Resolution: 122-26
File Number: 2026-1370
A RESOLUTION TO EXPRESS THE WILLINGNESS OF THE CITY OF FAYETTEVILLE TO UTILIZE
FEDERAL-AID FUNDS FOR THE CLABBER CREEK BRIDGE REPLACEMENT PROJECT
WHEREAS, ARDOT performs bi-annual bridge inspections for all the bridges in the state and during the most recent
inspection there were several significant items noted about a bridge spanning Clabber Creek, including reducing the
posted weight limit for the bridge; and
WHEREAS, a bridge engineering consultant retained by the City determined that the bridge has approximately five
years of service life if no further repairs are made and recommended that, due to the age of the structure, the best long-
term solution was full replacement; and
WHEREAS, the City of Fayetteville (hereinafter called the “City”) understands Federal-aid funds are available for
certain local projects at the following Federal and City participating ratios per project:
Type Work Work Phase Federal % City %
Bridge Replacement
All Phases
90%
10%
Projects that never progress to
Construction
All Right-of-Way & Utilities
0%
100%
WHEREAS, the City is requesting the Arkansas Department of Transportation (hereinafter called the “Department”)
make funding available to replace the Clabber Creek Bridge (Structure No. 19777) on North Hughmount Road; and
WHEREAS, the Department has agreed to provide Federal-aid funds for ninety percent of the costs for a feasibility
study; and
WHEREAS, the Department will assign an on-call consultant to perform the feasibility study, which will include
Docusign Envelope ID: A450D45F-4BFE-86EF-8376-A02075E04C33
Resolution: 122-26
File Number: 2026-1370
Page 2
preliminary engineering for conceptual level plans and development of a planning-level cost estimate; and
WHEREAS, upon completion of the feasibility study, the City will request additional funding for future phases as
needed.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas will participate in accordance with its designated
responsibilities in this project.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to execute all
appropriate agreements and contracts necessary to expedite the construction of these projects.
Section 3: That the City Council of the City of Fayetteville, Arkansas pledges its full support and hereby authorizes the
Arkansas Department of Transportation to initiate action to implement this project.
PASSED and APPROVED on May 19, 2026
Approved:
_______________________________
Molly Rawn, Mayor
Attest:
_______________________________
Kara Paxton, City Clerk Treasurer
Docusign Envelope ID: A450D45F-4BFE-86EF-8376-A02075E04C33
Mailing address:
113 W. Mountain Street
Fayetteville, AR 72701
www.fayetteville-ar.gov
CITY COUNCIL MEMO
2026-1370
MEETING OF MAY 19, 2026
TO: Mayor Rawn and City Council
THROUGH: Chris Brown, Public Works Director
FROM: Justin Bland, City Engineer
SUBJECT: Approval of a resolution expressing the willingness of the City of Fayetteville to
utilize federal-aid monies for the following project: Clabber Creek Bridge
Replacement on N. Hughmount Road (Structure No. 19777)
RECOMMENDATION:
Staff recommends the approval of a resolution expressing the willingness of the City of Fayetteville to utilize
federal-aid monies for the Clabber Creek Bridge Replacement on N. Hughmount Road (Structure No. 19777).
BACKGROUND:
This bridge spans Clabber Creek on N. Hughmount Rd. and was built in 1986. This section of roadway was in
Washington County until the Hughmount Village Subdivision and adjacent areas were annexed into the City on
07/04/2020 (Ordinance #6317).
DISCUSSION:
ArDOT performs bi-annual bridge inspections for all the bridges in the state. On the most recent inspection
there were several significant items mentioned including reducing the posted weight limit for the bridge. Staff
engaged with a bridge engineering consultant to review the inspection report and give recommendations. The
consultant stated that the bridge had approximately five years of service life if no further repairs are made.
They recommended that, due to the age of the structure, the best long-term solution was full replacement. This
new structure would have a much longer service life while also improving floodplain capacity and allowing the
addition of sidewalk/trails across it.
However, this is also the most expensive option, so staff explored options for grant assistance. The ArDOT
Local Bridge Program offers a significant federal funding match for bridge replacements, covering 90% of the
cost, leaving the City responsible for only 10%. The federal cap is limited by the amount available in the
program budget from year to year, though, so the total city match will likely be higher than 10%.
Staff submitted a request to ArDOT to determine the eligibility for this grant and was notified it is eligible for the
funding. In order to pursue this, the next step is to pass the attached resolution to enter an agreement with
ArDOT. This will allow them to initiate a feasibility study to determine the scope and cost of the work. The City
will be obligated to pay $5,000 to fund this study. Staff will then bring back a resolution to obligate any needed
city funding for the bridge project once this scope is completed. Staff will also continue to do bridge repairs as
necessary to maximize the life of the structure.
BUDGET/STAFF IMPACT:
Docusign Envelope ID: A450D45F-4BFE-86EF-8376-A02075E04C33
Mailing address:
113 W. Mountain Street
Fayetteville, AR 72701
www.fayetteville-ar.gov
ArDOT will charge a $5,000 fee for the City's share of the feasibility study. This will come from Sales Tax
Captial Improvements funds.
ATTACHMENTS: 3. Staff Review Form, 4. Structure No. 19777 Clabber Creek Bridge_Response Letter
Docusign Envelope ID: A450D45F-4BFE-86EF-8376-A02075E04C33
Page 1
City of Fayetteville, Arkansas
Legislation Text
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
File #: 2026-1370
A RESOLUTION TO EXPRESS THE WILLINGNESS OF THE CITY OF FAYETTEVILLE TO
UTILIZE FEDERAL-AID FUNDS FOR THE CLABBER CREEK BRIDGE REPLACEMENT
PROJECT
WHEREAS, ARDOT performs bi-annual bridge inspections for all the bridges in the state and during
the most recent inspection there were several significant items noted about a bridge spanning Clabber
Creek, including reducing the posted weight limit for the bridge; and
WHEREAS, a bridge engineering consultant retained by the City determined that the bridge has
approximately five years of service life if no further repairs are made and recommended that, due to the
age of the structure, the best long-term solution was full replacement; and
WHEREAS, the City of Fayetteville (hereinafter called the “City”) understands Federal-aid funds are
available for certain local projects at the following Federal and City participating ratios per project:
Type Work Work Phase Federal % City %
Bridge Replacement
All Phases
90%
10%
Projects that never progress to
Construction
All Right-of-Way & Utilities
0%
100%
WHEREAS, the City is requesting the Arkansas Department of Transportation (hereinafter called the
“Department”) make funding available to replace the Clabber Creek Bridge (Structure No. 19777) on
North Hughmount Road; and
WHEREAS, the Department has agreed to provide Federal-aid funds for ninety percent of the costs for
Docusign Envelope ID: A450D45F-4BFE-86EF-8376-A02075E04C33
Resolution: 122-26
File Number: 2026-1370
Page 2
a feasibility study; and
WHEREAS, the Department will assign an on-call consultant to perform the feasibility study, which
will include preliminary engineering for conceptual level plans and development of a planning-level cost
estimate; and
WHEREAS, upon completion of the feasibility study, the City will request additional funding for future
phases as needed.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas will participate in accordance with
its designated responsibilities in this project.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Rawn to
execute all appropriate agreements and contracts necessary to expedite the construction of these projects.
Section 3: That the City Council of the City of Fayetteville, Arkansas pledges its full support and hereby
authorizes the Arkansas Department of Transportation to initiate action to implement this project.
Docusign Envelope ID: A450D45F-4BFE-86EF-8376-A02075E04C33
Comments:
Purchase Order Number:
Change Order Number:
Previous Ordinance or Resolution #
Approval Date:
Original Contract Number:
02108.2601
Project Number
Budget Impact:
Other Drainage/Bridge Improvements - Clabber
Creek Bridge Repl
Fund
Sales Tax Captial Improvements4470.621.8810-5314.00
Account Number
Project Title
City of Fayetteville Staff Review Form
2026-1370
Item ID
5/19/2026
City Council Meeting Date - Agenda Item Only
Approval of a resolution expressing the willingness of the City of Fayetteville to utilize federal-aid monies for the
following project: Clabber Creek Bridge Replacement on N. Hughmount Road (Structure No. 19777)
N/A for Non-Agenda Item
Action Recommendation:
Submitted By
Justin Bland ENGINEERING (621)
Division / Department
4/30/2026
Submitted Date
Yes
5,000.00$
5,000.00$
Budgeted Item?
Does item have a direct cost?
Is a Budget Amendment attached?
Total Amended Budget
Expenses (Actual+Encum)
Available Budget
Item Cost
Budget Amendment
Remaining Budget
5,000.00$
-$
Yes
No -$
-$
Docusign Envelope ID: A450D45F-4BFE-86EF-8376-A02075E04C33
Docusign Envelope ID: A450D45F-4BFE-86EF-8376-A02075E04C33
RESOLUTION NO. _____________
A RESOLUTION EXPRESSING THE WILLINGNESS OF
THE CITY OF FAYETTEVILLE
TO UTILIZE FEDERAL-AID MONIES
FOR THE FOLLOWING PROJECT:
Clabber Creek Bridge Replacement on N. Hughmount Road
(Structure No. 19777)
WHEREAS, City of Fayetteville (hereinafter called the “City”) understands Federal-aid funds are
available for certain local projects at the following Federal and City participating ratios per project:
Type Work Work Phase Federal
Share Local Share
Bridge Replacement All Phases1 90% 10%
Projects designed but never
progressed to construction
All Right-of-Way &
Utilities2 0% 100%
1 Non-reimbursable utility relocation costs will be borne solely by the owner of the utility company.
2 All utility (reimbursable and non-reimbursable) relocation costs will be borne by the City if the project does not
proceed to construction.
WHEREAS, the City is requesting the Arkansas Department of Transportation (hereinafter called
the “Department”) make funding available to replace the Clabber Creek Bridge (Structure No. 19777) on
North Hughmount Road; and
WHEREAS, the Department has agreed to provide Federal-aid funds for ninety percent of the
costs for a feasibility study; and
WHEREAS, the Department will assign an on-call consultant to perform the feasibility study,
which will include preliminary engineering for conceptual level plans and development of a planning-level
cost estimate; and
WHEREAS, upon completion of the feasibility study, the City will request additional funding for
future phases as needed.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF FAYETTEVILLE,
ARKANSAS, THAT:
SECTION I: The City will participate in accordance with its designated responsibilities in this
project.
SECTION II: The Mayor, or their designated representative, is hereby authorized and directed to
execute all appropriate agreements and contracts necessary to expedite the construction of this project.
SECTION III: The City pledges its full support and hereby authorizes the Arkansas Department
of Transportation to initiate action to implement this project.
THIS RESOLUTION adopted this ______ day of __________________, ________.