Loading...
HomeMy WebLinkAbout137-26 RESOLUTIONPage 1 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 137-26 File Number: 2026-1811 A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE MASTER AGREEMENT WITH CRAFTON TULL AND ASSOCIATES, INC. IN THE AMOUNT OF $189,380.00 FOR PRELIMINARY DESIGN SERVICES ON THE GREGG STREET SAFE STREETS AND ROADS FOR ALL PROJECT WHEREAS, on December 4, 2024, the Fayetteville City Council passed Resolution 301-24, authorizing the City of Fayetteville to accept a grant from the Department of Transportation Federal Highway Administration in the amount of $25,000,000.00 through the Safe Roads for All Program; and WHEREAS, one of the five street sections identified for safety improvements funded through the grant was North Gregg Avenue between North Street and Drake Street; and WHEREAS, on August 19, 2025, the Fayetteville City Council passed Resolution 190-25 authorizing an agreement with Crafton Tull and Associates, Inc. for conceptual design phase services for the Gregg Avenue Safe Streets and Roads for All Project in an amount not to exceed $227,860.00; and WHEREAS, Fayetteville City Staff will present the design concept and public feedback received at a public meeting on April 29, 2026, to the Transportation Committee on May 26, 2026; and WHEREAS, the scope of services for the next phase of design includes another round of public engagement, preparation of land acquisition documents, agency coordination for environmental review and preliminary plan preparation, and other items. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to sign Amendment No. 1 to the Master Agreement with Crafton Tull and Associates, Inc. in the amount of $189,380.00 for preliminary design services on the Gregg Street Safe Streets and Roads for All Project. PASSED and APPROVED on June 2, 2026 Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F Resolution: 137-26 File Number: 2026-1811 Page 2 Approved: _______________________________ Molly Rawn, Mayor Attest: _______________________________ Kara Paxton, City Clerk Treasurer Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F Page 1 City of Fayetteville, Arkansas Legislation Text 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 File #: 2026-1811 A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE MASTER AGREEMENT WITH CRAFTON TULL AND ASSOCIATES, INC. IN THE AMOUNT OF $189,380.00 FOR PRELIMINARY DESIGN SERVICES ON THE GREGG STREET SAFE STREETS AND ROADS FOR ALL PROJECT WHEREAS, on December 4, 2024, the Fayetteville City Council passed Resolution 301-24, authorizing the City of Fayetteville to accept a grant from the Department of Transportation Federal Highway Administration in the amount of $25,000,000.00 through the Safe Roads for All Program; and WHEREAS, one of the five street sections identified for safety improvements funded through the grant was North Gregg Avenue between North Street and Drake Street; and WHEREAS, on August 19, 2025, the Fayetteville City Council passed Resolution 190-25 authorizing an agreement with Crafton Tull and Associates, Inc. for conceptual design phase services for the Gregg Avenue Safe Streets and Roads for All Project in an amount not to exceed $227,860.00; and WHEREAS, Fayetteville City Staff will present the design concept and public feedback received at a public meeting on April 29, 2026, to the Transportation Committee on May 26, 2026; and WHEREAS, the scope of services for the next phase of design includes another round of public engagement, preparation of land acquisition documents, agency coordination for environmental review and preliminary plan preparation, and other items. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to sign Amendment No. 1 to the Master Agreement with Crafton Tull and Associates, Inc. in the amount of $189,380.00 for preliminary design services on the Gregg Street Safe Streets and Roads for All Project. Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F City of Fayetteville Staff Review Form 2026-1811 Item ID 6/2/2026 City Council Meeting Date - Agenda Item Only N/A for Non-Agenda Item Justin Bland 5/13/2026 ENGINEERING (621) Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends approval of contract Amendment #1 to the master agreement with Crafton Tull in the amount of $189,380.00 for additional design services on the Gregg Ave. project Budget Impact: 2235.900.9225-5860.02 4702.860.7235-5860.02 Safe Streets & Roads Grant Streets Projects 2022 Bonds Account Number Fund 32401.9225 46020.7235.9225 Safe Streets & Roads Grant - Gregg Ave. Streets Bond Projects, SS4A City Portion - Gregg Ave. Project Number Project Title Budgeted Item?Yes Total Amended Budget $ 10,905,823.44 Expenses (Actual+Encum)$150,807.37 Available Budget $ 10,755,016.07 Does item have a direct cost?Yes Item Cost $189,380.00 Is a Budget Amendment attached?No Budget Amendment $- Remaining Budget $ 10,565,636.07 Purchase Order Number:Previous Ordinance or Resolution #301-24, 190-25 Change Order Number:Approval Date: Original Contract Number: Comments: 6/2/2026 Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F Mailing address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov CITY COUNCIL MEMO 2026-1811 MEETING OF JUNE 2, 2026 TO: Mayor Rawn and City Council THROUGH: Chris Brown, Public Works Director FROM: Justin Bland, City Engineer SUBJECT: Gregg St. SS4A –Amendment #1 with Crafton Tull RECOMMENDATION: Staff recommends approval of contract Amendment #1 to the master agreement with Crafton Tull in the amount of $189,380.00 for additional design services on the Gregg St. project. BACKGROUND: The city received a $25,000,000 Safe Streets for All grant for five construction projects including this section of Gregg St. (between North St. and Drake St.). Crafton Tull has a contract in place to provide a conceptual design which they are nearing completion on. This conceptual design phase included a public meeting which was held on April 29, 2026. Staff will present the recommended design concept along with public feedback/survey results at the Transportation Committee on May 26, 2026. DISCUSSION: The scope of services for this next phase of design include the Preliminary Design Phase which includes another round of public engagement, preparation of land acquisition documents, agency coordination for environmental review and preliminary plan preparation amongst other items. The amendment also includes similar tasks for completion of the final plan preparation and bidding services. BUDGET/STAFF IMPACT: The City has been awarded federal funding for this project through the Safe Streets and Roads for All (SS4A) Program, as approved by Resolution 301-24 and the original design contract with Crafton Tull was approved by Resolution 190-25. The $189,380 cost in this proposal is for preliminary and final design services. Matching funds for the SS4A grant funds will come from the 2019 Bond Program. Description Account Project Amount SS4A 2235.900.9225-5860.02 32401.9225 $141,334.29 Transportation Bond Program 4702.860.7235-5860.02 46020.7235.9225 $48,045.71 ATTACHMENTS: 3. Staff Review Form, 4. Gregg Ave Improvements - Amendment 1 Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F EJCDC No. E-501 1999 Edition Page 1 of 2 AMENDMENT NO. 1 TO OWNER-ENGINEER AGREEMENT Subject of Amendment: Modification of Services 1. Background Data: a. Effective Date of OWNER-ENGINEER Agreement: 8/19/2025 b. OWNER: City of Fayetteville, Arkansas c. ENGINEER: Crafton, Tull & Associates, Inc. d. Project: Gregg Avenue Improvements (North Street to Township Street 2. Nature of Amendment The scope of services is being modified to include construction observation & construction administration services. 3. Description of Modifications See Attachment 1, “Modifications” OWNER and ENGINEER hereby agree to modify the above-referenced Agreement as set forth in this Amendment. All provisions of the Agreement not modified by this or previous Amendments remain in effect. The Effective Date of this Amendment is . OWNER: ENGINEER: CITY OF FAYETTEVILLE, ARKANSAS CRAFTON, TULL & ASSOCIATES, INC. By: By: Molly Rawn Lucas Jost, P.E. Title: Mayor Title: Vice President Date Signed: Date Signed: 05/06/20266/2/2026 Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F EJCDC No. E-501 1999 Edition Page 2 of 2 ATTACHMENT 1 MODIFICATIONS Additional Services to be performed by ENGINEER: See Exhibit “A” Modifications to Payment to ENGINEER: o The Contract amount is to be increased by a total of $135,000. Summary of Contract Payments: Original Contract: $227,860.00 Change Order #1: $189,380.00 Revised Total: $417,240.00 Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F Exhibit “A” Civil Scope of Basic Services for: Project: Gregg Avenue Improvements Client: City of Fayetteville Location of Project: Gregg Avenue, Fayetteville, AR Discipline: Civil Engineering Discipline Manager: Luke Jost, P.E. Project Manager: Luke Jost, P.E. Proposal Date: May 5, 2026 Billing Type: Hourly with a Maximum/Reimbursable Expenses Fee/Estimate: Civil Design $166,880 Additional Survey $5,000 Landscape Plans (PRISM) $7,500 QA/QC (Laneshift) $10,000 TOTAL: $189,380 Description of the Construction Project: Design of approximately 1.8 miles Gregg Ave from North Street to Drake Street. Design to include road diet street improvements and intersection improvements within that corridor (see anticipated alignment Exhibit C). Project scope: Design of approximately 9,700 linear feet (1.8 miles) of Gregg Ave from North Street to Township Street and a crossing at Drake Street. The design is to include improvements to the existing corridor to better align the roadway section with the Neighborhood Link typical section per the City’s Master Street Plan. Improvements are expected to be concentrated on the east side of the corridor (largely holding the west curb line) and adding a wider sidewalk where feasible to the east side of the road. Turn lanes or parking lanes will be added as necessary. Special consideration will be given to the intersections with Sycamore Street and Poplar Street that are listed on the City’s High Injury Network (HIN). The following design aspects will also be included: - A traffic model will be developed to assess how proposed improvements affect level of service along the corridor. - Lighting improvements along the corridor. - Landscape improvements along the corridor (street trees). - Bus stops in accordance with latest ORT and Razorback Transit route plans. The improvements are anticipated to be split into two separate bid packages after the 90% design phase. Detailed services to be provided by the Engineer: 60% Design Phase: Finalize road geometrics based on 30% review comments Design of drainage structures as required Utility coordination Drawing Set to include: o Cover sheet o Plan & profile sheets o Signing & Striping plans o Grading & erosion control plans o Intersection improvement plans o Typical Section Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F __________________________________________________________________________________________ www.craftontull.com 2 o Cross sections o Standard Details Update construction cost estimate Submit plans to owner for review Review plans with City and stakeholders 90% Design Phase: Revise plans based on comments to the 60% design submittal Pre-final design of corridor improvements Prepare the following construction drawings: o Cover Sheet o Plan & profile sheets o Typical section sheets o Cross sections o Grading & erosion control plans o Intersection improvement plans o Signing & striping plans o Landscape Plans o Notes and Standard & Special Details Updated construction cost estimate Submit plans to owner for review Final Design Phase Finalize plans based on comments to the 90% design submittal Split project into two separate bid packages as agreed to with City staff Prepare storm water pollution prevention plan (SWPPP) Submit final plans to City for review and approval Submit permit applications to ADEQ and USACE (if required) Update construction cost estimate Prepare project specifications/bid documents Bidding and Contract Negotiation Phase Answer bidder’s questions and issue addenda Recommend Contractor to Owner Bid documents prepared and issued to bidders Receive bids and tabulate results Items Provided by City: Site access Construction materials testing Acquisition of Right of Way and Easements END SCOPE OF SERVICES THIS CONTRACT This is the scope of services for the Project. Should there be additions to this scope of services, those services shall be compensated for additional fee. Additional Items that can be provided by CTA under amendment or separate contract: Additional public input meetings Tree Preservation Plans/Calculations Construction Administration/Construction Observation ROW/Easement Acquisition Services Railroad Crossing design Retaining wall design (not anticipated) Structural/Bridge Designs FEMA applications/Coordination including CLOMR/LOMR process Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F Effective January 1, 2026 Hourly Hourly Category Rate Category Rate ENGINEERING LANDSCAPE ARCHITECTURE ENGINEERING PRINCIPAL ……....………..……………………..270$ VICE PRESIDENT OF LANDSCAPE ARCHITECTURE …..........220$ SR. ENGINEERING MANAGER ……………...……………...……240$ SR. LANDSCAPE ARCHITECTURE PROJECT MANAGER …............................................195$ ENGINEERING MANAGER ………………….……………....……..210$ LANDSCAPE ARCHITECTURE PROJECT MANAGER …..............................................................180$ SR. PROJECT ENGINEER …………………….…………...…….180$ SR. LANDSCAPE ARCHITECT ………………..…………………..170$ PROJECT ENGINEER …………………………..…………..…….160$ PROJECT LANDSCAPE ARCHITECT ………....………………..155$ ENGINEER INTERN III ………………………..………….………..145$ LANDSCAPE DESIGNER III …………………...……….................125$ ENGINEER INTERN II …………………………..………..………..135$ LANDSCAPE DESIGNER II …………………………...................115$ ENGINEER INTERN I …………………………..………….……….125$ LANDSCAPE DESIGNER I …………………………......................100$ SR. ENGINEERING DESIGNER ……………..…………..………..165$ LANDSCAPE DESIGN INTERN …………………………....................80$ ENGINEERING DESIGNER III ………………..…………..……….130$ LANDSCAPE CAD TECHNICIAN II …………………………....................85$ ENGINEERING DESIGNER II ………………..…………..………..110$ LANDSCAPE CAD TECHNICIAN I …………………………....................75$ ENGINEERING DESIGNER I …………………..………..…………100$ SURVEYING ENGINEERING CAD TECHNICIAN III ……..……………………..95$ SURVEYING PRINCIPAL ………………………………….............250$ ENGINEERING CAD TECHNICIAN II ……….………..…………..85$ SR. SURVEYING MANAGER ………………………………..………215$ ENGINEERING CAD TECHNICIAN I ………..……….……………75$ SURVEYING MANAGER …………………………….....................190$ ENVIRONMENTAL SR. PROJECT SURVEYOR ………………………………….........165$ SR. ENVIRONMENTAL MANAGER …………….……..………….220$ PROJECT SURVEYOR ……………………………………….........145$ ENVIRONMENTAL MANAGER …………………..……........…….185$ SURVEYOR INTERN II ………………………………………..…….125$ SR. ENVIRONMENTAL SCIENTIST ……………..…...………….155$ SURVEYOR INTERN I …………………………………………..….110$ PROJECT ENVIRONMENTAL SCIENTIST ……..……........……125$ SURVEY COORDINATOR …………………………………….……120$ ENVIRONMENTAL SCIENTIST II ………………..……...……….100$ CREW CHIEF II ………………………………………………..........110$ ENVIRONMENTAL SCIENTIST I ………………..………....…….80$ CREW CHIEF I ………………………………………………….......95$ ENVIRONMENTAL FIELD TECHNICIAN …..…………………….65$ FIELD SURVEYOR III …………………………………………........85$ INSPECTION FIELD SURVEYOR II …………………………………………...…...75$ INSPECTION MANAGER …........................................................140$ FIELD SURVEYOR I ……………………………………………......65$ SR. INSPECTOR ………………………………...…..……………..120$ SURVEY CAD TECHNICIAN III ………………………………..…..110$ INSPECTOR II ………………………………...….………………….100$ SURVEY CAD TECHNICIAN II ………………………………...…..90$ INSPECTOR I …………………………………....………………….80$ SURVEY CAD TECHNICIAN I ………………………………...…….80$ UAV SERVICES GEOGRAPHIC INFORMATION SYSTEMS UAV TEAM LEAD ………………………………...……………........125$ SR. GIS MANAGER ………………………………………………..180$ UAV PILOT ………………………………………...………………....85$ GIS MANAGER ………………………………………….....………..145$ ADMINISTRATIVE GIS ANALYST …………………...………………………....………..110$ ADMINISTRATIVE PRINCIPAL ………………...………………….240$ GIS TECHNICIAN II ……………………………………..……………85$ ADMINISTRATIVE MANAGER ………………...…………………..180$ GIS TECHNICIAN I …………………………………….…………….65$ ADMINISTRATIVE IV ………………………....……………………..120$ REIMBURSABLE EXPENSES ADMINISTRATIVE III …………………………...…………………..95$ GPS Equipment………...….....….……............…..….....…....$35/Hour ADMINISTRATIVE II ……………………...……...…………………..70$ Robotic Survey Equipment…….……….........…….............…$20/Hour ADMINISTRATIVE I ……………………………...………………….55$ Bathymetric Survey Equipment …………..….................…...$35/Hour PLANNING LiDAR Scanning Equipment …………..…..................….…..$35/Hour PLANNING PRINCIPAL …...........................................................250$ UAV ……………………………….............……….…..…...…$1000/Unit SR. PLANNING MANAGER …………………………………...…..220$ Job Related Mileage………...........................................…...$0.72/Mile PLANNING MANAGER ……………………………………….........210$ Per Diem for Out of Town Crews…...…................Per GSA Allowable SR. PLANNER …………………………………………………...…..170$ Airfare and other travel related expenses……….................….At Cost PROJECT PLANNER …………………………………………........130$ Black and white 8.5"x11" Copies ….……......................... $0.15/sheet PLANNER III …………………………………………………….…....120$ Color 8.5"x11" Copies …….……....……..................….…. $1.50/sheet PLANNER II ……………………………………………………..….....110$ Photo Paper Color Plan Sheet Copies ……..................... $0.75/sq. ft. PLANNER I ………...…………………………………………...……..100$ Reproducible Plan Copies (Vellum) …...…....................... $1.50/sq. ft Reproducible Plan Copies (Bond) ……........................…. $0.35/sq. ft. All rates are subject to change without notice. Exhibit "B" Standard Hourly Rate Schedule Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F Exhibit “C” Anticipated Design Schedule Notice to Proceed: August 2025 30% Plans: May 2026 o City Review (2 weeks) o Utility Coordination (2 weeks) 60% Plans: July – August 2026 (9 weeks) o City Review: 2 weeks o Utility Coordination (2 weeks) o FHWA Coordination (TBD) 90% Plans & Draft Contract docs: October – November 2026 (8 weeks) o City Review: 2 weeks o FHWA Coordination (TBD) o Utility Relocation (12 weeks) Final Plans & Specifications: January 2027 (6 weeks) Bidding & Construction: 2027 – TBD by City of Fayetteville Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F Proposal ADMN LA SR. ENGR PROJ PROJ PRINC Item ASST LA DSNR ENGR MGR ENGR Estimated Landscape (PRISM)$7,500 Survey (CTA)$5,000 Laneshift $10,000 2.1 Update Per City Comment 40 40 8 $12,720 2.2 Drainage Design 24 40 24 $14,800 2.3 Grading Design 24 40 24 $14,800 2.3 Grading & Erosion Control Plan 40 20 8 $9,520 2.4 Intersection Plans 40 40 24 $16,560 2.5 Signing & Striping Plans 16 8 8 $4,960 2.6 Details 4 $440 2.7 Estimate 4 8 2 $2,200 2.8 QC Review 16 4 8 $4,320 Subtotal $80,320 3.1 Update Per City Comment 40 16 12 $9,840 3.2 Finalize Drainage Design 24 8 $5,760 3.3 Finalize Traffic Design 40 40 16 $14,640 3.4 Lighting Plans 40 16 8 $8,880 3.5 City Permits 16 8 $4,480 3.6 Utility Coordination 24 16 $7,680 3.7 Bid Docs/Specs for Review 16 8 $4,480 3.8 QC Review 4 8 4 $3,400 Subtotal $55,760 4.1 Finalize Plans per City Comment 24 16 16 $9,040 4.2 Finalize Bid Documents/Specs 20 8 $5,120 4.3 QC Review 16 16 8 4 $7,280 Subtotal $14,160 5.1 Prebid Meeting/Prep 8 12 $4,160 5.2 Questions/Addenda 16 16 24 $10,080 5.3 Review Bids & Recommend Contractor 2 8 4 $2,400 Subtotal $16,640 MANHOUR ESTIMATE FAYETTEVILLE, ARKANSAS Gregg Avenue Improvements Appendix "D" Page 1 of 1 Docusign Envelope ID: 56E3B042-A1E5-86AB-8350-9E8FDA398C3F