer input whenever needed. This is a leading characteristic of our personalized, "small-firm" approach to client service. We offer comprehensive professional services. Our capabilities include design, planning, modeling, permitting, and more. Qualified experts in transportation, water and wastewater, aviation, field services (construction and survey), and other development disciplines have the technical competence to comprehensively address City projects of any type. In addition to in-depth capability, we have the staff capacity and resources available to complete your projects on time and without interruption. Our proven track record of delivering for you, and our familiarity with City projects, make us adept navigators of area requirements and regulations. Our partnership with you goes back more than 20 years. That valuable experience provides us with insight and familiarity we leverage to your benefit. Many of the successful projects we've completed together can be seen at a glance on page 24 of this submittal, and they demonstrate our ability to deliver any type or size of project the City requires. We're committed to being the team you trust to help you address current and coming challenges of population growth and more. Select the Garver team for upcoming project needs. We're ready to continue our successful partnership with you into 2026. Please contact Jerry Martin at 479-287-4653 or at JTMartin@GarverUSA.com if you have any questions or need additional information. Sincerely, Garver Jerry Martin, PE Arkansas Water Leader Zach Moore, PE Kyle Bennett, PE Transportation Team Leader Aviation Team Leader Seth Yancey, PE Field Services Team Leader Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 1 � � ! <S U- u � ' � � } -r L t � � ca i �� � I � Garver has provided innovative, sustainable solutions to Arkansas communities for 106 years. From the moment we opened our doors as an engineering company in 1919, Garver has established trust with clients through quality designs and innovative solutions. With more than a century of service, we now have more than 1,500 employees spread across 60 offices in 20 states. Our team continues to exceed client expectations with dedicated project leadership and a high level of technical knowledge. At Garver, we understand the challenges that our clients face and find the most creative solutions to meet their needs. Specialized Experience & Technical Competence Garver is a multi-disciplined firm with the specialized experience and technical competence to address any project for the City of Fayetteville. Garver offers a full range of engineering, architectural, and professional services for transportation, aviation, water and wastewater, survey, and construction and inspection projects. Garver practices diligent project oversight to address the smallest details from the planning stage through construction. Working with our clients from beginning to project completion gives Garver a comprehensive understanding of the importance of planning, budgeting, regulatory compliance, and meeting project schedules. For the City of Fayetteville, this experience and understanding will help deliver cost-effective improvements that meet the City's goals and objectives. Garver is authorized to practice engineering, surveying, and architectural services in Arkansas. We have 170 Arkansas-licensed professionals on staff to sign and seal plans, specifications, surveys, and other forms. Garver carries the insurance required by the City of Fayetteville. We also operate on a sound financial basis, and our firm is strong and solvent by any standard. Garver consistently teams with subconsultants, including certified Disadvantaged Business Enterprises (DBEs), to successfully execute projects of all sizes for our clients. Garver has been fortunate to have worked in collaboration with a number of engineering and specialty firms. Garver's commitment to DBE goes far beyond the team. We have successfully introduced competent minority firms to new areas of business through our Garver Partners Program. EXECUTIVE �. ...., � � Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 2 Capacity & Capability With more than 1,500 employees available company- wide, including more than 235 employees in Northwest Arkansas, Garver has the staff capacity and qualifications to provide professional services for the City of Fayetteville's upcoming projects. Garver has organized a team with extensive local project experience, supported by individuals who routinely work together and are knowledgeable in the criteria and requirements that shape the AEC process. Our familiarity with these requirements enhances our interactions with project owners, and we use that experience to develop familiar working relationships with our clients and to provide successful projects within strict and limited budgets and/or deadlines. Past Record of Performance Garver is committed to providing quality services that are valued by our clients; however, Garver recognizes our reputation is not based on what we say about ourselves but on what our clients and peers say about us. The numerous awards we've won and our continued designation as a top 100 firm by Engineering News-Record is a testament to our commitment to producing quality work and providing outstanding customer relations. Garver consistently meets deadlines and works diligently with contractors and clients to minimize costs and deliver projects on schedule. Garver's primary goal is to execute the project work scope, so your goals and objectives are met and the project is completed on schedule and within budget. Our record of successfully completing projects on time is due to realistic project scheduling and our ability to foresee and mitigate obstacles. Proximity & Familiarity Garver is confident that our professionals will provide the City of Fayetteville with the most relevant experience and cost-effective means of achieving project goals. With offices in Fayetteville, Rogers, and Fort Smith, Garver is conveniently located to provide services throughout the City. Garver's local offices have more than 235 professionals and support personnel who will be utilized to meet your project needs. Our professionals are accessible and available to respond quickly to your requests and to represent your interests. Garver's personnel has significant experience providing planning, architectural, engineering, surveying, and construction inspection services to municipalities throughout Northwest Arkansas, including the City of Fayetteville. As a result of this experience, we have become familiar with the opportunities and challenges faced when planning future improvements in this region. Water Design Center Our Fayetteville office includes one of our Water Design Center (WDC) locations, housing a complete team of treatment process, mechanical, electrical, automation/instrumentation and control, operations, civil, and technical production professionals focused on delivering water and wastewater projects. These teams have relevant planning and design experience that can support any water or wastewater project, from transmission lines and pump stations to complete wastewater treatment facilities. Aviation Design Center We also maintain an Aviation Design Center (ADC) in our Fayetteville office. These engineers are housed under one roof for increased coordination and efficiency. The Aviation Design Center has dedicated aviation engineers and technicians who provide expertise on complex projects with multiple constraints and accelerated schedules. This provides our Aviation Team with the depth to deliver large, complex projects on time and within budget and the flexibility to deliver smaller and less complex projects in a more cost- efficient manner. Appendix A: Resumes In this appendix, we provide resumes that detail the qualifications and experience of Garver's key personnel. We are prepared to undertake the City of Fayetteville's projects, and our personnel will be responsive to your requests, attentive to your cost-control needs, and committed to continuing the partnership with you. With Garver, the City of Fayetteville secures a resource with extensive technical expertise to provide quality services that meet your needs and expectations. Appendix B: Project Experience In this appendix, we provide summaries of projects that exemplify Garver's considerable expertise and experience in a broad range of disciplines. They demonstrate our ability to understand your project requirements, and show that we can provide complete project support. They also highlight the historical partnership Garver has had with the City of Fayetteville, as well as successful projects throughout Arkansas and the surrounding states. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 SELECTION CRITERIA_1 �GARVER Specialized Experience and Technical Competence Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26~01, Engineering & Architectural Services // 3 With more than 1,500 employees spread between more than 60 offices in 20 states, Garver offers a wide range of services with a focus on transportation, aviation, field services (construction and survey), water and wastewater. In this section, we detail Garver's capability to provide engineering and related professional services for the City of Fayetteville. Proposed Method for Performing Work Garver has long recognized that complex projects require stringent controls to meet schedules and budgets. To this end, Garver approaches each project with a plan for successful project delivery developed through extensive project experience and based on proven architecture, en ineerin , and mana ement les. We develop associated construction cost estimates, a construction sequence, and phasing of project components. As the project moves forward, we continually track work progress, adjusting resources and tasks so project milestones are met. In addition, we use experienced architects, engineers, and construction engineers to develop, review, and update the cost estimates based on the project scope, phasing, and known changes in material and labor costs. Our projects follow a clearly defined and streamlined approach of events as shown in the graphic below. All project schedules will include the following activities: • Holda kickoff meeting with project staff to discuss the project goals and requirements. • Develop a design completion schedule, listing the due dates for deliverables and periods for quality control review prior to delivery. • Review the project plans, specifications, and references to understand the assignment before beginning a task. • Perform reviews and checks before deliverables are sent to the City, including a technical review by multiple disciplines as necessary. PROGRESS MEETING ItTY REVIEW PROGRESS MEETING CITY REVIEW SPECIALIZED EXPERIENCE & TECHNICAL COMPETENCE QUALITY Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services II 4 Technical Competence Below and on the following pages, we detail Garver's capability to provide the same or similar services outlined in the request for qualifications for the City of Fayetteville. Airfields and Airports Airfield Pavement Improvements Garver has more than 66 years of airport design, Garver has designed and managed the construction planning, and construction administration experience of runway, taxiway, and apron improvements for with $8 billion in airport improvement projects airports of all sizes, including new construction, designed over the past 10 years. We provide continual extension, widening, strengthening, and rehabilitation client support throughout each project, for air carrier, general aviation, and military facilities. from developing grant applications for project Garver is proficient in new pavement rehabilitation funding through project planning, design, bidding, techniques, including seal coating, crack filling, cement construction inspection, and project closeout. We stabilization, and pavement reclamation. We also have also work extensively with the Federal Aviation experience with overlays, full-depth and partial-depth Administration (FM) from various regions and replacements, and joint rehabilitation. Our designers many state aviation agencies. and project managers continually update their Airfield Lighting practices to incorporate both the latest FM standards Garver's aviation electrical staff includes 15 dedicated and Garver'sexperience on runway and taxiway electrical engineers specializing in design and production of complete airside and landside project assignments. Garver's experience in electrical designs includes incandescent and LED runway and taxiway edge lighting, centerline lighting, touchdown zone lighting, specific lighting for surface movement guidance during low-visibility conditions, and various navigational aid systems. Our lighting systems utilize cutting-edge technology, such as LED fixtures and guidance signs, which reduce maintenance and operating costs. Garver regularly proposes the replacement of existing lighting systems with an enclosed system that protects the components extending their lifespan and making the lighting system more maintenance friendly. Runway/taxiway lights and transformers are installed using concrete-encased light base cans, and all cables are installed in conduits. As a result, troubleshooting and repair work is significantly simplified and minimized due to the protection and quick accessibility that conduits and cans provide. This is more reliable, durable, and maintainable while protecting system components. projects across the nation to provide creative solutions that meet updated safety requirements. Airport Construction The Garver Field Services Team has the experience and ability to handle all of your project needs during each phase of construction. Our qualified staff will work as a part of your team, making certain you are kept informed of the project's progress. Effective construction project management can be the most efficient way to meet project deadlines, avoid major cost overruns, and minimize potential disputes in the future. We involve the airport and serve as your representative in the field, working with contractors and monitoring the quality of construction as well as costs and schedules. Garver provides construction services ranging from periodic observation to full-time resident observation services. When approaching large-scale projects that will impact an entire airfield, Garver pays special attention to a project's phasing to reduce how much the project impacts airport activities and provide safe airport operations. From sequencing projects, minimizing community disruptions, and solving any construction problems, our field staff is committed to establishing II Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 5 good working relationships with our clients and contractors. Our approach to construction project management promotes quality construction and helps minimize problems that cause budget and schedule overruns. Bridges Garver provides a full range of design services for new and existing bridges. The Garver bridge staff have significant experience in the design of steel and concrete superstructures, bridge substructures, multi- level interchanges, and pedestrian structures. Garver staff also routinely design retaining walls, box culverts, and sign support structures. Our bridge designs range from short concrete spans on pile bents to long-span major river crossings founded on large drilled shaft foundations. Unique designs include airport taxiway bridges, curved steel box girder spans, through-girder railroad bridges, curved cast-in-place concrete box spans, multimodal (highway/rail/pedestrian), and innovative designs for accelerated bridge construction (ABC) to reduce construction duration and impacts on traffic. In addition, Garver's capabilities include bridge inspection, evaluation, and load rating services. Garver also has experience providing bridge rehabilitation designs and plan details. Civil/Site Design Garver has the design expertise to provide quality site design and deliver a project that fits into the community as you intend. Garver offers a complete range of planning and civil design services, including site analysis; site surveys and staking; facility site planning and layouts; permitting; design of roads, parking areas, stormwater, utilities, and sewage and drainage systems; erosion and sedimentation control; master planning; and environmental assessments. Our staff conducts extensive site investigations to understand the existing conditions, so we can coordinate project designs within those parameters. Construction Management Garver's Field Services Team provides construction services ranging from periodic inspection to full-time resident inspection. Garver's capabilities include providing project support from advertisement to bid opening to project closeout. Garver understands that construction engineering and inspection is a process of professional management applied to a construction project, generally from start to finish, achieving multiple goals. Those goals include reviewing the time of construction and project cost, promoting job-site safety, and monitoring the construction quality. Garver's philosophy is founded on construction inspection that is a balance of proactive supervision of the contractor, enforcement of the contract documents, and thorough project documentation. Drainage Design, Analysis, and Planning Garver has performed drainage studies and designs for numerous municipalities. We have designed detention facilities and prepared master and localized drainage plans. Garver also has extensive experience in stormwater management master planning and flood protection. Garver has prepared stormwater master plans, drainage basin studies, Federal Emergency Management Agency (FEMA) Letters of Map Revision, and regional detention studies. In addition, Garver has reviewed drainage plans and reports for compliance with drainage criteria, regulations, and procedures. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services II 6 Environmental Analysis, Remediation, and Permitting; Environmental Water Services Garver's environmental services include performing environmental studies, permitting, and documentation in accordance with local, state, and federal regulatory agency guidelines. Our services include National Environmental Policy Act (NEPA) documentation, environmental compliance, natural and cultural resource studies, site assessment, noise modeling, environmental studies, and agency coordination. Garver has a staff of biologists and NEPA specialists qualified and experienced in many areas of natural resource studies and document preparation, including Categorical Exclusions, Environmental Assessments, Environmental Impact Statements, and Planning and Environmental Linkage Studies. GIS Mapping Garver's GIS services include modern GIS deployments of cloud-based GIS solutions and applications, geodatabase implementation, mobile data collection, GIS application development, data development, conversion, analysis, and presentation quality exhibit production as well as customized training. Garver's GIS Team designs and deploys cloud-based GIS solutions that help cities provide electronic document mapping and management, asset mapping, and web-based mapping applications giving citizens up-to-date information. Our staff is proficient in a wide range of mapping and design software applications used for system design, management and maintenance, map production and analysis, database design and development, user training and support, and three- dimensional (3D) modeling and visualization for GIS mapping products. Floodplain Services Garver has a team of engineers dedicated to hydrologic and hydraulic (H&H) modeling and floodplain delineation. Our engineers are skilled in hydrologic modeling using HEC-HMS as well as legacy software such as HEC-1. Garver excels at the development of one-dimensional (1D) steady and unsteady-state hydraulic models in HEC-RAS. We also have extensive experience in two-dimensional (2D) hydraulic modeling and have successfully applied it as a hydraulic design tool involving complex hydraulics and floodplains. We have developed and applied models in riverine, lacustrine, and coastal floodplain environments. Landscape Architecture Garver provides a wide array of landscape architectural services from conceptual design through construction documentation and field inspection, including site planning, design, preservation and environmental restoration, and rehabilitation of the land and environment. Our personnel have provided complete landscape design services for municipal utilities, city agencies, and other clients throughout Arkansas. Our specialties include streetscape pedestrian paving, planting, and amenities design; roadway landscape planning and design; sustainable design, Low Impact Development (LID), and LEED accreditation for site and landscape issues; low maintenance plantings; native and drought tolerant species identification; paving and plaza design; landscape site development of university, city, and medical and commercial facilities; landscape design for transit and transportation; park and trail planning and design; and wayfinding. Master Planning Garver has successfully completed transportation, aviation, water, wastewater, and stormwater master plan projects ranging in size and complexity and is experienced with master planning and land use planning. Master planning provides foresight to help make sure infrastructure is appropriately ahead of the growth curve and provides both long-range (20-year) and short-range (5-year) development plans to identify a path forward for current and future needs. Garver's services include assessing existing facilities, examining available infrastructure, and planning for future requirements for a range of projects, including city/ government, parks, streets, wastewater, and water. Natural Resource Planning Garver coordinates with agencies regarding our clients' permitting and natural resources planning needs. Our ability to provide engineering, environmental, and surveying services allows us to accurately define natural resource issues that can affect project planning. These capabilities allow us to blend the built environment with the natural environment, producing mutually beneficial designs. Parks: Strategic Planning Garver has more than 30 years of experience designing a wide variety of parks and recreational facilities across the Southern United States, including more than 35 projects in Arkansas involving master planning, feasibility studies, and property acquisition; wetland delineation, cultural resource surveys, and environmental permitting; surveying; hydrologic analysis using HEC-HMS; schematic design, design development, and final construction document development for the civil/site, structural, mechanical/ Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 7 plumbing, electrical, and architectural design of park facilities; and construction services, including construction administration, inspection, and staking. As part of our park planning and design services, Garver emphasizes sustainable, energy-efficient design and conservation practices to minimize environmental impacts to a site. Stormwater Management Garver has extensive experience in stormwater management, master planning, and flood protection. Garver has performed drainage studies and design, including detention and channelization, for numerous municipalities, residential and industrial developments, and airports. We have designed detention facilities and prepared master drainage plans for cities throughout our service area as well. Our capabilities include stormwater pollution prevention planning, capture, detention and retention, channelization and routing, and hydrology and hydraulics. Streets Intersection Improvements/Design Garver's experience includes projects on all classifications of roadways ranging from interstates to local streets. Garver's street experience includes extension, reconstruction, rehabilitation and widening, alignments on new locations, and improvements to horizontal and vertical alignments along existing locations as well as pavement design, condition analysis, rehabilitation, and reclamation. Intersection design requires a specialized understanding of design criteria, traffic operations, and standards. As part of design, we consider pavement markings, intersection radii, turn bays, and pedestrian facilities. As an alternate to traditional intersections, Garver has analyzed and designed roundabouts, J-Turns, continuous flow intersections (CFI), and diverging diamond intersections (DOI). Surveying Garver is capable of staffing 10 field crews and can provide many types of surveying services, including lot, boundary, right of way (ROW), route, ALTA/ACSM land title, control, construction, geodetic, tract split/lot split, subdivisions, quantity inventories, hydrographic, topographic, aerial topographic, field 3D scanning, and property line adjustment. Garver's services also include producing ROW plans that generally consist of parcel surveys, title certificates, ROW appraisal and acquisition maps, legal descriptions, and contracts to sell. These projects include surveys to determine property boundaries, legal descriptions, and ROW plans. In addition, we provide elevation certificates for commercial, residential, multi-structure, and single- family structures in designated floodplains and letters of map amendment to redefine flood zones. Traffic Studies Garver has performed and reviewed traffic studies for virtually every type of traffic engineering situation that may be encountered from simple, isolated intersections to complex interchange studies involving trip generation and unconventional intersections. Our staff has developed traffic studies that included gathering traffic data in the field; studying past and present traffic information; forecasting traffic volumes; performing signal warrant, geometric, operational, and safety analysis; and preparing reports outlining our analyses and recommendations for improvements. Urban Planning Garver's approach to urban planning is informed by one that values innovation while using time- tested planning principles to make plans that are implementable. Our staff have extensive public-sector experience and understand the realities of running a planning department. Garver's planning services include the following: community engagement and meeting facilitation, code writing, development review, code amendments, development process advising, communication with the development community, grant writing/funding assistance, downtown planning, comprehensive planning, community strategic plans, visioning and community engagement, zoning Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services II 8 and subdivision regulations, design guidelines, recreation master planning, bike and pedestrian plans, neighborhood revitalization plans, land use analysis studies, and annexation analysis. Garver frequently works with cities as ongoing partners to assist with day-to-day planning functions and plan implementation. Whether it's development review, code changes, department policy, organizational restructuring, or plan implementation, we understand the challenges and have the expertise to help you achieve your goals in a timely and efficient manner. Garver's planning staff is local and our team has an understanding of Fayetteville's unique challenges and opportunities. We are passionate about cities and creating successful communities and places. This passion is what drives us to excel. We are here to be your partners in community success. Value Engineering Garver offers value engineering (VE) at any specified level of completion to maximize a cost-effective design. We have led and served on VE teams during formal value engineering workshops. In addition, we have assisted independent VE teams with the resources needed to conduct VE studies. Whether it is equipment or material selection options, Garver can provide formal or informal services to meet your project needs. Wastewater Treatment Master Planning Garver has consistently delivered creative and leading-edge solutions, while maintaining cost effectiveness for studies, designs, and master plans for wastewater treatment and collection projects across our footprint. These studies encompassed many planning horizons, which involve identifying infrastructure capacity, recommendations to replace aging equipment, optimization approaches, future service area projections, and demand allocation. These innovations are developed with long-term sustainability and operational efficiency in mind, using advanced technology to produce sustainable results. Wastewater SSES Garver has the experience and tools to fully support our clients in evaluating sanitary sewer conveyance infrastructure and identify the optimum solution for rehabilitation and renewal. We efficiently perform sanitary sewer evaluation surveys (SSES) and hydraulic modeling that identifies infrastructure that is in need of rehabilitation to improve performance and reduce infiltration, inflow and system risks from failure. Water/Wastewater Design and Management Garver's water capabilities include planning and modeling, GIS, design, and construction inspection for new facilities as well as expanding and rehabilitating existing facilities. Garver has provided services for water treatment, transmission, distribution, pumping, and storage facilities. We have designed facilities that implement a variety of process technologies, including ozone, chlorine dioxide, microfiltration, ultrafiltration, reverse osmosis, and ultra-violet disinfection. In addition, Garver performs all aspects of wastewater treatment plant design. We also have experience in collection systems that include gravity sewer lines, grinder pump installation, vacuum collection lines, major interceptor lines, pumping stations, and force mains. Water/Wastewater Modeling Garver embraces a design approach that utilizes a science-based methodology for process evaluation, with calibrated simulation models as a cornerstone of that approach. These process models allow us to understand the mechanics of the different interactions occurring inside the particular plant process, thereby unlocking the potential for solutions that might not be immediately obvious. Water Quality Monitoring From concept to operation, Garver takes pride in helping municipalities develop the best alternative for distribution and treatment plant needs. Whether the best solution is a custom monitoring and water quality action plan or includes the integration of innovative or conventional engineered systems, Garver endeavors to fully understand municipal needs and objectives. Our team provides comprehensive in-house services to successfully implement and optimize desired outcomes. Our engineers will work as an extension of municipal staff and in close coordination with the DEQ staff. Garver has extensive experience in drinking water studies with the goal of maintaining water quality throughout distribution. Hydraulic and water quality modeling, optimization of water treatment processes and distribution system operations, and development of practical water system monitoring plans are all tools utilized to assess and resolve water quality issues. Garver has assisted multiple utilities in developing and implementing strategies to retain consumer access to safe drinking water. Garver has considerable experience assisting utilities with the Water & Waste Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 9 Disposal Loan & Grant program and state revolving funds. Much of this experience includes distribution system modeling and identification of system modifications to minimize water age. Wetlands Garver has provided wetland delineations for roadway construction and various airports in Arkansas as well as several departments of transportation. Garver also provides Section 404 permitting, agency coordination, as well as wetland/stream mitigation design, planning and coordination services. Additionally, Garver has experience in mitigation area monitoring as required by U.S. Army Corps of Engineers' permits and wetland/ stream mitigation construction inspection. Additional Services Capital Improvement Plans (CIP} Garver understands how to bring together public and private interests to maximize benefits for investors and the community. Our proficiency in building communities extends into all types of development projects. Garver has vast experience preparing capital improvement and project plans and presenting them to funding agencies. We also routinely sequence and budget projects to fit available funding, such as multi- year phasing and bid schedules set for consecutive construction seasons. (IP Tool Garver developed a cloud-based web application CIP Tool to help clients plan and prioritize projects and allocate funds accordingly. This tool Includes all data that is typically included in a printed master plan document, including contingency rates, engineering costs, asset condition scores, prioritization of projects, schedule durations, and forecasting. What the tool provides that a paper copy does not is adaptability to automatically adjust project prioritization as your priorities change. The CIP Tool dashboard shows the prioritized list of projects that were identified during the master planning process. Within each project there is a prioritization score, which gives you when projects need to begin and any interdependencies relating to other projects. This information allows any changes in budget timeline or project priority to update the master plan in real time and allows you to see a snapshot of how that will affect your budget. Pavement Management Routine pavement upkeep is an important process that includes evaluating the pavement condition and economically providing design and specifications to produce a cost-effective solution to repair the surface. Garver's services include performing pavement analysis, pavement designs, and life cycle cost evaluations for design alternatives. Garver draws upon nearly three decades of pavement maintenance experience in developing customizable strategies to determine intended results for your pavement. Pedestrian Facilities Pedestrian facilities provide recreational and walkability opportunities for a safer transportation system. Garver has designed more than 150+ miles of pedestrian facilities in the past 15 years, including recreational multi-use paths and trails, pedestrian and shared- use bridges, pedestrian tunnels and underpasses, sidewalks, crosswalks, and various additional pedestrian access route structures. Garver also has led planning efforts for master transportation, bicycle, pedestrian, trail, and Americans with Disabilities Act (ADA) plans and has extensive experience planning and designing projects in compliance with the Federal Highway Administration (FHWA) and several state departments of transportation (DOT). In addition, many of our projects involve sidewalks, curb ramps, median, traffic islands, pedestrian pushbuttons and accommodations, and other pedestrian facility types. Garver has developed plans and specifications to repair, rebuild, widen, replace, and add sidewalks and trails. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 10 Public Input Sessions Garver understands the importance of educating and informing the public, communicating through proactive measures, and strengthening the client's brand and image. We can handle all stages of the public involvement process from planning the meeting, notifying the public, developing meeting materials, responding to comments, and providing reports. Alternative Project Delivery (APD) Garver's APD Team complements Garver's planning, design, construction, and program management experts to provide a strategic approach to program development, procurement management, and contract administration using the delivery method that best fits each unique client and project. Our approach to alternative delivery is to collaborate with each owner to listen, organize, plan, prepare, and implement optimal project delivery solutions. Alternative delivery methods are evolving. To effectively implement alternative delivery methods, a comprehensive understanding of available methods combined with experience implementing them is critical. In addition to design- build (DB), public agencies are exploring many other delivery methods, including Progressive Design-Build (PDB), Construction Manager/General Contractor (CMGC), Design-Build-Optimize-Refine (DBOR), and Public-Private Partnerships (P3). Scheduling/Project Controls Garver's project control specialists can review and validate project schedules, scope, and cost and provide assistance in claim avoidance. Our staff has experience analyzing schedule delays and disruptions, and applies best practices and industry standards to develop consistent, accurate schedules. Garver's staff can also assist with the development of contract execution and progress specifications along with appropriate processes and techniques to support the completion of construction projects. Grant Writing Garver boasts a robust track record in navigating the complexities of funding programs, leveraging our expertise to secure grant dollars for critical infrastructure projects. We have personnel dedicated to serving clients by identifying funding opportunities, evaluating a client's eligibility, devising competitive grant strategies, and crafting compelling applications. We have written successful grants for municipalities, local planning organizations, and state DOTs under multiple programs such as Infrastructure for Rebuilding America (INFRA), Rebuilding American Infrastructure with Sustainability and Equity (RAISE), Bridge Investment Program (BIP), Reconnecting Communities Pilot (RCP) Program, Advanced Digital Construction Management Systems (ADCMS), and several new programs offering funding opportunities for transportation, EV infrastructure, and resiliency projects. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 11 (I/ 0 0 :.::: Il i i (I/ ,. :::: :::::: ·s: ·s: 0 ·p >, 0:: (I/ �V �:J ,l. ·u u Representative Projects As demonstrated by the matrices on the following pages, Garver has significant experience providing engineering and related services and can provide these services for the City of Fayetteville's upcoming projects. The projects shown on the following pages are excellent examples of Garver's experience. VI :-e C: bO "vi (I/ Cl C: bO c.. Ill ·p VI bO .!!! u C: C: �Ill Ill VI � C: C: C: (I/ � bO Ill u <( C: 0 (I/ E C: (I/ bO ...... ..,; VI (I/ �,V._I c.. VI Ill ·p u ,:.J_ C: 0 I Ill (I/ u VI � Ill (I/ C: ti= 0 :-e "O VI .c ·s: ,(I./_ Ill ,c._.. C: C: ,._ C: � ·p Ill ::> w VI Cl I- u I. !) <( u � ::> ...J u Frisco Multi-Use Trail Fayetteville, AR �� � � Cato Springs Trail Fayetteville, AR ��� � �� Town Branch Trail Fayetteville, AR ��� ��� � � Hamestring Bridge Conway, AR ���� ��� �� � � Spring Street Parking Garage Fayetteville, AR ���� � � Meadow Street Parking Deck Fayetteville, AR � �� � � � Bentonville Master Street Plan Bentonville, AR � �� � Kessler Mountain Regional Park Fayetteville, AR ��� Gulley Park Sound Wall Fayetteville, AR � Conway Pavement Management Program Conway, AR � City of Rogers Future Land Use Plan Rogers, AR �� �� � �� Vision Plan and On-Call Planning Services Cave Springs, AR � I Centerton Downtown Master Plan Centerton, AR ������ Springdale Future Land Use Updates and Unified Development Code Springdale, AR ARDOT On-Call Design Services Statewide, AR ������ � AR ,:j < C: ,. a V b ·;: co .- ..c :::::: Ill u ·;: Ill u C Il ..c � w � Monte Ne Road Rogers, AR ��� � � �� Highway 12 - Walton Boulevard to Greenhouse Road Bentonville, ��� � � �� Johnson Road Springdale, AR � � � College Ave Corridor Plan and Design Fayetteville, AR ���� � � Rupple Road Fayetteville, AR ������ � Nelson Hackett Boulevard Improvements Fayetteville, AR ����� � Fulbright Expressway Ram Improvements Fayetteville, AR �� �� � �� Plainview Avenue Extension Fayetteville, AR ���� � � Cato Springs Road Fayetteville, AR �� � � Mount Comfort Road Fayetteville, AR � � � � 1-49 Widening and Interchange Fayetteville, AR � � � Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 12 Q 0 :.::: Il i i Q Il 0,. :::: :::::: · ·s: 0 bO � 0:: V) ;!:::! ..c Q C bO "vi QJ Cl C 0 bO C Ill C -1-J Ill ·p C u ·p � ..c bO QJ <( C C C QJ ,:j QJ .u..... :::::: Ill ,._ � 0 ·p QJ C ._; Ill u -1-J c.. u bO V) Ill QJ C bO "O <( u ·;: C Ill ..c u u �,._ -1-J V) -1-J I,l.l_ ·;: : QJ V) C Ill V) Cl co I- � I.!) <( ...J u Oak Street Corridor Study Conway, AR ����� � �� Multimodal Mobility Studies Tulsa, OK ��� � � � City-Wide Traffic Study Fayetteville, AR ��� � � �� Lake Atalanta Bridge Replacement Rogers, AR ����� � �� US 412 Springdale Bypass Springdale, AR �� �� � �� Double Springs Road Bridge Rehab Farmington, AR ���� � � Uptown Overpass Rogers, AR ������ � Oak Street Overpass Rogers, AR ������ � J.B. Hunt Drive Rogers, AR ����� J Street Interchange Fayetteville, AR ����� � � 1-57 EIS Multiple Counties, AR ��� � �� Northwest Arkansas National Airport Benton County, AR ��� ��� � � Jacksonville GIS Mapping Jacksonville, AR ��� �� Mapping and GIS Support Gentry, AR �� � � � GIS Deployment and On-Call Washington County, AR �� � � GIS System Design and Migration Elkins, AR � � � Sedgwick Sports Complex Site Assessment Sedgwick, KS � Naftzger Park Witchita, KS � The Point Huntsville, AL ��� Southwest Trail Multiple Counties, AR �� �� � �� Dean's Trail Springdale, AR �� Mena Park Bike Trail Mena, AR ��� Shillcott Bayou Pedestrian Bridge North Little Rock, AR �� � � Missouri Creek Drainage Study Fayetteville, AR ��� � � �� Coler Creek Drainage Study Bentonville, AR ��� � � �� Downtown Flood Study Siloam Springs, AR � � � ·u Ill c.. C V) � E u u V) � .!!! Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 13 0 0 Q :::::: :::::: ·;;: ·;;: 0 0 .!::.-0 bO Vl - e C u Q u C: Vl bO bO c.. 0,._ Vl ..... C: C: ..r.a.. Vl bO QJ <( >, C: u :.:::i ,._ QJ 0 ................ Vl QJ .. ::::::: ra ::::, QJ ,>._ ·.;:::; bO C: E Cl ,._; ,r.a_ ra u ..... u C: 0 C: C: Vl Vl ::::, u C: u ::::, ,:.::_:, ::::, ·.;:::; 0 Vl Cl ..... ·;:: ra QJ vi .V..l... ..... ra ,._ C: QJ u ..... ..c:: ;!:: Vl ,._ ·;;: C: u : ,:.::_:, u u ..c:: : $ C: QJ C: ra 0,._ ..... � QJ Vl ,u._ C: 0 c.. w a.. a.. u Vl � I.!) <( u => ra ...J c::: 0 TRA MCRWS WWTP lmpr. Midlothian, TX Celina Water and Wastewater Master Plan and Modeling Celina, TX TRA Central Regional Wastewater System Master Plan Dallas, TX Kessler Mountain to Cato Springs Road Water Main Fayetteville, AR SWU WWTF Phase 1 Improvements Springdale, AR Porter Road Water/Sewer Fayetteville, AR SWU Water & Sewer Master Plan Springdale, AR RWU Comprehensive Water Master Plan Rogers, AR City Corporation Water & Sewer Master Plan Russellville, AR Siloam Springs WWTP Siloam Springs, AR Sulphur Springs WWTP Master Plan and Improvements Sulphur Springs, TX Kaw Lake Water Supply Enid, OK Okmulgee Raw Water Line Okmulgee, OK Lake Thunderbird Raw Water Conveyance Norman, OK Spring Creek Interceptor Springdale, AR Honey Hill Booster Pump Station Searcy, AR Falls Creek SSES Davis, OK �� ��� ��� �� ��� ��� ��� �� ���������������� ������ � � ��� �������� � � � � � � �� � � � � �� � �� ��� � � � � �� � � � � � � � � � � � � ������� �� ���� ������������� �� � � � �� � �� �� � � � � �- � ���� �� ��� ��� � � � �� � � ��� C: c.. w .c NACA WWTP Master Plan & Expansion Bentonville, AR Noland WWTP Master Plan and Upgrades Fayetteville, AR Massard WWTP Master Plan Fort Smith, AR Bentonville Comprehensive Performance Evaluation Bentonville, AR Conway Tupelo Bayou WWTP and Pump Stations Conway, AR Baxter & Mount Sequoyah Tanks Fayetteville, AR Greenland Sewer Rehabilitation Fayetteville, AR EL-3 & EL-5 Gravity Sewer Lines Fayetteville, AR � Elkins Outfall Line Fayetteville, AR Central and Donnell Ridge Pump Stations Conway, AR Pump Station Evaluation/Design Hot Springs, AR � City Corporation On-Call Services Russellville, AR Stewart Creek North Interceptor Frisco, TX � �� �� � �� �� � �I Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 14 : 0 :.:::i V 0 :.:::i Q 0.... 0 Vl C u w ,1sESsl 1 <" - � �VfAT\0� Drake Field Airport Runway Pavement and Lighting Rehab Fayetteville, AR � �� � � �� Drake Field Airport Taxiway Lighting Rehab Fayetteville, AR � � � Drake Field Airport Taxiway B Widening Fayetteville, AR � �� � � �� Drake Field Airport Apron Rehabilitation Fayetteville, AR � � � Drake Field Airport Airport Master Plan Fayetteville, AR � Drake Field Airport Wildlife Fencing Rehab Fayetteville, AR � � Bentonville Municipal Airport Corporate Hangar Construction Bentonville, AR �� �� �� �� Springdale Municipal Airport East Hangar Construction Springdale, AR � � �� �� Bentonville Municipal Airport Southeast Taxiway B Extension Bentonville, AR � �� � � �� Rogers Executive Airport Taxiway Construction and Taxilane Rehabilitation Rogers, AR �� � � �� �� Siloam Springs Airport Parallel Taxiway Rehab Siloam Springs, AR � � � �� Springdale Municipal Airport East Taxiway Extension Springdale, AR � �� � � � Clarksville Municipal Airport Lighting Rehab Clarksville, AR � � � Boone County Regional Airfield Pavement Rehab Harrison, AR l � �� Ill Q) :E ·o tl.Q ci. C: Ill Ill 0........ re ·;:; C: C: .r..e. C: Q) E C: LL -ci Q) a.. Q) . ........ tl.Q .c Ill Ill >, Q) .>... ::::, C: 0 ·;:; u ::::, u....... tl.Q C: ::::, .I.l.l. re .V....l.. ...... "C Q) C: :-e $ Ill Q) ·s: .Q...) re u Vl C: .c ARDOT On-Call Surveying Services Statewide, AR C: .... .... Q) w I.!) ·;:; 0 u ::> c::: Vl lake Norfork Intake Pump Station Mountain Home, AR ARDOT Connecting AR Program (CAP) Statewide, AR I-49/Don Tyson Parkway Interchange Springdale, AR Har-Ber Avenue Extension Phase I and II CEI Springdale, AR Springdale 64th St Road Improvements Springdale, AR Gene George South Phase I CEI Springdale, AR Uptown Overpass Rogers, AR ARDOT CPM Scheduling Statewide, AR ARDOT 040901 Highway 22 - Gun Club Rd CEI Sebastian and Crawford Counties, AR ����������� ������ ��� ����� � � �� �� �I � �� �� � � ����� ���� � � �� ��� ·;:; C: ·;:; tl.Q 0 E tl.Q "C � ai u � ·:::: Q) ru ·;: :E Ill ;: 2 ·;:; ·o Ill C ·;: Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 SELECTION CRITERIA 2. of the Firm �GARVER Capacity and Capability Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 15 Garver has the staff capacity to start your projects immediately and complete your projects on time and without interruption. Garver has more than 1,500 employees company-wide, including engineers, planners, architects, environmental scientists, technicians, surveyors, and administrative support personnel. The organizational chart on the following page lists Garver's key personnel who will provide services for your upcoming projects. Our team leaders Zach Moore, PE; Chris Randall, PE; Kyle Bennett, PE; and Seth Yancey, PE-along with the other support personnel identified in the organizational chart-will be available for project coordination and communication to complete your upcoming projects within time limitations. The matrices that follow provide an overview of each team member's experience and qualifications, which provide the foundation to support your projects. Key personnel are indicated with an asterisk in the organizational chart. Resumes providing further information about key personnel experience and qualifications can be found in Appendix A. COMMITTED AVAILABLE Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 16 - Team Leader: Zach Moore, PE* QA/QC Ron Petrie, PE* STREETS & PED. FACILITIES Zach Moore, PE* Joe Adams, PE Luke Freedle, PE Taylor Austin, El Tim McCormick Kamryn Ray, El ENVIRONMENTAL Cassie Schmidt* Ryan Mountain, PWS Colby Marshall URBAN PLANNING Juliet Richey, AICP, ASLA, CFM* James Walden, AICP Courtney Tannehill-McNair, AICP, CFM Derek Linn, AICP PUBLIC INVOLVEMENT Jon Hetzel* Caitlin Hetzel DRAINAGE/ H&H Mark Hammons, PE, CFM* Kathryn McCoy, PE, CFM Allison Sites, CFM BRIDGES Joel Skinner, PE* Brandon Durden, PE Matthew Sandidge, El TRAFFIC ANALYSIS AND DESIGN Michael Rebick, PE* Nicci Tiner, PE, PTOE Annette Smalley, PE, PTOE Thomas Cusick, PE Justin Seabaugh, PE, PTOE PAVEMENT MANAGEMENT Jeremy Porterfield, PE* ELECTRICAL/LIGHTING Bart Gilbreath, PE, LEED AP* James Schmitt, PE GIS Drew Moffitt, GISP* Sean Wray PARK DESIGN/LANDSCAPE ARCH Brent Thomas, PLA, AICP, CPSI* Daniel Jordan, PLA Zach Moore, PE* Luke Freedle, PE GRANT WRITING Bob Cook* Adrianne Covington Graham Project Manager: Ryan Mills, PE* CLIENT SERVICE MANAGER Chris Randall, PE* WATER DESIGN CENTER DIRECTOR John Cutright, PE* PROCESS Rusty Tate, PE* Kam Sardari, PE* WATER DESIGN CENTER MANAGER Andy Pruitt, PE* PROCESS MECHANICAL Steve Schultz, PE* STRUCTURAL Kipp Martin, PE, SE* ELECTRICAL AND SCADA Jonathan White, PE* SITE DEVELOPMENT Charles Locher, PE* COLLECTION AND DISTRIBUTION Larry Gregory, PE* Daniel Hollinger, PE* WATER TECHNOLOGY TEAM DIRECTOR Randy McIntyre, PE, BCEE* WATER AND WASTEWATER MASTER PLANNING AND HYDRAULIC MODELING Evan Tromble, PhD, PE* INFRASTRUCTURE PRACTICE Maureen Carline, PhD* WASTEWATER PRACTICE LEADER Greg Knight, Eng OPERATIONS Ronnie Graves* BIOSOLIDS Jeff Sober, PE* STORMWATER Kathryn McCoy, PE, CFM CYBERSECURITY Clay Tidwell* FUNDING Tonya White * AVIATION Project Manager: Kyle Bennett, PE* TEAM LEADER Chris Maestri, PE PRINCIPAL IN CHARGE Adam White, PE QUALITY CONTROL Glenn Boles AVIATION PLANNING John Rostas, AAE, CM* Neil Gabrielson, ME, ACE, ENV SP AIRFIELD DESIGN Scott McReynolds, PE Greg Thomas, PE Chris Maestri, PE Logan Kiihnl, El Chase Allison, PE AIRFIELD ELECTRICAL DESIGN Jared Parr, PE Quinton Smith, PE PAVEMENT EVALUATION AND MAINTENANCE Jeremy Porterfield, PE HANGAR CONSTRUCTION Greg Archer, AIA, LEED AP BD+C Joe Kaminski, PE, FPE FIELD SERVICES Team Leader: Seth Yancey, PE* RIGHT OF WAY/SURVEYS Joshua Waite, SI* Jeff Jones, PS* Supported by 10 field crews company-wide CONSTRUCTION INSPECTION David Tag, PE* Johney Boles Supported by over 185 additional construction engineers and inspectors company-wide SCHEDULING AND PROJECT CONTROLS Mark Schwartz, CPM* Indicates key personnel. Resume is provided in Appendix A. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 17 YRS. OF MEMBER EDUCATION EXPERIENCE QUALIFICATIONS/EXPERTISE s Cassie Schmidt Mgmt. MS, Biology 13 NEPA doc., env. studies, and welands Juliet Richey, AICP, (FM Bachelor of Landscape Arch. 22 Urban planning and public involvement James Walden, AICP Master of Public Admin. 22 Urban planning and public involvement Courtney Tannehill-McNair, AICP, CFM Bachelor of Arch.; Landscape Arch. 19 Urban planning and public involvement Derek Linn, AICP Bachelor of Landscape Arch. 14 Urban planning and public involvement Jon Hetzel BS, Communications 21 Public involvement Caitlin Hetzel BS, Nursing 3 Public involvement Mark Hammons, PE, CFM MS, Water Resources 30 Drainage, H&H, and modeling Kathryn McCoy, PE, CFM MSCE 14 Drainage, H&H, and modeling Allison Sites, CFM BS, Biological Engineering 5 Drainage, H&H, and modeling Joel Skinner, PE MSCE 14 Structural analysis and design Brandon Durden, PE MSCE 8 Structural analysis and design Matthew Sandidge, El BSCE 3 Structural analysis and design Michael Rebick, PE MSCE 20 Traffic data collection, analysis, and design Nicci Tiner, PE, PTOE BSCE 37 Traffic data collection, analysis, and design Annette Smalley, PE, PTOE MSCE 14 Traffic data collection, analysis, and design Thomas Cusick, PE, PTOE Justin Seabaugh, PE, PTOE BSCE BSCE 10 Traffic data collection, analysis, and design 12 Traffic data collection, analysis, and TRANSPORATION TEAM AREA OF Zach Moore, PE BSCE 18 Roadway, drainage, park, pedestrian facilities design, utility coord. Ron Petrie, PE BSCE 34 Roadway, drainage, pedestrian faciliti design, utility coord. Joe Adams, PE BSCE 8 Roadway, drainage, and pedestrian facilities design Luke Freedle, PE BSCE 9 Roadway, drainage, park, and pedestrian facilities design Taylor Austin, El BSCE 4 Roadway, drainage, and pedestrian facilities design Tim McCormick MA, Microbiology 22 Roadway, drainage, and pedestrian facilities design Kamryn Ray, El Ryan Mountain, PWS BSCE BS, Fisheries & Wildlife 2 Roadway, drainage, and pedestrian facilities design 25 NEPA doc., env. studies, and welands Jeremy Porterfield, PE BSCE 13 design Pavement mgmt. and airfield design Bart Gilbreath, PE, LEED AP MSCE 20 Electrical inspection and design James Schmitt, PE BSCE 13 Electrical inspection and design Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 18 AREA OF YRS. OF TRANSPORATION TEAM MEMBER EDUCATION EXPERIENCE QUALIFICATIONS/EXPERTISE Drew Moffitt, GISP BS, Geography 20 GIS mapping Sean Wray 27 GIS mapping Brent Thomas, PLA, AICP, CPSI Bachelor of Landscape Arch. 27 Park design & landscape architecture Daniel Jordan, PLA Bachelor of Landscape Arch. 9 Park design & landscape architecture Adam Sheets Juris Doctorate 24 Alternative project delivery Mike Wawszkiewicz, PE, DBIA BSCE 26 Alternative project delivery Bob Cook BA International Relations 29 Grant Writing Adrianne Covington Graham MA, Human Relations 22 Grant Writing Ryan Mills, PE MS, Environmental 15 Chris Randall, PE BS, Biological 11 Jerry Martin, PE MSCE 17 John Cutright, PE MSCE 38 Rusty Tate, PE MS, Environmental 18 Kam Sardari, PhD, PE PhD, Chemical 8 Andy Pruitt, PE MSCE 17 Steve Schultz, PE MSCE 15 Kipp Martin, PE, SE MSCE 39 Jonathan White, PE MBA 18 Charles Locher, PE BS, Civil; BS, Business Mgmt 11 Daniel Hollinger, PE BS 13 Randy Melntyre, PE, BCEE MS, Environmental 41 Evan Tromble, PhD, PE PhD, Civil Engineering 21 Environmental compliance/collection and distribution design Environmental compliance/ww and stormwater design Water/wastewater process design Water Design Center multi-discipline coordination management, process design Water/wastewater process design Biological treatment processes Water Design Center Manager and process design Mechanical process design Structural analysis and design Electrical/energy optimization/application engineering Site development Collection and distribution Water/wastewater distribution, collection, and treatment plants Water and wastewater master planning and hydraulic modeling Maureen Carlin, PhD PhD, Civil, Environmental & 23 Water and wastewater infrastructure Sustainable Engineering Greg Knight, CEng MS, Environmental 21 Wastewater design and operations Ronnie Graves 55 Watewater treatment operations Treatment process design, master EDUCATION EXPERIENCE YRS. OF QUALIFICATIONS/EXPERTISE AREA OF Jeff Sober, PE MSCE, Environmental 24 planning, condition assessments, solids digestion, solids handling, and w/ww treatment plant operations Kathryn McCoy, PE, CFM MS, Civil 14 Stormwater Clay Tidwell 18 Cybersecu rity Tonya White BA 30 Funding Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 19 AREA OF YRS. OF AVIATION TEAM MEMBER FIELD SERVICES TEAM EDUCATION EXPERIENCE YRS. OF QUALIFICATIONS/EXPERTISE AREA OF MEMBER EDUCATION EXPERIENCE QUALIFICATIONS/EXPERTISE Kyle Bennett, PE MSCE 21 Airfield design and project management Chris Maestri, PE BSCE 10 Airfield design Adam White, PE BSCE 19 Airfield planning and design Quality control Glenn Boles BSAE 35 Quality control John Rostas, AAE, CM MBA 12 Aviation planning Neil Gabrielson, AAE, ACE, ENV SP MPA 15 Aviation planning Scott McReynolds, PE BSCE 19 Airfield design Greg Thomas, PE BSCE 9 Airfield design Logan Kiihnl, PE MSCE 5 Airfield design Chase Allison, PE BSCE 7 Airfield design Jared Parr, PE BSEE 13 Airfield electrical design Quinton Smith, PE BSEE 9 Airfield electrical design Jeremy Porterfield, PE BSCE 13 Pavement management, airfield pavement evaluation and maintenance Greg Archer, AIA, LEED AP BD+C MArch 35 Hangar construction Joe Kaminski, PE, FPE BSME 14 Hangar construction Seth Yancey, PE BSCE 20 Construction management and inspection; structural analysis and design Joshua Waite, SI AS 10 Right of way/surveys Jeff Jones, PS 41 Right of way/surveys David Tag, PE BSCE 27 Construction inspection Johney Boles 44 Construction management and inspection Mark Schwartz, CPM BS, Accounting 44 Project control and financial analysis Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 SELECTION CRITERIA 3. of the Firm �GARVER Past Record of Performance Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 20 OF PERFORMANCE As a client-oriented firm, Garver focuses its time and energy on delivering cost-effective services and customer care. Our staff works hard to maintain its reputation and strives for excellence. We encourage you to contact any of our references listed below to verify the quality of our work and our ability to coordinate and deliver your projects on time and within budget. LANCE MCAVOY UtilityDirector City of Fort Smith Utility Department 801 Carnall Avenue, Suite 500, Fort Smith, AR 72901 479-494-3908; lancem@fortsmithar.gov STEVE MALLETT, PE General Manager City Corporation - Russellville P.O. Box 3186, Russellville, AR 72811 479-968-2080 x113; smallett@citycorporation.com JENN IF ER ENOS Wastewater Facilities Director Springdale Water Utilities 526 Oak Avenue, Springdale, AR 72765 479-756-3657; jenos@springdalewater.com JAMES CLARK Public Works Director City of Tontitown 201 E. Henri de Tonti Boulevard, Tontitown AR 72770 479-361-2700, pwdirector@tontitownar.gov MELISSA MCCARVILLE City Business Manager City of Farmington P.O. Box 150, Farmington, AR 72730 479-267-3865; melissamccarville@cityoffarmington-ar.gov BEN PETERS, PE Director of Engineering City of Springdale 201 Spring Street, Springdale, AR 72764 479-271-5993; bpeters@springdalear.gov BRENT DOBLER Operations Manager Rogers Water Utilities 601 S. 2nd Street, Rogers, AR 72757 479-621-1142; brentdobler@rwu.org DAN WEESE, PE Transportation Deputy Director City of Bentonville 3200 SW Municipal Dr., Bentonville, AR 72712 479-254-2024; dweese@bentonvillear.com Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 21 Control of Costs Garver consistently meets requirements within the amount contracted for services and works diligently with subconsultants and clients to minimize cost increases. Change orders can be an owner's nightmare. We work to complete all contractual obligations within the original budget to avoid contract amendments, which can impact funding. In addition, Garver's staff can conduct a constructability review to minimize alterations. For each project assigned, one of Garver's Team Leaders Zach Moore, PE; Chris Randall, PE; Kyle Bennett, PE; and Seth Yancey, PE, will be responsible for cost control and will lead project development, including the preparation of cost estimates. They will work closely with the Garver team and City of Fayetteville to provide estimates that are accurate, complete, and realistic and includes all phases of construction. They will monitor the cost throughout the project execution using weekly cost and variance analysis reports to satisfy design objectives and meet specific project requirements. Garver's in- house construction inspectors can also review cost estimates from the contractor's perspective to enhance the accuracy and constructability during the review process. Constructability reviews are conducted so the project can be built as intended and the end product can be used, operated, maintained, and sustained for its intended purpose. This review includes both discipline-specific and interdisciplinary oversight and reduces ambiguities in the construction bid package so prospective bidders can respond in an informed manner with realistic costs. A constructability review can make a project a win-win for Fayetteville, Garver, and the contractor, producing such advantages as concise presentation of plans and contract documents, lower bid price by contractors, reduction in construction problems, and fewer change orders. To avoid any miscommunication, all of our key personnel will remain available and involved throughout the life of the project. This will help maintain continuity and help make sure the design intent is carried through construction. Garver believes that communication is especially critical during construction to avoid added costs and delays. Our priority is to limit the impact of these unforeseen variables by identifying the problem and offering multiple solutions quickly for consideration. We also will work closely with our clients to find alternatives to reduce costs. Quality of Work Garver is about quality, providing valuable services, meeting budgets, and finishing projects on time. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 22 I can, without reservation, recommend the Garver team. They bring a level of professionalism and depth of knowledge to the job that would be hard to find elsewhere. From personal experience, the most important thing Garver did was to listen to our team, hear our concerns, and develop several alternative options for addressing our current and future needs. The Garver Arkansas Water Team's expertise and quality of service is unrivaled in our area! Jennifer E. Enos Our numerous award-winning projects testify to the lasting quality of our work, as does our place on Engineering News- Record's United States top 100 design firms list, top 20 aviation design firms list, and top 20 airport facility engineering firms list. Garver emphasizes customer service, and our strong work ethic results in quality projects and lasting relationships. The positive feedback we receive from our clients highlights our commitment to delivering quality projects. Garver has established quality control processes and procedures to maximize the quality of our services and products. Our quality control procedures are developed to detect and prevent deficiencies early in the design process and is used for all stages of the design process. Garver's Team Leaders Zach Moore, PE; Chris Randall, PE; Kyle Bennett, PE; and Seth Yancey, PE, will develop a specific design quality control plan. They will oversee the project execution and work to implement independent technical reviews, cross-discipline reviews, and peer/senior reviews based upon the level of project complexity. Ability to Meet Schedules and Deadlines We approach each project with a plan for successful delivery based on our extensive experience and proven principles. Our primary goal is to execute the project work scope so your goals and objectives are met and the project is completed on schedule and within budget. Our record of successfully completing projects on time is due to realistic project scheduling and our ability to foresee and mitigate obstacles. As the project moves forward, we continually track the progress of work and adjust resources to meet tasks and project milestones. Wastewater Facilities Director, Springdale Water Utilities We also provide general review of work as construction progresses to ascertain that the contractor is conforming to the design intent and minimizing cost increases during construction. Our construction inspectors have the experience and confidence to thoroughly review plans and ask the appropriate questions before the contractor starts each phase of the work. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Firm's Proximity to and SELECTION CRITERIA 4• Familiarity with the Area �GARVER Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 23 Garver's success in Arkansas is the result of small-firm attention combined with the resources of a regional staff. With our convenient office location in Fayetteville, we excel at providing services in a fast and cost-effective manner. Through proactive responsiveness, our team will make your job easier. Whether through phone calls, in-person and virtual meetings, emails, or on-site visits, we work to alleviate any concerns or questions for the City of Fayetteville and offer input and advice. As a trusted advisor, Garver has developed collaborative work relationships in Fayetteville, as well as surrounding communities throughout Arkansas. Given our proven history, we know your needs are critical, and we have what it takes to lead your projects from concept to completion. The graphic on the following page highlights some of Garver's experience in Fayetteville. PROXIMITY & FAMILIARITY Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // 24 • ' Q C,• 0 0 ,, C, CJ t LEGEND 8Aviation e Bridge Design (i)Drainage G) Environmental Studies Fueling Station 0 Hydraulics/Hydrology e Parking Facility 0 Railroad Underpass 0 Recreational Facility 0 Roadway Design 8 Spillway Repair 8 Traffic Studies C,Trails C, Water/Wastewater Projects Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX A Key Personnel Resumes �GARVER Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // A TRANS PO RTATI ON Keep an eye out for this symbol denoting our staff in Northwest Arkansas Zach Moore, PE Transportation Team Leader, Streets & Pedestrian Facilities, Park Design Registration / Certifications Professional Engineer AR, 15657 Education BS, Civil Engineering Registration / Certifications Professional Engineer AR, 9113 Zach Moore is a project manager on our Transportation Team with 18 years of experience. His responsibilities include managing projects, coordinating with clients and project stakeholders, and writing specifications. Zach's transportation experience includes new and reconstructed roadways, highway interchanges, roundabouts, highway overpass projects, master street plans, bond program project development, major and minor drainage systems, site design, trails, recreational and athletic park design, and pedestrian facilities. He has served as contract city engineer for multiple cities and counties, and his responsibilities included review of development projects and addressing drainage and other engineering issues that arose within a given jurisdiction. Zach has participated in traffic studies that include intersection analysis, traffic mitigation, trip generation, warrant analysis, and signalization design. He has also evaluated city design standards for roadways, trails, and pedestrian facilities. He is proficient in AutoCAD, MicroStation, lnRoads, AutoDesk HyrdaFlow, and HEC-RAS. Ron Petrie, PE QA/QC Manager Ron Petrie serves as Garver's Quality Assurance and Quality Control manager, bringing over 34 years of experience in project production and oversight. He leads QA/QC efforts by updating processes, supervising multiple municipal teams, and ensuring that every project exceeds Garver's high standards. Ron specializes in organizing and leading teams, consistently guiding them to deliver outstanding results. He takes a hands-on approach to the projects he QA/QC checks, making sure the highest quality is achieved and delivered. Known for providing timely, dependable, and cost-effective solutions, Ron is someone people know that can count on. Education MS, Biology BS, Zoology Cassie Schmidt Environmental Cassie Schmidt is an Environmental Team Leader with 14 years of environmental data collection and assessment experience. She has knowledge of local, state, and federal environmental regulations and guidelines. Her experience includes preparing NEPA documents, conducting Phase I and II Environmental Site Assessments; completing alternative analyses and functions and services assessments to satisfy Section 404 permitting requirements; and drafting wetland and stream mitigation plans. Education BS, Civil Engineering Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // B Education Bachelor of Landscape Architecture Registration I Certifications American Institute of Certified Planners, 30453 Certified Floodplain Manager, AR-06-00104 Education BS, Mass Communications Education MS, Civil Engineering (Water Resources) BS, Civil Engineering Registration I Certifications Professional Engineer AR,9819 Certified Floodplain Manager, AR-07-00156 Juliet Richey, AICP, CFM Urban Planning Juliet Richey is an urban planner with 22 years of experience working with municipalities and counties across Arkansas. Her experience includes comprehensive plans, master street plans, special area plans, development review, policy and process review and modification, overlay districts, and drafting a variety of planning and zoning regulations for municipalities. She has in-depth knowledge of local government structure, governmental funding mechanisms, infrastructure, and the needs of Arkansans. Before joining Garver, Juliet spent 14 years working as a planner and planning director in the public sector. Her responsibilities included overseeing a planning department, floodplain and conditional use permits, zoning, variances, large-scale developments, and long-range planning. She has provided consulting planning/public outreach services over the past seven years for many cities throughout the state. Jon Hetzel Public Involvement Jon Hetzel is a communications manager and has 21 years of experience.Jon's responsibilities include developing and overseeing the strategy, development, and implementation of communication tools for the public involvement process. This includes writing communication plans and public involvement summaries; coordinating stakeholder meetings; conducting public involvement meetings and hearings; and implementing localized outreach plans to notify and engage with the public. Jon's responsibilities also include using Microsoft Power Bl for business analytics; overseeing the development of project logos and branding; providing content for and managing project websites; and preparing news releases, travel impact notices, and other announcements related to projects. Mark Hammons, PE, CFM Drainage and Hydrology/Hydraulics Mark Hammons is a H&H team leader and has 30 years of experience. Mark's experience includes drainage master plans, transportation hydraulic design, flood insurance studies, flood reduction design, coastal restoration studies, reservoir studies, and dam break studies. His modeling capabilities include advanced 2D hydrodynamic modeling for complex projects. He has hydraulic design experience with roadway bridges and culverts, interior levee drainage systems, stormwater pump stations, open channels, detention basins, reservoirs, irrigation systems, storm sewer networks, and floodplain delineation. He is knowledgeable in GIS analysis for H&H studies and mapping. He is proficient with multiple water resources computer modeling and mapping software packages, including but not limited to HEC-RAS (1D and 2D), SRH-2D, RMA-2, SMS, HEC-HMS, HEC-1, HEC-2, UNET, HEC-DSS, HEC-5, EPA SWMM, and ArcGIS. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // C Education MS, Civil Engineering BS, Civil Engineering Registration I Certifications Professional Engineer AR, 16458 ACI Concrete Field Testing Technician Grade I Joel Skinner, PE Bridges Joel Skinner is a project manager and bridge team leader with 14 years of experience. Joel's responsibilities include leading project engineers and designers through all aspects of bridge design and plan production. His design experience includes preparing layout drawings for bridge rehabilitation and new construction; preparing final project plans; designing structural members for bridge substructures including multi-column, hammerhead piers with drilled shaft or driven pile foundations as well as superstructures including concrete deck with rolled beams and plate girders; calculating construction quantities; and writing design specifications for bridge widening and replacements, hydraulic structures, and grade separation structures. Education MS, Civil Engineering BS, Civil Engineering Registration I Certifications Professional Engineer AR, 18454 Mike Rebick, PE Traffic Analysis and Design Michael Rebick has 20 years of experience and progressive responsibility in civil engineering consulting, specifically in the transportation/traffic field of transportation operations and Intelligent Transportation Systems (ITS). His qualifications include extensive hands-on planning, field investigation, design, construction management, and project management. Michael's background includes service to public and private-sector clientele. He is also responsible for client management, marketing, and business development activities. Education BS, Civil Engineering Registration I Certifications Professional Engineer AR, 18915 Jeremy Porterfield, PE Pavement Management Jeremy Porterfield is a project manager who is an expert in pavement analysis and recommendations.Jeremy oversees projects from start to finish and has hands- on experience with each step of the process. His experience includes program design and management, inspections and inspector training, pavement thickness evaluations, automated pavement data collection, and developing custom deliverables to precisely suit a client's needs. Jeremy is skilled at using Bl tools to solve real-world problems in creative and innovative ways. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // D Education MS, Electrical Engineering BS, Electrical Engineering Registration I Certifications Professional Engineer AR, 13836 LEED Accredited Professional, 10097104 Education BS, Geography Registration I Certifications Certified GIS Professional, 67799 FAA Remote Pilot License,4258494 Education BA, Landscape Architecture Registration I Certifications Registered Landscape Architect AR, 9593 CLARB Certified Landscape Architect, 1571 Certified Playground Safety Inspector, 55070-725 American Institute of Certified Planners, 36295 Bart Gilbreath, PE, LEED AP EIectrica1/Lighting Bart Gilbreath is Garver's Electrical Resiliency and Illumination Leader with 20 years of project design and management experience. Bart has assisted clients with a range of electrical improvements, often providing cutting-edge designs to improve resiliency and reliability of electrical systems. He is intimately involved in each project from conception to design through construction and closeout. His project experience includes lighting design from local streets to interstate highways, Federal Aviation Administration (FAA) airports, and U.S. Army Corps of Engineers navigational waterways. He is versed in various state DOT lighting standards, Illuminating Engineering Society (IES) recommended lighting practices, and various lighting modeling software packages. Drew Moffitt, GISP GIS Drew Moffitt is Garver's Geospatial Solutions Leader with 20 years of experience managing and working with advanced spatial analysis at a statewide scale, database development, and online GIS programming, scripting, and deployment. He has worked with clients to inform stakeholders on statewide asset inventories, complex pre-screening reporting, and large data analysis and reporting around clear-zone funding. He also has specialized experience working with CAD and GIS data and is well versed in converting CAD drawings or subdivision plans into Stormwater GIS data. Drew's previous experience includes developing the PAgis Stormwater Work Plan. He was tasked with overseeing the creation of the standards and processes that are required for all PAgis member agencies. Drew has supported development of several databases and web-based portals using ArcGIS and PowerBI, including projects for departments of transportation in Arkansas, Kansas, and Missouri. Brent Thomas, PLA, AICP, CPSI Park Design/Landscape Architecture Brent Thomas is a planner and landscape architect with 27 years of experience. Brent is passionate about projects that enhance communities through sound planning and quality design. Always looking for ways to better the communities in which he works, Brent enjoys bridging the technical realm of engineering with the physical realm that affects how users interact with and see a project-a positive combination of art and science. With past projects in Arkansas, Colorado, Kansas, Missouri, Oklahoma, and Texas, his experience includes education, retail, office, and medical site planning; land planning; streetscapes; park and recreation facilities; bicycle planning and design; and wayfinding and graphic design. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // E Education MA, International Economic Policy BS, International Relations & History Master of Business Administration Bob Cook Grant Writing Bob Cook is Garver's Government Relations Director and has 29 years of experience working with the local, state, and federal government. Bob works across all business lines to improve Garver's government ties and further strengthen those key relationships. He is uniquely experienced at positioning projects for grant funding. His work with state and federal officials gives him insight into what the grant reviewers are looking for in a successful application. Recent work includes serving as an advisor for the $2M 1-30 Deck Park Study Reconnecting Communities Pilot (RCP) Grant in Little Rock, Arkansas. He is also adept at organizing political support at all levels to promote grant applications. Bob spent his early career as staff to multiple members of Congress and served as Wisconsin Governor Tommy Thompson's representative in Washington, DC. He was later appointed by Governor Thompson to serve in the Wisconsin Department of Transportation leadership. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // F WATER & WASTEWATER Chris Randall, PE Northwest Arkansas Water Team Leader Education BS, Biological Engineering - Ecological Engineering Registration / Certifications Professional Engineer AR, 18334 Education MS, Environmental Management BS, Mechanical Engineering Registration I Certifications Professional Engineer AR, 16161 Certified Floodplain Manager AR, AR-23-00402 Chris is Garver's Northwest Arkansas Market Leader with 11 years of experience working as a water resource engineer. With his wide range of experience, Chis has touched every aspect of the water cycle, working full circle as a state regulator, environmental compliance consultant, wastewater & stormwater design engineer, and project manager. No stranger to environmental compliance, his prior experience includes two years working with ADEQ and eight years as an environmental permitting expert, where he worked with clients in over 20 states in a variety of regulatory and various engineering fields. During this time, Chris had extensive onsite experience solving and managing complex environmental compliance and regulatory challenges in various facilities across the manufacturing industry. Ryan Mills, PE, CFM Senior Project Manager Ryan is a Senior Project Manager with 15 years of experience. An expert in environmental compliance for stormwater, air, emergency response, and wastewater plant operations, he also has a wide variety of project experience, including water and sewer distribution and collection system design, lagoon treatment system upgrades, lead service line identification, floodplain management, elevated storage tank rehabilitation, and existing wastewater treatment system upgrades. Ryan has helped the City of Fayetteville advance wastewater treatment, having contributed to previous City water and wastewater projects. He led the Arkansas Department of Agriculture Water Service Line Inventory Program, and he served on the City's Environmental Action Committee for five years, acting as both Vice Chair and Chair. He is committed to understanding the details of client challenges so that all client needs and objectives are fully met. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // G Education MS, Civil Engineering (Environmental Engineering) BS, Civil Engineering Registration / Certifications Professional Engineer AR, 17428 Jerry Martin, PE Principal in Charge For 14 years, Jerry has provided customized solutions to municipalities' most pressing water and wastewater process concerns. His passion for process design and the nuances of treatment methods drives him to work closely with clients and advance their facilities. Jerry's operation and maintenance background, which he gained while serving as a machinist mate in the Navy, has enabled him to see projects from both sides, creating designs that not only increase efficiencies but operator safety. His designs are intended to serve the long-term needs of communities by using advanced treatment methods and sustainable solutions. As Garver's Arkansas Water Team Leader, Jerry uses his skills and knowledge to drive project objectives successfully forward, while allocating the necessary resources to meet those objectives. Through his streamline management approach, he makes sure that every client gets the best, responsive service from start to finish. Education MS, Civil Engineering BS, Civil Engineering Registration I Certifications Professional Engineer AR, 11920 Education MS in Environmental Engineering, Water Resources BS in Biological Engineering, Ecological/ Environmental Registration I Certifications Professional Engineer AR, 15423 Grade IV Water Treatment Operator AR, 08445T4 Grade IV Water Distribution Operator AR, 08445D4 Class II Wastewater Treatment Operator AR, 010414 John Cutright, PE Water Design Center Director John's 38 years of water and wastewater experience include transforming over 60 plants from conventional to advanced nutrient removal. He has provided facilities with the necessary support to improve the day to day functioning of the plant. John approaches each project by breaking down the facility's needs and evaluating its capabilities and identifying each process' limitations. He has expertly created process models to anticipate results and deliver maximized use of plant assets. John maintains involvement from start to finish with complex projects, ranging in size from 1 MGD to 1 BGD. Additionally, he has routinely followed biological nutrient removal projects through commission and trained personnel on the new technology to improve their efficiency and secure a safe operating environment. Rusty Tate, PE Process Rusty has spent 15 years modeling processes to improve their safety and efficiency. He has worked on over 25 wastewater treatment projects from conceptual design to construction administration. Rusty utilizes models to look at different potential process arrangements to gauge the best results, while guiding designs to make plans more efficient and easier to implement, which can increase capacity and performance. Having worked as an operator, Rusty understands needs and concerns of operations and maintenance staff. His insight into their day-to-day procedures allows him to construct designs in a manner that is easily implementable for operators, increases operator safety, and improves overall plant efficiency. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // H Education PhD, Chemical Engineering BS, Chemical Engineering Registration / Certifications Professional Engineer AR, 20764 Kam Sardari, PhD, PE Process When it comes to evaluating process alternatives, there are a wide range of options and not every option is best suited for a client's needs. Through his in-depth understanding of various treatment processes, Kam works closely with clients to identify their needs, concerns, and future goals and determine the best alternative for them. He's worked on projects ranging from .5 MGD up to 350 MGD, which has given him an understanding of how different scale/size facilities often have different needs and challenges. Kam often uses process modeling to evaluate the biological treatment performance (phosphorous removal, nitrogen removal, etc.) of a facility and simulate a new process' effect on those conditions. Through these models, he's able to identify the best treatment options for preliminary to primary treatment, secondary, and tertiary treatment. He always strives to provide the best solution for both a client's current and long-term needs.. Education MS, Civil Engineering BS, Civil Engineering Registration / Certifications Professional Engineer AR, 15176 Andy Pruitt, PE Water Design Center Manager Andy leads Garver's Fayetteville Water Design Center (WDC) and serves as a process mechanical engineering expert. He's extremely proficient in the design of treatment, hydraulics and pumping systems for water and wastewater treatment plants. Andy's approach to projects looks at ways to solve concerns in new and innovative ways that will exceed client expectations. He does this by working closely with clients to identify their needs and goals, then aligns design tasks and criteria with those goals. Andy's expertise focuses on the physical treatment of processes and pumping systems by looking at hydraulic models and flows to determine the most effective treatment alternatives. As the WDC leader, he makes sure that each of Garver's projects has the resources and staff necessary to successfully execute the project. He coordinates with the right skills and expertise to align with project goals, always making sure that our regional water and wastewater teams have the full support of the WDC's resources. Education MS, Civil Engineering, Water/Wastewater BS, Engineering, Chemical Registration I Certifications Professional Engineer AR, 20202 Steve Schultz, PE Process Mechanical Steve Schultz is a project engineer at Garver's Water Design Center with 15 years of experience as a process engineer and eight years of experience as a water and wastewater project engineer. During his time at Garver, Steve has been involved in the design of both water and wastewater treatment plants. His approach to design is to work with the client to identify what their needs and goals are, and create customized project solutions based on those insights. He has worked on projects in Arkansas, Oklahoma, North Carolina, and Texas. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // I Education MS, Civil Engineering BS, Civil Engineering Registration / Certifications Professional Engineer AR, 15272 Structural Engineer OR, 16276 Kipp Martin, PE, SE Structural Kipp Martin is a structural engineer on Garver's Water Team with 39 years of experience in planning, designing, and constructing water and wastewater treatment plants, pump stations, and reservoirs. He has successfully worked with fish screens, fish ladders, and dam and river hydraulic structure modifications. Kipp also has extensive experience in project budgeting, drawing layout, CAD drafting, and supervising junior engineers and drafters. He is skilled at working on projects for remote offices and locations and is familiar with finite element analysis software, structural design software, and AutoCAD and MicroStation software. Kipp's skills include general structural design, project structural budgeting, project management, concrete hydraulic structures, concrete design, steel design, masonry design, and seismic analysis.. Education Master of Business Administration BS, Electrical Engineering Registration I Certifications Professional Engineer AR, 16232 Jonathan White, PE Electrical and SCADA Jonathan has focused his career on providing electrical and l&C designs for a wide range of water and wastewater projects. He works with the process team to understand treatment processes and then determine how best to integrate electrical systems for those technologies. He also discusses daily operations with plant staff to understand the needs of their facility, control methodologies, and from there, automates processes to meet operators' specific needs. Jonathan also brings a well-rounded background and depth of understanding for water and wastewater treatment. He knows that if the electrical and l&C systems aren't reliable and structured with redundancy then even the best treatment processes can't operate efficiently. Using this knowledge, he's able to look at all aspects of a project and determine key factors and design criteria necessary to creating a reliable system. So, he navigates existing constraints and evaluates equipment and plant layout to create electrical designs that maximize system reliability. Education BS, Civil Engineering BS, Business Management Registration I Certifications Professional Engineer AR, 22381 Charles (Preston) Locher, PE Site Development Preston is a civil engineer and project manager on Garver's Water Team with 11 years of experience. Preston leads the Fayetteville, AR Site Civil Group within the Water Design Center, providing site civil design for Garver's treatment plant projects. In addition to all areas of water and wastewater infrastructure design, his background includes land development project experience of various aspects within civil engineering design, including commercial and residential development, street and stormwater drainage design with project management experience in each. Preston's attention to detail and ability to visualize design concepts ensures that projects are efficiently designed with precision, meeting both client's functional requirements and aesthetic goals. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // J Education BS, Civil Engineering Registration I Certifications Professional Engineer AR, 17421 Daniel Hollinger, PE Collection and Distribution Daniel Hollinger is a project manager on Garver's Arkansas Water Team with 13 years of experience. His responsibilities include water and wastewater conveyance, pump station design, water storage design, water distribution modeling, and general site/ civil design. His experience includes large diameter transmission line design, water storage tank design, utility relocation, pump station design, master plan reports, water distribution modeling, and sewer rehabilitation projects. Daniel is responsible for preparing contract documents, technical specifications, construction drawings, contractor oversight, submittal reviews, and construction administration. Education MS, Civil and Environmental Engineering BS, Civil Engineering Registration I Certifications Professional Engineer TX,64930 Education Ph.D., Civil Engineering - Water Resources BS, Civil Engineering Registration I Certifications Professional Engineer AR, 18112 Randy McIntyre, PE, BCEE Water Technology Team Director Randy's ability to see projects from multiple perspectives comes from his well- rounded experience. He has held positions with varying responsibilities on a wide range of projects including water/wastewater treatment, collection and distribution systems, pump stations, master planning, construction management, and surveying. Randy understands how every system and operation work together, so when issues arise, he can identify the source and develop designs that effectively improve the whole system. He approaches each project by keeping communication open, bringing the team and client together to collaborate on an effective project solution. Additionally, Randy has worked within municipal organizations, and he brings this perspective to each project, understanding the needs and expectations of clients. All his combined experience instills an ability to look at projects from all angles and bring experts together to develop dialogue, finding resolutions to even the most complex of problems. Evan Tromble, PhD, PE Water and Wastewater Master Planning and Hydraulic Modeling Evan Tromble has 20 years of experience and is Garver's Water Practice Area Teams Manager, leading teams specializing in water resources, hydraulic modeling, master planning, utility management services, program management, and project implementation. As a leader in hydraulic modeling and master planning for Garver, he oversees hydraulic modeling, alternatives evaluations, and master planning efforts for water supply, conveyance, water distribution, and wastewater collection systems. Through open communication, Evan works with technical staff and clients to gather all necessary information to identify the best alternatives. He focuses on understanding the system as a whole, including identification and analysis of all potential operating conditions both current and future, so he can identify key elements impacting system performance. Through this in-depth system understanding, he develops optimized concepts for improvements that address system challenges while limiting the potential for stranded capital and negative unintended consequences. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // K Education PhD, Civil, Environmental & Sustainable Engineering MBA BS, Architectural Engineering & Civil Engineering Maureen Carlin, PhD Infrastructure Practice Over the course of Maureen's career, she has been fortunate to expand her experience across a wide array of project types, sizes, and regions, both locally and internationally. From this experience, she has built an extensive knowledge of horizontal directional drilling (HDD) and micro tunneling techniques and applications. Maureen evaluates a variety of techniques for each project by considering location, depth, and pipe size to determine the best installation method. She also leverages her industry connections to find answers to the most complex of project challenges so that her clients receive the right solution for their project. Education Btec Professional Diploma, Water Treatment Management MS, Environmental Engineering BS, Physics Registration / Certifications Chartered Engineer 604414 Registration I Certifications Class A Water Operator OK, 2128 Class B Laboratory OK, 2128 Class A Wastewater Treatment Operator OK, 2128 Greg Knight, CEng Wastewater Practice Leader Greg has dedicated his career to becoming a wastewater and biosolids treatment specialist and supporting operators with the troubleshooting and commissioning of their treatment plants. Having previously served as a plant manager for a large drinking water facility, he gained an in-depth understanding on the operational and environmental concerns and budget/maintenance challenges associated with water facilities. He carries that perspective into his design roles to develop solutions that are practical and meet the goals and needs of operators. Greg also specializes in advanced treatment methods, such as nutrient removal processes, advanced digestion, thermal hydrolysis, and biogas upgrading. Ronnie Graves Operations Ronnie's 55 years of experience spans a variety of roles from plant WTP operator to superintendent. His work involved the day to day responsibility of overseeing the plant's operations and staff. He enforced health and safety to create a reliable work environment for operators. Additionally, Ronnie has provided a range of complex supervisory, administrative, and technical work for water and wastewater treatment plants that includes the responsibility of regulatory compliance and maintenance of records. Ronnie's thorough and extensive knowledge of plant operations means he understands the needs of the operators and the daily challenges they face. He knows how to streamline operations and improve efficiency and quality to deliver a more effective operations approach. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // L Education MS, Civil Engineering (Environmental) BS, Civil Engineering (Environmental) Registration I Certifications Professional Engineer AR, 14115 Board Certified Environmental Engineer, 20-20012 Jeff Sober, PE, BCEE Biosolids Jeff has spent 24 years working on water and wastewater master plans, process designs, condition assessments, solids digestion/handling, and plant operations. His experience includes managing 25 WWTP improvement and expansion projects ranging in size from 0.2 MGD up to 405 MGD. Jeff approaches projects by identifying innovative, time-saving solutions to reduce project costs, successfully reducing scope and cost on over a dozen improvement projects. Having held a role as WWTP operator, Jeff has a thorough understanding of operator needs and challenges. He coordinates directly with the client to see that their project vision is delivered effectively. Licenses Certified Cybersecurity Fundamentals Specialist Certified Cybersecurity Risk Assessment Specialist Clay Tidwell, CFS, CRAS Cybersecurity Clay is the Instrumentation and Controls Team Leader in Garver's Water Design Center with over 9 years of experience in the water and wastewater industry. His experience as a former operator, systems integrator contractor, and as a consultant have afforded him unique perspectives and expertise in developing and executing sophisticated control system designs. Additionally, Clay's background with facility physical security systems and performance of cybersecurity assessments for several municipal water systems has provided him the experience to develop robust SCADA network designs with modern cybersecurity needs in mind. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // M AVIATION Kyle Bennett, PE Project Manager Education MS, Civil Engineering, Geotechnical Emphasis BS, Civil Engineering Registration I Certifications Professional Engineer AR, 14025 Education BS, Civil Engineering Registration I Certifications Professional Engineer AR, 20075 Education BS, Civil Engineering Registration I Certifications Professional Engineer AR, 15425 Kyle Bennett is a project manager on the Aviation team with 19 years of combined experience providing aviation and geotechnical engineering, pavement design, construction materials testing, and project inspection services. His experience includes a diverse portfolio of projects comprised of airfields, highways, bridges, industrial complexes, parking structures, and large-scale commercial developments. His primary responsibilities currently include project coordination, developing plans and specifications, client services, and construction management. Areas of design expertise include pavement design, pavement rehabilitation, materials selection, and evaluation/mitigation of geotechnical considerations. Chris Maestri, PE Team Leader Chris Maestri serves as the team leader for Garver's Northwest Arkansas Aviation Team and has eight years of experience in design, construction, and project management. His responsibilities include airport design, project management, construction management, client coordination, FAA and state agency coordination, and construction document production. He has worked with several airport throughout the state of Arkansas. His project experience includes construction of runways, taxiways, aprons, hangars, parking lots, and access roads. Adam White, PE Principal in Charge Adam White is a senior project manager on Garver's Aviation Team and serves as as Aviation's Operations Manager. He has 17 years of experience specializing in design, evaluation, and maintenance of airfield pavements. Adam's responsibilities include airport design, project management, construction management, airport master planning, coordination with commercial service and general aviation clients, coordination with the FAA, and writing specifications. His project experience includes construction of runways, taxiways, aprons, hangars, perimeter fencing, parking lots, access roads, ARFF stations, and terminals. Adam has participated in the development of four greenfield airports. He also specializes in pavement rehabilitation and has inspected over 10 million square feet of airport pavement. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // N Education BS, Architectural Engineering Glenn Boles Quality Control Glenn Boles is an Aviation Quality Manager on Garver's Aviation Team with over 35 years of experience contributing to the safety, development, and improvement of airports. Before joining Garver in 2025, Glenn dedicated 33 years to the Federal Aviation Administration, including 11 years as Manager of the Arkansas/Oklahoma Airports District Office (ADO). He has demonstrated knowledge of FM airspace, design standards and airport programs, and ability to achieve results from his previous experience with the Federal Aviation Administration. Glenn's responsibilities include assisting in administering Garver's Total Quality Management Team by reviewing project management plans, evaluating quality control (QC) reviewer assignments, assisting in QC reviews, and performing QC audits. Education BS, Civil Engineering Registration I Certifications Professional Engineer, AR, 21939 Chase Allison, PE Airfield Design Chase Allison is a project manager on Garver's Northwest Arkansas Aviation Team with over six years of experience in design and project management. Although his background is in commercial land and site development engineering, in his time with Garver, he has worked on taxiway and taxilane extensions, apron reconstruction, and hangar design projects for general aviation and commercial service airports. His responsibilities include airport design, project management, construction management, client coordination, and construction document production. Education MBA BS, Business Administration Registration I Certifications Accredited Airport Executive Licensed Pilot John Rostas, AAE, CM Aviation Planning John serves as a senior aviation planner for Garver's Aviation Team with 10 years of experience in airport planning and development. He has extensive experience as a planning consultant where he developed Airport Master Plans, Airport Layout Plans, environmental assessments, feasibility studies, and capital improvement plans. Prior to joining Garver, John served as Planning Manager for Birmingham Airport Authority where he managed the airport Capital Improvement Plan and oversaw development of the airport's cargo facility study and land use redevelopment plan. This experience enables John to understand the planning process from an Owner's perspective.John is a Certified Member of the American Association of Airport Executives and is a licensed pilot. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26~01, Engineering & Architectural Services // 0 Education BS, Fisheries & Wildlife Management Registration I Certifications Professional Wetland Scientist Education BS, Mechanical Engineering Registration I Certifications Professional Engineer, AR, 16917 NCEES Licensed Fire Protection Engineer Ryan Mountain, PWS Environmental Ryan Mountain is our environmental special studies manager and senior environmental scientist with 23 years of environmental and project management experience. Primary responsibilities include managing special environmental studies provided to Garver's aviation, transportation, industrial, federal, development, construction, and water business lines. This includes authoring and co-authoring NEPA documents, agency coordination, threatened and endangered species survey coordination, Phase I environmental site assessments, Section 404 permitting, wetland delineations, detailed wetland and stream mitigation planning and specifications, biological evaluations and habitat assessments, and preparing spill prevention and stormwater pollution prevention plans. He has previous experience in fish rearing, distribution, spawning, identification, and aging. Joe Kaminski, PE, FPE Hangar Construction Ryan Mountain is our environmental special studies manager and senior environmental scientist with 23 years of environmental and project management experience. Primary responsibilities include managing special environmental studies provided to Garver's aviation, transportation, industrial, federal, development, construction, and water business lines. This includes authoring and co-authoring NEPA documents, agency coordination, threatened and endangered species survey coordination, Phase I environmental site assessments, Section 404 permitting, wetland delineations, detailed wetland and stream mitigation planning and specifications, biological evaluations and habitat assessments, and preparing spill prevention and stormwater pollution prevention plans. He has previous experience in fish rearing, distribution, spawning, identification, and aging. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // P FIELD SERVICES Seth Yancey, PE Field Services Team Leader Seth is a project manager with 20 years of experience. As part of the Field Services Team, Seth reviews projects for constructability, coordinates with field staff, and interprets plans and specifications for each project. He also works directly with Owners, Design Teams, Contractors, and Inspectors so projects are constructed within specifications. Seth also has seven years of bridge design experience, which includes designing and detailing vehicular and pedestrian bridges, retaining walls, drainage improvements, stormwater layout, and bridge layouts for highway interchanges and roadway intersections, as well as coordinating and reviewing NEPA environmental processes and documents. Registration / Certifications Professional Engineer AR, 14058 OSHA 10-hour Construction Safety and Health ACI Concrete Field Testing Technician Grade I, 00093424 Jeff Jones, PS Registration / R • h Certifications ig t f W /S ay u rveys Professional Surveyor Jeff Jones is a Survey Team Leader with 41 years of surveying experience. AR, 1615 His responsibilities include survey data collection and processing data from field to OSHA 10-hour finish, along with the creation of right of way, utility, and construction easement legal ConStruction Safety descriptions. His experience includes ALTA/ACSM land title, boundary, topographic, cadastral, architectural, aerial photography control, civil pre-design, GPS control, and and Health construction surveys. Jeff also possesses legal and technical knowledge in regard to creating topographic survey maps, boundary maps, and descriptions for acquisition documents related to roadway and utility improvements as well as field evidence and procedures, records research, analysis of deeds, title reports, right of way, easements, and utilities. Education BS, Accounting Registration / Certifications Certified Project Manager Mark Schwartz, CPM Scheduling and Project Controls Mark Schwartz is a program controls manager and has 42 years of project control and financial analysis experience. Mark is responsible for working with teams to establish project controls specifications, schedules, and cost-loaded schedules. He establishes program and project reporting based on schedule and cost performance of contractors and claims support. Mark has experience maintaining project controls, scheduling, cost structure, work process improvement, and contract auditing. He has experience designing new technologies, developing project management tools and techniques, and managing financial infrastructures. Mark also has experience in risk management establishing risk registers, mitigation plans, and risk scoring. O Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // Q Education BS, Civil Engineering Registration I Certifications Professional Engineer AR, 20160 OSHA 30-hour Construction Safety and Health David Tag, PE Construction Services David Tag is a resident engineer on Garver's Field Services Team with 27 years of experience, including 4 years in inspection and 23 years in construction project management. He oversees projects, reviews contractor proposals, and maintains constructability and compliance with specifications. David coordinates with field staff, design teams, owners, and contractors, and he has managed over 100 highway and roadway projects in Missouri and Arkansas. His expertise spans traffic control, SWPPP, grading, paving, bridges, retaining walls, roundabouts, interchanges, signals, lighting, and utilities. Education Associate of Applied Science Registration I Certifications Surveyor Intern AR, 745 OSHA 10-Hour Construction Safety and Health Joshua Waite, SI Right of Way/Surveys Joshua Waite is a project surveyor with 10 years of experience. His responsibilities include managing field crews, implementing new software and equipment, and performing boundary, topographic, and ALTA surveys. He has a working knowledge of various equipment, such as scanners, drones, total stations, levels, and GPS field equipment. Joshua performs data processing using Carlson and Trimble processors. After processing, he utilizes Trimble, Virtual Surveyor, Pix4D, Carlson, AutoCAD, Civil3D, as well as OpenRoads and GeoPak with MicroStation, to create various deliverables, depending on project requirements. Additionally, Joshua compiles and reviews right of way acquisition drawings for ARDOT. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 APPENDIX s. Project Experience �GARVER Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // i TRANS PO RTATI ON College Avenue Corridor Plan and Design Fayetteville, Arkansas Garver provided project programming for improvements to College Avenue between North Street and Township Road and School Avenue between MLKJr. Boulevard and Cato Springs Road. We also provided LiDAR surveying, traffic studies, and design/construction plans for the North Street to Township Street section. Improvements consist primarily of corridor improvements associated with all modes of transportation, access control, traffic signal upgrades, and streetscapes. Rupple Road Fayetteville, Arkansas Garver provided environmental, surveying, and design services to relocate Rupple Road from Mount Comfort Road to Starry Night Drive. Improvements include a new four-lane bridge over Hamestring Creek and a divided four-lane parkway typical section with an adjoining 12-foot multi-use trail. Water and sewer improvements included approximately 1,500 linear feet of 10-inch gravity sewer and 2,000 linear feet of 12-inch water line. The design included boring under Hamestring Creek, maintaining a sensitive area. Nelson Hackett Boulevard Improvements Fayetteville, Arkansas Garver performed a traffic study to evaluate the improvements along Nelson Hackett Boulevard from Martin Luther King, Jr. Boulevard to Mountain Street. The improvements for Nelson Hackett Boulevard, which included new signals at South Street, a road diet along Nelson Hackett Boulevard, and improvements to the intersection at College Avenue/Rock Street, were analyzed for this study. The intersection at College Avenue/Rock Street was realigned in the build conditions thus creating two intersections. Both intersections were converted to stop-controlled on the minor approaches. The improvements for the intersection at College Avenue/Rock Street improved the performance of the intersection when compared to no-build conditions. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // ii Fulbright Expressway Ramp Improvements Fayetteville, Arkansas Garver provided design and construction phases services for the Fulbright Expressway Ramp and Shiloh Drive Improvements project. The scope of services included surveying, roadway and intersection design, preparation of property acquisition documents, bidding, and construction inspection and administration for the improvements to the Fulbright Expressway Access Ramps on Shiloh Drive and improvements to the intersection of Shiloh Drive and Steele Boulevard. Improvements consisted primarily of intersection reconfiguration, intersection signalization, turn lane additions by notch, widen, and overlay, and on- and off-ramp widening. The roadway pavement within the project limits was evaluated and rehabilitated through milling, overlaying, installation of paving fabric, and full-depth pavement replacement in areas with significant deterioration. Plainview Avenue Extension Fayetteville, Arkansas The scope of services includes surveying, design, water and sewer relocations and adjustments, preparation of property acquisition documents, and bidding services for the extension of N. Plainview Avenue from East Longview Street to East Appleby Road. Improvements will consist primarily of the widening of approximately 600 feet of existing roadway with sidewalks, the extension of N. Plainview Avenue approximately 2,000 feet through the Fiesta Square Shopping Center parking lot to E. Appleby Road, installation of a roundabout at the intersection of the existing Fiesta Square entrance with the new roadway, and improvements to the Fiesta Square Entrance/E. Rolling Hills Drive intersection with College Avenue. This project will also include signal design at Rolling Hills Drive at College Avenue. Cato Springs Road Fayetteville, Arkansas Garver performed traffic studies, design and property surveys, conceptual design, and final design services to improve Cato Springs Road from School Avenue to Razorback Road. The street was reconstructed and widened, including curb and gutter and drainage improvements. The typical section is two lanes (with three lanes at appropriate intersections) with curb and gutter and sidewalks on both sides with variable green space. I/ Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // iii Mount Comfort Road Fayetteville, Arkansas Garver provided engineering services to study and design improvements to widen Mount Comfort Road from 1-49 to Rupple Road, approximately 8,000 linear feet; relocate and replace Shiloh Drive with new street construction approximately 2,600 linear feet; and widen the ARDOT ramp approximately 600 linear feet. Improvements also included new traffic control signals at four intersections, off-site drainage improvements, and extensive water and sanitary sewer relocations. 1-49 Widening and Interchange Fayetteville, Arkansas Garver provided engineering services to widen approximately 2.5 miles of 1-49 from four lanes to six lanes from Porter Road through the Highway 112/71B interchange. The bridge types include 365-foot and 300-foot three-span continuous composite plate girder main lane bridges and a 512-foot three-span continuous composite plate girder ramp bridge. Frisco Multi-Use Trail Fayetteville, Arkansas Garver provided surveying, design, property acquisition documents, bidding, and construction services for the trail. Improvements included extending the trail from Martin Luther King, Jr. Boulevard to Walker Park and constructing a 120-foot tunnel, two prefabricated bridges, and a pedestrian hybrid beacon crossing. The tunnel under the five-lane arterial consisted of 120 feet of a 12-foot-wide by 10-foot tall prefabricated box culvert complete with drainage, lighting, and retaining walls on all approaches. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // iv Cato Springs Trail Fayetteville, Arkansas Garver provided surveying, environmental, design, and bidding services as well as ARDOT permits to improve the Cato Springs Trail, a pedestrian/bicycle trail. Improvements included extending the trail approximately 2.3 miles from Town Branch Trail to the Fayetteville Regional Park with lighting; crossings under existing bridge structures at 1-49, Highway 265, A&M Railroad, and Cato Springs Road; and new bridges over Cato Springs Branch and Fulbright Expressway main lanes. Town Branch Trail Fayetteville, Arkansas Garver provided design and partial bidding services to improve the Town Branch Trail. Improvements included constructing a new pedestrian bridge, upgrading a prefabricated bridge, and designing the trail under the Highway 71B (School Avenue) Bridge over the Town Branch Creek. Design also included hydraulic modeling for all structures and acquisition of a permit for ARDOT. Hamestring Bridge Fayetteville, Arkansas Garver provided surveying, design, drainage studies, environmental services, bidding services, and construction support services for the Hamestring Creek Pedestrian Crossing. HEC-RAS analysis was performed to certify a "no-rise" condition of the Hamestring Creek floodplain. This required various bridge/culvert configurations to determine the most hydraulic efficient and cost-effective structure. Improvements consisted primarily of the installation of a pre-cast three-sided pedestrian culvert located to the east of the Rupple Road bridge. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // v Spring Street Parking Garage Fayetteville, Arkansas Garver provided design services for a four-level, 236-space, 102,551-square-foot vehicle parking garage in the City's downtown area/entertainment district on the northwest corner of N. School Avenue and W. Spring Street, adjacent to and southeast of the Walton Arts Center. The new parking facility includes two new buildings: a parking garage and a three-story office building. Meadow Street Parking Deck Fayetteville, Arkansas Garver completed a structural evaluation and condition assessment to determine the scope and cost of the necessary repairs. Under a subsequent contract, the City hired Garver to provide design, bidding, and construction phase services to rehabilitate the Meadow Street Parking Garage, including roof top drainage repairs and ramp repairs. Bentonville Master Street Plan Bentonville, Arkansas Garver prepared an updated Master Street Plan for the City of Bentonville. The goal of this study was to create a comprehensive street network plan for all modes of transportation that works in conjunction with the current City plans. We prepared a detailed plan for developing infrastructure and recommended improvements in order of priority, including cost estimates. Project responsibilities also included updating the current street standard specifications and details, developing a local transit system plan, conducting a parking analysis, and conducting public involvement meetings. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // vi Kessler Mountain Regional Park Fayetteville, Arkansas Garver provided engineering services for a new regional park and sports complex. The new park covers approximately 200 acres and includes soccer fields, baseball fields, playground, parking, on-site wastewater treatment facilities, maintenance facility, passive and active recreation areas, paved and natural surface hiking trails, and road and utility infrastructure. Gulley Park Sound Wall Fayetteville, Arkansas Garver provided design and details for a retaining/sound wall on the north side of the proposed tennis/pickleball courts to be included in improvements to Gulley Park. Improvements outside of the retaining/sound wall will be completed by the City of Fayetteville. This project is part of a larger project that includes parking lot expansion, playground improvements, and several upgrades to park amenities Conway Pavement Management Program Conway, Arkansas Garver provided pavement condition inspection services for City streets. Data was collected, evaluated, and analyzed. Maintenance recommendations and budgets were developed for the City Engineering Department along with interactive budget planning tools and GIS compatible condition and planning information. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26~01, Engineering & Architectural Services // vii City of Rogers Future Land Use Plan Rogers, Arkansas The City of Rogers is one of the fastest growing metro areas in the country and developing rapidly. Garver worked closely with city staff to complete a comprehensive update to the Future Land Use Plan and Map. Intensive site visits to evaluate ground conditions, and demographic information was used to guide the land use categories. Public involvement included multiple community meetings and events, an interactive map, public survey, and communication with other entities involved with the community. Vision Plan and On-Call Planning Services Cave Springs, Arkansas Garver completed a comprehensive plan for the City of Cave Springs, which included a review of the historical and demographic conditions in the City, creation of goals and objectives, and detailed information for each land use category and the future land use map. We completely facilitated the process that included public input sessions, an interactive online survey, and multiple meetings with the City and stakeholders. Other services provided to the City include development review, updating zoning and development code, and assisting with updates and ongoing maintenance of the City Zoning Map hosted by Northwest Arkansas Regional Planning Commission. Centerton Downtown Master Plan Centerton, Arkansas Garver is partnering with the City of Centerton to develop a Downtown Master Plan that will serve as a blueprint for the City's future growth and identity. This project focuses on creating a connected downtown area that links the Old Town area with the New Town district. Garver is providing urban design, master planning floodplain mitigation strategies, and robust public involvement to make the plan reflect the community's vision. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // viii Springdale Future Land Use Updates and Unified Development Code Springdale, Arkansas The City of Springdale has selected Garver to revise and enhance the Future Land Use Plan for the city to reflect the rapid changes and growth in the city. Additionally, Springdale has selected Garver to complete a Unified Development Code for the city. This will include creating the structure of the code as well as updating component of the regulations. Areas that will be updated will include zoning code changes, downtown code clarifications, development regulations, design guidelines, and engineering updates. SPRINGDALETM WE'RE MAKING IT HAPPEN ARDOT On-Call Design Services Statewide, Arkansas Since 2002, Garver has provided services for consecutive on-call design contracts. Most task orders have been for signalization projects, which has included more than 150 signalized intersections. In addition, we have completed several task orders to design Safe Routes to School (SRTS) projects. These projects include designing sidewalks and many of the same design aspects that we use on our signal projects, such as flashers on signs, wheelchair ramps, crosswalks, and pedestrian signals. Monte Ne Road Rogers, Arkansas Garver provided design services to develop plans for roadway improvements. The project consisted of 3,500 linear feet of widening from a two-lane section with open drainage ditches to a four-lane section with underground drainage and sidewalk/trail improvements along either side of the roadway. _ Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // ix Highway 12 - Walton Boulevard to Greenhouse Road Bentonville, Arkansas Garver provided engineering services to study and design improvements for 2.1 miles of Highway 12. Improvements consisted of widening the two-lane highway to a five-lane facility with curb and sidewalks on both sides of the roadway. The project included underground storm drainage systems, traffic signals, and many other incidental systems and facilities. Garver also provided engineering services to relocate water and sewer facilities. Johnson Road Springdale, Arkansas Garver provided engineering services for this multi-phase infrastructure project that consisted of widening 2.11 miles of Johnson Road and widening 0.66 miles of Greathouse Springs Road/ Main Street then extending it 0.57 miles on a new location. The project provided a three-lane or five-lane facility through the project limits with curb and gutter on both sides of the roadway. The project provided an eight-foot multi-use trail on both sides of the street. Oak Street Corridor Study Conway, Arkansas Oak Street is one of Conway's legacy corridors traversing historically disadvantaged portions of the community as well as the City's largest retail areas. The route has significant redevelopment opportunities and dangerous conditions for vehicular and active transportation modes. The Oak Street Corridor Study is an integrated corridor plan that is driven by community engagement. The study addresses land use, development/redevelopment strategies, traffic safety, active transportation, access management, and conceptual transportation design. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // x Multimodal Mobility Studies Tulsa, Oklahoma Garver performed Multimodal Mobility Studies, including a multimodal level of service analysis using methods outlined in the Highway Capacity Manual on multiple streets. These studies included evaluating design alternatives that will provide a multimodal street to accommodate all road users, including vehicles, pedestrians, transit, and cyclists. In addition, traffic and safety analyses were conducted to identify the need for turn lanes, signal timing adjustments, pedestrian crossing locations, bike lanes, sidewalks, and enhancements along each corridor. City-Wide Traffic Study Bentonville, Arkansas Garver conducted a traffic study that included developing short, mid, long, and future projects. The study included evaluating 14 intersections (including traffic data collection, future traffic volume projections, crash analysis, stop control analysis, operational analysis, geometric analysis, and development of planning level costs) and providing recommendations to prioritize projects based on indicators such as functional classification, observations, and level of service. US 412 Springdale Bypass Springdale, Arkansas Garver designed 10 miles of a 20-mile, four-lane, fully controlled access interstate highway. The project includes nine grade separations and two hydraulic crossings. The grade separations were designed using two-span bridges supported by MSE abutments. These two-span bridges are plate girder superstructures with spans ranging from 100 feet to 135 feet. The remaining grade separations and hydraulic structures are prestressed girder structures with spans ranging from 60 feet to 130 feet in length. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xi Double Springs Road Bridge Rehabilitation Farmington, Arkansas Garver provided design, bidding, and construction inspection services to improve the Double Springs Bridge. These improvements consist primarily of bridge rehabilitation to address the deficiencies that were noted in the ARDOT Bridge Inspection Report. Uptown Overpass Rogers, Arkansas Garver provided alternative studies, surveying, design, maintenance of traffic plans, agency coordination, landscape architecture, environmental permitting, water/sewer relocations, bidding, and construction phase services. The project included improving approximately 1,700 feet of collector street roadway from W. Northgate Road to S. Rife Medical Lane, including an approximately 232-foot multi-span bridge over 1-49 and a mini-roundabout at the intersection. Improvements also included side paths, raised stamped and colored concrete intersection for pedestrian safety, a bike plaza with bike repair station, water fountain, and bike racks, and bus stop with shelter. Oak Street Overpass Rogers, Arkansas Garver provided alternative studies, surveying, design, maintenance of traffic plans, agency coordination, landscape architecture, environmental permitting, water/sewer relocations, bidding, and construction phase services. The project included road construction for approximately 2,700 feet of Oak Street, featuring a two-lane road section with a 10-foot side path, a 226-foot multi-span bridge allowing for access across 1-49, and three intersections utilizing two (two-lane) roundabouts and one mini roundabout. The mini-roundabout utilized stamped and colored concrete flower patterns and in-pavement LED lighting for aesthetics and safety considerations. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xii J.B. Hunt Drive Rogers, Arkansas Garver provided design, surveying, bidding, and construction inspection services to construct approximately 3,100 linear feet of South J.B. Hunt Drive from South 48th Street to Bellview Road. The project included constructing a two-lane roadway with a raised median, bike lanes, sidewalk, trail, and a new 450-foot bridge spanning Blossom Way Creek and the Razorback Greenway trail. Design services included hydraulic modeling and channel improvements to provide a no-rise certificate for Blossom Way Creek with the proposed bridge, as well as the addition of a roundabout at the Bellview Road and South J.B. Hunt Drive intersection. J Street Interchange Bentonville, Arkansas Garver is providing NEPA clearance and documentation, interstate justification, H&H, surveying, roadway and bridge design, property acquisition documents, bidding, and construction services for a new interchange on 1-49 and the extension of NE J Street from Tiger Boulevard to 1-49 approximately 1.1 miles. The project includes new bridges over Shewmaker Creek and 1-49, traffic/pedestrian signalization, sidewalks, drainage with stormwater BMPs, and lighting. 1-57 EIS Multiple Counties, Arkansas Garver provided an Environmental Impact Statement (EIS) for Highway 67 (future 1-57 corridor), including 35 miles of roadway on new location between Walnut Ridge and the Missouri state line. This EIS included a tiered approach starting with corridor selection then an evaluation of a range of alternatives within the corridor, public involvement, stakeholder coordination, detailed analysis of the natural and built environments, impact determinations, and environmental clearance documents. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xiii Northwest Arkansas National Airport Benton County, Arkansas Garver completed an Environmental Assessment and recommended a preferred alternative for a new intermodal connector proposed between Highway 612 (Springdale Northern Bypass) and the airport. This project involved critical threatened and endangered habitat associated with numerous Karst features. Other important project studies included residential and business relocations, sensitive noise receptors, historic or archeology resources, wetlands, streams, floodplains, hazardous materials, protected mitigation areas, and public involvement. Jacksonville GIS Mapping Jacksonville, Arkansas Garver digitally mapped the entire City's stormwater system network in less than four months. The completed first phase collected almost 14,000 above and below ground features using aerial imagery, LiDAR, and other geospatial products. By digitally mapping the stormwater system prior to having "boots on the ground," the client saved about 30% of the cost of a field only collection, and Garver gains the ability to accurately scope and fee for the second phase of the field work; a win-win. Mapping and GIS Support Gentry, Arkansas Garver successfully developed a cloud-based GIS map of Gentry's wastewater collection system using Esri's ArcGIS Online. The project included digitizing system assets, creating a detailed asset database, and implementing a GIS data model. Garver trained City staff on using the system and GNSS equipment for field data collection. The resulting GIS supports Gentry's wastewater master planning and ongoing asset management, with Garver continuing to provide administrative and technical support. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xiv GIS Deployment and On-Call Washington County, Arkansas Garver modernized Washington Water Authority (WWA) GIS and field data systems by deploying Esri's Water Distribution tools and customizing data for migration. Field workflows were improved with new tech and training, enabling efficient data collection across 418 square miles. Garver developed GIS tools to analyze water demand and support future planning and launched pressure prediction tools, streamlined permitting, and managed ArcGIS Online. This significantly enhanced WWA's GIS capabilities. GIS System Design and Migration Elkins, Arkansas Garver delivered comprehensive services for the creation of a new cloud-based GIS system for Elkins Water and Wastewater system, establishing a modern geospatial foundation for infrastructure management. Garver's GIS Team delivered field verified utility mapping, custom automated data collection methods for increased efficiency, system integration, and ongoing staff training that enabled long-term data management. Sedgwick Sports Complex Site Assessment Sedgwick, Kansas In October 2022, members of the Sedgwick Recreation Commission met with staff from Garver and a local contractor to discuss a new sports complex on 17.4-acres of city-owned land on the Cwity's east side and requested a feasibility study to determine what was possible on the site and the costs associated with development. They envisioned new baseball fields, a maintenance building, a possible multi-use field, and a long-term space for a future recreation center. Using that input, Garver prepared the feasibility, analyzing the site for utility, access, zoning, flood, and land use impacts. • Covered Boot� Grav�I Parking 1 Accessible, Parkinp 1 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xv Naftzger Park Wichita, Kansas Garver provided surveying, civil engineering design, and local coordination for the redevelopment of the park. The park features a large public lawn, performance stage, LED screen, space for food trucks, dog run, outdoor seating, fountain, and landscaping. The lawn was split between natural grass and more durable artificial turf where more activities will be programmed. Underneath the lawn is a large underground detention basin, which serves as relief for an overtaxed storm sewer system in the adjacent Douglas Avenue and collects a significant portion of on-site runoff. Garver was subsequently hired for two additional improvement projects. Due to the success of the park, the natural grass portion of the event lawn became difficult to maintain. Garver's landscape architects designed improvements that included replacement of grass with artificial turf, a concealed based for the City's annual holiday tree, and game tables. A 2025 project added a new public restroom to the park. The Point Huntsville, Alabama Garver provided engineering services for the Point, a planned 12,000-square-foot urban park in the middle of the MidCity District. The Point is located on a triangular island in the middle of MidCity Drive, which can be closed to traffic on weekend, creating a one- block walkable event space. From the north, a small seating node flanked by a sinuous custom wood structure built around a fire pit welcomes visitors. Landscape lighting will create a space that glows and becomes a nighttime centerpiece of MidCity District. The park opened in fall 2025. Southwest Trail Multiple Counties, Arkansas Garver is providing complete environmental, survey, and design services to support a recreational trail from Hot Springs to Little Rock that is dedicated for pedestrians/cyclists. The Southwest Trail will provide a safe route for pedestrians and cyclists to enjoy outdoor recreation while simultaneously providing an economic stimulus to central Arkansas. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xvi Dean's Trail Springdale, Arkansas Garver provided a preliminary study, surveying, environmental, permitting, design, cost estimating, and bidding services. Improvements include 1) extending a new 12-foot-wide shared use trail from Shiloh Trail to Oriole Street, 2) constructing a 12-foot-wide concrete trail from Oriole Street to the west and southward through a tunnel under Hwy. 412 west of the Thrush Street Fire Station, ending on the south side of Hwy. 412, 3) constructing a 12-foot- wide concrete trail from the end of Phase 2 southward along the unnamed tributary of Clear Creek to Don Tyson Parkway, and 4) designing a 12-foot-wide concrete trail from Don Tyson Parkway to a pedestrian bridge over Hwy. 265, connecting to the Fayetteville Trail System at Lake Fayetteville. Mena Park Bike Trail Mena, Arkansas Mena Park Bike is being built through phased development, eventually connecting the City of Mena, Arkansas, to Queen Wilhelmina State Park. Once complete, this downhill bike park will fill a monumental slot of being the largest lift-served mountain bike park in the world built from scratch solely for mountain biking. Garver is performing survey, environmental services, H&H modeling, on-site wastewater plant design, water line improvements, electrical, and site civil design services. Shillcott Bayou Pedestrian Bridge North Little Rock, Arkansas Garver provided surveying, conceptual planning, environmental handling and documentation, final bridge design, bidding, and construction inspection services to replace the bridge. The bridge has a clear width of 14 feet and approximately 16 feet out to out, which makes it suitable for both pedestrians and cyclists. The new bridge has an approximately 6.5-inch concrete slab supported by prefabricated steel truss spans with a total length of approximately 145 feet. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xvii Lake Atalanta Bridge Replacement Rogers, Arkansas Garver provided design services to repair and improve structures that were damaged at Lake Atalanta Park due to recent flooding. The design services included hydraulic modeling and scour analysis, bio-engineered stream bank stabilization, and structural analysis of existing and proposed structures. Missouri Creek Drainage Study Fayetteville, Arkansas Garver provided surveying, hydrologic/hydraulic studies, design, and bidding services for improvements within the Missouri Creek watershed basin. Improvements included installing an underground drainage system along Stanton Avenue between N. Elizabeth Avenue and Rolling Hills Drive with a potential settling basin near Rolling Hills Drive, along Loxley Avenue between Cortland Street and Harold Street, and capacity improvements to Missouri Creek between Rolling Hills Drive and Stubblefield Road, including a potential box culvert crossing replacement on Eton Street. Coler Creek Drainage Study Bentonville, Arkansas Garver conducted a drainage study of Coler Creek. The study included a detailed hydrologic analysis using HEC-HMS for current and future conditions. It also included a detailed hydraulic analysis using HEC-RAS. A Letter of Map Revision (LOMR) was submitted to the Federal Emergency Management Agency (FEMA) on behalf of the City to account for changes to flood mapping due to construction of a bike trail with pedestrian bridges throughout a two-mile reach of creek. Detailed results and mapping were provided to the City along with coordination with FEMA for the LOMR application. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xviii Downtown Flood Study Siloam Springs, Arkansas Garver provided 1D floodplain modeling and mapping at Sager Creek. Under this work order, the City completed a flood study and submitted a FEMA LOMR for approximately 4,200 feet of Sager Creek in the downtown area from a point approximately 800 feet upstream of the Benton Street Crossing to a point approximately 350 feet upstream of the Main Street Crossing. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xix WATER & WASTEWATER Noland WWTP Master Plan and Upgrades Fayetteville, Arkansas Garver provided master planning, conceptual, and is currently conducting 30% design services to upgrade the existing Noland Wastewater Treatment Plant (WWTP). We developed hydraulic and process models, conducted staff interviews, performed technical evaluations, and drafted preliminary 30 renderings. The Phase I improvements design project is focused on critical infrastructure upgrades needed within the next five years to mitigate aging equipment failures and maintain operational resiliency. Later phases (5-10 years and 10+ years) will address long-term capacity expansion and additional process enhancements as flows and loadings increase. We also provided a Phase I 10% design deliverable to maintain project momentum, refine the prioritization approach, develop construction sequencing options, and identify the recommended design criteria to provide effective, custom solutions. C ND. D '' Massard WWTP Master Plan Fort Smith, Arkansas The City of Fort Smith selected Garver to develop a master plan for the Massard Wastewater Treatment Plant (WWTP). Garver performed evaluations of the existing treatment process to identify which systems should be reused, rehabilitated or replaced. Following the evaluation, the Garver team develop a phased implementation plan for the WWTP process and evaluated cost effective ways to expand the plant while maintaining the existing infrastructure. Plant improvements included the design of a new biological treatment process to address future flow and permit limits. The master plan included a detailed hydraulic survey and modeling to identify hydraulic constraints in the system and detailed process modeling to evaluate treatment alternatives and determine which will be the most cost effective. Also included was the development of a phased approach to implement the alternatives based on triggers for the plant. Garver assisted with evaluations of potential funding sources and opportunities, including the Water Infrastructure Finance and Innovation Act (WIFIA) loan program administered by the Environmental Protection Agency. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xx f Bentonville Town Branch Sewer Improvements Bentonville, Arkansas Garver is designing critical sewer infrastructure improvements for the Town Branch Sewer Basin, which serves Bentonville's historic downtown, the new Walmart campus, and surrounding neighborhoods. The project addresses significant capacity limitations caused by major interceptors experiencing surcharge conditions and overflows. These improvements are critical to support urban growth and maintain compliance with regulatory requirements. Garver is designing sewer improvements for all six identified CIP projects within Town Branch Sewer Basin under a single program, providing hydraulic modeling, validation of the City's proposed CIP projects for the basin, and • detailed design. The work includes upsizing more than 11,000 feet of gravity mains and associated infrastructure throughout the sewer basin to provide capacity for near-term development and future growth based on the recently finalized 2050 land use plan. Bentonville Water Utilities selected Garver as their most trusted consultant to manage accelerated design and construction timelines while maintaining a high level of quality, allowing the City to keep pace with development and growth demands within the basin. N ' _, A�,,, CIP Project: North Lift Station capacity: 7 MGD·�,, o'jQ Shewmaker Interceptor Improvements � :.��.. 7 I I, ,:J, I L r 1 CIP Project: • ) Revised CIP Project: SM-25, I 6,575 LF of 24-inch pipe ® ----...,_ T Bentonville, Arkansas Garver is providing comprehensive services to Bentonville Water Utilities (BWU) for the Shewmaker Sewer Basin Interceptor Improvements, including hydraulic modeling, validation of the City's proposed capital improvement plan projects for the basin, 3,400 LF of 18-inch , r, .,, ,. force main .;tr,.,,tl e WRRF Lift Station North LS • • • Force Main CJP - Revised SM·25.l - Revised SM-25.2 ,.,,,.,,·1 ' Revised CI; Project: SM-25. 2 ,/ 298 LF of 24-inch pipe 9,192 LF of 18-inch pipe ¾!:!} ,� I -Ll- .,,J "'' 11�s, , .. and detailed design of the improvements. The basin improvements were split into two phases in order to accelerate relief from additional capacity. Phase 1 includes approximately 7,500 linear feet of upsized gravity sewer to eliminate current constraints and significantly increase capacity within the lower section of the interceptor. A second phase will address 9,000 linear feet of upstream sewer improvements as well as the design and construction of a new North Lift Station and force main to the Bentonville Water Resource Recovery Facility. BWU selected Garver as their most trusted Gravity Main Diameter ,..�. :-v�l .._t:os(:'��.,,�,s, Force Main Diameter i!], �· Ifill .. EJrdlt 1u11 Nf 1 d�I ,.; consultant to manage accelerated design and construction timelines while maintaining a high level of quality, allowing the City to keep pace with development and growth demands within the basin. I ■ Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxi Bentonville Comprehensive Performance Evaluation Bentonville, Arkansas Garver performed a comprehensive audit and evaluated ways to improve operations at the Bentonville WWTP, comply with future potential permit requirements, and accommodate increasing flows. Garver's evaluation included the WWTP's liquid and solids trains. We identified alternatives to replace equipment, improve process control and performance, and reduce power costs. The audit also focused on energy efficiency, providing a variety of ways to reduce current costs through operational efficiency and lessen future capital improvements by maximizing the plant's infrastructure. Garver recommended that the identified capital improvements be separated into three phases, which starts with the first phase of optimizing the BNR process, along with implementing automated controls and monitoring. The phases following will be designed to provide long-range solutions to meet phosphorus limits, first at 5 MGD then followed by a 12 MGD build- out scenario. This project was designed by our Fayetteville Water Design Center. Conway Tupelo Bayou WWTP and Pump Stations Conway, Arkansas Garver delivered the Tupelo Bayou WWTP, which replaced two existing plants to serve the rapidly expanding Central Arkansas metropolitan area for the next 20 years. The new greenfield WWTP was designed to process an average daily flow of 16 MGD and utilizes a conventional activated sludge process to achieve the discharge limit. The collection system improvements included 22,352 feet of 36-inch diameter force main; 17,000 feet of 48-inch gravity line; 1,500 feet of 24-inch force main; two new pump stations; and upgrades to one of the WWTPs. The existing Stone Dam Creek WWTP was taken out of service upon the completion of the Tupelo Bayou WWTP. This station along with the East German Pump Station was replaced by the new Central Pump Station which serves to pump flows to a gravity line flowing westward toward the Tupelo Bayou WWTP. Ultimately, this project included diverting flows from the old WWTPs to the new WWTP. This project was designed by our Fayetteville Water Design Center. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxii TRA MCRWS WWTP Improvements Midlothian, Texas Garver provided master planning, design, and construction services for the expansion of the existing 3 MGD treatment plant to 9 MGD, with long-term planning to treat sewer-shed build-out. We developed a plant hydraulic model, plant water system hydraulic model, and plant process model to identify water system needs and plant system deficiencies and problem areas. Technical evaluations were completed for the plant's electrical service, building use, influent pump station wet well, hydraulic capacity, solids management, future expansion layout, and solids loading. Using information and insights from these evaluations, our team developed a comprehensive capital improvements plan. Each project in the CIP will have phasing, OPCC, O&M budget impacts, and flexibility criteria with a detailed timeline. This project was designed by our Fayetteville Water Design Center. Celina Water and Wastewater Master Plan and Modeling Celina, Texas Garver conducted a City-wide water and wastewater modeling and master planning effort. The project evaluated current water and sewer needs, as well as projected needs for the full build-out population of 343,267. The wastewater collection system model was developed based on a combination of GIS, record drawings, and survey data, with field survey being required on portions of the City that lacked reliable elevation data to assess the system hydraulics. The buildout evaluations were used to identify a roadmap for system improvements. Due to the rapid growth projected, hydraulic modeling evaluations were performed on an annual basis to determine project priorities. This project was designed by our Fayetteville Water Design Center. .. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxiii NACA WWTP Master Plan & Expansion Bentonville, Arkansas NACA hired Garver to develop the conceptual design for the first expansion of the WWTP, which helped maintain adequate treatment capacity to meet the needs of Northwest Arkansas's growing population. The planned capital improvements included modification, refurbishment, and expansion of existing facilities to increase liquid treatment process capacity average day flow rate from 3.6 to 7.2 MGD. To project future loading rates, Garver analyzed and tested daily flow composite samples at strategic points in the process stream, like the raw influent, oxidation ditch effluent, secondary clarifier effluent, polishing filter effluent, and final effluent. Garver developed and calibrated a process model of the existing facilities' process data to help with this evaluation, verified the existing plant biological treatment, identified any biological volume necessary for the planned capacity expansion, and determined the capability of existing processes to meet future nutrient limits. RWU Comprehensive Water Master Plan Rogers, Arkansas Garver evaluated improvements needed to accommodate continued growth within the existing service boundary and expansions for the 5-year and 35-year planning horizons. Utilizing ArcGIS based software, Garver also developed a hydraulic model to evaluate the water distribution system for the Rogers Water Utilities (RWU). Siloam Springs WWTP Siloam Springs, Arkansas Garver partnered with Siloam Springs to develop, design, and implement enhanced nutrient removal processes at the WWTP. The project's first two phases are now online and improve the liquid process treatment train through biological nutrient removal (BNR) and chemical nutrient removal (CNR). The new bioreactor is producing a discharge phosphorus of less than 0.4 mg/Land nitrate less than 10 mg/L. Additionally, membrane treatment is planned as a third phase improvement to meet an extremely stringent phosphorus limit of 0.037 mg/L. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxiv SWU WWTF Phase 1 & 2 Improvements Springdale, Arkansas The Springdale Wastewater Treatment Facility is undergoing a multi-phase improvement plan. Phase I included construction of several new facilities to meet an increased targeted capacity and treatment criteria that was outlined in a peak flow study completed by Garver in 2019. The improvements include increasing the design and peak flow pumping capacity, two new 150-foot diameter final clarifiers, rehabilitation of the existing four final clarifiers, new mixed liquor splitter box, RAS/WAS pumping upgrades, site improvements, electrical improvements, and SCADA improvements. Garver's work will also include surveys (including 3D scanning), geotechnical coordination, permitting assistance, bidding (including pre-qualifying contractors), construction phase services, and warranty services. Garver is currently designing Phase 2 of the WWTF upgrades, which include a new disk filter facility, upgrades to site electrical capacity, and new yard piping. Porter Road Water/Sewer Fayetteville, Arkansas Garver provided design and full-time construction inspection services for approximately 3,000 linear feet of water lines (up to 12-inch) and facilities, including bored steel encasement and approximately 5,000 linear feet of gravity sewer lines (mostly 18-inch) and facilities, including bored steel encasement to accommodate improvements at the Interchange of 1-49, Highway 112, and Highway 71B. SWU Water and Sewer Master Plan Springdale, Arkansas Garver created a comprehensive water and sewer master plan for Springdale Water Utilities (SWU). Based upon planning data obtained from the Northwest Arkansas Regional Planning Commission, the service population for SWU was estimated at approximately 110,000 in 2020 (5-year planning horizon) and approximately 169,000 in 2040 (25-year planning horizon). The total water and wastewater CIP for the 25-year planning horizon exceeded $236 million. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxv Sulphur Springs WWTP Master Plan and Improvements Sulphur Springs, Texas Among several plant-wide improvements, Garver provided design and planning services for a new headworks facility including fine screening and grit removal at the Sulphur Springs WWTP. The design took into account multiple design considerations, including varying flow from both gravity and pumped influent, unknown peak demands, and re-utilization of existing infrastructure. Garver provided a detailed technology evaluation of screen and grit removal technologies, and ultimately recommended fine screens with vortex grit removal. The facility included automated flow split to primary clarification, as well as a new primary splitter box with an automated weir gate to automatically utilize the plant's peak flow basins for peak flow shaving. The design also incorporated challenging hydraulics within the existing processes. Kaw Lake Water Supply Enid, Oklahoma Garver served as program manager and lead designer for a multi- phased, $315 million program to deliver raw water from the Kaw Reservoir to the City of Enid. The program provided the City of Enid with a new SO-year sustainable water supply to supplement its depleted groundwater supply. The project included a new intake structure in the Kaw Reservoir and approximately 70 miles of raw water conveyance, including 36-inch piping and booster pumps along the alignment. Garver's services also included providing environmental, design, and communication support services. Okmulgee Raw Water Line Okmulgee, Oklahoma Garver completed a project to evaluate, recommend, and design methods to rehabilitate the City of Okmulgee's raw water conveyance system. To increase raw water conveyance capacity in an economical manner, Garver used a low-impact, trenchless method that cost $2.1 million less than an estimated open-trench technique. The solution lay with a 90-year-old concrete pipe and a trenchless technology known as sliplining. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxvi TRA Central Regional Wastewater System Master Plan Dallas, Texas Garver performed master planning and modeling on the 189 MGD facility. The Garver Team evaluated process changes, which included analyzing peracetic acid and low pressure UV for alternative disinfection, evaluating the potential for reuse of the effluent, evaluating harvesting and recovery of phosphorus through the biosolids side stream, and evaluation of post aerobic digestion for nitrogen removal. Kessler Mountain to Cato Springs Road Water Main Fayetteville, Arkansas Garver provided design, bidding, and construction phase services for 6,300 linear feet of 18-inch water line connecting two six million gallon water storage tanks to the distribution system near Cato Springs Road (Highway 265). Baxter and Mount Sequoyah Tanks Fayetteville, Arkansas Garver provided design, bidding, and construction support services to repair and paint the five million gallon Baxter ground storage tank and 250 thousand gallon Mount Sequoyah elevated tanks. Greenland Sewer Rehabilitation Fayetteville, Arkansas Garver provided design services for approximately 11,000 linear feet of removal and replacement, pipe bursting, upsizing up to an 18-inch pipe size, and point repairs to existing gravity sewer and manholes as defined by a previous sanitary sewer evaluation study. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxvii Lake Thunderbird Raw Water Conveyance Norman, Oklahoma Garver designed approximately 13,000 linear feet of 48-inch raw water line from Lake Thunderbird to the Vernon Campbell WTP. These conveyance improvements were designed to increase conveyance capacity to meet the short-term water demand. Norman's population growth has created increased water demands on the Norman WTP and the 44-year-old pipeline. Stewart Creek North Interceptor Frisco, Texas Garver has provided conceptual and final designs for over 8,700 linear feet of new 18-inch to 48-inch FRP sewer interceptor in Phase 1 and over 10,000 linear feet of 30-inch to 48-inch FRP interceptor in Phase 2 of this project. The interceptor alignment parallels an existing 24-inch to 27-inch line, as well as provides service to a new area. Pump Station Evaluation/Design Hot Springs, Arkansas, Arkansas Garver assessed wastewater pump stations in Hot Springs to identify improvements for increasing station reliability and capacity. Over 200 pump stations were included in this project under three separate contracts. EL-3 and EL-5 Gravity Sewer Lines Fayetteville, Arkansas Garver provided design, bidding, and construction inspection services for approximately three miles of up to 42-inch gravity sewer line primarily buried up to 17 feet of cover but with approximately 400 linear feet of elevated emplacements. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxviii AVIATION Drake Field Airport Runway Pavement and Lighting Rehabilitation Fayetteville, Arkansas Garver provided design, bidding, and construction support services to rehabilitate aging Runway 16-34 pavements and upgrade the airfields electrical and infield drainage systems. At a total cost of $6.7M, this project is the most comprehensive development completed at Drake Field in over 30 years. The project encompassed a broad scope of work including mill and overlay of runway and connector taxiway pavement, runway grooving, airfield markings, replacing deteriorated drainage infrastructure, new runway edge lighting, new airfield signage, upgraded Air Traffic Control Tower controls, new electrical vault, and new backup generator. Project design was completed on an accelerated schedule to take advantage of additional discretionary federal funding that became available in 2021. By securing these additional funds, the project costs were able to be 100 percent federally funded, with less than $2.00 in costs attributed to the City for AIP ineligible expenses. Construction within the Runway Safety Area was completed during a single 16-day runway closure phase to minimize impacts to airport operations. Drake Field Airport Taxiway Lighting Rehabilitation Fayetteville, Arkansas Garver provided design services to rehabilitate the existing taxiway edge lighting system for all taxiways on the airfield. Rehabilitation included clearing conduit of existing conductors, installing new conductors in existing conduit, and replacing all existing incandescent taxiway edge light fixtures with new LED fixtures and transformers on existing base cans. Drake Field Airport Taxiway B Widening Fayetteville, Arkansas Garver provided design services to widen and rehabilitate Taxiway B to accommodate charter traffic, including the Airbus A321 and Boeing 757. As part of the widening project, the existing Taxiway B pavement was also analyzed through a Pavement Condition Index (PCI) survey to determine the appropriate rehabilitation method. After performing the PCI survey, it was determined that the existing pavement was in need of an overlay. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxix Drake Field Airport Apron Rehabilitation Fayetteville, Arkansas Garver provided design, bidding, and construction support services to rehabilitate Fayetteville-Drake Field's 25,000 square yard concrete terminal apron. The terminal apron had multiple widespread distresses, including spalling, cracking, corner breaks, and ponding. To acquire a special $500,000 grant from the Arkansas Department of Aeronautics, Garver completed design in under 45 days. Drake Field Airport Airport Master Plan Fayetteville, Arkansas Garver is working with the airport to develop an Airport Master Plan with the primary goals of 1) identifying the actual developable envelope on and near airport property, and 2) identifying the highest and best use of the limited developable land. To accomplish these goals, the master plan includes a comprehensive hydrological analysis to accurately delineate wetlands on and near the airport. This will establish what the actual developable limits will be for airport development. Concurrently, the master plan also involves engaging heavily with local and regional stakeholders to identify what the existing and potential uses of the airport could include. This includes a thorough vetting of the based aircraft waitlist. In doing so, we will be able to optimize the limited developable space to make sure that the development will support based aircraft most able to generate sustainable revenue and balance community goals. Drake Field Airport Wildlife Fencing Rehabilitation Fayetteville, Arkansas Deficiencies with the existing wildlife fencing were identified during the FAA's 2022 Part 139 inspection. Existing barbed wire fencing south of Runway 34 was not compliant with current FAA standards and its poor condition provided little barrier to local wildlife. Existing chain link fencing to the north was overgrown and in need of localized repair to restore its condition. Garver led this project to replace approximately 3,500 linear feet of existing barbed wire wildlife fence southeast of Runway 16-24 with 10-foot-tall wildlife exclusion fence and performed localized repairs to approximately 3,400 linear feet of existing chain link fence. The project also included clearing and grubbing of existing fence lines to be retained. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxx Bentonville Municipal Airport Corporate Hangar Construction Bentonville, Arkansas Garver provided surveys, site civil design, and construction phase services for a privately-funded, 19,740-square-foot hangar on the east side of the airfield. Constant coordination with the architect and developer was critical in providing a site that met all the developer's needs. Due to the building's large size and limited space for development, existing water and sewer lines had to be relocated both inside and outside the airfield fence. An underground detention basin was also installed, as the existing drainage infrastructure could not accommodate the additional hangar area without adding detention capacity. Garver led the project through the City's large scale development review process to ultimately receive approval for construction. Bentonville Municipal Airport Southeast Taxiway B Extension - Phase 11 Bentonville, Arkansas Garver provided surveying, geotechnical, design, bidding, and grant closeout services associated with a 600-linear foot parallel taxiway extension to Taxiway Bat Bentonville Municipal Airport. This extension provided direction access to the recently extended Runway 36 end, providing a safer alternative to the back-taxi that aircraft currently had to perform to access the full runway length. Springdale Municipal Airport East Hangar Construction Springdale, Arkansas Garver provided design and construction services for the construction of a new taxiway, apron, and a 100-foot by 100-foot hangar facility on the northwest side of Taxiway Bat Springdale Municipal Airport. As part of the design effort for the project, Garver led coordination efforts with multiple entities including the city's Large Scale Development Process, state and local funding agencies, the airport board, and other client representatives. Garver assisted the City in procuring two separate Arkansas Department of Aeronautics grants for all site work associated with the project. In addition, Garver assisted the Airport in procuring a Construction Manager for construction of the 10,000 square foot hangar. Springdale Municipal Airport East Taxiway Extension Springdale, Arkansas Garver provided survey, engineering, bidding, and construction phase services for the extension of the existing east parallel taxiway at ASG. This project included: relocation of an 18" sewer main, extension of a quadruple barrel 8' x 10' box culvert, engineering to mitigate flooding impacts, relocation of the 18 end PAPI system, coordination with FAA to perform a flight check for the 18 PAPls and the FAA owned glideslope system, as well as 1300 linear feet of paving, relocation of the Runway 18 threshold, lighting and signage upgrades, and environmental documentation. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxxi Siloam Springs Municipal Airport Parallel Taxiway Rehabilitation Siloam Springs, Arkansas Garver provided survey, design, bidding, and construction phase services for the reconstruction of approximately 1,600 feet of parallel taxiway. Reconstruction consisted of new full-depth pavement and lighting infrastructure. Rogers Executive Airport Taxiway Construction and Taxilane Rehabilitation Rogers, Arkansas Rogers Executive Airport was in need of hangar development space. Garver provided survey, design, bidding, and construction phase services to reconstruct an existing taxiway and build a new taxilane for access to previously undeveloped green space. In the early design stages of the new taxilane, we worked closely with the Airport to determine a site layout that would provide optimum development potential adjacent to the new taxilane. A critical element of the project was the design and construction of approximately 2,050 feet of water, 1,550 feet of sanitary sewer, and 1,500 feet of gas main lines to accommodate future hangar development. Additionally, approximately 50,000 cubic yards of earthwork had to be moved to adjust the site elevation by as much as eight feet in some locations. Garver also designed the relocation of an existing detention pond that was not sized or located in an efficient manner to serve future development. The project included reconstruction of the existing taxiway and the removal of an outdated T-hangar. Clarksville Municipal Airport Lighting Rehabilitation Clarksville, Arkansas Garver designed a complete overhaul of the airport's lighting system. This included designing new LED runway edge lights, LED airfield signage, LED PAPls, an LED windcone, and a new electrical transclosure for all airfield electrical power equipment. Boone County Regional Airport Airfield Pavement Rehabilitation Harrison, Arkansas Garver provided design, bidding, and construction phase services to rehabilitate the parallel taxiway and apron pavement at Boone County Regional Airport. The project included rehabilitation of approximately 115,000 square yards of taxiway and apron pavement using slurry and fog seal, reconstruction of 800 square yards of asphalt pavement, reconstruction of approximately 150 square yards of concrete pavement, and installation of pavement markings. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxxii Fl ELD SERVICES ARDOT On-Call Surveying Services Statewide, Arkansas Garver is currently providing on-call topographic, boundary, and construction surveys for the Arkansas Department of Transportation. Garver has been assigned tasks to establish mapping, horizontal control, and vertical control for statewide projects. Garver has also provided control and hydrographic surveys for various projects. In addition, Garver has provided right of way surveys and plans and has completed several right of way projects. Kaw Lake Water Supply Enid, Oklahoma Garver provided control, topographic, hydrographic, boundary, and right of way acquisition documents for the City of Enid's Kaw Lake Reservoir program. The scope of the project involved combining all the types of surveys utilizing every piece of survey equipment in our arsenal, including an eBee fixed-wing drone to perform the aerial topographic surveys for the 70-mile-long corridor. Lake Norfork Intake Pump Station Mountain Home, Arkansas Garver performed bathymetric surveys of the surrounding area on Lake Norfork at the proposed water intake structure located off Cranfield Road, near the Cranfield Park Recreation area. Garver was tasked to conduct a water source intake study for the City of Mountain Home. The City's SO-year-old intake needed to be replaced, and this project included identifying potential sources of water, including wells, riverbank filtration, and another lake intake. , Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxxiii ARDOT Connecting Arkansas Program (CAP) Statewide, Arkansas Garver is providing construction engineering and oversight support as well as project controls and program management support for approximately 37 miles and $440 million of construction projects located in Northwest Arkansas. Garver is developing, updating, and reporting on 36 CPM schedules; developing and leading risk workshops; publishing risk memos with recommendation on contingency; implementing project update meetings; reviewing and inputting data into the ReCAP quarterly publication; and working with the budget manager on cost reports. 1-49/Don Tyson Parkway Interchange Springdale, Arkansas Garver provided design and construction engineering and inspection services for a new interchange on 1-49 and to extend Don Tyson Parkway from 48th Street to 56th Street. The project provides a five-lane facility on Don Tyson Parkway through the project limits, with medians, curb and gutter, and sidewalks on both sides of the roadway. Har-Ber Avenue Extension Phase I and II Springdale, Arkansas Garver provided comprehensive construction inspection services for the Har-Ber Avenue and 40th Street coridor improvements. The project spans Har-Ber Avenue from 48th Street to Gutensohn Road and includes the widening of 40th Street, featuring an overpass over Interstate 49. Key components include sidewalks, pavement, bridges (including two steel bridges), utilities, lighting, drainage, traffic signals, and MSE retaining walls. Our responsibilities included oversight of plans and specifications, monthly progress reporting, and submittal reviews to uphold quality and compliance throughout the project lifecycle. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxxiv Northwest Arkansas Conservation Authority (NACA) Wastewater Treatment Plant Bentonville, Arkansas Garver is currently providing professional engineering services for the NACA Wastewater Treatment Plant improvements, focusing on design and construction services. The project includes surveying and planning for modifications to existing facilities and construction of new infrastructure to increase treatment capacity. Work involves site layout, yard piping, and integration of new process units. Garver also has coordinated geotechnical investigations, prepared construction plans and specifications, and developed sequencing strategies to minimize operational disruptions. Springdale 64th St Road Improvements Springdale, Arkansas As part of the City of Springdale's 2018 Bond Program, Garver is providing construction services for approximately 5,280 LF of four- lane street improvements, including a roundabout at the Apple Road intersection, along with drainage improvements, lighting, landscaping, and other miscellaneous items associated with street construction. Also including approximately 6300 LF of 12" water main construction, 1400 LF of 8" & 12" sewer force main relocation, and other miscellaneous utility construction. Gene George South Phase I CEI Springdale, Arkansas Garver provided CEI services for the improvement of approximately 2,000 linear feet of Gene George Boulevard, extending from Don Tyson Boulevard to 56th Street. The project transformed the existing two-lane roadway into a four-lane corridor, complete with a raised median, sidewalks, and a multi-use trail to support both vehicular and pedestrian traffic. These enhancements were designed to improve traffic flow, safety, and accessibility in a rapidly developing area of the city. In addition to roadway expansion, the project involved several complex infrastructure upgrades, utility improvements, and traffic phase coordination. Responsibilities included daily site observations, documenting work progress, coordinating closely with contractors and city staff to resolve issues in real time, and verifying compliance with federal requirements. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 !JGARVER RFQ 26-01, Engineering & Architectural Services // xxxv •: � I •, • ._ .. ARDOT CPM Scheduling Statewide, Arkansas Garver is providing Critical Path Method (CPM) scheduling support statewide for ARDOT. Services have included conducting time impact analysis (TIA) as well as bid, baseline, and updated schedule support. Along with schedule support, we have provided CPM Special Provision training for all Resident Engineer offices. Garver is also developing Primavera training, which will also be given to every Resident Engineer office. ARDOT 040901 Highway 22 - Gun Club Road CEI Sebastian and Crawford Counties, Arkansas Garver is currently providing construction, engineering, and inspection (CEI) services with CPM Scheduling services for the new 1-49 over the Arkansas River Bridge. The project constructs a 3.2 mile long 4-lane section of the Future 1-49 from Highway 22 to Gun Club Road. It also includes the completion of the interchange at Highway 22 and construction of a portion of the Gun Club Road interchange. Also included is the construction of two separate bridge structures across the Arkansas River Valley. Garver's role also includes survey control verification, surveys for quality control and quantity computations, monitoring contractor operations, and inspection, sampling, and testing of materials. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services SECTION B: Vendor References The following information is required from all firms so all statements of qualification may be reviewed and properly evaluated: COMPANY NAME: Garver LLC NUMBER OF YEARS IN BUSINESS: 106 HOW LONG IN PRESENT LOCATION: 30 years TOTAL NUMBER OF CURRENT EMPLOYEES: -1,5-2 4----FULL TIME -1,4-70---- PART TIME 54 *TBD based on the scope of NUMBER OF EMPLOYEES PLANNED FOR THIS CONTRACT: --- FULL TIME --- PART TIMEservices required to complete tasks PLEASE LIST FOUR (4) REFERENCES THAT YOU HAVE PREVIOUSLY PERFORMED CONTRACT SERVICES FOR WITHIN THE PAST FIVE (5) YEARS (All fields must be completed): City of Rogers 1. City of Springdale 2. COMPANY NAME Rogers, AR 72756 COMPANY NAME Springdale, AR 72764 CITY, STATE, ZIP Lance Jobe, PE CITY, STATE, ZIP Ben Peters, PE CONTACT PERSON 479-621-1186 TELEPHONE 479-631-2767 CONTACT PERSON 479-750-8105 TELEPHONE 479-750-8539 FAX NUMBER ljobe@rogersark.org E-MAIL ADDRESS City of Bentonville 3. FAX NUMBER bpeters@springdalear.gov E-MAIL ADDRESS 4. Springdale Water Utilities COMPANY NAME Bentonville, AR 72712 CITY, STATE, ZIP Preston Newbill COMPANY NAME Springdale, AR 72765 CITY, STATE, ZIP Heath Ward, PE CONTACT PERSON 479-271-3140 CONTACT PERSON 479-751-5751 TELEPHONE 479-271-3137 TELEPHONE 479-750-4039 FAX NUMBER pnewbill@bentonvillear.com FAX NUMBER hward@springdalewater.com E-MAIL ADDRESS E-MAIL ADDRESS City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services Page 12 of 16 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services SECTION C: 2026 Annual Statement of Qualifications Summary Form SUMMARY STATEMENT: Proposer should provide summary information on this form by checking the areas of expertise based on experience and qualifications. The City will utilize the selection marked by each firm to correspond with the scope of work for each project. This form MUST be completed and returned for your proposal to be eligible for consideration. X Airport x Architecture x Bridges Carbon Sequestration Analysis _X Natural Resource/Conservation Planning Parks: Urban Forestry Planning Parks: Land Dedication Fees Consultant Parks: Aquatics Consultant Site Utility X Civil/Structural Design Climate Resilience Analysis Solid Waste Management x Studio Design x Construction Administration x Drainage Design, Analysis, & Planning Ecosystem Services Analysis Environmental Analysis, Remediation, & X Permitting x Storm Water Management x Stormwater Modeling x Stormwater Design X Stream Restoration X Environmental Water Services x Structural Design x Floodplain Services x GIS Mapping - ------------------- Geotechnical Engineering Historical Architecture/Structures x Hydrology x Grant Writing Services x Impact Fee Studies Independent Fee Estimates Interior Design x Surveying x Sustainability Design - ------------------- Testing Services: Soil/Materials x Traffic Studies x Utility Asset Inspections x Value Engineering x Wastewater Design x Wastewater Management x Wastewater Modeling X Landscape Architecture LEED/Sites Certification X Lighting Design Master Planning: Arts/Culture x Master Planning: City/Government x Master Planning: Parks x Master Planning: Streets x Master Planning: Wastewater x Master Planning: Water x Mechanical, Electrical, & Plumbing x Wastewater SSES x Watershed Studies x Water/ Sewer Rate Studies x Water Audit Services x Water Design x Water Management x Water Modeling x Water Quality Monitoring x Wetlands City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services Page 13 of 16 X Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services Page 14 of 16 City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services SECTION D: Signature Submittal 1. DISCLOSURE INFORMATION a. Proposer must disclose any possible conflict of interest with the City of Fayetteville, including, but not limited to, any relationship with any City of Fayetteville employee. Proposer response must disclose if a known relationship exists between any principal or employee of your firm and any City of Fayetteville employee or elected City of Fayetteville official. i. If, to your knowledge, no relationship exists, this should also be stated in your response. Failure to disclose such a relationship may result in cancellation of a purchase and/or contract as a result of your response. This form must be completed and returned in order for your bid/proposal to be eligible for consideration. PLEASE CHECK ONE OF THE FOLLOWING TWO OPTIONS, AS IT APPROPRIATELY APPLIES TO YOUR FIRM: X -----1) NO KNOWN RELATIONSHIP EXISTS 2) RELATIONSHIP EXISTS (Please explain): b. I certify that; as an officer of this organization, or per the attached letter of authorization, am duly authorized to certify the information provided herein are accurate and true; and my organization shall comply with all State and Federal Equal Opportunity and Non-Discrimination requirements and conditions of employment. c. Proposer agrees that they have a current, valid registration with the Arkansas Secretary of State at time of RFQ deadline OR be able to provide proof of registration before contract award. d. Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently boycott Israel and will not boycott Israel during any time in which they are entering into, or while in contract, with any public entity as defined in §25-1-503. If at any time during contract the contractor decides to boycott Israel, the contractor must notify the contracted public entity in writing. e. Pursuant Arkansas Code Annotated §25-1-1002, the Contractor agrees and certifies that they do not currently boycott Energy, Fossil Fuel, Firearms, and Ammunition Industries during any time in which they are entering into, or while in contract, with any public entity as defined in §25-1-1002. If at any time during the contract the contractor decides to boycott Energy, Fossil Fuel, Firearms, and/or Ammunition Industries, the contractor must notify the contracted public entity in writing. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services Page 15 of 16 2. PRIMARY CONTACT INFORMATION At the discretion of the City, one or more firms may be asked for more detailed information before final ranking of the firms, which may also include oral interviews. NOTE: Each Proposer shall submit to the City a primary contact name, e-mail address, and phone number where the City's Procurement Division can contact for clarification or interview request. Name of Firm: Garver, LLC Name of Primary Contact: _J_e_rr_y_M_a_r_ti_n_,_P_E Title of Primary Contact: Arkansas Water Leader Phone Number: 479-287-4653 E-Mail Address: JTMartin@GarverUSA.com 3. ACKNOWLEDGEMENT OF ADDENDA Acknowledge receipt of addenda for this invitation to bid, request for proposal, or request for qualification by signing and dating below. All addendums are hereby made a part of the bid or RFP documents to the same extent as though it were originally included therein. Proposers/Bidders should indicate their receipt of same in the appropriate blank listed herein. Failure to do so may subject Contractor to disqualification. SIGNATURE AND PRINTED NAME 4. DEBARMENT CERTIFICATION: a. As an interested party on this project, you are required to provide debarment/suspension certification indicating in compliance with the below Federal Executive Order. Certification can be done by completing and signing this form. b. Federal Executive Order (E.O.) 12549 "Debarment and Suspension" requires that all contractors receiving individual awards, using federal funds, and all sub-recipients certify that the organization and its principals are not debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any Federal department or agency from doing business with the Federal Government. c. Signature certifies that neither you nor your principal is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. ADDENDUM NO. DATE ACKNOWLEDGED Addendum 1 <" '-- '-- J --- Jerry Martin, PE 12/08/2025 Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services Page 16 of 16 5. SIGNATURE SUBMITTAL: COMPANY: Garver, LLC PHYSICAL ADDRESS: 2049 E Joyce Blvd., Suite 105, Fayetteville, AR 72703 MAILING ADDRESS: 2049 E Joyce Blvd., Suite 105, Fayetteville, AR 72703 TAX ID#: 01-0733400 SAM UEI#: ZEHTVZ6KMSK5 ARKANSAS SECRETARY OF STATE FILING#: 100214921 PHONE: 479-287-4653 FAX: ----------- E-MAIL: JTMartin@GarverUSA.com By submitting your response, you certify that you are authorized to represent and bind your company : SIGNATURE: � PRINTED NAME : Jerry Martin, PE TITLE: Arkansas Water Leader DATE: 12/18/2025 END OF SECTION D: SIGNATURE SUBMITTAL Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 CITY OF FAYETTEVILLE ARKANSAS Garver, LLC 2049 E. Joyce Blvd., Suite 105 Fayetteville, AR 72703 TEL 479-527-9100 FAX 479-527-9101 www.GarverUSA.com Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services Page 14 of 16 City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services SECTION D: Signature Submittal 1. DISCLOSURE INFORMATION a. Proposer must disclose any possible conflict of interest with the City of Fayetteville, including, but not limited to, any relationship with any City of Fayetteville employee. Proposer response must disclose if a known relationship exists between any principal or employee of your firm and any City of Fayetteville employee or elected City of Fayetteville official. i. If, to your knowledge, no relationship exists, this should also be stated in your response. Failure to disclose such a relationship may result in cancellation of a purchase and/or contract as a result of your response. This form must be completed and returned in order for your bid/proposal to be eligible for consideration. PLEASE CHECK ONE OF THE FOLLOWING TWO OPTIONS, AS IT APPROPRIATELY APPLIES TO YOUR FIRM: X -----1) NO KNOWN RELATIONSHIP EXISTS 2) RELATIONSHIP EXISTS (Please explain): b. I certify that; as an officer of this organization, or per the attached letter of authorization, am duly authorized to certify the information provided herein are accurate and true; and my organization shall comply with all State and Federal Equal Opportunity and Non-Discrimination requirements and conditions of employment. c. Proposer agrees that they have a current, valid registration with the Arkansas Secretary of State at time of RFQ deadline OR be able to provide proof of registration before contract award. d. Pursuant Arkansas Code Annotated §25-1-503, the Contractor agrees and certifies that they do not currently boycott Israel and will not boycott Israel during any time in which they are entering into, or while in contract, with any public entity as defined in §25-1-503. If at any time during contract the contractor decides to boycott Israel, the contractor must notify the contracted public entity in writing. e. Pursuant Arkansas Code Annotated §25-1-1002, the Contractor agrees and certifies that they do not currently boycott Energy, Fossil Fuel, Firearms, and Ammunition Industries during any time in which they are entering into, or while in contract, with any public entity as defined in §25-1-1002. If at any time during the contract the contractor decides to boycott Energy, Fossil Fuel, Firearms, and/or Ammunition Industries, the contractor must notify the contracted public entity in writing. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services Page 15 of 16 2. PRIMARY CONTACT INFORMATION At the discretion of the City, one or more firms may be asked for more detailed information before final ranking of the firms, which may also include oral interviews. NOTE: Each Proposer shall submit to the City a primary contact name, e-mail address, and phone number where the City's Procurement Division can contact for clarification or interview request. Name of Firm: Garver, LLC Name of Primary Contact: _J_e_rr_y_M_a_r_ti_n_,_P_E _ Title of Primary Contact: Arkansas Water Leader Phone Number: 479-287-4653 E-Mail Address: JTMartin@GarverUSA.com 3. ACKNOWLEDGEMENT OF ADDENDA Acknowledge receipt of addenda for this invitation to bid, request for proposal, or request for qualification by signing and dating below. All addendums are hereby made a part of the bid or RFP documents to the same extent as though it were originally included therein. Proposers/Bidders should indicate their receipt of same in the appropriate blank listed herein. Failure to do so may subject Contractor to disqualification. ADDENDUM NO. SIGNATURE AND PRINTED NAME DATE ACKNOWLEDGED Addendum 1 � _J - Jerry Martin, PE �.-- 12/08/2025 4. DEBARMENT CERTIFICATION: a. As an interested party on this project, you are required to provide debarment/suspension certification indicating in compliance with the below Federal Executive Order. Certification can be done by completing and signing this form. b. Federal Executive Order (E.O.) 12549 "Debarment and Suspension" requires that all contractors receiving individual awards, using federal funds, and all sub-recipients certify that the organization and its principals are not debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any Federal department or agency from doing business with the Federal Government. c. Signature certifies that neither you nor your principal is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816 5. SIGNATURE SUBMITTAL: COMPANY: Garver, LLC PHYSICAL ADDRESS: 2049 E Joyce Blvd., Suite 105, Fayetteville, AR 72703 MAILING ADDRESS: 2049 EJoyce Blvd., Suite 105, Fayetteville, AR 72703 TAX ID#: 01-0733400 SAM UEI#: ZEHTVZ6KMSK5 ARKANSAS SECRETARY OF STATE FILING#: 100214921 PHONE: 479-287-4653 FAX: ----------- E-MAIL: JTMartin@GarverUSA.com By submitting your response, you certify that you are authorized to represent and bind your company : PRINTED NAME : Jerry Martin, PE TITLE: Arkansas Water Leader DATE: 12/18/2025 END OF SECTION D: SIGNATURE SUBMITTAL City of Fayetteville, AR RFQ 26-01, Engineering & Architectural Services Page 16 of 16 l6llA l,f\J9l!!U' bE Docusign Envelope ID: 37324E2B-84DA-8EF6-838D-EC29D8403816